SY 6278-1997 Safety Specification for Natural Gas Purification Plants

Basic Information

Standard ID: SY 6278-1997

Standard Name: Safety Specification for Natural Gas Purification Plants

Chinese Name: 天然气净化厂安全规范

Standard category:Oil and gas industry standards (SY)

state:Abolished

Date of Release1997-07-17

Date of Implementation:1998-01-01

Date of Expiration:2005-05-01

standard classification number

Standard ICS number:Environmental protection, health and safety >> 13.100 Occupational safety, industrial hygiene

Standard Classification Number:Medicine, Health, Labor Protection>>Labor Safety Technology>>C67 Factory Fire and Explosion Safety Technology

associated standards

alternative situation:Replaced by SY/T 6137-2005

Publication information

other information

Introduction to standards:

SY 6278-1997 Safety Specification for Natural Gas Purification PlantsSY6278-1997 Standard download decompression password: www.bzxz.net

Some standard content:

IC: S 13.100
Record number: 477-1997
Petroleum and natural gas industry standard of the People's Republic of China SY 62781997
Safety code for natural gas conditioning plant1997-07-17 Issued
China National Petroleum Corporation
1998-01-01 Implementation
SY 6278
The task of the natural gasification plant is to treat the natural gas containing impurities such as sulfide oxide, magnetic dioxide, organic sulfide, etc., so that it meets the natural gas product standards. Natural gas is an industrial energy, chemical raw material and civilian fuel, etc., and covers a wide range of areas. Standardize natural gas! Safety management is extremely necessary. For this reason, this standard is specially formulated. This standard is proposed and coordinated by the Petroleum Industry Safety Professional Standardization Technical Committee. The originating units of this standard are: Refining and Chemical Division, Technical Safety Division, and Technical Supervision Division of Sichuan Petroleum Pipeline Bureau. The main drafters of this standard are Zhang Jieshan, Chen Ming, Wang Zhengping, Du Shunyou, Chen Shengyong, Zhang Bolin, and Liu Xiao. Scope
Petroleum and Natural Gas Industry Standard of the People's Republic of China Safety Specification for Natural Gas Purification Plants
Safety rude for natural gas conditioning plantsSY 62781997
This standard specifies the overall requirements for the design, commissioning, production, and equipment maintenance of natural gas purification plants. This standard is applicable to petroleum enterprises with a natural gas processing capacity of 50×10m/d and above. Natural gasification stations with relatively small treatment capacity can also refer to it for implementation.
2 Referenced standards
The following standards may contain provisions, which constitute the provisions of this standard through reference in this standard: The editions shown are valid at the time of publication of this standard. All standards will be revised, and the parties using this standard should explore the possibility of using the latest editions of the following standards GBJ14090 Design model for fire extinguisher configuration in buildings GB150—:989 Steel pressure vessels
GB 151—1989
Steel shell and tube heat exchangers
GB6067—1985 Mechanical safety regulations
GB 89781988
Comprehensive sewage discharge standard
GB16297——1996Comprehensive emission standard for gas pollutantsGB50058-92Design specification for power plant in explosive and fire hazardous environmentGB 50183-93Design fire protection code for crude oil and natural gas engineeringGBI 4-73
Trial standard for industrial "three degrees" emission
JGI 80—91
Technical specification for safety of high-altitude operation in constructionSY 5690-95
Management and allocation regulations for personal labor protection articles for employees in petroleum enterprisesSY 5858--93
Safety regulations for industrial accidents in petroleum enterprises
SY598494 Safety inspection regulations for oil (gas) field containers, pipelines and loading and unloading facilities and towing devicesSYI12-85 Requirements for metal materials for resistance to sulfide stress cracking of natural gas surface facilitiesSYT0011-96 Design specifications for natural gas purification plants in gas fieldsFangren Guo [!985] No. 4
Regulations on supervision and management of boilers and pressure vesselsLabor Guo Zi [9908] Safety technical supervision regulations for pressure vessels issued by the Ministry of Labor [1996 No. 1276, Safety Technical Supervision Regulations for Steam Boilers 3 Design
