GA/T 70-2004 Methods for compiling budget estimates for security engineering costs
Some standard content:
1s 13.310
People's Republic of China Public Security Industry Standard GA/T 70—2004
GA/T TO-I
Compiling method of budget for serurity & prevention engineering expenses
Published on September 22, 2004
Ministry of Public Security of the People's Republic of China
Implementation on January 1, 2005
This standard amends GA/T73·-1H1 Compilation method of budget for serurity & prevention engineering expenses: The main revisions of this standard to the original standard are as follows: GA/T 70—2004
According to the National Development and Reform Commission, the charging standards for project investment projects are set up? In accordance with the spirit of the revision of this standard in 2000, the "design fee" in the original standard has been revised; the "safety adjustment fee" in the original standard has been revised to "installation fee" in accordance with the research document issued by the Ministry of Construction in 1980. The "cost of the film has become" has been revised. We have not made specific calculations before the law to adapt to the increase in the quota of different categories. The composition of the calculation document and the content of the corresponding document are given by examples (informative appendix). This standard will replace (A/T70-1991) from the date of implementation. The requirements of the standard are for information purposes only. This standard is proposed by the National Standardization Technical Committee (SAC/TC100). The originating units of this standard are: the First Analysis Institute of the Ministry of Public Security, the Electronic Quota Station of the Ministry of Information Industry. The drafters of this standard are: Li Jiahong, He Xiji, Yi Yongsheng, Liu Baoli, Shang Si. 1 Scope || tt || Method for the preparation of budget for security and prevention engineering costs GA/T 70—2004
This standard specifies the composition and calculation methods of safety and prevention engineering before use, and is the basis for preparing the cost estimate, budget and final accounts of safety and prevention engineering. It is the basis for the bidding and calculation of engineering standards. This standard is applicable to the safety and prevention engineering of new construction, expansion and renovation (including technical transformation projects), and is applicable to ten units such as safety and prevention engineering management, design, consulting, construction, supervision, and audit. 2 Normative reference documents
The clauses in the following documents become clauses of this standard through reference in this standard. This is a reference document with a date, and all subsequent consumption documents (excluding the content of the error) or The revised versions are not applicable to this standard. However, the latest versions of these documents may be used for projects that have reached an agreement based on this standard. For any undated referenced documents, the latest versions shall apply to this standard, including the Methods for Preparing Construction Project Budgets, Provisions on Costs for Installation of Electrical Equipment (Ministry of Industry of the People's Republic of China) 11
Regulations on Design Fees for Projects (National Development and Reform Commission, Ministry of Construction and Investment Price No. L20102_11), National Unified Installation Engineering Budget Calculation Standards, and National Unified Installation Engineering Budget Calculation Rules (Ministry of Design of the People's Republic of China) [2 000] No. 60 Support]
Tendering Agency Service Charge Management Office (National Development and Reform Commission Price (2002>1U90 Card Exchange) 0.1 The general plan of relevant provisions of the project (State Price Bureau, Ministry of Construction [1972] Price and Fee No. 479) National Unified Installation Calculation Quota 3 Thirteenth Construction Materials and Energy System Equipment Installation Procedure (People's Republic of China February 25, 2003 No. 120!
3 Terms and Definitions
The following terms and definitions apply to this bid. 3.1
Engineering Cost Pre-shared Hadget forengineeringlngapenaCalculate the engineering cost from the project documents and acceptance process: 3.2
Quota
The amount and standard of consumption of various production materials (manpower, material, capital, land, time, etc.) in the process of completing a unit of qualified products,
Budget quotahaidgetmtilon
Taking each sub-project (i.e., the one that can be divided on the engineering entity) as the measurement object, stipulates the number of labor (material), equipment (instrument) and work hours consumed on the unit project, 3. 4
Site surveyimportant
Release an fee
According to the requirements of the entrustment letter, collect relevant information, formulate the fees to be charged for on-site assistance, conduct on-site survey operations, and prepare on-site survey case documents.
