JB/T 1644-1999 JB/T 1664-1999 Permanent Magnetic Dehydration Tank JB/T1664-1999 Standard download decompression password: www.bzxz.net
Some standard content:
ICS73.120 Machinery Industry Standard of the People's Republic of China JB/T1664-1999 Permanent magnetic dewatering tank Permanent magnetic dewatering tank1999-06-28 Issued National Machinery Industry Bureau 2000-01-01 Implementation JB/T16641999 This standard is a revision of JB1664-75 "Permanent magnetic dewatering tank". Compared with JB1664-75, the main technical content of this standard is the addition of "top magnetic system" in the magnetic system type, and the expression method is given to distinguish "tower type magnetic system". This standard replaces JB1664-75 from the date of implementation. This standard is proposed and managed by the National Technical Committee for Standardization of Mining Machinery. The responsible drafting unit of this standard: Shenyang Mineral Processing Machinery Research Institute. The main drafters of this standard are Li Wenqi, Wang Yanhua, Li Jun, Liu Yuheng and Huang Jialin. 1 Scope Machinery Industry Standard of the People's Republic of China Permanent magnetic dewatering tank Permanent magnetic dewatering tank JB/T 16641999 Replaces JB166475 This standard specifies the product classification, technical requirements, test methods, inspection rules, signs, labels, instructions for use and packaging, transportation and storage of permanent magnetic dewatering tanks. This standard applies to permanent magnetic dewatering tanks. The machine is used to separate minerals with a specific magnetic susceptibility of not less than 3000×10*cm/g. 2 Reference standards The provisions contained in the following standards constitute the provisions of this standard through reference in this standard. When this standard is published, the versions shown are valid. All standards will be revised, and parties using this standard should explore the possibility of using the latest versions of the following standards. GB 191—1990 GB/T 63881986 GB/T 9969.1—1988 GB/T 13306—1991 JB/T 1604—1998 JB/T 9042—1999 3 Product classification 3.1 Model Packaging, storage and transportation pictorial mark Transportation packaging, receiving and delivery mark Industrial product manual Method for compiling mining machinery product models Permanent magnetic blocks for ore dressing equipment The structural types of permanent magnetic dewatering troughs are divided into: a) Magnetic system type b) Ore feeding method c) Tank structure 3.2 Model There are two types: tower type magnetic system and top magnetic system; -upper center ore feeding; inverted cone. The model should comply with the provisions of JB/T1604. Model representation method: c 3.3 Marking example Magnetic system type: top magnetic system, tower-type magnetic system omitting the upper diameter of the trough body, dm Magnetic dehydration Kai Magnetic separation equipment The tower-type magnetic system permanent magnetic dehydration trough with an upper diameter of 20dm is marked as approved by the State Machinery Industry Bureau on 1999-06-28 and implemented on 2000-01-01 3.4 Basic parameters JB/T1664-1999 Permanent magnetic dehydration trough The basic parameters of the permanent magnetic dehydration trough shall comply with the provisions of Table 1. Table 1 Body upper opening diameter Technical requirements CS-12D CS-16D CS-20D 4.1 Permanent magnetic dewatering troughs shall comply with the requirements of this standard and be manufactured in accordance with drawings and technical documents approved by the prescribed procedures. 4.2 Each weld of the trough body, discharge box, etc. shall be welded firmly and fully welded. 4.3 The overflow weir at the upper opening of the trough body shall be in the same horizontal plane with a flatness tolerance of 4mm. The quality of the magnetic block shall comply with the provisions of JB/T9042. 4.4 4.5 The connection (or bonding) of the magnetic blocks in the magnetic system shall be firm and shall not be loose. The gaps between the magnetic blocks in the magnetic system shall be filled with non-magnetic conductive materials. 4.6 All parts must be inspected and qualified, and purchased parts and cooperative parts must have a certificate of conformity before they can be assembled. 4.7 5 Test method 5.1 The welds of the tank body and all welded parts shall be subjected to a water penetration test of 14.71kPa at normal pressure cS-30 5.2 When a tower-type magnetic system is used, the determination of the magnetic induction intensity in the working area is shown in Figure 1. Five points (five points are also taken when there are two rows of magnetic blocks) are measured with a Tesla meter. The average value is not less than 30mT and is qualified. Figure 1 Tower-type magnetic system magnetic induction intensity measurement position Figure 6 Inspection rules 6.1 Inspection classification Permanent magnetic dehydration tanks are divided into factory inspection and type inspection. 6.2 Factory inspection 6.2.1 Each permanent magnetic dehydration tank must be inspected and qualified by the quality inspection department of the manufacturer before it can be shipped. Documents proving the quality of the product should be attached when leaving the factory. JB/T1664—1999 6.2.2 The factory inspection shall comply with the requirements of 4.2, 4.3, 4.4, 4.5 and 4.6 of this standard. 6.3 Type inspection 6.3.1 The permanent magnetic dehydration tank shall be subjected to type inspection in any of the following cases: a) When new products or old products are transferred to the factory for production and identification; b) When there are major changes in product structure, materials and processes after normal production; e) When the product is resumed after long-term suspension of production; d) When the results of the factory inspection are greatly different from the last inspection; e) When the national quality inspection agency puts forward the type inspection requirements. 6.3.2 The type inspection items shall include all the requirements of this standard. 6.3.3 The type inspection shall be conducted on one unit selected from the products that have passed the factory inspection. If the inspection fails, double sampling shall be conducted. 7 Marking, labeling and instruction manual 7.1 Each permanent magnetic dehydration tank shall have a product label fixed in an appropriate and obvious position. Its type and size shall comply with the provisions of GB/T13306 and indicate the following contents; a) manufacturer's name and trademark; b) product name and model; c) main technical parameters: d) factory number; e) manufacturing date. 7.2 A product instruction manual shall be prepared for the permanent magnetic dehydration tank, and its content shall comply with the provisions of GB/T9969.1. 7.3 The packaging mark of the permanent magnetic dehydration tank shall include the transport packaging receipt and delivery mark, the packaging storage and transportation pictorial mark, and shall comply with the provisions of GB/T6388 and GB191. 8 Packaging, transportation and storage 8.1 The main body of the permanent magnetic dewatering tank can be installed as a whole, and the pipes, plates, discharge pipes and other parts can be bundled or placed in the box. 8.2 The permanent magnetic dewatering tank should be accompanied by the following technical documents: a) Product general drawing and installation drawing; b) Product instruction manual; c) Product certificate or quality certificate; d) Packing list. 8.3 There should be obvious text marks on the wall of the closed box, and it should comply with the provisions of 7.3. The contents include: the name of the receiving station and the receiving unit; b) The name of the shipping station and the shipping unit: Www.bzxZ.net c) Contract number and product name and model; d) Weight, box number and overall dimensions: e) Center of gravity, lifting line, storage and transportation diagram mark. 8.4 When packaging or unpacking, a label should be attached in a conspicuous position and comply with the provisions of 8.3. 8.5 The permanent magnetic dehydration trough should be well kept in the warehouse or under the shed. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.