title>HG/T 20637.6-1998 Preparation of instrument technical specifications - HG/T 20637.6-1998 - Chinese standardNet - bzxz.net
Home > HG > HG/T 20637.6-1998 Preparation of instrument technical specifications
HG/T 20637.6-1998 Preparation of instrument technical specifications

Basic Information

Standard ID: HG/T 20637.6-1998

Standard Name: Preparation of instrument technical specifications

Chinese Name: 仪表技术说明书的编制

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1998-06-22

Date of Implementation:1999-01-01

standard classification number

Standard ICS number:Mechanical Manufacturing>>Industrial Automation Systems>>25.040.40 Measurement and Control of Industrial Processes 71.010

Standard Classification Number:Engineering Construction>>Industrial Equipment Installation Engineering>>P94 Metal Equipment and Process Pipeline Installation Engineering

associated standards

Publication information

other information

Introduction to standards:

HG/T 20637.6-1998 Preparation of Instrument Technical Specifications HG/T20637.6-1998 Standard download decompression password: www.bzxz.net

Some standard content:

Preparation of Instrumentation Specification
Preparation of Instrumentation SpecificationHG/T20637.6—1998
Preparation Unit: China Huanqiu Chemical Engineering Corporation Approval Department: State Administration of Petroleum and Chemical Industry Implementation Date: January 1, 1999 Preparer:
Wang Dazheng
Reviewer:
Li Nenghai, Cai Dongzhu, Xie Changjie, Duanmu Xian
1 General Principles
1.0.1 In order to normalize and standardize the content and format of instrumentation specifications, and to put forward clear and unified requirements for common contents, so as to achieve consistent style and avoid omission of contents, this regulation is specially formulated to guide the preparation of instrumentation specifications.
1.0.2 This regulation applies to the technical specifications of various products prepared by the automatic control profession for the procurement of testing instruments, control systems and equipment, actuators, instrument accessories and installation materials such as pipes, pipe fittings, cables and wires. 365
2 Content and preparation requirements
2.1 Content
The content of the instrument technical manual shall at least include the following five aspects 2.1.1
-Purpose;
Standards and specifications;
Technical requirements;
-Inspection and experiment;
-Spare parts and consumables.
2.2 Preparation requirements
The preparation of the instrument technical manual shall be prepared according to the characteristics of each type of instrument. This regulation only summarizes the common content of each type of instrument and its preparation requirements are as follows. 2.2.1 “Purpose” shall at least state the following: 1 “Instrument Design Specifications” and “Instrument Data Sheet” attached to the purchase order and the specifications and standards specified in the instrument technical manual shall serve as technical requirements for the design and manufacture of instrument products together with the manual; 2 Once there is any inconsistency between the above documents, the following sequence shall be followed: 1. Instrument data sheet;
1. Instrument technical manual;
1. Instrument design specifications;
1. Standards and specifications.
It shall be noted here that the paragraphs marked with the symbol “×” in the symbol “” of this document are the basic requirements of the purchaser.
2.2.2 “Standards and specifications” shall state that the relevant standards and specifications that should be followed in the design and manufacture of such products shall be the current versions, and the numbers and names of the standards and specifications that can be selected shall be listed. In addition, the following standards and specifications should be specified as needed: 366
- pipe thread;
- flange and fasteners;
- enclosure protection grade;
- explosion-proof requirements.
2.2.3 "Technical requirements" should be written according to the specific requirements of various instruments, control equipment, actuators and other products. You can refer to the attached template and describe its unique technical requirements as completely as possible for designers to choose for specific projects.
In addition, the following requirements should be selectively stated (and modified and supplemented if necessary) according to the characteristics of each type of product:
The measurement part includes the following contents:
-Accuracy grade;
-Measurement unit;
Dial size and scale;
-Material;
-Connection method;
-Output signal;
2The electrical part includes the following contents:
Power supply;
-Explosion-proof structure;
-Wiring box;
-Output indicator.
3 The pneumatic part includes the following contents:
-pneumatic signal;
-matching air source device (pressure reducing valve with air filter and output meter): -air source interface;
-pneumatic pipe and fittings;
-enclosure protection grade;
-output indication meter;
-remote indication meter (secondary meter)
Accessories (for those instruments that require matching accessories) the specifications and technical requirements of the required accessories should be listed one by one, otherwise this item can be cancelled. 5 Climate and environmental protection include the following contents: 1) The instrument provided by the supplier shall have climate protection measures to meet the climate conditions listed in the purchase request (REQUISITION)
2) State the environmental conditions where special protection measures should be taken, such as: the atmosphere contains ammonia, sulfide oxygen and other corrosive gases, for the designer to choose, 3) The supplier shall propose detailed countermeasures for the climate and environmental conditions specified in the purchase request, and provide them together with the quotation.