GA/L /0—20C4
Engineering design fee dexig expenke for engineering according to the requirements of the entrustment book: provide preliminary design documents and scheme demonstration, drawing design files, non-standard design installation documents, calculation files, practice files, etc. 3. G
Equipment quality fee rywipaent purchasing peuse fee to be deducted from the entrustment book, purchase of equipment, instruments, materials, etc. required for the project should be charged as the fee, domestic equipment, instruments, materials, software purchase equipment, natural materials, materials, teaching materials, copyright and transportation fees, etc. The cost composition is: the quality price is also the price or the price at the funding location, the equipment rights and materials, the desired parts are subject to the judgment of half the price and tariff increase, bank financial slow, foreign-funded company renewal fees, rate supervision fees, domestic transportation fees, etc. 3.7
transportation expense
the transportation cost of the required equipment, materials, machinery, software, etc. from the place of delivery of the equipment, materials, and materials from the manufacturer (from the second port of entry) to the warehouse or the storage point at the construction site. The person who purchases the equipment and materials only pays the above-mentioned capital and other related expenses. The renewal fee, service fee, set fee or complete set fee of the supplier. The equipment fee is charged according to the actual occurrence.
installation engineering installation 3.8.1 Direct costs Direct costs are composed of project costs, construction costs and workplace expenses. 3.8.1.1 Direct engineering costs The various costs incurred during the construction process and during the construction process. 3.8.1.2 Other costs Other costs incurred during the construction process other than construction costs. 3.8.1.3 Current costs Construction preparation and construction production 3.8.2 Indirect costs
Not directly caused by the construction process, but related to the overall conditions of the technology, the three shifts of the construction enterprise, and the various facilities required for the necessary production and service. 3.8.3 Profit
The profit of the construction enterprise after completing the contracted work 3.8.4 Taxes
The tax included in the construction and installation cost, maintenance tax, education and labor tax, etc. 3.9
expense fnr engineering sysitem engineering (system) inspection ticket
The unit shall pay the fees for entrusting the statutory inspection agency to implement the system inspection after the system is completed and put into operation according to the relevant provisions.
The management fee of the design unit is the necessary expenses incurred for the management of the project during the design process. Including the preparation of the project, design, case verification (demonstration), system trial operation, acceptance inspection, project handover, summary evaluation, financial accounting. It is the reasonable expense expenditure of the whole process of quality management and supervision,
lo invite tenders eapense for engineeringcring engineering bidding (co-operation) fee
The cost paid by the project construction unit for the project site standard 3. 12
Engineering supervision fee The project construction unit shall pay the fees required by the project construction unit in accordance with the standards stipulated in the contract or the agreement of the contract. 3.13
Engineering presrrve expedse engineering maintenance fee
Engineering supervision fee The time required for maintenance to ensure the correct operation of the system after the warranty period shall be paid. 3.14
erdneringsafeexpense
regular project insurance premium
the project construction process should pay the cost of the accidental disaster and the risk of the accident. 3.15
neck pipe fee
the cost of the project implementation process. The cost of the project should be increased due to the loss caused by the natural disaster and the new heat of the project. The cost of the project should be increased due to the loss caused by the natural disaster and the new heat of the project. During the construction process, the cost of equipment, labor, materials, and other equipment during the construction period will increase due to changes in the prices of machinery, instruments, and instruments, as well as changes in politics, interest rates, exchange rates, etc. The additional cost of pre-allocation
4 Calculation of security engineering costs
Site research costs
According to the electronic engineering construction budget and preparation methods, the electronic equipment and installation engineering cost quota (China Information Industry Business D--see Table 1 The rate of calculation of the frequency assistance fee is as follows: 1 million yuan × 1.1 million yuan
