Standard ID: SY 5540-1992

Standard Name: Labor quota for seismic exploration in beach areas

Chinese Name: 海滩区地震勘探劳动定额

Standard category:Oil and gas industry standards (SY)

state:in force

Date of Release1993-02-22

Date of Implementation:1993-08-01

standard classification number

Standard ICS number:Petroleum and related technology >> 75.020 Extraction and processing of petroleum and natural gas Petroleum and related technology >> Equipment for the oil and gas industry >> 75.180.10 Exploration and drilling equipment

Standard Classification Number:Petroleum>>Petroleum Exploration, Development and Gathering>>E11 Petroleum Geological Exploration

associated standards

Publication information

other information

Introduction to standards:

SY 5540-1992 Labor quota for earthquake exploration in beach areasSY5540-1992 Standard download decompression password: www.bzxz.net

Some standard content:

Petroleum and Natural Gas Industry Standard of the People's Republic of China SY5540-92
Labor quota for seismic exploration in beach areas
Published on February 22, 1993
Ministry of Energy of the People's Republic of China
Implementation on August 1, 1993
Subject content and scope of application
2 Basic requirements
3 Regional categories
4 Labor quota
5 Various time and parameter values
Appendix Part A Team Daily Quota (Supplementary Document)
Appendix B Calculation Example (Reference Document)
Appendix C Beach Area Seismic Exploration Team Labor Quota (Reference Document)
(1)
: (1)
1 Subject Content and Scope of Application
Petroleum and Natural Gas Industry Standard of the People's Republic of China Beach Area Seismic Exploration Labor Quota
This standard specifies the beach area seismic exploration area categories, team daily labor quotas and relevant time parameters. SY 5540-92
This standard applies to beach areas, using 48-240 digital seismographs, mechanized and manned construction forms, and using cannon and airgun seismic source methods to conduct two-dimensional and three-dimensional exploration. 2 Basic Requirements
2.1 This standard team daily quota is formulated based on the staffing of Appendix C (Reference Document). 2.2 The daily quota of the team is calculated according to the relevant formula and the numerical value specified in Table 2. For examples, see Appendix B (Reference). For some conventional team quotas, see Appendix A (Supplement).
2.3 According to the construction characteristics of the beach area for seismic exploration, the daily work shift time in the Class I area is 540 minutes: the work shift time in the Class II area is 360 minutes.
3 Regional categories
See Table 1 for regional categories,
Table 1 Regional categories
Regional classification
4 Labor quotas
There are many shrimp ponds, brine ponds, swamps and other waters near the coastline, as well as mudflats, beaches, ditches and dams near the coastline. They are affected by the tides, and general vehicles can only pass through the intertidal zone between the low tide and the sea level. It is mostly silt and sand lakes, which are severely affected by the tides, and general vehicles cannot pass through
Tianyang, Hebei: Zhaojiabao-Nanbao coastal land part Shandong: Dazhengzhuang, Zhuangxi, No. 5 Guilin, Chengdong, Jingxi and other coastal areas that are less affected by the tide Liaoning: Erjiegou area
Dajin, Hebei, Zhaojiabao coastal areas of the tidal belt Shandong: coastal areas of the tidal belt
Liaoning, Rongxingtun, Hongcun Machinery Factory, Datanhekou and other areas of the tidal belt
4.1 Well gun team mechanized construction team daily quota calculation formula Q: -T-(T+T)-KEK2:2+K(+02
T+TK+I
Where Q--team H quota, gun
7\-standard site T work shift time, minT, personal time required, mins
- non-quota time, nin
approved by the Ministry of Energy of the People's Republic of China on February 22, 19931)
implemented on August 1, 1993
SY5640-92
K, the coefficient of the influence of the spacing between lines on the time of laying and collecting, see formula (2) K--the coefficient of the influence of the number of small wires per line on the basic time of laying and collecting, see formula (3) Ta basic time of laying and collecting, minl
K:-- The coefficient of the number of instrument channels on the organization time of arrangement and inspection time, see formula (4) T-organization time of arrangement and inspection time, minT
-time for inspection, nin
7e1-relocation time of each blasting vehicle, min, see formula (5) Tbasic time of each blasting, min
K4-coefficient of the combined well on the blasting time, see formula (6) T-
where
wheree
-time for troubleshooting each blasting arrangement in mechanized construction, min, see formula (7). K-
channel spacing, m.
-number of small wires per channel.
whereN-number of instrument receiving channels.
Longitudinal gun spacing,
4×+15
The distance between the gun points at both ends of each row of guns, 11*-the number of gun points in each row,
The average apparent velocity of a blasting noon, m/min,-the number of blasting machines.
The number of combined groups.
The number of vertical coverages.
K,=1+b-1
The daily quota calculation formula for the well blasting team is 4.2
Q.=T-(T.+Tm)-Ki5K:T++K(T+T))Tn+T·K4+Tpz
In the formula, the relocation time of each gun blaster, min, see formula (9) T-
The time for one person to remove faults in each gun arrangement, min, see formula (10). To2
The semi-average speed of the blaster carrying the load, m/min. Te2
The daily quota calculation formula for the airbag source team
Q-(T+T)-KK++K(T+))
T+Zh +T;+T+:
In the formula, Tix is ​​the auxiliary time for each blast point, minsZ, and the lightning for each blast point
$Y 5540--92
T is the time for each earthquake source vehicle to vibrate once, min. 5 Various time values
See Table 2 for various time and parameters.
Table 2 Various times and parameters
SY554092
Appendix A
Part of the daily quota of a team
(Supplement)
This appendix calculates some of the regular daily quota of a team according to the relevant formulas and the various times and parameter values ​​in Table 2, see Table A1 to Table A14. Table A1
Daily labor quota of mechanized construction team with 96-line instrument in two dimensions
SY 5540-92
Daily labor quota of mechanized construction team with 120-line instrument in two dimensions
Daily labor quota of non-mechanized construction team with 96-line instrument in two dimensions
SY 5540-92
Daily labor quota of mechanized construction team with 120-line instrument in two dimensions
Daily labor quota of non-mechanized construction team with 120-line instrument in three dimensions Table A5
Mechanized construction
Three-line ten
Line-one
Manual construction
Two-line-rottenwwW.bzxz.Net
Three-line「--to
SY 5540—92
Continued Table A5
Research and Development
Second Line" One Robe
Note: The values ​​in the table are all calculated based on one refining machine. Shang
Three-line "-cannon
Man-made construction
Line--cannon
Table A6 and cannon team 240 instruments three-dimensional team daily labor quota land
Return line six cannon
Mechanized construction
Four-line ten cannon
38.84 41.75
35.30L38,15
24.00:25.08
23.28120.76
Jiang, the lug values ​​are calculated based on one blasting machine. 20.89 1$.64
21.80 22.94
19.50 20.68
19.82 20.9:
Fourth line six shots
Man-lifted construction
Third line -}·One shot
Third line eleven shots
23.73 25.05
22.36 23.82
22.451 21.12
SY5540-92
Air gun source 96-channel instrument two-dimensional 1 type area team daily labor quota coverage
SY 5540--92
Air gun source 96-channel instrument two-dimensional 1 type area team daily labor quota coverage
SY 5540—92
Air gun source 120-channel instrument two-dimensional I type area team daily labor quota coverage
8,26