This standard specifies the technical requirements, test methods, inspection rules, marking, packaging, storage and transportation, and safe use of H06-2 iron red, zinc yellow, and iron black epoxy ester primers. This standard applies to epoxy ester primers based on epoxy resin and vegetable oil acid esters. Iron red and iron black epoxy ester primers are suitable for coating ferrous metal surfaces; zinc yellow epoxy ester primers are suitable for coating light metal surfaces; they are also suitable for priming the surfaces of metal materials in coastal areas and humid tropical climates. HG/T 2239-1991 H06-2 Iron red, zinc yellow, and iron black epoxy ester primers HG/T2239-1991 Standard download decompression password: www.bzxz.net
Some standard content:
Chemical Industry Standard of the People's Republic of China HG2239—91 H06-2 Iron red, zinc yellow, iron black epoxy ester primer 1991-11-12 Issued Ministry of Chemical Industry of the People's Republic of China 1992-07-01 Implementation Chemical Industry Standard of the People's Republic of China H06-2 Iron red, zinc yellow, iron black epoxy ester primer 1 Subject content and scope of application HG2239—91 This standard specifies the technical requirements, test methods, inspection rules, marking, packaging, storage and transportation, and safe use of H06-2 iron red, zinc yellow, iron black epoxy ester primer. This standard is applicable to epoxy ester primers with epoxy resin and vegetable oil acid ester as the paint base. Iron red and iron black epoxy ester primers are suitable for coating ferrous metal surfaces; zinc yellow epoxy ester primers are suitable for coating light metal surfaces. They are also suitable for priming the surface of metal materials in coastal areas and humid tropical climates. 2 Reference standards GB1727 GB1732 GB1764 GB3186 GB5208 GB6739 GB6741 GB6750 General preparation method for paint film Determination method for impact resistance of paint film Determination method for paint film thickness Sampling of paint products Determination method for flash point of paint Rapid balance method Determination method for hardness of paint film Pencil method Uniform paint film preparation method (rotary paint coater method) Determination of density of paint and varnish Determination of grinding fineness of paint 3 Test method for storage stability of paint Determination of flow time of paint ISO flow cup Large-area brushing test of coating products GB9271 GB9273 GB9274 GB9278 GB9286 GB9750 GB9753 GB9761 3 Technical requirements Standard test panels for paints and varnishes No-marking test for paint films Determination of resistance of paints and varnishes to liquid media Temperature and humidity for condition adjustment and test of coating specimensScratching test for paint and varnish films Packaging marking of coating products Cupping test for paints and varnishes Paints and varnishes Visual colorimetry of paints The products should meet the technical requirements in the following table. Approved by the Ministry of Chemical Industry of the People's Republic of China on November 12, 1991 and implemented on July 1, 1992 W. Properties of liquid paint in container: Material state in container Density, g/mL Viscosity (No. 6 cup) S Fineness, μm Iron red, iron black Performance of dry paint film: Color and appearance of paint film Pencil hardness Impact strength, cm Scratch test, grade Cup test, mm Resistance to nitrocellulose paint Resistance to liquid media : Salt water resistance Iron red, iron black (immersion 48h) Zinc yellow (immersion 96h) Construction usability: Brushability Drying time (1000g), h No mark (23±2℃, 50±5%) No mark, (120±2℃) Storage stability: Skinning, grade Sedimentation, grade Flash point, ℃ 4 Test method 4.1 General conditions of the test 4.1.1 Sampling: in accordance with the provisions of GB3186. HG2239—91 Not less than Not less than Not greater than Not greater than Not less than Not greater than Not greater than Not greater than Not less than Not less than Not less than Not less than 4.1.2 Conditioning and test environment: According to GB9278. 4.1.3 Standard test plate: According to GB9271. Points No abnormality Iron red, zinc yellow, iron black are not fixed, the paint film is flat 2B No blistering, no expansion, no color penetration No blistering, no rust No blistering, no rust 4.1.4 Paint film preparation: According to GB1727. During arbitration, the provisions of GB3741 shall be followed. Determination of paint film thickness: According to the provisions of GB1764. 4.1.5 4.1.6 Except for the paint film color and appearance items, the test of dry film performance shall be carried out at 120±2℃ and cooled to room temperature after 1h. 4.2 Material state in container W.bzsoso:com shall be carried out in accordance with the provisions of Chapter 4 of GB3186. 4.3 Density shall be carried out in accordance with the provisions of GB6750. bzxz.net 4.4 Viscosity shall be carried out in accordance with the provisions of GB6753.4. 4.5 Fineness shall be carried out in accordance with the provisions of GB6753.1. 4.6 Paint film color and appearance HG2239-91 Perform in accordance with GB9761. During arbitration, paint shall be applied in accordance with GB6753.6. 4.7 Pencil hardness Perform in accordance with GB6739. 4.8 Impact strength Perform in accordance with GB1732. 4.9 Cross-cut test Perform in accordance with GB9286. 4.10 Cupping test Perform in accordance with GB9753. 4.11 Nitrocellulose lacquer resistance 4.11.1 Paint film preparation First spray one coat of paint and dry it before testing (the film thickness should be 23±3um). 