(53-yuan × 5 86-5.2 yuan
0u0-10,000X3.0 yuan
6 engineering design fee = 1-3.2+30=yuan, 2 yuan
4.2 engineering design fee
Our national reform and opening up of charging regulations for design, based on the design price 200 yuan) GA/T 702004
Table 2 rate to calculate engineering design fee,
ratio/10,000 yuan
10 disease
50-100
1c~2:x
san~1 x:
Case 2 Safety precautions engineering quick billing rate/%
Preliminary design
Note: The billing amount is based on: the difficult-to-control items of the post-design stage, the pre-support equipment purchase fee and the actual installation engineering fee, and the engineering design fee is calculated according to the differential rate progressive method. Take the engineering design billing bottle for 20,000 yuan, and the design fee is calculated as follows: 100,000 yuan 26.5%-0.6 million yuan
(5-1C) million yuan×6.2%-2.4E million yuan
(100-500,000 yuan×5.6%=30,900 yuan (200-100) million yuan×5.6%=58,000 yuan. 30,000 yuan 4.3 Equipment purchase fee
Equipment fee and freight shall be calculated according to the documents of the construction cost energy buried organization in the project location. 4.4 Installation engineering fee
4.4.1 Calculation of direct engineering cost
Construction drawing section calculation
According to the national unified installation project budget quota, "Yu Guojing-Installation. Engineering Budget Calculation Rules 3 (Ministry of Construction Standards of the People's Republic of China_2000 No. 60) and the unified installation project filling quota Volume 2 of the Intelligent System Installation Engineering Guidelines (Ministry of Construction of the People's Republic of China, 2003, No. 120), adopts the unified installation engineering family calculation quota, the unit price table 3 of the project, the estimated quota of the engineering project or the corresponding industry standard, 4.4.2 The calculation period of the engineering cost is calculated by the direct cost, indirect cost, and tax after calculating the installation engineering cost, 4. 5 Engineering (system) inspection fee
The project inspection fee shall be calculated by the project construction unit and the engineering inspection unit according to the relevant national or industry regulations. 4.6 Other engineering costs
Equipment unit management fee
Construction unit management fee shall be calculated according to the electronic engineering equipment pre-screening and reduction method, the neutron section equipment installation project cost standard of the Ministry of Information Industry of the People's Republic of China (H41-01-99), with the total estimated cost of 1 as the base code. Refer to the rates in Table 3 for calculation. Table 3 Engineering unit management fee rate
Total project budget/10,000 yuan
Below 500
52:-1 000
1 006-3 000
Above 3000
Cost/%
Renovation and expansion
.6.2 Engineering bidding (service) ticket
GA/T 70--2004
According to the Interim Measures for the Fee Collection of Bidding Agent Services (National Development and Reform Commission, 2002) 19A2), the rate specified in Table 1 of the bidding service shall be used to calculate the engineering bidding (service) fee. Table 4 Bidding Agent Service Fee Standards
Fees/
Both types of services
Secret bidding: 3
Winning bid amount/10,000 yuan
100 or less
60-1 0(0
1 ---5 on0
Get more bids/%
L process bid judgment/56
The fee calculated according to the rate in this table is the basic price for the whole process of bidding agency services. If the service of preparing bidding documents (including bidding documents with bid base) is offset separately, it can be charged according to the prescribed standard of 3(1%1F. The bidding agency service fee is calculated according to the differential fixed rate progressive method. The winning bid amount of the concurrent engineering bidding agency business is 10 million yuan. The calculation of the bidding agency service fee is as follows: 1×10,000 yuan×1,0%=10,000 yuan
5-1 million yuan307,000-28,000 yuan
(10050m) yuan × 0.55-2.5 million yuan
Total charge - 112,812.75 = 6.55 yuan
4.6.3 Construction supervision fee
According to the relevant notice on the determination of construction supervision fee (National Price Bureau, Ministry of Construction [1992 Second Price Bureau 179 Guide), the construction supervision fee is calculated according to the usual charges stipulated in Table 5. 5
Construction supervision fee standard
Project budget (M: 10,000 yuan
500M-1000
1000M-5 000
4.6. 4 Engineering maintenance fee
No design stage (with design bid) supervision rate
0.15-$0.20
Quhui (including 1 bidding and warranty period
Supervision fee rate 65
2. 0-. 50
According to the project system acceptance warranty period after the daytime operation period, the project maintenance fee is calculated based on the rate in Table G. Table 6 Engineering maintenance fee charging standard
