title>HG/T 20704.2-2000 The relationship between the engineering design stage of pump and other disciplines - HG/T 20704.2-2000 - Chinese standardNet - bzxz.net
Home > HG > HG/T 20704.2-2000 The relationship between the engineering design stage of pump and other disciplines
HG/T 20704.2-2000 The relationship between the engineering design stage of pump and other disciplines
Basic Information
Standard ID:
HG/T 20704.2-2000
Standard Name: The relationship between the engineering design stage of pump and other disciplines
HG/T 20704.2-2000 The relationship between the engineering design stage of pump and other disciplines HG/T20704.2-2000 standard download decompression password: www.bzxz.net
Some standard content:
Relationship between the pump specialty and various specialties during the engineering design phase HG/T 20704.2-2000 Subject content and scope of application This standard specifies the working relationship between the pump specialty and various specialties and departments during the engineering design phase, and lists the interface content between them. Applicable to design management during the engineering design phase. Relationship with the design manager Documents and information that the design manager needs to provide to this specialty: commencement report; Contact related content. Conditions and information that this major needs to submit to the design manager: engineering design regulations; Equipment (inquiry, order) purchase requisition/technical specification (when general contracting); suggestions for selecting the manufacturer (commercial) for inquiry; Quotation technical review form (when general contracting); Quotation review opinions and suggestions for selecting the purchasing manufacturer (commercial) (when general contracting); list of issues in the quotation review (when general contracting); suggestions on convening a manufacturer (commercial) coordination meeting (VCM); VCM meeting agenda and detailed topics; Documents and data sheets modified or recompiled after the VCM meeting; summary opinions on reviewing the manufacturer (commercial) ACF and CF drawings and data sheets; equipment procurement technical risk memorandum (submitted when necessary); completion report. 3 Relationship with Chemical Process Major Conditions and information that the Chemical Process Major needs to provide to this major: process specification; process flow diagram (PFD); material balance sheet; machine and pump process data sheet: preliminary steam and cooling water balance; Opinions on the engineering design regulations (draft); opinions on the machine and pump (inquiry, order) purchase order/technical specification (draft); opinions on the manufacturer's (commercial) quotation review; opinions on VCM detailed issues. Conditions and information that this major needs to provide to the Chemical Process Major: relevant parts of the engineering design regulations (draft); estimated machine and pump energy consumption summary table (when necessary); relevant parts of the equipment (inquiry, order) purchase order/technical specification; relevant parts of the manufacturer's (commercial) quotation technical documents (data sheet); relevant parts of the VCM detailed issues (draft); relevant parts of the VCM modified or updated technical documents (data sheet). 4 Relationship with process system specialty Conditions and information that the process system specialty needs to provide to this specialty: Piping instrument flow diagram (PID); Data summary table of machine pumps; System calculation table of machine pumps: Equipment elevation and effective net positive suction head NPSH of the pump; Steam and cooling water balance; Opinions on engineering design regulations (draft); Opinions on equipment inquiry, order) purchase requisition/technical specification (draft); Opinions on the quotation review of the manufacturer (merchant); 279 Opinions on the detailed topics of VCM (draft); 9 Opinions on reviewing the ACF and CF drawings and data sheets of the manufacturer (merchant). Conditions and information that this major needs to submit to the process system major: relevant parts of engineering design regulations; Estimated energy consumption summary table of pumps (when necessary); relevant parts of equipment (inquiry, order) purchase order/technical specification: relevant parts of the manufacturer's (commercial) quotation technical documents; relevant parts of VCM detailed topics; Steam turbine load summary table (when necessary): documents and data tables modified or updated after the VCM meeting: other requirements of the unit that are not within the scope of supply of the manufacturer (commercial) (such as changing to a centralized oil station, adding steam accompanying pipes and paint, insulation requirements, etc.); Relevant parts of the manufacturer's (commercial) ACF and CF drawings and data tables: 9 10 Design of non-standard pumps. The pump major proposes flow charts, operating requirements and instructions, etc., and the instrument major cooperates with the process system major to complete the PID diagram (including the PID diagram of the oil system and the main pipe of the sealing system of multiple units). The oil and sealing systems of the unit itself are the responsibility of this major. 