title>QB/T 1696-2004 Industrial steam irons - QB/T 1696-2004 - Chinese standardNet - bzxz.net
Home > QB > QB/T 1696-2004 Industrial steam irons
QB/T 1696-2004 Industrial steam irons

Basic Information

Standard ID: QB/T 1696-2004

Standard Name: Industrial steam irons

Chinese Name: 工业用蒸汽熨斗

Standard category:Light Industry Standard (QB)

state:in force

Date of Release2004-08-15

Date of Implementation:2005-01-01

standard classification number

Standard ICS number:Household and commercial equipment, entertainment, sports >> 97.060 Laundry equipment

Standard Classification Number:Light Industry, Cultural and Living Supplies>>Light Industry Machinery>>Y99 Other Light Industry Machinery

associated standards

alternative situation:QB/T 1696-1993

Publication information

publishing house:China Light Industry Press

ISBN:155019.2661

Publication date:2005-01-01

other information

drafter:Xu Guoyou

Drafting unit:Shanghai Weijie Hongxin Ironing Equipment Co., Ltd.

Focal point unit:National Technical Committee for Standardization of Clothing Washing Machinery

Proposing unit:China Light Industry Federation

Publishing department:National Development and Reform Commission of the People's Republic of China

Introduction to standards:

This standard specifies the terminology, product classification, requirements, test methods, inspection rules and marking, packaging, transportation and storage of industrial steam irons. This standard applies to steam irons used in industrial departments or in commercial service places (hereinafter referred to as "irons"). QB/T 1696-2004 Industrial Steam Irons QB/T1696-2004 Standard download decompression password: www.bzxz.net

Some standard content:

ICS ST CEC
Classification: Y99
Preparation No.: 43062CC4
Light Industry Standard of the People's Republic of China
QR/T 1696 —2C04
QH/16—[3
Industrial steam iron
Industrial clectric steam ircn2004-08-15Released
National Development and Reform Commission of the People's Republic of China2005-01-01Implementation
Standard is based on QB/T1696—1993-Industrial steam iron. The Federation of Industry Promotion:
Not a national energy installation sinking source standard city standardization technology fee public mountain this standard part is the main starting unit: "Haihong travel heart snake equipment installation: this standard is the main starting section: permission.
-iKAONhiKAca
QR/T1656-2004
Standard with: 1989 issued the standard certificate 28/141189 industry monthly, 1 year a copy is 0BT[696·1993, this is the second revision. This standard is implemented, the representative of the light industry 1 will issue a diameter 1. Industry standard Q69619 (industry piece steam 4
a scope
industrial steam iron
OR/T13952084
This standard is determined by the Swiss government. The industry health system is used by people: the product is separated from the family. The western concentration method is used to check the stock dam. The standard is joyful, exciting, and freight prices.
Wood: The industry door is used to manage the service field (the following questions are "members of the fight" and this standard has no health. There are few places where the immortals have established a place to buy yuan people in the middle of the middle and the middle of the middle. The risk of the medium is fierce, etc. This standard:
Sign the same sweep similar to the road, Wu Zili travel heart some 4 things, put the static and fly 1.1 bar of the electric number of the fight; the family uses the heart
★A certain collection condition is a special field such as the unique or honorable gas "Dust, Yan gas or body: etc. The monthly test of the national Lan door, labor production, etc.: the human department, such as the North group, only observes a certain radiation The financial requirements should be 2. The referenced documents 4 || tt || are listed in the documents as standard or marked with the remaining materials. All the documents used shall be subject to the modification or design of this standard. The latest version of this standard shall apply to all the documents without any errors or omissions. The basic method of the whole process shall be the latest version of this document. All the documents without any notes shall be subject to the latest version of this standard. GB: T14-200G. The basic inspection number plus GR2011996 home horse rental micro-industry road head disassembly seat first company: GB/: 2423.17-1993 electric 1 electric: product English car degree collection test Test K: service test supervision from GB/T2828.1-2003 count deduction selection test process! Part: non-part: epidemic female quality (AQI., natural step by step: North border test F design
(H7062-1996 home use and this assumption under the whole power benefit only effective point GB Ting 5226.1-1996 machine each machine over this line of equipment Part 1: common technical measures 3 terms and definitions
the following technical provisions support this standard science
in the use of the normal cow stop and the same flow, except for the male war provisions, the density is the core value 3.1
micro rated voltage ratedvoltago
is planned for the operation of Shenzhen
rated voltagerange
Rated voltage range
The range specified by the main
.
R/T16962004
KNrKa-
Working voltage wurhingyollage
To be determined by the title and the death of the mountain belt under the "working conditions, the total non-part of the maximum current = when the circuit rate
rated input power ratedpowerinput
The system is designed for the specified input power. 3.5
Rated input power range ratedpnwerinputrang The input frequency is commonly used as specified by the manufacturer, upper and lower limits: 3.6
Rated current Faledcnrren
Can be specified for the iron current
Juice: North wave core real power + fuel mountain new: Three-flow day is the training rate of the extra yuan power: good 3.7
Rated frequency nutrdfreyueney
Company made is still the frequency of the installed bucket.
Normal working standard murmaloperatio
Two-way power supply: its! "The whole state. 3.9
The source of the soft cord suppycord
is effective +, H one uses the soft excitation
basic insulation hasirinulatinn
The power department plans to provide cost protection.
Type of appliance cags1appliance
Rise the mountain protection instrument does not include a green towel what a person's industry to do a personal protection trick, its protection is the same as the insulation, the conductive parts of the easy to complete the control facilities have paid the local protection, the protection measures are always in the school 3.12
Thermostat thermaslal
must be accurate temperature or gas temperature sense set, the city with its children through the automatic connection or disconnection of the month to protect the money heat Meng ten temperature value in certain installations.
Thermostat temperature Uimiter
door temperature solid high my state consider taking reduction device, big belt working period, ironing point method to the first determine the Bo, its with ten or connected to the Song
heat circuit breaker theimalcutour
belt! , eliminate the plan to limit the performance of the circuit breaker with less current, the conclusion of the purchase of the production of large by the total setting value:
natural melt wire"
therpaink
six times of work", after the water department or the whole production of the thermal reducer 5.16
weak touch parts aerasililepart
proof non-must reach parts or tables, and inclusive, easy to drive the metal part of the near chemical protection parts. 3.1!
livepart
: often use hours, energized conductive parts, including neutral line, 3. 15
creepage distance
QB, T1896-2004
The distance between two conductive parts, or between a conductive part and the easily accessible surface of the product measured by the insulation material. 3.19
Electrical clearance
The space between two conductive parts, or between a conductive part and the easily accessible surface of the device. 3.20
The space between two conductive parts, or between a conductive part and the easily accessible surface of the device. 4 Product classification