The charging basis is the system equipment and materials,
Warranty period is limited to 4 yearsWww.bzxZ.net
3:~5 5. The maintenance and replacement costs of equipment and materials shall be calculated separately according to the actual cost. 4.6.5 Work insurance premiums shall be calculated according to the insurance content and relevant national regulations. Rate/GA/T 70-2004 4.7 Reserve Funds According to the special method of electronic engineering design budget, electronic equipment installation project cost determination topic 3 (the Ministry of Industry and Information Technology of the People's Republic of China [ITT1-1-1S9, vertical table, the current rate is calculated. Table 7 Reserve Funds Rates Design Director Preliminary Section Calculation The above figure is based on the total number of engineering and equipment, etc., and its overall indicators are the design unit and the construction unit. 5 The structure and content of the budget document 5. 1 The composition of the budget document
16-·15
The budget document (budget book) generally includes: cover, second cover, compilation statement, general budget table, equipment material price list, equipment safety certificate, installation cost calculation, etc. 5.2 Contents of the budget document
5.2.1 Cover
It should be stamped or signed by ten relevant persons such as the compiling unit, the preparer, the reviewer, the approver, etc. 5.2.2 Second cover
The contents should include the project date, design unit, instrumentation certificate, construction unit, compiling unit, and the deadline. 5.2.3 Preparation Description
The preparation description shall include the following project overview, preparation basis, etc. 5.2.3.11 Project overview, which shall describe the project content, nature and location, ground environment and equipment, etc. 5.2.3.2 Preparation basis, which shall describe the laws and documents approved by the preparation of the project and budget, budget quota, acceptance standards, relevant price adjustment and other related matters, etc. 5.2.4 Budget summary
The contents of the budget summary should include equipment purchase, installation, engineering costs, design fees, testing costs, preliminary preparation costs and total cost of the project.
5.2.4.1 Equipment purchase and testing
The calculation of equipment purchase and testing costs includes equipment quotation and transportation costs. 5.2.4.2 Installation engineering cost
5.2.4.2.1 The cost calculation table of the installation engineering should be marked with the number, material cost, machine cost, instrument cost, unit, quantity, total, etc.
5.2.4.2.2 The calculation table of the installation engineering should be used. 5.2.4.3.
5.2.4.4 Engineering (system) testing costs.
5.2.4.5 Other expenses for equipment.
5.2.4.6 Preparation.
5.2.4.7 Total cost:
5 Budget example for security projects
See the attached budget example.
Among them, A,- is the cover example;
A.2 is the start-up example. Example:
A,3 is the preparation instructions example: Take the Beijing second-stage budget for the project as an example A.4 as the budget summary example;
A.5 is the equipment and equipment quotation list example 1
A,1 is the cost calculation process table for each installation process: Take the Beijing project cost calculation example. GA/T70—2C04
A. is the calculation table for equipment installation engineering: taking the engineering cost quota of the Ministry of Information Industry as an example, AB is the calculation table example of direct cost of installation engineering GA/T 70-2004
A1 Cover
Appendix A
(Attachment:
Example of cost sheet of security protection engineering
Budget of a certain security protection system project
Audit:
(Compilation unit)
A.2 Cover 2
Key points:
Construction unit,
Design unit:
Construction unit,
Abstract unit:
GA/T 70—2004
GA/T 702004
A.3 Preparation Instructions
2 Project Overview
1.1. Project location:
纟,Project content:
,Preparation basis
Preparation instructions
! ,China Public Security Industry Standard (A/7 1202 Safety Prevention 1. Old Cost Overview Institute of the University of Science and Technology 32. Beijing Municipal Construction Engineering Committee (Heart 1 Single Release Beijing Continuous Collection Cost Quota. Beijing Municipal Planning Committee () issued the fourth volume of Beijing Construction Engineering Budget Quota "Electrical Engineering Type\, sub-items, equipment and equipment missing in the Beijing Municipal Construction Engineering Budget Quota, add a filial piety before the sub-item quota abbreviation: (Shou Feng Information Industry Department 1 Project Notes Pre-set No. 1 Quota||. (Other topics that need to be mentioned)
Shen: Chuang Laichuan Beijing Construction Engineering in the new budget quota.