title>JB/T 10344-2002 Power head drilling rig - JB/T 10344-2002 - Chinese standardNet - bzxz.net
Home > JB > JB/T 10344-2002 Power head drilling rig
JB/T 10344-2002 Power head drilling rig

Basic Information

Standard ID: JB/T 10344-2002

Standard Name: Power head drilling rig

Chinese Name: 动力头式钻机

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release2002-07-16

Date of Implementation:2002-12-01

standard classification number

Standard ICS number:Mining and Mineral Products >> 73.100 Mining Equipment

Standard Classification Number:Mining>>Mining Machinery and Equipment>>D92 Mining Equipment

associated standards

Publication information

publishing house:Mechanical Industry Press

other information

Focal point unit:National Mining Machinery Standardization Committee

Publishing department:National Mining Machinery Standardization Committee

Introduction to standards:

This standard specifies the type, basic parameters, test methods, inspection rules, marking, packaging, transportation and storage of hydraulic power head drilling rigs. JB/T 10344-2002 Power head drilling rigs JB/T10344-2002 Standard download decompression password: www.bzxz.net

Some standard content:

ICS73.100
Machinery Industry Standard of the People's Republic of China
JE/T10344—2002
Puwer head drill
Published on July 16, 2002
Implemented on December 1, 2002
Published by the State Economic and Trade Commission of the People's Republic of China
2 Reference documents
3 Types and basic parameters
3.3 Basic parameters
4 Technical requirements
4.1 Basic requirements.
4.2 Environmental adaptability requirements
Motion requirements
Technical requirements for main components
Safety and dust protection requirements
4.6 Painting requirements
Suitability:
5 Test methods.
Test preparation
No-load running test
Load test
Noise test
Inspection of filtration system
6 Inspection specifications!
Inspection classification…
Factory inspection…
Type test
7 Marking, packaging, transportation and storage
7.4 Items
JB/T10344-2002
JE/T10344-20Q2
This standard is proposed by China Machinery Industry Federation. Foreword
This association promotes the National Technical Committee for Standardization of Mining Machinery: SACTC8). Standard drafting unit: Manyang Mining Machinery Engineering Design Institute, this standard is mainly drafted by: Zhang Luzhao, Xia Zhanjun, Maosong, Sun Haisheng, Ma Kui, Yang Huali. 1 Scope
Power head type drilling rig
JB/T10344—2002
This standard defines the type, basic parameters, technical requirements, testing methods and operation, inspection rules, marking, packaging, operation specifications and storage of hydraulic power head type drilling rigs.
This standard applies to hydraulic square head type drilling machines (hereinafter referred to as simple stable drilling machines). The table drilling machines are used to produce small and medium diameter and light and large holes, suitable for rock formations with impact and uniaxial extreme tensile strength of not less than 20MPa, and the (hole) diameter is 1mm, the (hole) is vertically offset and the compensation angle is within 20” (hole: 2 standards). The following documents are cited in this standard and become the referenced documents of the period. All subsequent amendments (excluding errata) are not applicable to this standard. However, it is encouraged to reach or set various standards based on this standard. The value rate shall not refer to the latest edition of these documents. For any document not marked with an H date, the latest edition of the applicable technical standard shall apply. GB11095 New involute gear - Part 4: Gear tooth tolerances - Part 2: Specifications and approximations for radial misalignment and radial vibration. GB11328-2: 1997: GBT11345 [989 Steel seam ultrasonic inspection method and inspection result classification [GH/ 13306-199] JB/T S000.12-1008 Resistant coating for mechanical applications JErT S00.15—[998
Vertical machinery general technical conditions general parts no price according to the inquiry: JT69961993
Three-certificate recovery system reverse use technical conditions 3 types and basic effects
3.1 type
Drilling fluid dynamic station, drill frame, slide, dynamic head, bottom plate, drilling tools and mud circulation system, etc.: adopt case lubricating machine or electric motor to drive hydraulic pressure, The motor drives the power head to directly pull the drilling tool. The mountain must be completed to improve the efficiency of the station, and the ball pressurization is used for two types of drilling: non-falling gas lifting and reverse ring ticket. The station can be installed with a cabinet, and the platform can be installed on the 3.2 model
3.3 basic difference
The basic integer of the drilling rig is shown in Table 1. Model
Drilling deep safety
Drilling well use
o ·20
Rated wellbore diameter, single-axis
inclined (hole)
power head type
one drill ()
rotating spring N·t
lifting capacity
pressurized energy knife
2·200
IB/T 10344 2002
station well A diameter m
A+X?-15
AD (×) 20
AD(×-30
AD×40
4 Technical requirements
4.1 Basic requirements
Well depth
Table 1 continued)
Drilling angle
Bucket lifting capacity
4.1.1 The drilling rig shall comply with the provisions of the standard and be manufactured according to the drawings and technical documents approved by the prescribed procedures.