6 The surface color shall indicate whether it adopts the supplier's standard or the color specified by the project. 7 The identification shall indicate that the nameplate fixed on the instrument housing shall be engraved with the position number, model, rated value, material and explosion-proof grade. The material of the nameplate shall be anti-corrosive metal, and it shall be indicated that the nameplate can be made and fixed according to the accessories (accessory number and name).
8 Shipping preparation shall indicate:
1 The threaded interface shall be blocked with a suitable protective device, and temporary blockage and permanent metal blockage shall be easy to distinguish.
2 Flanges and threaded joints should be protected to prevent damage and/or foreign matter from entering. 2.2.4 "Inspection and test" should state the following: 1 "Inspection and test items" should list the number and name of the purchaser's inspection standard, the supplier's standard, and the "Inspection and test items" listed in 2.2.4 of this technical specification for selection. 2 "Inspection and test procedures and acceptance criteria" should state the standards specified by the purchaser and the supplier's standards for selection.
3 Items for inspection and testing witnessed by the purchaser The purchaser's standards, inspection and test items (i.e. Table 2.2.4) and the purchaser's right to witness the inspection and testing of the product in the manufacturer's workshop should be stated here for selection.
In addition, the contents of Table 2.2.4 should be listed here, and the symbols in Table 2.2.4 should be explained. The format and symbol explanation of Table 2.2.4 are usually as follows (according to the category of specific products, its inspection and test items can be reasonably adjusted).
×××x
Note: 0
Inspection and test by the manufacturer
-Daily impact test by the purchaser
Inspection and test items
△Inspection and test report submitted by the manufacturer;-All inspection;
S—Sampling inspection (10% of the same type and pressure level) Test
High voltage
2.2.5 "Spare parts and consumables" Here, the spare parts and consumables for installation and commissioning within a to-be-determined time and the spare parts and consumables for production within a to-be-determined time shall be stated respectively. In addition, the following shall be stated: 1 It shall also be stated that the supplier shall prepare and submit the above-mentioned spare parts list and consumables list. 2 For spare parts of certain products, if there are provisions in the contract with the customer or requirements in the design, they can also be stated in the form of Table 2.2.5 "Spare parts selection table". 1) The supplier shall prepare and provide a list of spare parts and consumables for use within the following specified time periods according to Table 2.2.5\Spare Parts Selection Table; 2) The supplier may adjust the variety and quantity in the "Spare Parts Selection Table" based on its own experience, but the adjustment should be minimal.
List the list of spare parts and consumables for the monthly installation and commissioning phase. List the list of spare parts and consumables for the annual normal production operation phase. 369
Spare Parts The format and description of the spare parts selection table are as follows. Table 2.2.5 Spare parts selection table
For production operation
Instrument name and
Parts name
(Instrument name)
Assembly parts
Machine parts
(Instrument name)
Assembly parts
Machine parts
P: Parts
For installation
and commissioning
Note :①The supplier can determine the products and their quantities based on experience and process conditions. ②N is the number of instruments.
Minimum quantity
INST.102—101
INST.102-—102
INST.102-103
INST.102—104
INST.102-105
INST.102-201
INST.10 2--202
INST.102--203
INST.102—204
INST.102-205
INST.102-206
INST.102—207
INST.102—208
INST.102-209|| tt||INST.102—-301
INST.102-302bzxz.net
Appendix A
Instrument Panel
Instrument Technical Specifications Catalog
Distributed Control Systems (DCS)
Programmable Logic Controllers (PLC)
Controllers and Panel and/or Rack-mounted Instruments
Flash Alarms
Differential Pressure Flow Elements
Variable Area Flow Meters
Positive Displacement Flow Meters
Mass Flow Meters
Vortex Flow Meters
Turbine Flow Meters
Electromagnetic Flow Meters
Anuba Flow Meters
Flow Switches
Glass Level Meters
Magnetic Float Liquid Meters Bitmeter
INST.102--303
INST.102-304
INST.102-305
INST.102-401
INST.102-402
INST.102-501
INST.102-502
INST .102—503
INST.102-601
INST.102-602
INST.102—603
INST.102-701
INST.102-- 702
INST.102—-703
INST.102—801
INST.102-901
Float-type liquid level gauge
Storage tank liquid level gauge
Liquid level switch
Pressure gauge/pressure switch
Pressure, differential pressure transmitter and local controllerThermometer
Temperature measuring element and thermowell
Temperature switch
Gas detection instrument
Conductivity meter
Safety relief valve
Control valve
Desuperheater
Industrial television system
Instrument cable
INST.102--902
INST.102-903
INST.102-904
Copper pipe cable and polyethylene pipe cable
Instrument pipe and pipe fittings, valves
Cable tray
(Name of design unit)
1.1 Purpose
Appendix B Instrument panel technical specification
Project name
PROJECT
Instrument technical specification
Contract number
1.2 Scope of supply and scope of work
Deviations from procurement requirements
Supplier’s responsibilities
1.5. Standards and specifications
Legends and symbols
Climatic conditions
Inspection and testing
Spare parts and consumables
Calibration equipment and tools (including special tools) Supplier’s guarantee||tt| |Supplier's On-site Service
General Technical Requirements
General Principles·
2.3 Structure
2.4 Painting
2.5 Power Supply and Wiring
2.6 Alarm
2.7 Specification of Wiring Color
Alarm Operating Procedure
DESCRIPTION
Sub-item Name
SUBPROJECT
Document No.
Design Phase
Page 1 of 17
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.