Some standard content:
Chapter L and Chapter 6 of this part are mandatory, and the rest are recommended. B51 automatic fire control system is currently divided into 15 parts. Part 1, sprinkler:
Part 2: Type of fire alarm, delay, hydraulic light; Part 3, water sprinkler:
Part 1: Type of fire alarm:
Part 5: Rain shower alarm:
Part 1, gate!
Part 7, Water system indication:
Part 1: Seat;
Part 1: Mid-term run Kuaidi late-stage ESFR) information head-Part 10: Point force and related:
Part 11: Effective joint components:
Part 1: Machine surface only drink nozzle
Part 1, Water spray
Part 11: Prefabricated device,
Part 13: Customer head;
This part is the part of GB2135,
GH 5:35.5-2003
Part 4-1S&White dynamic flow This fire system wide travel limit performance more demand and test as the basis of the law E formulation department and GA2 non-compared with the above you consult the following
Added "marking, installation, identification, busy storage" requirements This part from the date of implementation: 0A195 This part of the system A is a normative appendix, the appendix is the sand material appendix, the wood part is issued by the Ministry of Public Security of the People's Republic of China. This part of the National Fire Equipment Promotion Technical Committee British Technical Committee CSBTSTT13SC2:11 This part of the reform unit: Ministry of Public Security Engineering Fire Research Institute: This part should be started by: cross-nature, field shrinkage, mountain medicine, Gu Fangliang. 1 Scope
Automatic sprinkler systems
Part 5: Deluge alarm valves
GA 5135. 5—2003
This part of GB5155 specifies the requirements, test methods and inspection period for deluge alarm valves in automatic sprinkler systems. This part is applicable to deluge alarm valves in sprinkler systems. 2 Normative references
The following documents are not applicable to this part of GB135. Any referenced document and its subsequent amendments (excluding the contents of the later period) or subdivisions are not applicable to this part. However, all parties who have reached an agreement on this part shall use the latest version of this document. It is not an outdated reference document, but the latest version is applicable to this part. GB/T 533 Determination of the tensile strength of rubber or thermoplastic materials in the bite position GB/T 3098.1 Mechanical properties of fasteners, tensile strength and tensile strength of studs GB/T 8,2 Fasteners - Performance test results GB/T 1098.3 Determination of the cutting properties of fasteners GB/T 3287 Test method for thermal aging of cast iron pipe joints GB/T 312 Test method for thermal aging of rubber GB/T 1098.3 Determination of the thermal aging properties of cast iron pipe joints GB/T 3287 Test method for thermal aging of cast iron pipe joints GB/T 312 672 (.
Heart-shaped rubber seal test method
G Liang/T51 Research on chemical stability or thermoplastic rubber span hardness determination (1 ~ -RHDGE:T!I12
Steel pipe flanges are referred to in the reference
3 Technical coordination definitions
The following language is applicable to this department's GB5_3=3.1
leingealarmvalves
Nanlin alarm supplier
Tongtou also moved, Kaicheng or other you force to enter The anti-reseat latch mechanism prevents the components from re-fixing their closed position after the action. 4
Start point trippuimt
Rain sprinkler pipe special water into the automatic sprinkler ※ fire system action point. Use the system side, water supply side or spray auxiliary force to show 3.5
primiwater
B5135.5—2003
City to spray limit components and sections of the upper limit components material structure: 3.6
avoid guide sprinkler pipe welpilollin
installed with heat micro-element pipeline, when affected by abnormal source, test the pipeline in the knife, use the sprinkler two white automatic opening, 3.7
water supply pressure servicepreasure
When the registered sprinkler is poor, the valve enters! The necessary water pressure, 3. 8
Rated working pressure Tatedworkkngpregsure The rated working pressure under the corresponding state or working state. 4 Requirements
4.1 Appearance and marking
4.1.1 Appearance
Clear, smooth: smooth processing and damage, uniform layer, color production mark: 4.1.2 Marking
The valve body should be marked with clear water flow direction: a) production name and model; b) production unit name or product number:
e Rated working pressure:
production period and product number:
!
2.2 Specifications
The nominal diameter of the inlet and outlet is 25mm.10mm.50mm, 65mm.80nm.10cnm12mm, 15inr.annirm, 35nn.m,ar.m.