4. Type
411 Full steam
4.1.2 Electric heating hot steam iron
Medium heat steaming
b Steam effect bucket.
4.2 Model
Collection serial number: Use Arabic digital table
Product code: Q is full steam, D1 is relative steam, L2 is hanging bottle medium heat steam
Regulation code: Electric The value of the heating film is expressed in W, the steam iron is expressed in
, the single is MP
, the design guide: expressed in Arabic
, the industrial gas iron is expressed in the upper layer of the design of the combination of Arabic words, QB/T1696—2004
5.1 The double bar under the number can be expressed in 1
5.1. Absorption point illumination 0 0m
5.1.2 Week use you, -4℃
5.2 Safety requirements of electric heating fan
Heat reduction points should include all parts B/5226.: -190% of the requirements -TKAONhiKAca
5.2.1 Grounding resistance
Mon pool line grid or control and need to be connected with the new parts can: power supply ratio value is not greater than 0, make gate source line When measuring the diameter, the value is 1022, up to, and the middle of the United States agricultural color dial, according to the landmark points of the North 5.2.2 electric wire
power line account tensile strength should not be lower than the braided government or stop the heart 24 S line), the strand temperature is not lower than 5
insulation driving, the key to the case has a non-critical installation and anti-installation benefits 5.2.2.1 power line cross-section tax
a), can not be less than 6A power supply I should not be less than 0.75m: effective current of 10A power line nominal load version is not less than +-m5.2.2.2 other power and ground wire type vertical or / green double blue: 5.2.2.3. The power cord is bent and the power line is reduced by 2 times. 4. The wire is not new, except for the wire breakage rate of 10%, and the loss of the wire is not guaranteed.
: The main load surface is built at 2 points
b.2.3 The internal wiring
is designed according to the shallow media or layer, and some loose parts are not available. The indication is that the connection is not light and the connection is not possible. 5.2.4 The power supply used is in accordance with the standard B119962099.1-996: 5.2.b The half resistance is not less than T≤M0.
5. 2. 6 Leakage current
a) On state: At T, the total leakage current is 1 person inch n75mA. Tidal concept: the temperature is 4021, relative humidity is 1%, the duration is 48h, the tidal state will be sincere, the reduced current is not more than 0.75m
5.2. Electric strength
) Cold state: the electric strength test of the live parts between the hot + cold parts can be used for 50Hz1500V, 3mm, no flash and mountain penetration occurs,
b] "state: at the temperature of the parts, the quality of the parts can withstand the reverse change of 50Hz, 00)V, l[m in the air return test box, no flash occurs.] Lake state: after experience or verification, the components of the city enterprise can withstand 2 dynamic, 1250V, the registered electrical strength reduction Inspection, no industry network science wear home 5.2.3 power code difference
Shengdou number and process to sink one, dynamic element in the head point solid 5.2.9 Dou 1 has a broken or road phenomenon mountain
5210 under overload conditions T work
table in the test unit small adjustment input for the rated input station new flash 1.27 low conditions: after 13 people can this after the test input should include this death work system.
5211 handle temperature rise
or the center of the learning support is not yet under 5.2.12 Dou temperature stability requirements
self-identification test and life test, the percentage of polarization is not under 2 requirements. 5. 2. 13 abnormal second work
QB/I 1656-2U04
Flexible bucket structure, can also prevent 1 abnormal operation or read the abnormal fire other tests, complete umbrella or power protection business opportunities in the above test, wide bucket also spray mountain fire purchase, rate of reading gold disease, reach the dangerous gas 5.2.14-a change
5.2.15 Shuang bucket board strength and drop test Sheng bucket in the government fall monitoring high, not full technical model, with world limit parts external frequency: ironing has active learning to make chemical production humidifier still production benefit gas change number of the mouth score is not much more than 20%. 53 Performance requirements of the bucket
5.3.1 The temperature of the bottom plate of the bucket should be within 5 minutes. The temperature of the center point of the bucket should be within 130 minutes. The center point refers to the temperature distribution of the bottom plate of the bucket. The temperature distribution of the bottom plate of the bucket should be within 25K. The temperature of the bottom plate of the bucket should be within 25K. The temperature of the bottom plate of the bucket should be within 25K. Into the state or Zhu) pressure! : Should be humid steam lake gas phenomenon 5.3.4 Thermostat requirements || tt || 5.3.4.1 The stimulated should have your consumption scale indication: 5.3.4.2 The temperature of the high and low points of the report should be (20 + 25) [within 5.3.4.3 The temperature change range of the bottom plate || tt || The temperature of the bottom plate should be large: The temperature of the whole piece should be high in the steam flow, the product should be full of information, and the temperature should be 45: low hair clothes hot spot over temperature The temperature should not be 0, the temperature device or the hot spot temperature fluctuation should not be too severe, the temperature should be good or normal, 5.3.5 The gas volume of the positive electric steam bottle should be large (h) steam per day, 30 guiu:
=) gas: 30g/min
The vaporization performance of the hanging bottle type electric steam bucket should be 1m with steam spray, and there should be no full water source. 5.3.8 Drum coating
5.3.8.1 Drum bottom plate corrosion resistance
The net layer is penetrated by the bottom plate of the drum, and the bottom plate of the drum is not allowed to be separated from the bottom plate. The front plate is not allowed to be separated from the bottom plate. 5.3.8.2 Physical properties of bottom plate coating
5.3.3.2.1 Coating formula: In the 10 times of scratch test, the first 5 materials are not allowed to be coated! For this device, the 5 materials in the 5 times of the whole test are not the core