4.1.2 The standard parts, non-standard parts, materials and accessories that can be used to manufacture the drilling rig shall comply with the requirements of the current relevant national standards and industry standards.
All technical requirements for casting, forging, processing, inspection and assembly that are not specified in this standard shall comply with the requirements of the relevant national standards and industry standards.
4.t.4: The drilling structure shall be easy to assemble and move, and convenient and accurate for the selection of cores and accurate storage. 4.1.5 The storage system should be convenient for general maintenance and replacement of wearing parts on site. 4.1.6 The hydraulic pipes and cables of the drilling rig should be neatly arranged and replaced during transportation and relocation. 4.2 Environmental adaptability requirements
The drilling rig should be able to work normally in the following environment: a) Ambient temperature: -20℃-45℃
b) Travel distance not exceeding 2000m
) Wind speed should not exceed 4.3 Mechanical requirements
4.3.1 The drilling rig should meet the following requirements
a) The pressure of the drilling tool should be adjustable in steps; b) The speed of the drilling tool should be adjustable in steps; c) The drilling tool should be convenient for connecting and hanging porcelain; d) The drilling rack should be able to open enough space for the drill bit to pass through; e) The drilling rig shall have the function of closed and parallel port. 4.3.2 The drilling rig shall be equipped with a storage device for segmental tools and small spare parts. 4.4 Technical requirements for ten major parts
4.4.1 Drill rig and slide
4.4.1.1 The distance between the drill rig and the slide shall not be greater than 3mm. The welded layer of the column shall have a deformation tolerance of 2mm within a length of 2m.
4.4.1.2 When subjected to maximum working pressure, the deformation of the drill rig (the center of the rotation of the projecting part) shall not exceed 25mm.
4.4.2 Power head
4.4.2.1 The gear accuracy shall not The requirements of B/I009.1~2-20 are met. 4.4.2.2
The internal parts, gear details and shaft parts shall be tested by non-destructive testing in accordance with the provisions of BT5000.1S-1008. The test results shall not be obtained at the [1st level quality requirement. No numbness or filling shall be required after mailing.
JG/T10344-2002
4.42.3 The transmission parts shall maintain the smoothness. The bearings and necessary parts shall be kept at a high temperature of 75℃. There shall be no leakage, mud or water leakage at all sealing parts.
4.4.2.4 After assembly, the air channel shall adopt 1MPa/downward air inlet sealing test: 20m/downward air inlet sealing test shall not exceed 4.4MPa. .5 Base
Type: The base should be able to adapt to the width of the lead (hole) and (dead) two extension postures: The walkway of the base should be able to follow the drilling of the bacteria well (hole: When drilling, the bottom seat capacity and the base support shell should serve the reaction force 4.4.4 Aluminum tools
4.4.4.1 The pin tool is equipped with a station guide, and a stabilizer should be provided when the incline meter (ritual) is measured. 4.4.4.2 The drill length should be greater than 1m: The straightness tolerance should be greater than 1.5mm, and the joints at both ends should have a degree tolerance of no more than mm.
4.4.4.3 The welding process should be inspected and tested, and the new inspection should be controlled by C3/3451989 City A-level inspection, strict crown, etc. The level shall not be reduced to the lower level, and the joint stress shall be eliminated. 44.4.4 The air belt on the drill pipe shall be tested for air leakage at 1MP, and no leakage shall occur. 4.4.4.5 The flanges between the hydraulic pump, the drilling head and the drilling head shall be interchangeable. 4.4.5 Hydraulic system
4.4.5.1 The hydraulic system shall comply with the standard of Taiwan/B/6996-1993. 4.4.5.2 The hydraulic system shall be able to achieve both pressurized and reduced drilling. 4.4.5.3 The hydraulic system shall be able to adjust the pressure, drilling speed and rotation speed within the rated range. 4.4.5.5 The oil level indicator should be installed on the oil level pin and connected to the electronic control system to automatically alarm when the minimum pressure is reached. 4.5.6 The temperature rise of the oil in the oil tank should not exceed 35℃ and should not exceed 65℃. 4.5.7 The hydraulic system should have an oil protection function. 4.4.5. The oil cleanliness of the hydraulic system shall not be lower than that of the contamination level of 1916. 44.6 Electrical system
The electrical control system of the drilling rig shall have reliable overload and short-circuit protection functions: the electric control system shall be fixed in place and have good resistance to change:
44.7 Operation control system
4.4.7.1 The operation of the drilling rig shall be carried out in the engine room, and other operating tables outside the operating room shall be used for necessary operations.
4.4.72 The operating table shall be equipped with a station that can record the main operating status of the drilling rig and the main drilling operations (including voltage, current, speed, etc.) and indication signals.
4.4.7.3 The operating mechanism of the drilling rig shall be equipped with a label that explains its purpose and the actual operation direction of the system. 4.5 Safety Hygiene requirements