The diameter of the network can be less than the nominal diameter
4.3 Rated working pressure
The rated pressure of the bottle of the rain report customer network should not be less than 1.2MP. The valve and the lower pressure grade of the equipment are designed to withstand the low pressure grade 1, but the pressure must be made relatively low! 4.4.1 The valve body and valve cover shall be made of high-quality iron materials, and the seat parts shall be made of steel. 4.4.2 The valve body shall be made of stainless steel, galvanized steel, austenitic stainless steel and other resistant materials. If the valve body and valve cover are made of materials with relatively good corrosion resistance, 4.5.1 The valve body and valve cover shall be made of the following materials: 1/T4112 and G3/1297. 4.5.2 The valve body is provided with a water supply, the total water outlet nominal direct price or minimum is 20mm, 4.5.3 The water supply side of the required components shall be equipped with facilities for testing the alarm device without opening the valve "1, 4.6 Parts
4.6.1 When the valve is fully opened, the parts shall not have permanent deformation or breakage under the conditions of 3.4.. Risk reset test
4.6.2 Under the 4 micro-pricing force, the nominal load of the cumulative parts shall not be less than B/393.11/338.% of the rated load,
2.6.3 The spring width and the interval shall be able to withstand the T high T operation cycle specified in 5.2 for 5200 times without breaking and nuclear loss. 4.6.4 Use the leaching alarm See B.4.7 Brushless non-metallic parts
GB5135.5-2U03
4.7.1 Brushless non-metallic parts shall not cause damage, deformation, or other deformation that hinders the normal operation of the device after the aging test as specified in 5.3 and 5.4.
4.7.2 When the parts that have been subjected to the aging test are assembled and subjected to the leakage or non-functional test as specified in 5.7 and 5.5, they shall meet the requirements of 10 and 12.
4.9 Seals
4.9.1 The tensile stress-strain durability and heat aging performance of seals shall not be less than the following requirements:) The maximum rated value is lU MFa, and the minimum elongation is =CU%(25 ㎡m to [center mm), the maximum rated strength is 15MP: the minimum elongation rate is 20M% (70-75h
the nominal size of the part is 25ml, but it is pulled to 75rsm. Keep for 2min, lift it for 2s.n and then measure it. The maximum residual deformation does not exceed 5ma
the part is tested in (7.0=1.C and c.2MPa pressure is 96a. Its rated elongation and elongation rate should not be lower than 70% of the test pressure hardness. The part is placed in (97.±2.) distilled water for 7h. Its rated strength and elongation rate should not be lower than 7% before the test. The volume change rate does not exceed 20%
4. The nominal size of the part is 5.2. After the test, it should not be sticky on the surface of the matching part. The distance between the parts and the network needs to be more than 10%.14MPa. For products of different specifications, it is allowed to test only one part of the valve surface. 4.9 Body strength
The assembled sample can withstand a pressure of 4 times the rated working pressure (not less than 4.MPa) and maintain 5mm without
4.10 Leakage and deformation
4.10.1 The front valve should be able to withstand a working pressure less than the rated working pressure under the condition of the smoke assembly opening. It should maintain 6rmi without fullness, water deformation or pull ring for a long time, and it should also meet the functional requirements specified in 1.12. 4.10.2 When the two parts of the sprinkler are closed, the front water sheet of the water supply section that is cut twice the rated working point should maintain large leakage for 2h without permanent deformation or damage. In addition, the functional requirements specified in 4.12 shall be added. 4.11 Hydraulic resistance
The test shall be carried out in accordance with the provisions of 5.6. Under the water supply flow conditions given in Table 1, the hydraulic resistance shall not exceed 0.07MF1. Table 1
Diameter/mm
Supply flow rate.mir
GB 5135.5—2003
4.12.1 When the rain alarm valve is in the state of emergency, the valve shall not be affected by the start of the valve. 4.12.2 According to the provisions of i.9, the reverse test shall be carried out. The rain alarm arm shall be able to operate under the water supply pressure within the range of C.14MFa to the rated working pressure.
4. 12.3 If there is a warning, water should be prevented from leaking into the system from the water supply side when in the state of emergency, or there should be facilities to automatically discharge the seepage water.
4,2.A, according to the provisions of 3.!, 2, the test: the alarm should be able to operate frequently through the method of manual and automatic. 4.2.5 After the previous alarm network is completed, it should be within the range of two (the diameter of the south pipe network will be more than 209mm, and the stock should be avoided within: 4.12.6 The start-up device of the flat alarm is the starting step of the head line, and the high and low pressure limit of the room is determined by 0.1I2 to the rated working pressure,
4.1.? The rain alarm has a starting point pressure value under each water supply pressure, which is expressed by the water column change (r) meters. The maximum production rate of the condensation type is also expressed by the water column height (1). Its value is equal to 1 starting point force divided by the full coefficient 1.54.12.8 When the power test is carried out according to the provisions of 5., when the supply R is 0.MPa, the alarm port has a force of 0.03MP to start the alarm.
4.12.9 The rain alarm should be narrow when the wood enters the system pipeline and reaches more than 0.5 pieces above the valve correction part, which can make the system produce a sound alarm.