5 Relationship with the layout specialty Conditions and information that the layout specialty needs to provide to this specialty: Equipment layout drawing (outline version): Opinions on the review of the manufacturer's (commercial) quotation; Opinions on the detailed topics of VCM; Opinions on the review of the manufacturer's (commercial) ACF and CF drawings and materials. Conditions and information that this specialty needs to provide to the layout specialty: Relevant parts of the manufacturer's (commercial) quotation technical documents; Estimated equipment dimensions; Maximum lifting load and maximum lifting height of the hook during support and maintenance; 4. Requirements for operation and maintenance platforms attached to the machine pump; 5 Relevant parts of the detailed topics of VCM: Relevant information modified or updated after the VCM meeting; Relevant parts of the manufacturer's (commercial) ACF and CF drawings and materials; 8 Conceptual layout drawings of non-standard units (when necessary). 6 Relationship with Pipeline Design Specialty Conditions and information that Pipeline Design Specialty needs to provide to this specialty: Opinions on the engineering design regulations (draft); Opinions on the purchase order/technical specification (draft) for pumps (inquiry, order); Opinions on the quotation of the manufacturer (commercial company); Opinions on the detailed topics of VCM; Pipeline plane design drawings (related to pumps): Opinions on the review of the ACF and CF drawings and materials of the manufacturer (commercial company). Conditions and information that this specialty provides to Pipeline Design Specialty: Relevant parts of the engineering design regulations (draft); Relevant parts of the purchase order/technical specification for equipment (inquiry, order); Relevant parts of the technical documents of the manufacturer (commercial company's quotation); Opinions on the division of the supply scope of the unit pipeline; Relevant parts of the detailed topics of VCM; Relevant drawings and materials modified or updated after the VCM meeting: Relevant parts of the ACF and CF drawings and materials of the manufacturer (commercial company); Special requirements of pumps for pipeline design (if required). Relationship with Pipeline Machinery Specialty Conditions and information that Pipeline Machinery Specialty needs to provide to this specialty: 7.0.1 Opinions on reviewing the ACF and CF drawings of the manufacturer (commercial). 1 7.0.2Conditions and information that this specialty provides to Pipeline Machinery Specialty: 1 Allowable values and requirements for the calculated load acting on the main flange surface of the pump: Relevant parts of the ACF and CF drawings of the manufacturer (commercial). 281 8Relationship with Pipeline Materials Specialty Conditions and information that Pipeline Materials Specialty needs to provide to this specialty: Pipeline classification index; Pipeline material classification: Pipeline insulation and painting instructions; Opinions on reviewing the ACF and CF drawings and data sheets of the manufacturer (commercial). Conditions and information that this specialty provides to Pipeline Materials Specialty: Manufacturer (commercial) pipe support summary table (if necessary); Relevant parts of the ACF and CF drawings of the manufacturer (commercial). 9 Relationship with the instrumentation specialty Conditions and information that the instrumentation specialty needs to provide to this specialty: instrumentation design regulations; Opinions on the engineering design regulations (draft); Opinions on the purchase order/technical specification (draft) for pumps (inquiry, ordering); Opinions on the review of the manufacturer's (commercial) quotation; Opinions on the detailed topics of VCM; Opinions on the review of the manufacturer's (commercial) ACF and CF drawings and data sheets; Design technical documents for the instrumentation and control devices of special pumps (when necessary). Conditions and information that this specialty provides to the instrumentation specialty: Relevant parts of the engineering design regulations (draft); Relevant parts of the purchase order/technical specification for equipment (inquiry, ordering); Relevant parts of the manufacturer's (commercial) quotation technical documents; Relevant parts of the detailed topics of VCM; Relevant parts of the relevant drawings and data sheets modified or updated after the VCM meeting; Relevant parts of the manufacturer's (commercial) ACF and CF drawings and data sheets: Design requirements for the instrumentation and control devices of special pumps. 