4.5.1 The electrical housing of the needle machine should be reliably grounded, and the grounding resistance should not be greater than 4 Ω. 4.5.2 All electrolytic devices on the machine should have 5 devices..453 All electrical buses on the temporary machine should not be F dream stocks. Multi-core soft frequency, 4.5.4 The new machine should have an "emergency stop button" for 2-3 hours in the control and fuselage positions. 4.5.5 The limit system circuit should be equipped with a safety circuit 4.5.6 The lifting and lowering cylinder: the hydraulic stop of the driving head, the hydraulic cylinder of the drilling rack tilting material, the hydraulic cylinder of the turning flange and the hydraulic stop of the liquid currency holder should be able to stop at any position and reliably. 4.5.7 The maximum lifting force of the drilling rig should not be less than 1.3 times of the rated belt lift. Under the full maximum lifting force, other mechanisms: working belt.
4.5.8 Drilling When the machine drills with an inclined hole, the inclined square should be held by hand under any working condition. m/T10344-2002
4.5.9 The drilling rig can withstand 15% rated short impact load, 4.5.10 The working noise at 5m away from the drill should not exceed 95dB (A). The driver's room is equipped with a temperature control device: its temperature should be controlled within 15℃28℃.
4.6 Painting requirements
The painting of the lead hanger should comply with the provisions of JB/T50X.12-1998. 4.7 Inspection
The scope of supply of the inner sleeve of the drilling rig includes:
) Main machine and 50m drill pipe:
b) Random accessories:
Central dedicated maintenance work point,
5 Test method
5.1 Test preparation| |tt||5.1.1 The test drilling rig shall be equipped with technical documents such as the instruction manual and the test outline. 5.1.2 Before the test, the temporary machine shall be fully adjusted and put in working condition. 5.1.3 The test shall be carried out under the working environment specified in the standard. 5.2 Air-conditioning operation test
Start the pliers and check the operation status of the power system. The time should be at least 10 [0min: The drilling rig shall be vertically and horizontally three times to measure the material concentration pressure and the hydraulic pressure of the cover. The hydraulic cylinder and the hydraulic regulator of the moving head shall be locked. Observe the operation status and check whether it can reach the designed position: () Operate the moving head to rotate: Check the speed adjustment function of the vehicle in the reverse direction within the rated speed range. The time return shall not be less than 10min: The power head is stable and there is no periodic impact and abnormal noise. Operate the main hydraulic stop, observe the fast lifting, lowering and slow feeding: the hydraulic pressure and the two pressure steps, there should be no slow running phenomenon after the pressure cylinder stops working:
C: Check the entire hydraulic system, the temperature of the hydraulic parts and the temperature rise of the machine box should meet the requirements of 4.4..6, and there should be no oil separation in the sealing part:
) Check the vibration of the drill pipe with the small head, and ensure that the drill tool position is accurately reached: 8. The connection and interchangeability of the drill pipe joints
5.3 Load operation test
Make the following inspections when the machine is running under load:
1 ) Check the rotation stability of the power head and the rotation speed. This includes meeting the requirements of 3.3 design parameters of the wooden standard 6) Check the main lifting capacity, pressure capacity, rapid lifting and lowering speed, avoidance speed and whether it also meets the requirements of 3.3 and design parameters: mud system internal circulation quantity and efficiency:
d) Drilling speed:
) Pure drilling delivery:
: The feasibility of the pressure system:
Check the temperature rise and sealing performance of the entire pressure system and the pressure-exciting parts, the effective temperature and source should meet the requirements of 4.4.5.6: All density positions show no leakage and the basic items specified in the industrial test support are effective
) 5.4 Sound test 5.4.1 The test shall be carried out under the condition of the drilling rig being stopped. 5.4.2 The background noise at the microphone shall be 10cB [A] higher than the noise floor. 5.4.3 Take a point at the front, rear and left of the drilling rig 5m away from the bottom of the drilling rig and 1.5m above the surface of the pool. Use a sound level meter to measure whether it meets the requirements of 4.5.10. 5.5 Inspection of hydraulic system The inspection of hydraulic system shall be carried out in accordance with the relevant provisions of 1966-199. 6 Inspection regulations 6.1 Inspection classification The inspection of drilling rig is divided into operation inspection and formation test. 6.2 Factory Inspection
62.1 Each drill bit shall be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped to the factory. When it leaves the factory, it shall be accompanied by a document proving that the product is of qualified quality.
6.2.2 When the drill bit leaves the factory, it shall be inspected and tested according to the requirements of 5.2: All inspection items shall meet the requirements of this standard. 6.3 Type Test
