This standard specifies the basic requirements for the factory acceptance of the main materials used in boilers by boiler manufacturers, except where otherwise specified in the order contract. JB/T 3375-2002 Rules for the factory acceptance of boiler materials JB/T3375-2002 Standard download decompression password: www.bzxz.net
Some standard content:
ICS27.060 Machinery Industry Standard of the People's Republic of China TBT39752002 Replaces TB/T3375—1991 Rules for receiving auceptance uf materials for builer Construction2002-07-16 Issued 2002-12-01 Implementation The State Economic and Trade Commission of the People's Republic of China Issued Foreword Normative references 3 Terms and definitions 4 Principles for determining factory acceptance items 5 Material quantity certificate and verification 6 Factory inspection of materials from the same production 6.1 Factory inspection date, 6.2 Inspection quantity, method and joint standard of incoming materials. Disposal of materials that do not meet the inspection standards 9 Acceptance mark and identification Table 1 Product standards and quality certificates for domestic materials Standard JM/T3375-2002 This standard replaces JM/T3375-1991 Boiler Raw Materials Factory Inspection 3 Compared with JD/T3375-1991, this standard has the following main changes: ... Added definitions of factory inspection and related terms (Chapter 3 of this edition); : Principles for determining the factory inspection period (Chapter 3 of the 1991 edition; Chapter 4 of this edition); JB/T3375-2002 Modified and added factory inspection of domestic and imported materials (3.1.123.6 of the 1991 edition: 5 of this edition); .3, 5.4 and Chapter 6 and Chapter 7 simplify the number of inspections and the selection method of the inspection party to meet the qualified standard! Chapter 3 and 4 of the 1991 edition; Chapter 6.2 and Chapter 7 of this edition add the provisions for the arbitration of the problems caused by the acceptance of non-conforming bridges (Chapter 10 of this edition). This standard is issued by the China Machinery Industry Association. This standard is under the jurisdiction of the National Furnace Standardization Technology Committee (CSBTSITC73). The drafting unit of this standard is: Shanghai Power Generation Equipment Complete Design Research Institute, the main person in charge of the whole standard, and the previous versions of the non-litigation alternative standard are: JB.7.1201975 JB/I337 5—1983.JB/T3375—1991. 1 Scope Rules for factory acceptance of boiler materials JR/T3375—2002 This standard specifies the basic requirements for factory acceptance of boiler materials by steel furnace manufacturers, except for those otherwise specified in the order contract. This standard is applicable to the main core materials for fixed boilers, including: boiler guard pliers, boiler guard pliers, mold pins (No. 25 and above), steel (for manufacturing tie rods (suspenders with a diameter of 4m and above), structural steel plates (for manufacturing large plate beams, called plates) and welding materials (including rods, welding wires, flux-cored wires and fluxes). Other materials for fixed boilers may refer to the provisions of the standard for factory acceptance. 2 Normative references The clauses in the following documents shall become the clauses of this standard by virtue of the application of this standard. For all referenced documents with a specific date, all subsequent amendments shall apply to the following standards, excluding the internal rate or revised version mentioned above. However, the parties to the consultation reached or agreed upon by this standard shall study whether the latest version of this document can be used. For all undated referenced documents, the latest version shall apply to this standard. GB/T24? Inspection, packaging, marking and quality certificate of steel plates and steel strips GB/T 700 Carbon steel Hot rolled steel and square size, shape, weight and allowable deviation GB/T702 GH/T706 Hot rolled steel size, shape, weight and allowable deviation Hot rolled steel size, shape, weight and allowable deviation Hot rolled steel plate size, shape, weight and allowable deviation GB709 GB/T710 High quality copper hot rolled thin steel plate and steel high quality carbon shrinkage system Hot rolled Thick steel and wide steel strip boiler steel plate GB/T908 GB/T984 Dimension, shape, design tolerances for steel sections and sheets Welding rods GH1591 Specifications for the collection, packaging, marking and quality certificate of low-alloy high-strength structural steel sectionsGRT2QL GB/T2102 GBT2103 GB/T 3077 GB30ST Wire acceptance, packaging, marking and quality certificate of steel wire acceptance, packaging, marking and quality certificate of steel wire Seamless steel for low alloy steel GET3274 Carbon steel structural steel and low alloy structural steel Hot-rolled thick steel electrode and key strip GE5117 Steel welding rod GH/T5118 Low alloy steel wire Spiral steel wire and welding flux for extended welding G1/T 5293 GB 5310F Light chain for commercial pressure boiler GB/T8163Non-galvanized steel pipe for conveying fluid GBT10015Carbon cored flux-cored welding wire Hot-rolled I-type welding wire and T-type welding wire GB/T11263 Flux for alloy aluminum buried glass welding GB/T1220 JB/T33752002 High quality magnetic structure platinum cold rolled thin steel drawing and steel backing GB/T13237 Olefinized welding steel wire GB/T14957 Wire for gas shielded welding GB/T14958 GB17493Low alloy steel cored welding wire General technical conditions for steel and steel products CBT17505 GB/T17853 Stainless steel flux-cored welding wire Stainless steel welding wire and flux for welding GR/T17854 3 Terms and definitions The following terms and definitions apply to this standard. 3.1 Recelvingacceptancebzxz.net The boiler manufacturer confirms the purchased materials through verification and (or) inspection. 32 Supplementaryrequiranentmaterials are not specified in the product standard and are selected by the boiler manufacturer when necessary. 3.3 AdditionalrequirementAdditiunalrequirementThe requirements are not specified in the product standard and are agreed upon by the steel boiler manufacturer and the material supplier. 4 Principles for determining factory acceptance items 4.1 The boiler manufacturer shall verify the quality certificates and marks of all the boiler materials used in the factory. 4.2 The boiler manufacturer shall determine the inspection items in accordance with this standard, material production standards and the provisions of the order contract. 4.3 The boiler manufacturer shall report the needs of the product in the design and manufacturing, and list the supplementary requirements and additional requirements in the order contract as inspection items. 4.4 For materials with complete certificates and confirmed quality, the boiler manufacturer's quality management department shall propose 1, and the inspection items and the inspection quantity may be appropriately reduced or increased after approval by the technical person in charge of the factory. 5 Verification of material quality certificates and marks 5.1 Inspection items and the inspection quantity may be appropriately reduced or increased. All materials should be accompanied by a quality certificate: documents without a quality certificate should be collected. 1 Product standards and quality certificates for domestic materials Standard serial number Material category Boiler steel plate Structural steel plate Boiler steel Welding flux Material product standard GB 713 GB/TT09.GB/T710, GB/T711, GB/11591. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.