4.3 Fire performance
The melting point of the metal exhibition village material is 0.5. The valve parts and the reading are made of non-enterprise materials. The test is carried out according to the provisions of 5.10. The water-filled rain juice reduction plate should be able to withstand 6C fire test 13. The whole component should be able to withstand 2 times the opening. The water card of the workpiece is kept at a constant pressure of 2M.n. Especially the permanent deformation and damage of the ring 5 Test method
5.1 External inspection
Use measuring tools and measuring instruments to inspect and correct the materials, parts, external markings, etc., which shall meet the requirements of 1.[, 1.2, 1.7, 1.1, and .5.
5.2 Working cycle test
The elasticity and tightness of the components can be subjected to the working cycle test at a rate not exceeding 6 times. 5.3 Air aging test for non-life parts 5.3.1 All samples of non-life parts are subjected to air aging test. During the aging test, there shall be no contact between the samples or between the samples and the wall of the test box. The sound and pressure applied to the samples shall be the same as those of the samples. 5.3.2 The test temperature is 7℃: the test time is 11h. If the product cannot withstand the above temperature and softens, it is allowed to carry out the test at a lower temperature. The test duration is calculated by formula 1, = 737 000e-.11
—Test time unit is (
——Test group and, unit is Celsius: e=2.7183.
5.3.3 After the air aging test, take out the detailed product and cool it in (2% main 4)T air for 24h. The test result is in accordance with 4.7.1. 5.4 Warm water aging test for rigid non-metallic parts 5.4.1 Place the rigid non-metallic part sample in heated water up to 7:1G:1 test. If the product cannot withstand the above conditions and softens and deforms, it is allowed to carry out long-term aging test under low humidity (no humidity), and the test duration is calculated according to Formula 2.
\) Test duration, unit is day (d:;—Test temperature, unit is reported as degree!.
D74 857-:
GB 5.4.2 After the warm water aging test, the product shall be placed in a controlled air derating rate of (23--4) for at least 21 h and not more than 72 h. The test results shall comply with the provisions of 7.1. 5.5 Valve seal test 5.5.1 The accelerated aging and thermal tests shall be carried out in accordance with the provisions of R/T523.G/GB/6031 for the determination of the mechanical properties of the valve seal. The physical performance test of the valve seal shall be carried out in accordance with the provisions of CB/372J: the test results shall comply with the provisions of 4.8.1. 5.5.2 The valve seal shall be subjected to a 0.00 servo pressure test when the valve is in an idle state. No other heating method shall be used to make the test. When the cooling water is adjusted to 1:1, the pressure of the valve bottle opening should meet the requirements of the test. 5.6 Body strength test
The assembled valve is installed on the test device. The pressure of the pressure station parts is replaced by the pressure code and parts. The valve is opened. When filling with water, the pressure of the bottle is increased by 4 times except for the filling age. The pressure is lower than 4.8: MPa). Wait for 5 minutes. The test results will meet the requirements of 4.3. 5. Roll adjustment and deformation test
5.7. 1. Leakage test of valve body
The assembled valve body is installed on the test device, all valves are in the open position, the valve assembly is filled with water and emptied, and static water with a force twice the rated working force is applied to the valve body for 5 seconds. The test results shall comply with the provisions of 4.1.1. 5.7.2 Leakage test of valve body
The assembled valve body is installed on the test device, the whole assembly is in the closed position, the system side of the valve is connected to the air, and the water side of the valve is added. The rated working pressure is maintained for 21 seconds. Check the valve body's belt condition: 1. Pay attention to the stagnation of the valve assembly; 2. Pay attention to the sliding condition of the valve body:
The test results shall comply with the provisions of 4.1.2.
5. Hydraulic resistance test
5.1 Hydraulic resistance test method (test method) 5.8.2 Install the rain shower valve in the test method shown in Figure 1, and take the distance between the two holes. The difference between the two holes is equal, and the diameter is the same. The difference between the two holes can be measured. 5.3 Instantaneous water metering device, whether the frequency of the rain shower is flashing or not, the flow rate is combined with the table: the new conditions are given in the table, and the difference between the two is forbidden and the formula (S) is calculated to calculate the hydraulic seat P.AP = aP::-AP..
Strictly meet the requirements of 4. GB 5135.5-2003 A-1 Liquid-liquid-trigger: R-1 control panel (fast-change open type) 5.9 Fast-change test 5.9.1 Test device Test display meter Open salt collection 1 The temperature is 2. The single device can take the hole and the rain shower function test is carried out on the test device shown in Figure 1. The device includes the air supply system, the inlet pressure instrument, the alarm pipeline control panel, the drainage system, the water meter, the pressure difference of the flow meter, etc. The measurement range is not less than 2%.
5.9.2 Change test
5.9.2.1 Make the rain valve withstand the water F of 6.14MPa.0, the technical MPa system rating is 1. The difference is 0.1MP: series drive test.