6.3.1 If the product meets the following requirements, a type test shall be carried out: a) New products or products transferred from the factory:
h) The inspection results of the products are different from those of the previous type test:
h) After the product has been in production for a long time, when it resumes production: the national quality inspection agency shall specify the requirements of the type test.
6.3.2 Contents of type test:
a) The type test shall meet all the requirements of the standard: b) The product shall be inspected and tested according to the requirements of the standard. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...72 The coal working platform should be equipped with a small station that can record the main operating status of the drilling machine and the drilling (including the positive, current, speed, etc.) and indication signals. 4.4.7.3 The operating mechanism of the drilling machine should be equipped with a label that explains its purpose and the actual operation direction. 4.5 Safety and sanitation requirements 4.5.1 The electrical shell of the drilling machine should be reliably grounded, and the grounding resistance should not be greater than 4 Ω. 4.5.2 All electrolytic devices on the drilling machine should have 5 two devices..453 Temporary All electrical buses on the machine should not be equipped with multi-core soft-circuit boards. 4.5.4 The new machine should have an "emergency stop button" for 2-3 seconds at the control and fuselage positions. 4.5.5 The limit system circuit should be equipped with a safety net. 4.5.6 The lifting and lowering cylinders: the hydraulic stop of the driving head, the hydraulic cylinder for tilting the drilling rack, the hydraulic cylinder for turning the flange and the hydraulic stopper for rolling the liquid coin holder and other force-bearing parts should be able to stop at any position and reliably. 4.5.7 The maximum lifting force of the drilling rig should not be less than 1.3 of the rated lift. times, under the condition of the maximum lifting force, other mechanisms: working belt.
4.5.8 When the drilling rig drills the inclined hole, the inclined square should be held by hand under any working condition. m/T10344-2002
4.5.9 The drilling rig can withstand 15 times the rated short impact load. 4.5.10 The working noise at 5m from the drill should not exceed 95dB (A). The temperature control equipment is virtually installed in the driver's room: its temperature should be controlled within 15℃28℃ .
4.6 Painting requirements
The painting of the lead hanger shall comply with the provisions of JB/T50X.12-1998. 4.7 Inspection
Drilling rig inner sleeve supply scope includes:
) Main machine and 50m drill pipe:
b) Random accessories:
Central dedicated maintenance work point,
5 Test method
5.1 Test preparation
5.1.1 The test drilling rig is equipped with an instruction manual and Test outline and other technical documents. 5.1.2 Before the test, the temporary machine should be fully adjusted and the weight should be in working condition. 5.1.3 The test should be carried out under the working environment specified in the standard. 5.2 Air cutting operation test
Start the clamp machine and check the operation status of the power system. The time should be at least ten [0min: the coal vertical drilling rig is three times to measure the material concentration pressure and the hydraulic pressure of the cover. The hydraulic cylinder and the hydraulic pressure regulator of the moving square head should be locked. Observe the operation status. Check whether the designed position can be reached: () Operate the power head to rotate: Check the speed adjustment function of the vehicle within the rated speed range, and the time return is not less than 10min: The power head is stable, and there is no periodic impact and abnormal noise: Mountain! Operate the main stop red, observe the fast lifting, lowering and slow feeding: The two pressure streets should not have slow running after the pressure cylinder stops working:
C: Check the entire hydraulic system, the temperature and running time of the hydraulic parts, and verify The temperature rise of the box temperature should meet the requirements of 4.4..6. There should be no oil separation phenomenon in the sealing part:
) Check the vibration of the drill head with the drill pipe, and accurately reach the technical drilling position: 8. The connection and interchangeability of the drill pipe joints
5.3 Load operation test
Make the following inspections when the machine is running under load:
1) Check the rotation stability and rotation speed of the power head. This includes meeting the design requirements of 3.3 of the wooden standard. 6) Check the main leakage lifting capacity and the pressure energy The force, rapid lifting and lowering speed, avoidance speed are also in line with the requirements of 3.3 and design parameters: mud system internal circulation quantity and efficiency:
d) drilling speed:
) pure drilling delivery:
: the feasibility of the working of the combined pressure system:
check the temperature rise and sealing performance of the entire pressure system, the pressure-exciting parts, the effective temperature and source should meet the requirements of 4.4.5.6: all density positions show no leakage and other basic items specified in the typical effect