10.0.1 Relationship with electrical engineering Conditions and information that the electrical engineering major needs to provide to this major: hazardous area division map; Electrical motor engineering procurement instructions; Opinions on engineering design regulations (draft); Opinions on equipment (inquiry, order) purchase requisition/technical specification (draft); Opinions on the evaluation of manufacturer's (commercial) quotations; Opinions on detailed VCM issues; Opinions on the review of manufacturer's (commercial) ACF and CF drawings and data sheets. The conditions and information proposed by this major to the electrical major: relevant parts of the engineering design regulations (draft); relevant parts of the equipment (inquiry, order) purchase order/technical specifications and motor data sheets (excluding those compiled by the electrical major and purchased separately); relevant parts of the manufacturer's (commercial) quotation technical documents: relevant parts of the VCM detailed agenda; data sheets and relevant information modified or updated after the VCM meeting; motor power consumption summary table: relevant parts of the manufacturer's (commercial) ACF and CF drawings and data sheets. 11 Relationship with civil engineering and structural majors 11.0.1 The conditions and information that the civil engineering structure specialty needs to provide to this specialty: Opinions on the evaluation of the manufacturer's (commercial) quotation; 1 Opinions on the detailed issues of VCM; Opinions on the review of the manufacturer's (commercial) ACF and CF drawings and information; 3 The basic appearance drawing of the final design. The conditions and information that this specialty provides to the civil engineering structure specialty: 11.0.2 The relevant parts of the manufacturer's (commercial) quotation technical documents; The relevant parts of the detailed issues of VCM; The relevant parts of the drawings and information modified or updated after VCM: 283 The relevant parts of the manufacturer's (commercial) ACF and CF drawings and information; The design requirements for the maintenance platform attached to the pump; The civil engineering foundation design conditions for special pumps. 12 Relationship with materials major Conditions and information that the materials major needs to provide to this major: Engineering material selection regulations (material memorandum) and pipeline material identification drawings (when necessary); material engineering standards or regulations related to machine pump materials; opinions on engineering design regulations (draft); opinions on equipment (inquiry, order) purchase requisition/technical specification (draft); opinions on manufacturer's quotation review; opinions on VCM detailed issues; Opinions on reviewing the manufacturer's ACF and CF drawings and data sheets; opinions on reviewing the manufacturer's welding process regulations (when necessary). The conditions and information proposed by this major to the materials major: relevant parts of the engineering design regulations (draft); relevant parts of the equipment (inquiry, order) purchase order/technical specification: relevant parts of the manufacturer's (commercial) quotation technical documents; relevant parts of the VCM detailed topics; relevant documents modified or updated after VCM: relevant parts of the manufacturer's (commercial) ACF and CF drawings and materials; manufacturer's (commercial) welding process regulations (when necessary). 13 Relationship with the container and heat exchanger design major 13.0.1 The container and heat exchanger major shall review and provide opinions on the strength calculation of the auxiliary equipment related to the pump, and special pump auxiliary equipment design shall be required when necessary. 13.0.2 This major shall provide the container and heat exchanger major with the ACF, CF drawings and data sheets of the above-mentioned manufacturers (commercials), and propose special pump auxiliary equipment design conditions when necessary. 284 Relationship with the Standards Department 14.0.1 The Standards Department shall review the design regulations, equipment (inquiry, order) purchase order/technical specifications and other technical documents prepared by this specialty 14.0.2 This specialty shall provide the Standards Department with the engineering design regulations (draft), equipment (inquiry, order) purchase order/technical specifications (draft) and other technical documents. 