QH/1:606-2004
5.3.A.22 Coating/sequence: The average film thickness of the coating is 10um~20um. iKNrKca
5.3.23 The blister layer of the heating plate: When the temperature of the bottom plate is increased to 250, there should be no color change, and the coating should be smooth and stable. 5.3.9.24 The coating life is not less than 5001 months under rated power. After the test, the damage score under the temperature of the device is not more than 20%.
5.3.10 Appearance
5.3.10.1 The surface of the body should be fully covered with protective film, and there should be no obvious spots, bubbles, cracks, peeling, etc. after the surface protection method is fully covered. Color change c! Metal core is applied with a protective coating. Other protective treatments are required. The surface of the overall layer is smooth: no obvious stalling, flaking and bottom exposure. 5310.2 The surface of the vehicle should be smooth and smooth, without burrs, cracks, etc. The handle will be steamed under high temperature. The steel surface should be coated with anti-rust paint. 5.3.11 Anti-rust property
The overall metal core protection parts have been tested for 24 hours. The layer outside the edge and corner should not show corrosion.
No penetration test is allowed. This test is not allowed.
5.3.12 The length of the power cord
The effective length should not be less than 2.5
5.3.13 The length of the steam hose ||tt ||The hot liquid steam hose should not be less than 3
5.3.14 Drop test with air
The good effect of the drop test with air shall meet the requirements of GB4706.2-199. 6 Test method
6 "Test case"
6.1.1 Environmental conditions
This standard type of test should be carried out in the environment of light flow, strong light and other heat radiation, and the ambient temperature should be 20 5 ℃. It can be carried out in a general indoor environment: 6.1.2 Temperature test
The condensation rate is measured by a thermocouple. The diameter of the fake wire is not more than 0.3m. The electric couple is used for the test. The rate difference is large at the center of the fake piece with a diameter of 10u and m. The rate will be reported at the bottom of the test if it is less than 5. . And measures should be taken to ensure that the bottom of the limit piece has a good connection, and try to reduce the support: 6.1.3 The three-point metal bracket used for the test
The test piece is placed on the metal bracket with three fulcrums. The one-point bracket should be able to support the bottom of the bucket horizontally, and its support should be at least 100m vertically from the bottom of the bucket. 8.1.4 Construction conditions bzxZ.net
After the bucket finds the central source for 30 minutes or injects pressurized hot steam for 15 minutes, it can be confirmed that the stable condition has been reached: 6.1.5 Reduce the test voltage
for half the test, and allow 1% of the setting during the test. 6.1.6 Steam pressure
The steam pressure used for the double bucket is 0.2MP4~0.3M. 6
±. 1. The strength test of the electrical transformer is 50% AC voltage, and the positive capacity of the transformer used in the test is not less than 0.5kVA. The test current of the transformer is 50mA. 6. 1. The test of the transformer is 0.5 level for type inspection and 1.0 level for type inspection of electrical measuring instruments: b) The test accuracy of the wet test meter is not more than 1℃, and the factory inspection accuracy is not less than ℃. ) 19
6.1.9 Others
When testing the appearance of the control vehicle, it should be observed whether it meets the requirements of this standard, and the image and the selected one can be used to meet the requirements of the appropriate length of the sample. The test terminal can be used as much as possible: 6.2 Safety requirements of the bucket
Avoid half of the closeness of the enterprise fee according to the relevant provisions of GE4706.2-[996. 62.1 Grounding resistance
The battery core instrument is used to measure the width of the bucket terminal and the metal outer system, which should meet the requirements of 52. 6.2.2 Power supply
a) Use visual education, etc. in accordance with the requirements of 5.2.2.1, 5.2.2.2 b) Use this to conduct a life test on the power cord, which meets the requirements of 5.22.3. 6.2.3 Internal connection voltage test, should meet the requirements of 5.2.3. 6.2.4 Electrical connection, should meet the requirements of 5.2.4. 6.2.5 Insulation resistance, the live parts of the metal casing should be filled with insulation, should meet the requirements of 5.2.5: 6.2.6 Leakage current test, when the power is on, the leakage current is measured by leakage current meter, should meet the requirements of 5.2.6. 8.2.7 Electrical strength, when the live parts of the metal casing ... 6.2.9 Short circuit
Check the test tube with a thermometer to see if there is any short circuit or short circuit.6.2.10 Overload
Adjust the test voltage to the rated voltage according to the pressure gauge, and meet the requirements of 5.2.10. 6.2.11 Temperature rise of the test tube
Set the temperature control of the whole tube to the high position, apply the rated current: after reaching the test conditions, use the thermometer to measure the temperature rise of the tube at the center of the side of the tube, which should meet the requirements of 5.2.11. 6.2.12 Qualitative characterization of thermostatic processes 6.2.12.1 Measure the temperature change of the thermostat at the highest temperature position in accordance with 6.3.4.2, and then calculate its temperature average. Then do not change the position of the thermostat and perform a drop test as specified in 6.2.15. After the test, measure the temperature change of the thermostat at the highest temperature in accordance with 6.3.4.2 and calculate the average temperature. After the drop test, the temperature deviation of the thermostat is expressed in % and is calculated according to the formula (1:1). QB/T16SE—2004 Please pay attention to the manufacturer's specifications when purchasing the product or thermostat. The value of the flat inquiry letter;, a reading of the added, active belt maximum temperature letter temperature ratio of the average. 2.122 according to the 6.39 gold formula, 634.2 use temperature information. The heat price element adjusts the temperature number to complete the number as % cold small, our public Wu let bamboo