4.11.2 Test After wet grinding, dry the prepared paint film at 60±2℃ for 30min, and then spray a layer of Q04-2 white nitrocellulose exterior enamel (viscosity is about 18s, measured according to the medium B method specified in GB1723) and observe after drying. 4.12 Salt water resistance Perform according to the medium A method specified in GB9274. Sodium chloride (NaCl, chemically pure) is prepared into a 3% (m/m) aqueous solution with distilled water. Spray a layer of paint on the treated thin steel plate, let it stand for 10-15min, and then bake it at 120±2℃ for 1h. After cooling, gently water-grit it with 320-mesh water sandpaper, bake it at 60±2℃ for 30min, take it out, cool it to room temperature, and then spray another layer of paint. Let it stand for 10~15min and bake it at 120±2℃ for 1h, and test it after cooling. The total thickness of the paint film is 45±5um. 4.13 Brushability Perform in accordance with GB6753.6. 4.14 Drying time Perform in accordance with GB9273. 4.15 Storage stability Perform in accordance with GB6753.3. The skinning test can be determined using a 250mL wide-mouth bottle. 4.16 Flash point Perform in accordance with GB5208. 5 Inspection rules 5.1 All technical requirements listed in this standard are type inspection items. Under normal circumstances, type inspection is carried out every six months, among which density, viscosity, fineness, paint film color and appearance, pencil hardness, impact strength, cross-cut test, cupping test, nitro resistance, salt water resistance, and drying time are factory inspection items. 5.2 The product shall be inspected by the inspection department of the manufacturer in accordance with the provisions of this standard. There is also a certificate of conformity, and instructions for use and precautions are attached when necessary. Wbzsoso,cOHG2239—91 5.3 The receiving department has the right to inspect the product according to the provisions of this standard. If the quality is found to be inconsistent with the technical requirements of this standard, the supply and demand parties shall jointly re-sample and re-test according to GB3186. If it still does not meet the requirements of the indicators of this standard, the product is unqualified and the receiving department has the right to return it. 5.4 The product is sampled according to GB3186, and the sample is divided into two parts, one is sealed and stored for one year for future reference, and the other is used as a sample for inspection. 5.5 When the product leaves the factory, the product packaging, quantity and marking are inspected and checked. If the packaging is damaged or leaking, the quantity is inconsistent, and the marking does not meet the regulations, it should be handled in time. 5.6 When the supply and demand parties have a dispute over product quality, the product quality supervision and inspection agency shall perform arbitration inspection. 6 Marking Carry out according to GB9750. 7 Packaging, storage and transportation 7.1 The product should be stored in a clean, dry, sealed container with a filling volume not exceeding 95% of the volume. When storing, the product should be kept ventilated, dry, and protected from direct sunlight. It should be isolated from fire and away from heat sources. When the temperature is too high in summer, efforts should be made to cool it down. 7.2 The product should be protected from rain and sunlight during transportation, and should comply with the relevant regulations of the transportation department. 7.3 The product has an effective storage period of one year from the date of production under the storage and transportation conditions of Articles 7.1 and 7.2. 8 Safety and health regulations The paint contains organic solvents such as xylene and butanol, which are flammable liquids and have certain toxicity. Attention should be paid to ventilation at the construction site, and measures such as fire prevention, anti-static and poisoning prevention should be taken. The safe operating procedures and relevant regulations for coating operations should be observed. 4 WW.bzsoso.cOmFree download of various US standard industry materials HG2239-91 Appendix A Construction reference (reference) A1 Before painting, remove the rust and oil stains on the metal surface, and then apply a layer of phosphating primer. Before construction, the paint must be stirred evenly and diluted with a mixed solvent of xylene and butanol. It can be applied by spraying or brushing. After the paint film is dry, it should be polished with water sandpaper, and then putty or topcoat can be applied after it is dry. Products that exceed the storage period can be inspected according to this standard. If they meet the technical requirements, they can still be used. A2 Additional instructions: This standard is proposed by the Science and Technology Department of the Ministry of Chemical Industry of the People's Republic of China. This standard is under the jurisdiction of the National Technical Committee for Standardization of Paints and Pigments. This standard is drafted by the Secretariat of the National Technical Committee for Standardization of Paint Products. The main drafter of this standard is Kong Xiangwen. From the date of implementation of this standard, the original professional standard ZBG51048-87 of the People's Republic of China "H06-2 Iron Red, Zinc Yellow, Iron Black Epoxy Ester Primer" shall be invalid. W. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.