5.9.2.2 Each time the test is carried out, the flow system valve travel and other action parts are in the state of rotation, and the pressure of the valve movement point is recorded during the test.
5.9.2.3 Note that the pressure of the valve movement point should be recorded during the test.
5.9.2.4 After each performance test, the position of the valve assembly should be observed. 5.9.3.9.3.1 Connect the normal device to the position where the cooling circuit is installed. According to Figure 2, scan a quick-release door with a diameter of 15uxm. Use a pipe with a diameter of mm to connect the door to a water-cooled room with a volume of not less than 5.9.3.2. When the door is tested, the components of the door should be connected to the room. The system should be fully satisfied. 1.9m2 of water is added back into the system according to the data given in Table 2 to pump air. Before testing again, be sure to use the quick-connect self-closing valve and the drain valve in the water supply side pipeline!
Air drainage trap
GE5135.5—2033
5.9.3.3 Under each of the conditions listed in Table 2, close the water supply and start the quick-connect opening network to allow water to flow through the test valve components.
Capacity (g/kg)
Fast Hongya FA door
Figure 2
Anti-reset test
Capacity MPs
Chemical East touch water accumulation dispersion/
5.9.3.4 Check whether the components of the door are in the required state, whether there is damage, cracking, or other damage phenomena. 5.9.3.5 Test the function of the door. 5. 10 Fire resistance test
5.10.1 The fire resistance test of the rain alarm is carried out on the test assembly shown in Figure 8. The flow meter includes the water system, flow meter, temperature control and filter meter, etc.
A thermocouple is installed at the same level as the suppression line. The temperature measuring point is equal to the valve plate. The surface of the oil plate is not less than 1 μL.
Control two,
Rain 3 Fire resistance test station layout
5.10.2 Install the test station horizontally on the test device, remove the external parts of the valve, keep the valve assembly open, clean the opening width of each diameter F and the pipeline. Expel air, GR 5135.5-2003bzxz.net
Ignite the oil pan under the fire door, and keep the half-average temperature of the room at 8((.-S) when cleaning the door. Keep it for 1min: After the fire is reached, immediately extinguish the oil pan fire. After 1min, 1m1m:n ordinary water is added to the test pipeline. The test results should meet the requirements of 1.11.
6 Qualification inspection and testing
The production should be carried out according to the approved drawings and technical documents during the production period. The quality system should ensure that the quality of each batch of products meets the requirements of the test section.
6. 1 Inspection classification
6.1.1 Type inspection
6.1.1.1 For each type and specification of pipeline network, before the product is put into production, a comprehensive inspection of various performance factors must be carried out. If the following conditions are found, the type inspection shall be reported to the industry for review: a) Qualitative appraisal of new product development:
b) After formal production, if the structure, material, craftsmanship, etc. are relatively large, it may affect the overall performance of the product; if a larger quality accident occurs:
The product is produced for more than one year, the production should be resumed: e) During normal production, a type inspection shall be carried out once a year: The supervisory agency shall carry out a special inspection according to the requirements
6.1.1.2 Product type inspection shall be carried out in accordance with the provisions of this part and the items shall be inspected monthly. 6.1.2 Factory inspection
Products shall be inspected and checked by the relevant department and scheduled at 5.1.5,7,F,! 6.2 Batch test: The same materials and accessories are used for assembly or production of the same bow and the same specifications. 6.3 Sampling: The machine force method is used, and the number of samples is not less than 12 units. 6.4 Inspection procedures: The rain alarm debugging process is carried out according to Figure 4. 7. 1-Appearance test: 5, 2-Workmanship: Deterioration test seat: 3-Aging test: 54, aging ... E-formula library attached diagnosis type:
5.5--Dynamic verification:
Use 4 rain Lin report warlord test procedure
Fire test length:
6.5 Inspection result judgment
Part II.1--.13 Enterprise Standard. This batch of products was judged as qualified products, TA5135.5-2003
This department will.74. There is a non-conforming item: The batch of products is classified as non-conforming products. The rest of the items are not in compliance with the fast time, and the sample is allowed to be tested separately. There is still one phenomenon that is unqualified. This product is not in compliance with the situation, and the label and instruction section
7.1 Label
The marking of the rain alarm valve shall comply with the provisions of 4.1.2. 7.2 Instructions for use
The rain alarm valve shall have an instruction manual on the front of its packaging. The instruction manual shall at least include the product name, specification and model, operating environment, storage conditions, production date, production data standards, necessary usage, installation instructions and installation instructions, quality assurance, manufacturer's name, location and contact information, etc. 8 Packaging, transportation, storage
8.1 Packaging
8.1.1 The rain alarm valve shall be fixed in the box. 8.1.2 The product packaging shall be accompanied by instructions for use and a certificate of conformity. 1.3 The packaging shall indicate modifications, emergency conditions, safety restrictions, and storage protection conditions, etc. 8.2 Transportation
During transportation, keep the amount of waste water down and limit the amount of waste water during loading and unloading. 8.3 Storage
The waste water should be stored in a ventilated workroom. It should not be stored together with biomass. The storage temperature should be -10. GB 5135.5:2003 (Normative Record) Hydraulic resistance test method 4.1 Make sure the test object flows through a calibrated standard nozzle at a flow rate of 4.5m/s. The pressure gauge is installed on the water supply side of the test valve. The pressure loss of the two nozzles should not be lower than the test pressure. 4.2 Adjust the spray pressure to make the test pipe drop velocity remain at 1.5m/s. The total pressure loss of the test pipe between the two positive ports of the proposed valve is directly measured by the flow meter. 4.3 Use a straight pipe section with the same nominal diameter to replace the test valve: use a positive pressure gauge to measure the positive pressure loss of the test pipe between the two pressure ports under corresponding flow reverses.