) industrial test support. 5.4 Sound test 5.4.1 The test shall be carried out under the condition of the drilling rig being stopped. 5.4.2 The background noise at the microphone shall be 10cB [A] higher than the noise floor. 5.4.3 Take a point at the front, rear and left of the drilling rig 5m away from the bottom of the drilling rig and 1.5m above the surface of the pool. Use a sound level meter to measure whether it meets the requirements of 4.5.10. 5.5 Inspection of hydraulic system The inspection of hydraulic system shall be carried out in accordance with the relevant provisions of 1966-199. 6 Inspection regulations 6.1 Inspection classification The inspection of drilling rig is divided into operation inspection and formation test. 6.2 Factory Inspection
62.1 Each drill bit shall be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped to the factory. When it leaves the factory, it shall be accompanied by a document proving that the product is of qualified quality.
6.2.2 When the drill bit leaves the factory, it shall be inspected and tested according to the requirements of 5.2: All inspection items shall meet the requirements of this standard. 6.3 Type Test
6.3.1 If the product meets the following requirements, a type test shall be carried out: a) New products or products transferred from the factory:
h) The inspection results of the products are different from those of the previous type test:
h) After the product has been in production for a long time, when it resumes production: the national quality inspection agency shall specify the requirements of the type test.
6.3.2 Contents of type test:
a) The type test shall meet all the requirements of the standard: b) The product shall be inspected and tested according to the requirements of the standard. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...72 The coal working platform should be equipped with a small station that can record the main operating status of the drilling machine and the drilling (including the positive, current, speed, etc.) and indication signals. 4.4.7.3 The operating mechanism of the drilling machine should be equipped with a label that explains its purpose and the actual operation direction. 4.5 Safety and sanitation requirements 4.5.1 The electrical shell of the drilling machine should be reliably grounded, and the grounding resistance should not be greater than 4 Ω. 4.5.2 All electrolytic devices on the drilling machine should have 5 two devices..453 Temporary All electrical buses on the machine should not be equipped with multi-core soft-circuit boards. 4.5.4 The new machine should have an "emergency stop button" for 2-3 seconds at the control and fuselage positions. 4.5.5 The limit system circuit should be equipped with a safety net. 4.5.6 The lifting and lowering cylinders: the hydraulic stop of the driving head, the hydraulic cylinder for tilting the drilling rack, the hydraulic cylinder for turning the flange and the hydraulic stopper for rolling the liquid coin holder and other force-bearing parts should be able to stop at any position and reliably. 4.5.7 The maximum lifting force of the drilling rig should not be less than 1.3 of the rated lift. times, under the condition of the maximum lifting force, other mechanisms: working belt.
4.5.8 When the drilling rig drills the inclined hole, the inclined square should be held by hand under any working condition. m/T10344-2002
4.5.9 The drilling rig can withstand 15 times the rated short impact load. 4.5.10 The working noise at 5m from the drill should not exceed 95dB (A). The temperature control equipment is virtually installed in the driver's room: its temperature should be controlled within 15℃28℃ .
4.6 Painting requirements
The painting of the lead hanger shall comply with the provisions of JB/T50X.12-1998. 4.7 Inspection
Drilling rig inner sleeve supply scope includes:
) Main machine and 50m drill pipe:
b) Random accessories:
Central dedicated maintenance work point,
5 Test method
5.1 Test preparation
5.1.1 The test drilling rig is equipped with an instruction manual and Test outline and other technical documents. 5.1.2 Before the test, the temporary machine should be fully adjusted and the weight should be in working condition. 5.1.3 The test should be carried out under the working environment specified in the standard. 5.2 Air cutting operation test
Start the clamp machine and check the operation status of the power system. The time should be at least ten [0min: the coal vertical drilling rig is three times to measure the material concentration pressure and the hydraulic pressure of the cover. The hydraulic cylinder and the hydraulic pressure regulator of the moving square head should be locked. Observe the operation status. Check whether the designed position can be reached: () Operate the power head to rotate: Check the speed adjustment function of the vehicle within the rated speed range, and the time return is not less than 10min: The power head is stable, and there is no periodic impact and abnormal noise: Mountain! Operate the main stop red, observe the fast lifting, lowering and slow feeding: The two pressure streets should not have slow running after the pressure cylinder stops working:
C: Check the entire hydraulic system, the temperature and running time of the hydraulic parts, and verify The temperature rise of the box temperature should meet the requirements of 4.4..6. There should be no oil separation phenomenon in the sealing part:
) Check the vibration of the drill head with the drill pipe, and accurately reach the technical drilling position: 8. The connection and interchangeability of the drill pipe joints
5.3 Load operation test
Make the following inspections when the machine is running under load:
1) Check the rotation stability and rotation speed of the power head. This includes meeting the design requirements of 3.3 of the wooden standard. 6) Check the main leakage lifting capacity and the pressure energy The force, rapid lifting and lowering speed, avoidance speed are also in line with the requirements of 3.3 and design parameters: mud system internal circulation quantity and efficiency:
d) drilling speed:
) pure drilling delivery:
: the feasibility of the working of the combined pressure system:
check the temperature rise and sealing performance of the entire pressure system, the pressure-exciting parts, the effective temperature and source should meet the requirements of 4.4.5.6: all density positions show no leakage and other basic items specified in the typical effect
) industrial test support. 5.4 Sound test 5.4.1 The test shall be carried out under the condition of the drilling rig being stopped. 5.4.2 The background noise at the microphone shall be 10cB [A] higher than the noise floor. 5.4.3 Take a point at the front, rear and left of the drilling rig 5m away from the bottom of the drilling rig and 1.5m above the surface of the pool. Use a sound level meter to measure whether it meets the requirements of 4.5.10. 5.5 Inspection of hydraulic system The inspection of hydraulic system shall be carried out in accordance with the relevant provisions of 1966-199. 6 Inspection regulations 6.1 Inspection classification The inspection of drilling rig is divided into operation inspection and formation test. 6.2 Factory Inspection
62.1 Each drill bit shall be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped to the factory. When it leaves the factory, it shall be accompanied by a document proving that the product is of qualified quality.
6.2.2 When the drill bit leaves the factory, it shall be inspected and tested according to the requirements of 5.2: All inspection items shall meet the requirements of this standard. 6.3 Type Test
6.3.1 If the product meets the following requirements, a type test shall be carried out: a) New products or products transferred from the factory:
h) The inspection results of the products are different from those of the previous type test:
h) After the product has been in production for a long time, when it resumes production: the national quality inspection agency shall specify the requirements of the type test.
6.3.2 Contents of type test:
a) The type test shall meet all the requirements of the standard: b) The product shall be inspected and tested according to the requirements of the standard. 6.3.3 The product that has been approved for type verification shall be subject to industrial testing. 6.3.3 The product that has passed the factory inspection shall be selected for type verification. If the product fails the inspection, it shall be doubled. If it still fails, it shall be inspected on the way to the factory.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, dimensions, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in a strong and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...70% inspection
Drilling rig inner sleeve supply scope includes:
) Main machine and 50m drill pipe:
b) Random accessories:
Central dedicated maintenance work point,wwW.bzxz.Net
5 Test method
5.1 Test preparation
5.1.1 The test drilling rig is equipped with technical documents such as instruction manual and test outline. 5.1.2 Before the test, the temporary machine should be fully adjusted and put in working belt operation state. 5.1.3 The test is carried out under the special requirements of the standard! Working environment competition. 5.2 Air cutting operation test
Start the pliers machine, check the operation status of the power system, the time should be at least ten [0min: the coal vertical three times respectively measure the concentrated material pressure, flip the hydraulic blood, the moving square head should move the hydraulic cylinder and the hydraulic stabilizer to lock the purple plate at the right low:, h:
Observe the operation status, check whether it can reach the set position: () Operate the moving square head to rotate: Check the speed adjustment function when reversing within the rated speed range of the vehicle, the time return should not be less than 10mim: the power head is stable, there is no periodic impact and abnormal noise! Operate the main hydraulic stop, observe the fast lifting, lowering and slow feeding: the hydraulic pressure and the two pressure steps, there should be no slow running phenomenon after the pressure cylinder stops working:
C: Check the entire hydraulic system, the temperature of the hydraulic parts and the temperature rise of the machine box should meet the requirements of 4.4..6, and there should be no oil separation in the sealing part:
) Check the vibration of the drill pipe with the small head, and ensure that the drill tool position is accurately reached: 8. The connection and interchangeability of the drill pipe joints
5.3 Load operation test