15 Relationship with the Inspection Department (when necessary)15.0.1 Conditions and information that the Inspection Department needs to provide to this specialty: Opinions on the engineering design regulations (draft); Opinions on the equipment (inquiry, order) purchase order/technical specifications (draft); Opinions on the quotation review of the manufacturer (commercial); Detailed requirements for technical inspection and test items for pumps; Opinions on detailed VCM topics. Conditions and information proposed by this specialty to the inspection department: relevant parts of the preliminary draft of the engineering design regulations: relevant inspection parts of the equipment (inquiry, order) purchase requisition/technical specification: relevant parts of the manufacturer's quotation technical documents: VCM detailed agenda; VCM minutes (technical part) and modified or updated documents and data sheets: ACF and CF drawings and data sheets of the manufacturer. 16 Relationship with the purchasing department (when necessary) The purchasing department needs to provide the following conditions and information to this specialty: 16.0.1 The manufacturer’s (commercial) quotation and technical documents; the relevant manufacturer’s (commercial) technical and economic information, product catalogs and samples; the manufacturer (commercial) participating in the VCM agreed upon with the user (owner); 285 The notice of holding the VCM agreed upon with the user (owner); the relevant contents of the order contract; The manufacturer’s (commercial) ACF and CF drawings and data sheets and the manufacturer’s (commercial) drawing and information dispatch form; the manufacturer’s (commercial) final CF drawings and technical documents; the manufacturer’s (commercial) product test records and certificates. The conditions and information that this specialty proposes to the purchasing department include: equipment (inquiry, order) purchase requisition/technical specification; suggestions for selecting the manufacturer (merchant) for inquiry; review opinions on the manufacturer's (merchant's) quotation and suggestions for selecting the manufacturer (merchant) for ordering; procurement technical risk memorandum (submitted when necessary); VCM detailed agenda: VCM minutes (technical part) and modified or updated documents and data sheets; summary opinions on reviewing the manufacturer's (merchant's) ACF and CF drawings and data sheets; memorandum involving procurement aspects during the design process.1 The manufacturer's (commercial) quotation technical documents; the manufacturer's (commercial) technical and economic information, product catalogs and samples; the manufacturer (commercial) participating in the VCM agreed with the user (owner); 285 The notice of holding the VCM agreed with the user (owner); the relevant contents of the order contract; The manufacturer's (commercial) ACF and CF drawings and data sheets and the manufacturer's (commercial) drawings and data sending sheet; the manufacturer's (commercial) final CF drawings and technical documents; the manufacturer's (commercial) product test records and certificates. The conditions and information that this specialty proposes to the purchasing department include: equipment (inquiry, order) purchase requisition/technical specification; suggestions for selecting the manufacturer (merchant) for inquiry; review opinions on the manufacturer's (merchant's) quotation and suggestions for selecting the manufacturer (merchant) for ordering; procurement technical risk memorandum (submitted when necessary); VCM detailed agenda: VCM minutes (technical part) and modified or updated documents and data sheets; summary opinions on reviewing the manufacturer's (merchant's) ACF and CF drawings and data sheets; memorandum involving procurement aspects during the design process.1 The manufacturer's (commercial) quotation technical documents; the manufacturer's (commercial) technical and economic information, product catalogs and samples; the manufacturer (commercial) participating in the VCM agreed with the user (owner); 285 The notice of holding the VCM agreed with the user (owner); the relevant contents of the order contract;bZxz.net The manufacturer's (commercial) ACF and CF drawings and data sheets and the manufacturer's (commercial) drawings and data sending sheet; the manufacturer's (commercial) final CF drawings and technical documents; the manufacturer's (commercial) product test records and certificates. The conditions and information that this specialty proposes to the purchasing department include: equipment (inquiry, order) purchase requisition/technical specification; suggestions for selecting the manufacturer (merchant) for inquiry; review opinions on the manufacturer's (merchant's) quotation and suggestions for selecting the manufacturer (merchant) for ordering; procurement technical risk memorandum (submitted when necessary); VCM detailed agenda: VCM minutes (technical part) and modified or updated documents and data sheets; summary opinions on reviewing the manufacturer's (merchant's) ACF and CF drawings and data sheets; memorandum involving procurement aspects during the design process. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.