A, 4 From the total force of the test tube between the two ports of the raindrop, the three forces of the test tube head are reduced by the three forces of the test tube head between the inner and outer ports. The water and moment of the previous reading can be obtained. Appendix B
(Informative Appendix)
Space requirements for raindrop valves
GA 5135.5—2003
B.1 In the fully open position, the clearance between the valve head and the throat of the body should not be less than 19mm for iron. For metal or stainless steel, it should not be less than
B.2 In the closed position, there is at least 3mm of semi-final clearance between the valve head and the inner edge of the foot. H.3 The annular clearance between the shaft and the shaft can be no less than 3mm. H.4 The diameter of the shaft can be no less than 1.12=mmB.5 The axial clearance between the valve head and the bearing surface of the valve head should not be less than 1.125mm1. .6 For the moving parts of the valve body, the minimum radial distance between the moving parts should not be less than 3 mm, the minimum radial distance between the moving parts and the fixed parts should not be less than 1.2 mm, and the distance between the shaft pin, bearing and other parts should not be less than 3.11 mm. B.71 The fire resistance test of rain shower is carried out on the test assembly shown in Figure 8, which includes a water circulation system, a flow meter, a temperature control and filtration instrument, etc. An electric couple is installed horizontally at the position containing the inhibition line. The temperature measuring point is equal to the distance between the valve plate and the oil pan, and the surface area of the oil pan is not less than 1uL.
Control two,
Rain 3 Fire resistance test station layout
5.10.2 Install the test station horizontally on the test device, remove the external parts of the valve, keep the valve assembly open, clean the opening width of each diameter F and the pipeline. Expel air, GR 5135.5-2003
Ignite the oil pan under the fire door, and keep the half-average temperature of the room at 8((.-S) when cleaning the door. Keep it for 1min: After the fire is reached, immediately extinguish the oil pan fire. After 1min, 1m1m:n ordinary water is added to the test pipeline. The test results should meet the requirements of 1.11.
6 Qualification inspection and testing
The production should be carried out according to the approved drawings and technical documents during the production period. The quality system should ensure that the quality of each batch of products meets the requirements of the test section.
6. 1 Inspection classification
6.1.1 Type inspection
6.1.1.1 For each type and specification of pipeline network, before the product is put into production, a comprehensive inspection of various performance factors must be carried out. If the following conditions are found, the type inspection shall be reported to the industry for review: a) Qualitative appraisal of new product development:
b) After formal production, if the structure, material, craftsmanship, etc. are relatively large, it may affect the overall performance of the product; if a larger quality accident occurs:
The product is produced for more than one year, the production should be resumed: e) During normal production, a type inspection shall be carried out once a year: The supervisory agency shall carry out a special inspection according to the requirements
6.1.1.2 Product type inspection shall be carried out in accordance with the provisions of this part and the items shall be inspected monthly. 6.1.2 Factory inspection
Products shall be inspected and checked by the relevant department and scheduled at 5.1.5,7,F,! 6.2 Batch test: The same materials and accessories are used for assembly or production of the same bow and the same specifications. 6.3 Sampling: The machine force method is used, and the number of samples is not less than 12 units. 6.4 Inspection procedures: The rain alarm debugging process is carried out according to Figure 4. 7. 1-Appearance test: 5, 2-Workmanship: Deterioration test seat: 3-Aging test: 54, aging ... E-formula library attached diagnosis type:
5.5--Dynamic verification:
Use 4 rain Lin report warlord test procedure
Fire test length:
6.5 Inspection result judgment
Part II.1--.13 Enterprise Standard. This batch of products was judged as qualified products, TA5135.5-2003
This department will.74. There is a non-conforming item: The batch of products is classified as non-conforming products. The rest of the items are not in compliance with the fast time, and the sample is allowed to be tested separately. There is still one phenomenon that is unqualified. This product is not in compliance with the situation, and the label and instruction section