Make the following inspections when the machine is running under load:
1 ) Check the rotation stability of the power head and the rotation speed. This includes meeting the requirements of 3.3 design parameters of the wooden standard 6) Check the main lifting capacity, pressure capacity, rapid lifting and lowering speed, avoidance speed and whether it also meets the requirements of 3.3 and design parameters: mud system internal circulation quantity and efficiency:
d) Drilling speed:
) Pure drilling delivery:
: The feasibility of the pressure system:
Check the temperature rise and sealing performance of the entire pressure system and the pressure-exciting parts, the effective temperature and source should meet the requirements of 4.4.5.6: All density positions show no leakage and the basic items specified in the industrial test support are effective
) 5.4 Sound test 5.4.1 The test shall be carried out under the condition of the drilling rig being stopped. 5.4.2 The background noise at the microphone shall be 10cB [A] higher than the noise floor. 5.4.3 Take a point at the front, rear and left of the drilling rig 5m away from the bottom of the drilling rig and 1.5m above the surface of the pool. Use a sound level meter to measure whether it meets the requirements of 4.5.10. 5.5 Inspection of hydraulic system The inspection of hydraulic system shall be carried out in accordance with the relevant provisions of 1966-199. 6 Inspection regulations 6.1 Inspection classification The inspection of drilling rig is divided into operation inspection and formation test. 6.2 Factory Inspection
62.1 Each drill bit shall be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped to the factory. When it leaves the factory, it shall be accompanied by a document proving that the product is of qualified quality.
6.2.2 When the drill bit leaves the factory, it shall be inspected and tested according to the requirements of 5.2: All inspection items shall meet the requirements of this standard. 6.3 Type Test
6.3.1 If the product meets the following requirements, a type test shall be carried out: a) New products or products transferred from the factory:
h) The inspection results of the products are different from those of the previous type test:
h) After the product has been in production for a long time, when it resumes production: the national quality inspection agency shall specify the requirements of the type test.
6.3.2 Contents of type test:
a) The type test shall meet all the requirements of the standard: b) The product shall be inspected and tested according to the requirements of the standard. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...70% inspection
Drilling rig inner sleeve supply scope includes:
) Main machine and 50m drill pipe:
b) Random accessories:
Central dedicated maintenance work point,
5 Test method
5.1 Test preparation
5.1.1 The test drilling rig is equipped with technical documents such as instruction manual and test outline. 5.1.2 Before the test, the temporary machine should be fully adjusted and put in working belt operation state. 5.1.3 The test is carried out under the special requirements of the standard! Working environment competition. 5.2 Air cutting operation test
Start the pliers machine, check the operation status of the power system, the time should be at least ten [0min: the coal vertical three times respectively measure the concentrated material pressure, flip the hydraulic blood, the moving square head should move the hydraulic cylinder and the hydraulic stabilizer to lock the purple plate at the right low:, h:
Observe the operation status, check whether it can reach the set position: () Operate the moving square head to rotate: Check the speed adjustment function when reversing within the rated speed range of the vehicle, the time return should not be less than 10mim: the power head is stable, there is no periodic impact and abnormal noise! Operate the main hydraulic stop, observe the fast lifting, lowering and slow feeding: the hydraulic pressure and the two pressure steps, there should be no slow running phenomenon after the pressure cylinder stops working:
C: Check the entire hydraulic system, the temperature of the hydraulic parts and the temperature rise of the machine box should meet the requirements of 4.4..6, and there should be no oil separation in the sealing part:
) Check the vibration of the drill pipe with the small head, and ensure that the drill tool position is accurately reached: 8. The connection and interchangeability of the drill pipe joints
5.3 Load operation test
Make the following inspections when the machine is running under load:
1 ) Check the rotation stability of the power head and the rotation speed. This includes meeting the requirements of 3.3 design parameters of the wooden standard 6) Check the main lifting capacity, pressure capacity, rapid lifting and lowering speed, avoidance speed and whether it also meets the requirements of 3.3 and design parameters: mud system internal circulation quantity and efficiency:
d) Drilling speed:
) Pure drilling delivery:
: The feasibility of the pressure system:
Check the temperature rise and sealing performance of the entire pressure system and the pressure-exciting parts, the effective temperature and source should meet the requirements of 4.4.5.6: All density positions show no leakage and the basic items specified in the industrial test support are effective
