SY 5467-1992 Specification for casing string pressure testing

Basic Information

Standard ID: SY 5467-1992

Standard Name: Specification for casing string pressure testing

Chinese Name: 套管柱试压规范

Standard category:Oil and gas industry standards (SY)

state:Abolished

Date of Release1992-06-30

Date of Implementation:1992-12-01

Date of Expiration:2008-03-01

standard classification number

Standard Classification Number:>>>>Drilling Engineering

associated standards

alternative situation:Replaced by SY/T 5467-2007

Publication information

other information

Introduction to standards:

SY 5467-1992 Casing String Pressure Test SpecificationSY5467-1992 Standard download decompression password: www.bzxz.net

Some standard content:

SY5467-92, Petroleum and Natural Gas Industry Standard of the People's Republic of China
Casing String Pressure Test Specification
1992-06-30 Issued
Ministry of Energy of the People's Republic of China
1992-12-01 Implementation
Subject Content and Scope of Application
Casing String Pressure Test Specification of Petroleum and Natural Gas Industry Standard of the People's Republic of China
This standard specifies the time, method, index, organization and implementation of the pressure test of oil and gas casing. This standard is applicable to the full-lift casing string pressure test after the casing of each layer of oil and natural gas is cemented. 2 Pressure test time
The surface casing string shall be pressure tested 24 hours after the cementing is completed. 2.2 The pressure test of the technical casing string and the production casing string shall be carried out after the sound amplitude is measured. Pressure test method
$Y 5467--92
The height of cement in the casing string of the pressure test shall meet the design requirements. Use parallel port pressure test tool to connect parallel port to test casing internal pressure. The original drilling fluid is used as the pressure test fluid for the layer casing and technical casing string. 3.25
The production casing string test fluid is free state, but the original drilling fluid in the casing is not replaced. 3.32
The production casing string pressure test tool uses cement head to load pressure test joint. The surface casing string and technical casing string pressure test use blowout preventer, cement head or pressure test joint. 3.6 The pressure test equipment uses cement truck or other pressure test equipment. The surface casing hanger, technical casing and core casing string are all the test beds of the well casing. 3.7
4 Pressure test index
When the production casing string is produced, the pressure test index of the casing is not more than 20MPa 4.1
4.1.1 The surface casing string is tested at 6MPa, and the pressure drop is less than 0.5Mpa in 30min, which is qualified. 4.1.2 The pressure test of technical casing string shall comply with the provisions of the table. Table 1
Casing outer diameter
177.80~193.67bzxZ.net
219.07--244.47
273.05~~339.72
Test pressure resistance
4.1.3 The pressure test of production casing string shall comply with the provisions of Table 2. 4.2 When the production casing is used for production, the casing pressure is greater than the test pressure index of 20MPa. 4.2.1 The surface casing string pressure test shall comply with Article 4.1.1. 30min pressure drop
4.2.2 The pressure test pressure of technical casing string and production casing string is equal to 70% of the minimum internal pressure strength of the casing. During the pressure test, the pressure is stabilized for 30min, and the pressure drop is allowed to not exceed 0.5MPa.
Organization and implementation of pressure test
$Y 5467-92
Test pressure
Jiangxi steam well
30min pressure peak
5.1 The drilling team's engineering and technical personnel are responsible for the pressure test of the layer casing string and the technical casing string, and make records, sign them and fill them in the book history. 5.2 When the casing string is tested with dust, the drilling team engineering and technical personnel shall be responsible for the pressure test, and the geological technicians shall be on-site to supervise and fill in the pressure test record form, and both parties shall sign and fill in the record. 5.3 For drilling teams that implement the joint management system of Party B, Party B shall organize the pressure test, and the Chinese party or Party A's entrusted representative shall supervise on-site, fill in the form at the end of the pressure test, and both parties shall sign.
5.4 The content and format of the pressure test record form are shown in Table 3. Table 3 Pressure Test Record Form
Pressure Test Equipment
Pressure Test End
Team Technician:
Additional Notes:
Pressure Medium
Pressure Test Initial
Team Geologist:
This standard is proposed and submitted by the Petroleum Drilling Engineering Professional Standardization Committee. This standard was drafted by the Drilling Engineering Company of Dagang Shihong Administration. The main drafters are Ling Kexin, Shi Xiaopei, and Xiu Liuyong. ?a
Test date
Pressure test start time
Pressure test end
A pollution blue:
This standard continued to be valid after the review in 199
, and the review result has been approved by the State Bureau of Petroleum and Chemical Industry.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.