7.1 Label
The marking of the rain alarm valve shall comply with the provisions of 4.1.2. 7.2 Instructions for use
The rain alarm valve shall have an instruction manual on the front of its packaging. The instruction manual shall at least include the product name, specification and model, operating environment, storage conditions, production date, production data standards, necessary usage, installation instructions and installation instructions, quality assurance, manufacturer's name, location and contact information, etc. 8 Packaging, transportation, storage
8.1 Packaging
8.1.1 The rain alarm valve shall be fixed in the box. 8.1.2 The product packaging shall be accompanied by instructions for use and a certificate of conformity. 1.3 The packaging shall indicate modifications, emergency conditions, safety restrictions, and storage protection conditions, etc. 8.2 Transportation
During transportation, keep the amount of waste water down and limit the amount of waste water during loading and unloading. 8.3 Storage
The waste water should be stored in a ventilated workroom. It should not be stored together with biomass. The storage temperature should be -10. GB 5135.5:2003 (Normative Record) Hydraulic resistance test method 4.1 Make sure the test object flows through a calibrated standard nozzle at a flow rate of 4.5m/s. The pressure gauge is installed on the water supply side of the test valve. The pressure loss of the two nozzles should not be lower than the test pressure. 4.2 Adjust the spray pressure to make the test pipe drop velocity remain at 1.5m/s. The total pressure loss of the test pipe between the two positive ports of the proposed valve is directly measured by the flow meter. 4.3 Use a straight pipe section with the same nominal diameter to replace the test valve: use a positive pressure gauge to measure the positive pressure loss of the test pipe between the two pressure ports under corresponding flow reverses.
A, 4 From the total force of the test tube between the two ports of the raindrop, the three forces of the test tube head are reduced by the three forces of the test tube head between the inner and outer ports. The water and moment of the previous reading can be obtained. Appendix B
(Informative Appendix)
Space requirements for raindrop valves
GA 5135.5—2003
B.1 In the fully open position, the clearance between the valve head and the throat of the body should not be less than 19mm for iron. For metal or stainless steel, it should not be less than
B.2 In the closed position, there is at least 3mm of semi-final clearance between the valve head and the inner edge of the foot. H.3 The annular clearance between the shaft and the shaft can be no less than 3mm. H.4 The diameter of the shaft can be no less than 1.12=mmB.5 The axial clearance between the valve head and the bearing surface of the valve head should not be less than 1.125mm1. .6 For the moving parts of the valve body, the minimum radial distance between the moving parts should not be less than 3 mm, the minimum radial distance between the moving parts and the fixed parts should not be less than 1.2 mm, and the distance between the shaft pin, bearing and other parts should not be less than 3.11 mm. B.71 The fire resistance test of rain shower is carried out on the test assembly shown in Figure 8, which includes a water circulation system, a flow meter, a temperature control and filtration instrument, etc. An electric couple is installed horizontally at the position containing the inhibition line. The temperature measuring point is equal to the distance between the valve plate and the oil pan, and the surface area of the oil pan is not less than 1uL.
Control two,
Rain 3 Fire resistance test station layout
5.10.2 Install the test station horizontally on the test device, remove the external parts of the valve, keep the valve assembly open, clean the opening width of each diameter F and the pipeline. Expel air, GR 5135.5-2003
Ignite the oil pan under the fire door, and keep the half-average temperature of the room at 8((.-S) when cleaning the door. Keep it for 1min: After the fire is reached, immediately extinguish the oil pan fire. After 1min, 1m1m:n ordinary water is added to the test pipeline. The test results should meet the requirements of 1.11.
6 Qualification inspection and testing
The production should be carried out according to the approved drawings and technical documents during the production period. The quality system should ensure that the quality of each batch of products meets the requirements of the test section.