) 5.4 Sound test 5.4.1 The test shall be carried out under the condition of the drilling rig being stopped. 5.4.2 The background noise at the microphone shall be 10cB [A] higher than the noise floor. 5.4.3 Take a point at the front, rear and left of the drilling rig 5m away from the bottom of the drilling rig and 1.5m above the surface of the pool. Use a sound level meter to measure whether it meets the requirements of 4.5.10. 5.5 Inspection of hydraulic system The inspection of hydraulic system shall be carried out in accordance with the relevant provisions of 1966-199. 6 Inspection regulations 6.1 Inspection classification The inspection of drilling rig is divided into operation inspection and formation test. 6.2 Factory Inspection
62.1 Each drill bit shall be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped to the factory. When it leaves the factory, it shall be accompanied by a document proving that the product is of qualified quality.
6.2.2 When the drill bit leaves the factory, it shall be inspected and tested according to the requirements of 5.2: All inspection items shall meet the requirements of this standard. 6.3 Type Test
6.3.1 If the product meets the following requirements, a type test shall be carried out: a) New products or products transferred from the factory:
h) The inspection results of the products are different from those of the previous type test:
h) After the product has been in production for a long time, when it resumes production: the national quality inspection agency shall specify the requirements of the type test.
6.3.2 Contents of type test:
a) The type test shall meet all the requirements of the standard: b) The product shall be inspected and tested according to the requirements of the standard. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...1 Products shall be subject to type tests when the following conditions are met: a) New products or products transferred to other factories: h) There are significant changes in the production process, such as the structure, which may affect the product performance; the test results are different from the previous type test results; ii) After a long period of production, when the product is resumed: the national quality inspection agency points out the requirements of type tests. 6.3.2 Contents of type tests: a) Type tests shall meet all the requirements of the standard; b) Products that have been identified shall be subject to industrial tests. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double the inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...1 Products shall be subject to type tests when the following conditions are met: a) New products or products transferred to other factories: h) There are significant changes in the production process, such as the structure, which may affect the product performance; the test results are different from the previous type test results; ii) After a long period of production, when the product is resumed: the national quality inspection agency points out the requirements of type tests. 6.3.2 Contents of type tests: a) Type tests shall meet all the requirements of the standard; b) Products that have been identified shall be subject to industrial tests. 6.3.3 Type test is carried out on products that have passed the factory inspection. If the inspection fails, double the inspection shall be carried out. If it still fails, the product shall be inspected on the way.
7 Marking, packaging, transportation and storage
7.1 Marking
The product label shall be fixed on the machine. The label shall comply with the requirements of (BT13306-1991). The label shall include: product model, name, main technical parameters, appearance size, weight, production number, manufacturing date, Factory name and place, 7.2 Packaging
7.2.1 Drilling rig can be used for drilling. Unpack the exposed single-pressure pipe joints, and wrap the joints with water. Random tools, small precision parts, etc. are packed in wooden boxes: and waterproof measures are taken. The exposed surface of the case should be coated with anti-rust coating and wrapped with waterproof materials and marked with anti-rust marks.
7.22 Drilling rig is attached with random technical documents. The technical documents of the machine can be packed in plastic bags and put in the box, and the "Document" should be written on the box. "Parts are in this box": Randomly supplied technical documents include: &: Product quality certificate:
1 Product instructions:
The delivery list and packing list should be included:
d, the product should also provide installation diagrams, hydraulic power diagrams, and electrical schematic diagrams. e) Spare parts catalog for users to order.
7.3 Transportation
3.1 The new machine should be in its powerful and reliable position, and have obvious lifting ball marks. 7.3 .2 The drilling rig shall be transported as a whole after the rig and the power system are separated through the pipe line: When transporting by road, the rig shall be transported upright and the drilling rig shall be transported upright. The drilling rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the power head shall be transported in the lowest position. The drilling rig shall be transported by rail and the rig shall be transported upright and the rig shall be transported in the lowest position. The drilling ...
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.