Some standard content:
Chemical Industry Standard of the People's Republic of China
HG2237—91
A01-1, A01-2 Amino Baking Varnish
Published on November 12, 1991
Ministry of Chemical Industry of the People's Republic of China
Implemented on July 1, 1992
Chemical Industry Standard of the People's Republic of China
A01-1, A01-2 Amino Baking Varnish
1 Subject Content and Scope of Application
HG/T 2237—91
This standard specifies the technical requirements, test methods, inspection rules, marking, packaging, storage, transportation and safe use of A01-1 and A01-2 amino baking varnish. bZxz.net
This standard is applicable to coatings composed of alkyd resin, amino resin and organic solvent. The coatings specified in this standard are applicable to the finishing of metal surfaces coated with various colors of amino baking varnish or epoxy baking varnish. 2 Product classification
A01-1 The paint film is full and flexible;
Light color, high hardness and good gloss.
3 Reference standards
GB1721
GB1727
GB1730
GB1732
GB1740
GB1764
GB1765
GB1771
GB1922
GB3186
GB5208
GB6682
GB6741
Appearance and transparency test of varnish, clear oil and thinner General preparation method for paint film
Determination method for paint film hardness Pendulum damping test
Determination method for paint film impact resistance
Determination method for paint film moisture and heat resistance
Determination method for paint film thickness
Preparation method for paint film for moisture and heat resistance, salt spray resistance, weather resistance (artificial acceleration) Determination method for paint film salt spray resistance
Solvent oil
Sampling of paint products
Determination method for paint flash point Rapid balance method
Laboratory water specification
Uniform paint film preparation method (spinning paint coater method) GB6753. 4
GB9271
GB9273
GB9274
GB9278
GB9281
GB9286
GB9750
GB9753
GB9754
Determination of paint outflow time ISO flow cup method paint and varnish standard test plate
Paint film no mark test
Determination of paint and varnish resistance to liquid media
Coating sample state adjustment and test Temperature and humidity of paints and varnishesGardner color grade for evaluating color of transparent liquidsScratch test for paint and varnish films
Paint product packaging marking
Cupping test for paints and varnishes
Determination of specular gloss at 20°, 60° and 85° of paint films without metallic pigmentsPaints and varnishes
Approved by the Ministry of Chemical Industry of the People's Republic of China on November 12, 1991 and implemented on July 1, 1992
Wbzsoso,cO4Technical requirements
The products should meet the technical requirements in the following table.
Properties of liquid paint:
State of material in container
Original paint color, No.
Original paint appearance and transparency
Viscosity (No. 6 cup) s
General properties of dry film:
Appearance of paint film
Impact strength, cm
Hardness, s
Adhesion, grade
Cup test, mm
Gloss (20℃)
Liquid medium resistance:||tt ||Water resistance (immersed in GB6682 grade 3 water for 36h)Gasoline resistance (immersed in GB1922,120 solvent oil for 48h)Moisture and heat resistance (7d), grade
Salt spray resistance (7d), grade
Construction and usability:
Drying time (110±2℃, 1000g), hFlash point, ℃
5 Test method
5.1 General conditions of the test
5.1.1 Sampling shall be carried out in accordance with the provisions of GB3186. HG/T2237—91
Not greater than
Not less than
Not small hand
Not less than
Not less than
Not less than
Not greater than
Not less than
5.1.2 Conditioning and test environment shall be carried out in accordance with GB9278. 5.1.3 Standard test panels shall be prepared in accordance with GB9271. A01-1
No abnormality
No mechanical impurities, transparency level 1
Smooth and bright
No blistering, slight changes are allowed, can be restored within 3 hoursNo blistering, wrinkling, no falling off, slight color change is allowed1
5.1.4 Plate preparation shall be carried out in accordance with the method specified in GB1727, and in arbitration in accordance with GB6741. 5.1.5 Determination of paint film thickness shall be carried out in accordance with GB1764. 5.1.6 When testing the performance of the paint film in the technical requirements, the paint film should be sprayed, dried under the drying conditions (110±2℃, 1.5h), and then placed under constant temperature and humidity conditions for 0.5~1h before testing.
5.2 Material state in the container
Perform the test in accordance with Chapter 4 of GB3186.
5.3 Original paint color
Evaluate the test in accordance with GB9281.
W.5.4 Original paint appearance and transparency
Evaluate the test in accordance with GB1721.