3.1 Mature, reliable and advanced technologies and equipment should be adopted. The design of the purification plant should comply with the provisions of SY? 0011. 3.2 Safety, sanitation and fire protection facilities should be designed, constructed and put into operation at the same time as the main device. 3.3 Various devices, containers, heat exchangers and storage tanks should be designed in accordance with GB150 and GB151. 3.4 In order to prevent hydrogen sulfide cracking corrosion, the materials and manufacturing of equipment, pipelines and valves used in acidic environments should comply with the provisions of SY? 2.
3.5 The natural gas purification plant with a processing capacity of 400×10m/d or more shall be powered by two sources according to the first-level load: China National Petroleum Corporation approved on July 17, 1997 and implemented on January 1, 1998
SY62781997
When one power source is damaged: the other source should not be damaged at the same time 3.6 The design of the electrical circuits of the transformer and distribution machine shall comply with the provisions of 57 and 25.8 of GB50058-925, and the selection of electrical equipment shall comply with the provisions of 2.5.2 and 2.5.3 of GB50058-925-92! An uninterruptible power supply (UPS) shall be installed to provide power for instruments and emergency lighting. The capacity of P is full! After the power outage, the power for instruments and emergency lighting will be 0mim, 3.8 Absorption 3.9 Fire safety design shall comply with the provisions of GB50183. 3.10 Fire extinguishers in buildings such as general control rooms and office areas shall comply with the provisions of (factory! 4090)15.23. 3.11 Ignition facilities and anti-fire measures shall be reserved for ignition 3.2 In flammable, explosive and self-gas quality areas, automatic monitoring and alarm systems for flammable and toxic gases shall be set up. 4.1 During the acceptance and handover of the room, the safety, health and fire-fighting facilities shall be accepted and handed over at the same time as the main device. 4.2 Before the trial operation of feeding, a safety inspection shall be carried out on the warehouse surface, and the problems found shall be rectified one by one. 4.3 For boilers installed automatically, the pressure vessels shall be in accordance with the "Pressure Vessels In accordance with the requirements of the "Technical Supervision Regulations for Safety Equipment" and the "Technical Supervision Regulations for Gas and Gas Equipment", the system can be put into operation only after being reviewed and registered by the local management department and obtaining a license. Imported boilers and exported equipment shall be implemented in accordance with the "Regulations on the Supervision and Management of Furnace Containers". 4.4 The trial operation and commissioning plan also includes fire drills, non-accident demonstrations, and non-accident handling procedures. 4.5 The trial operation and commissioning plan shall be organized and implemented only after the technical department has made preparations. 5.1 The technical operation procedures shall be implemented in full compliance with the safety technical operation procedures to avoid over-temperature and over-pressure operation of equipment and pipelines. 5.2 The emergency lighting system and grounding system shall be inspected regularly. The grounding of electrical equipment shall comply with the provisions of GB053\92:15. The grounding of pipelines and storage tanks shall comply with the provisions of SY5984. 5.3 Automatic control 5.4 For important liquid control systems, the errors of the glass plate liquid level gauge and liquid level transmitter should be adjusted in time. 5.5 For the concentration detection and alarm device of methane, toxic and combustible gas, the control and emission systems should be tested and adjusted regularly to ensure that the emission valve is in a positive state and the ignition facilities are complete. 5.7 During the maintenance of the gas filter separation switch, humidification measures should be adopted to prevent the sulfide from igniting. 5.8 The daily inspection and maintenance of the doors should be strengthened to ensure that the valves are tight and close flexibly. 5. Carry out regular inspections. If any potential accidents are found, they should be reported to the competent department in time and the rectification measures should be taken. 5.1 For hazardous operations such as gas prevention, sulfur treatment, sewage treatment, etc., the test group should be allocated according to the number of people on duty! 5.11 The equipment must be properly equipped and used (medical respirator and military protective equipment must be in good condition). 5.12 The fire fighting equipment must be properly equipped and must not be used at any time. 53 The fire fighting equipment must be inspected and kept in good condition. The fire fighting pool must be kept in good condition at all times. The bottom mud and sand must not be cleaned regularly. The water surface must be prevented from freezing. 54 The fire fighting equipment must be properly maintained and protected during the period. 5.15 The ventilation facilities must be in good condition and the air flow must be maintained. 5.16 The analysis and testing must be carried out before the medium is discharged. The degree of strictness must be met according to the requirements of the operation period! The internal command network of the fire fighting and safety rescue system must be followed and the equipment must be inspected and repaired properly. 6.1 Stop "