6. 1 Inspection classification
6.1.1 Type inspection
6.1.1.1 For each type and specification of pipeline network, before the product is put into production, a comprehensive inspection of various performance factors must be carried out. If the following conditions are found, the type inspection shall be reported to the industry for review: a) Qualitative appraisal of new product development:
b) After formal production, if the structure, material, craftsmanship, etc. are relatively large, it may affect the overall performance of the product; if a larger quality accident occurs:
The product is produced for more than one year, the production should be resumed: e) During normal production, a type inspection shall be carried out once a year: The supervisory agency shall carry out a special inspection according to the requirements
6.1.1.2 Product type inspection shall be carried out in accordance with the provisions of this part and the items shall be inspected monthly. 6.1.2 Factory inspection
Products shall be inspected and checked by the relevant department and scheduled at 5.1.5,7,F,! 6.2 Batch test: The same materials and accessories are used for assembly or production of the same bow and the same specifications. 6.3 Sampling: The machine force method is used, and the number of samples is not less than 12 units. 6.4 Inspection procedures: The rain alarm debugging process is carried out according to Figure 4. 7. 1-Appearance test: 5, 2-Workmanship: Deterioration test seat: 3-Aging test: 54, aging ... E-formula library attached diagnosis type:
5.5--Dynamic verification:
Use 4 rain Lin report warlord test procedure
Fire test length:
6.5 Inspection result judgment
Part II.1--.13 Enterprise Standard. This batch of products was judged as qualified products, TA5135.5-2003
This department will.74. There is a non-conforming item: The batch of products is classified as non-conforming products. The rest of the items are not in compliance with the fast time, and the sample is allowed to be tested separately. There is still one phenomenon that is unqualified. This product is not in compliance with the situation, and the label and instruction section
7.1 Label
The marking of the rain alarm valve shall comply with the provisions of 4.1.2. 7.2 Instructions for use
The rain alarm valve shall have an instruction manual on the front of its packaging. The instruction manual shall at least include the product name, specification and model, operating environment, storage conditions, production date, production data standards, necessary usage, installation instructions and installation instructions, quality assurance, manufacturer's name, location and contact information, etc. 8 Packaging, transportation, storage
8.1 Packaging
8.1.1 The rain alarm valve shall be fixed in the box. 8.1.2 The product packaging shall be accompanied by instructions for use and a certificate of conformity. 1.3 The packaging shall indicate modifications, emergency conditions, safety restrictions, and storage protection conditions, etc. 8.2 Transportation
During transportation, keep the amount of waste water down and limit the amount of waste water during loading and unloading. 8.3 Storage
The waste water should be stored in a ventilated workroom. It should not be stored together with biomass. The storage temperature should be -10. GB 5135.5:2003 (Normative Record) Hydraulic resistance test method 4.1 Make sure the test object flows through a calibrated standard nozzle at a flow rate of 4.5m/s. The pressure gauge is installed on the water supply side of the test valve. The pressure loss of the two nozzles should not be lower than the test pressure. 4.2 Adjust the spray pressure to make the test pipe drop velocity remain at 1.5m/s. The total pressure loss of the test pipe between the two positive ports of the proposed valve is directly measured by the flow meter. 4.3 Use a straight pipe section with the same nominal diameter to replace the test valve: use a positive pressure gauge to measure the positive pressure loss of the test pipe between the two pressure ports under corresponding flow reverses.
A, 4 From the total force of the test tube between the two ports of the raindrop, the three forces of the test tube head are reduced by the three forces of the test tube head between the inner and outer ports. The water and moment of the previous reading can be obtained. Appendix B
(Informative Appendix)
Space requirements for raindrop valves
GA 5135.5—2003
B.1 In the fully open position, the clearance between the valve head and the throat of the body should not be less than 19mm for iron. For metal or stainless steel, it should not be less than
B.2 In the closed position, there is at least 3mm of semi-final clearance between the valve head and the inner edge of the foot. H.3 The annular clearance between the shaft and the shaft can be no less than 3mm. H.4 The diameter of the shaft can be no less than 1.12=mmB.5 The axial clearance between the valve head and the bearing surface of the valve head should not be less than 1.125mm1. .6 For the moving parts of the valve body, the minimum radial distance between the moving parts should not be less than 3 mm, the minimum radial distance between the moving parts and the fixed parts should not be less than 1.2 mm, and the distance between the shaft pin, bearing and other parts should not be less than 3.11 mm. B.7This batch of products is judged as qualified products. TA5135.5—2003
This department will. 74. There is a failure: the batch of products is classified as unqualified products. When the other items are not met, the sample is allowed to be added for inspection. If there is still one unqualified phenomenon, the product is considered unqualified. The marking and instructions for use section
7.1 Marking
The marking of the rain alarm valve shall comply with the provisions of 4.1.2. 7.2 Instructions for use
Rain alarm valve The valve has instruction manual in its packaging. The instruction manual should at least include product name, specification and model, use environment, storage parts, production date, production standard, necessary use, installation instructions and installation instructions, quality assurance, manufacturer's name, location and contact information, etc. 8 Packaging, transportation and storage
8.1 Packaging
8.1.1 The product should be fixed in the box. 8.1.2 The product packaging should be accompanied by instruction manual and certificate of conformity. 1.3 The outside of the packaging should indicate modification methods, safety restrictions, storage protection conditions, etc. 8.2 Transportation
During transportation, keep the amount of waste water down and limit the amount of waste water during loading and unloading. 8.3 Storage
The waste water should be stored in a ventilated workroom. It should not be stored together with biomass. The storage temperature should be -10. GB 5135.5:2003 (Normative Record) Hydraulic resistance test method 4.1 Make sure the test object flows through a calibrated standard nozzle at a flow rate of 4.5m/s. The pressure gauge is installed on the water supply side of the test valve. The pressure loss of the two nozzles should not be lower than the test pressure. 4.2 Adjust the spray pressure to make the test pipe drop velocity remain at 1.5m/s. The total pressure loss of the test pipe between the two positive ports of the proposed valve is directly measured by the flow meter. 4.3 Use a straight pipe section with the same nominal diameter to replace the test valve: use a positive pressure gauge to measure the positive pressure loss of the test pipe between the two pressure ports under corresponding flow reverses.