5.5 Viscosity
Perform the test in accordance with GB6753.4.
5.6 Appearance of the paint film
Observe the test under natural sunlight.
5.7 Impact strength
Perform the test in accordance with GB1732.
5.8 Hardness
According to the provisions of Koenig pendulum in GB1730. 5.9 Adhesion
HG/T2237-91
According to the provisions of GB9286 (cutting spacing 1mm), stick the drawing adhesive tape on the area of the orthogonal cut of the grid, and press it steadily with your fingers three times to make it completely adhered, and remove the tape within 1 to 5 seconds for observation. 5.10 Cupping test
According to the provisions of GB9753.
5.11 Gloss
According to the provisions of GB9754.
5.12 Liquid medium resistance
According to the provisions of GB9274.
5.13 Moisture and heat resistance
According to the provisions of GB1740. Plate making is carried out according to the provisions of GB1765. 5.14 Salt spray resistance
Perform according to GB1771, and plate making shall be carried out according to GB1765. 5.15 Drying time
Perform according to GB9273.
5.16 Flash point
Perform according to GB5208.
6 Inspection rules
6.1 All technical requirements listed in this standard are type inspection items, among which the original paint color, original paint appearance and transparency, viscosity, drying time, paint film appearance, impact strength, hardness, adhesion, cupping test, gloss and water resistance are factory inspection items. Under normal production conditions, type inspection is carried out once every six months, among which the cupping test is for the first batch or the first batch of continuous batches. 6.2 The product shall be inspected by the inspection department of the manufacturer in accordance with the provisions of this standard and shall be issued with a certificate of conformity, and instructions for use and precautions shall be attached when necessary.
6.3 The receiving department has the right to inspect the product according to the provisions of this standard. If the quality is found not to meet the technical requirements of this standard, the supply and demand parties shall jointly re-sample and re-test according to GB3186. If it still does not meet the technical requirements of this standard, the product is unqualified and the receiving department has the right to return it.
6.4 The product is sampled according to GB3186, and the sample should be divided into two parts (one is sealed and stored, and the other is used as a sample for inspection). 6.5 When the product leaves the factory, the product packaging, quantity and marking shall be inspected and checked. If the packaging is damaged or leaking, the quantity is inconsistent, or the marking does not meet the regulations, it shall be handled in time. 6.6 When the supply and demand parties have a dispute over product quality, the product quality supervision and inspection agency shall perform arbitration inspection. 7 Marking
Carry out according to the provisions of GB9750.
W8 Packaging, Purchasing, Storage and Transportation
HG/T2237—91
8.1 The product should be stored in clean, dry and sealed containers, with the filling volume not exceeding 95% of the volume. When storing, the product should be kept ventilated, dry, and protected from direct sunlight. It should be isolated from fire and heat sources. When the temperature is too high in summer, efforts should be made to cool it down. 8.2 When transporting the product, it should be protected from rain and sunlight, and should comply with relevant regulations. 8.3 The product has an effective storage period of one year from the date of production under the storage and transportation conditions in accordance with Articles 8.1 and 8.2. 9 Safety and Health Regulations
This paint contains organic solvents such as xylene and butanol, which are flammable liquids and have certain toxicity. Attention should be paid to ventilation at the construction site, and measures such as fire prevention, anti-static and poisoning prevention should be taken. The safe operation procedures and relevant regulations for coating operations should be followed. 4
W.bzsoso.cOmHG/T2237—91
Appendix A
Construction Reference
(Reference)
A1 The construction is mainly spraying. The paint should be stirred before construction. The thinner can be ZBG52003X-4 amino thinner or a mixed solvent of xylene and butanol (4:1).
A2 When used as a glazing, the paint film on the surface of the object to be coated should be gently polished and cleaned with sandpaper before use. A3 To make the paint film bright and full, the baking temperature should not be too high. A4 After spraying, the construction parts must be left to stand for more than 5 minutes before baking. Additional notes:
This standard is proposed by the Science and Technology Department of the Ministry of Chemical Industry of the People's Republic of China. This standard is under the jurisdiction of the National Technical Committee for Standardization of Paints and Pigments. This standard is drafted by the Secretariat of the National Technical Committee for Standardization of Paint Products. The main drafter of this standard is Sun Jiaqi.
From the date of implementation of this standard, the original professional standard ZBG51042-87 "A01-1, A01-2 Amino Baking Thousand Varnishes" of the People's Republic of China will be invalid.
W.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.