SY 6278-1997
61 Before installation, a shutdown plan and corresponding safety measures shall be formulated and approved by the responsible person and the relevant person in charge. In addition to the shutdown engineering, it shall also include: (1.2Www.bzxZ.net
) The flow and time of purge, replacement and cleaning of the equipment; (1) The replacement position and time arrangement of the isolation plate before installation! Sampling and analysis items, frequency and sampling point location; (2) The items to be monitored and the distribution of points.
61.3 The shutdown plan and process operation procedures shall be followed, and the equipment shall be cooled and the pressure shall be reduced according to the process operation line. 6.2 Standard maintenance
2.1 Before the standard operation, the personnel who sign and listen to the maintenance shall be given safety education. 62.2. The maintenance and inspection of the furnace, power pipe and its safety accessories shall be carried out in accordance with the "Pressure Vessel Safety Technical Temporary Regulations" and the "Full Technical Dog Inspection Period". The maintenance process shall be carried out in accordance with the electrical safety regulations. Temporary power facilities shall be equipped with lighting and steam platform safety inspection tickets! # Temporary use of hair continued
6.2.4 The installation operation shall be carried out in accordance with the regulations of GB6067 (2.5 Multi-virtual operations shall be equipped with a full network, and the maintenance operation shall be carried out in accordance with the provisions of 8. 6.2.6 The production equipment shall be inspected and the safety adjustment shall be checked. 6.2.7 After the maintenance project is completed, a comprehensive quality inspection shall be carried out. (h.3JF L. Before the work is started, a comprehensive safety inspection shall be conducted on the equipment and the problems found shall be rectified in time. The work shall be implemented only after approval by the person in charge of the factory. (3. Regarding the content: the workshop operators shall clarify the 7 basic requirements for safety measures and implement the safety regulations and rules. The system of food safety management shall be established and improved to ensure the overall safety of the meal: a comprehensive system of food safety management; a comprehensive system of food safety technology ... t||Safety education system
Equipment maintenance system
Distribution and hidden danger reporting system
72-type worker training and certification
The dyeing worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world: after the examination, the worker should be trained in the new technology of the whole world Fire is a fire source. When starting a fire in the fire protection area, the regulations of SY5858 shall be followed. 7.4 Workers shall wear the uniforms in accordance with the regulations of SY5690. 75 Prevention of poisoning by toxic media such as hydrogen sulfide, trioxide, and carbon monoxide shall be educated on the knowledge of preventing poisoning by toxic media such as hydrogen sulfide, trioxide, and carbon monoxide: the use of anti-poisoning devices and their methods as well as the first aid of poisoning. 7.5.2 Management and control of sulfur-containing flushes, bays, etc. shall be strengthened, and the discharge shall be sent to the regulations of B16297 and Ci308B4. The surrounding areas of sulfur-containing water pits shall be fenced or covered. 753 When entering toxic sites for work, suitable gas masks shall be selected and oxygen-containing gas masks shall be worn. 7.54 When entering a tower, container, furnace, flue or other enclosed equipment, underground or semi-underground pool for inspection and maintenance, ventilation should be done first; gas sampling and analysis should be conducted to confirm that the oxygen content is not less than 18, and the content of flammable and strong gases is not less than 125% below the maximum allowable concentration specified in Table 1, and special operation safety work tickets should be processed. Maintenance personnel should have special personnel to monitor outside the equipment:
Maximum allowable concentration of toxic gases
Gas scale
Tolerant concentration
7.6 Safety signs
Safety signs should be set up in the factory area. HS