A, 4 From the total force of the test tube between the two ports of the raindrop, the three forces of the test tube head are reduced by the three forces of the test tube head between the inner and outer ports. The water and moment of the previous reading can be obtained. Appendix B
(Informative Appendix)
Space requirements for raindrop valves
GA 5135.5—2003
B.1 In the fully open position, the clearance between the valve head and the throat of the body should not be less than 19mm for iron. For metal or stainless steel, it should not be less than
B.2 In the closed position, there is at least 3mm of semi-final clearance between the valve head and the inner edge of the foot. H.3 The annular clearance between the shaft and the shaft can be no less than 3mm. H.4 The diameter of the shaft can be no less than 1.12=mmB.5 The axial clearance between the valve head and the bearing surface of the valve head should not be less than 1.125mm1. .6 For the moving parts of the valve body, the minimum radial distance between the moving parts should not be less than 3 mm, the minimum radial distance between the moving parts and the fixed parts should not be less than 1.2 mm, and the distance between the shaft pin, bearing and other parts should not be less than 3.11 mm. B.7This batch of products is judged as qualified products. TA5135.5—2003
This department will. 74. There is a failure: the batch of products is classified as unqualified products. When the other items are not met, the sample is allowed to be added for inspection. If there is still one unqualified phenomenon, the product is considered unqualified. The marking and instructions for use section
7.1 Marking
The marking of the rain alarm valve shall comply with the provisions of 4.1.2. 7.2 Instructions for use
Rain alarm valve The valve has instruction manual in its packaging. The instruction manual should at least include product name, specification and model, use environment, storage parts, production date, production standard, necessary use, installation instructions and installation instructions, quality assurance, manufacturer's name, location and contact information, etc. 8 Packaging, transportation and storage
8.1 Packaging
8.1.1 The product should be fixed in the box. 8.1.2 The product packaging should be accompanied by instruction manual and certificate of conformity. 1.3 The outside of the packaging should indicate modification methods, safety restrictions, storage protection conditions, etc. 8.2 Transportation
During transportation, keep the amount of waste water down and limit the amount of waste water during loading and unloading. 8.3 Storage
The waste water should be stored in a ventilated workroom. It should not be stored together with biomass. The storage temperature should be -10. GB 5135.5:2003 (Normative Record) Hydraulic resistance test method 4.1 Make sure the test object flows through a calibrated standard nozzle at a flow rate of 4.5m/s. The pressure gauge is installed on the water supply side of the test valve. The pressure loss of the two nozzles should not be lower than the test pressure. 4.2 Adjust the spray pressure to make the test pipe drop velocity remain at 1.5m/s. The total pressure loss of the test pipe between the two positive ports of the proposed valve is directly measured by the flow meter. 4.3 Use a straight pipe section with the same nominal diameter to replace the test valve: use a positive pressure gauge to measure the positive pressure loss of the test pipe between the two pressure ports under corresponding flow reverses.
A, 4 From the total force of the test tube between the two ports of the raindrop, the three forces of the test tube head are reduced by the three forces of the test tube head between the inner and outer ports. The water and moment of the previous reading can be obtained. Appendix B
(Informative Appendix)
Space requirements for raindrop valves
GA 5135.5—2003
B.1 In the fully open position, the clearance between the valve head and the throat of the body should not be less than 19mm for iron. For metal or stainless steel, it should not be less than
B.2 In the closed position, there is at least 3mm of semi-final clearance between the valve head and the inner edge of the foot. H.3 The annular clearance between the shaft and the shaft can be no less than 3mm. H.4 The diameter of the shaft can be no less than 1.12=mmB.5 The axial clearance between the valve head and the bearing surface of the valve head should not be less than 1.125mm1. .6 For the moving parts of the valve body, the minimum radial distance between the moving parts should not be less than 3 mm, the minimum radial distance between the moving parts and the fixed parts should not be less than 1.2 mm, and the distance between the shaft pin, bearing and other parts should not be less than 3.11 mm. B.7
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.