small test and adjust the product Cui low temperature Xie
home filter. The temperature sensor conducts the highest elimination transmission province needs to sign the average: the flow inspection is high core temperature this product must be flat. 6.2.13 Abnormal normal operation
Abnormal, with the following terms:
a) The internal receiving and sending circuit shows the components, the typical thermal economy (line) circuit converter, the terminal seat connected to the main station reduces the limit product exposure with the test side, the top technology receiving board temperature does not move: 5
e) or test s uHz.1ymmh
E. 2. 14 Stability
Natural cattle together with the "wine year needs 1, no cattle when the original 6.2.15 mechanical strength and drop
certification will be purchased on the machine, the transmission 4 with the year of Xu 2: the style of the bucket to fall not 15, less: 5 product system support, point test into 0 accepted design, make the bucket price big effect 1% of the stock time +, make it flat to fall in: road time flow can cloud
original power, material enterprise for the division of teaching heat spare parts, constant also:. Original test three, two change green 52.15 time request
6 .2 bucket performance
.3.1 bucket bottom heating time
center 3.1! A stealing inflammation cattle: will be a oxygen temperature circuit effect, the mega-send heart of the table has 2 points to the extreme center, note 2MP0M, from the quality upgrade open! 1 total low center point method to 90, plan 6.3.1.2 plus ten: will be at + temperature effect, effect and human support plan:, the temperature device produces ten highest height high, heat tight station investment center, in. To start with suitable out, the whole trip to do the center wide temperature must:: all time! Heating time ||t t||6.3.1.3 hot spots
average 6.312 treasure method, flow original grid, cut-off source, certificate north fee bucket release: 5 books flange model city: to report worker hunger in the whole of the meal, installed bucket with agricultural Ning, next year product heart finished product management of the market, deep students one that is the heat of the board 6.3.2 bottom extremely warm thick left groove sex
6.3.2.1 for the test standard or happy to receive the heat on the students, the punishment is) the teaching deficiency point:
0) bottom core center:||t t||Technical line in front
d) No report giant × Mi special edition on the end 25mm&OR/T1596-2334
Land such as installed crown bucket: near the electric after waiting for Man meter format: Thank you Shanghai temperature release, estimate the center point product must ensure the effectiveness of the technology, measure at each point method
completely natural steam beauty bucket: enter DM pressure must steam, poem complex urgent want to think of the point temperature 6.322 temperature calculation
Calculate the total weekly system changes within 10m, predict the customer! The heart proves the production benefit of 5 degrees, and then reduces the appropriate board point by half, the heart calculates the deep average product intention and allocates the total half of the family, compared with the step: in the benefit automobile or benefit, the thermal power sales representative car, the authorization pass the predetermined point, the sample dynamic network we 6.3.3 seal production
ttao.4MP thermal power: tk mountain j0min
single electric Dong capital time to this design test.
6.3.4 Temperature controller
6.3.4.1 Inlet.
63.4.2 Flow: effective point of the product, the temperature of the product needs to be increased, and the product can be returned to the lowest point after the standard is reached. The maximum value of the product can be obtained by the maximum temperature point within the half-point. 3.4.2 Standard
8.3.4. Point: the maximum commercial temperature of the device is 3 times the average. 3.4.3.
6.3.4.4 Starting value, add super humidity and temperature cycle dynamic 6.3.4.4.14 effect, full acceptance, the bottom cost of the point of enthusiasm. Determine the use of electricity, the core is the ground grid steam generator, pure site temperature emission technology 2, to prevent the effective migration of the battery, three times of power injection, a total of only the first ten, there are the most measured point temperature difference and the corresponding "out of the line chart: hand
QB/T1696-2C01
63.4.42 limit station mountain line chart to determine
iKAoNirKAca-
a determine the initial peak encounter: it is the first peak temperature of the first mountain after the adjustment of the cave device 6) half-motion selection value mixed: it is the low level of the flat after the normal entry: the core heating avoidance temperature: it card starting price peak group love and the average peak steam temperature cover d) the number of hot spot temperature to compare the period of wave cutting: the early product hot spot after the five whole value of the temperature of the average value of the corresponding minimum humidity under the average question half.
storage. 3 5 electromagnetic regulation
signal,, to meet the requirements of 5.3.5.
6.36 cause Doushan steam volume
6.36.1 full steam volume method - and electric heating Hui Dou power is not under the state of your volume method. Every drop of the whole steam pseudo protection connected to move in: up,? under enough weight 1 love power supply, steam is sent 03P: the steam room to make the steam Dou Qing long capital! , adjust the gas market, so that its state production remains unchanged, mountain, 30m of the water in the boiler, the rate of steam conversion unit is calculated to be realized. The determination of the heat effect of the hot steam in the new article: the metal bracket of the village bucket is used as the quantitative requirement of the heart machine cat (the distance between the opening of the small device and the bottom of the bucket is the main distance between the price and the price of the small device). The temperature adjustment effect is at the highest temperature. The rated voltage is applied. After reaching the specified value, press the steam: the steam is sprayed after mim times: the steam is sprayed: the total cost is calculated by the technical public) and the steam emission rate is calculated. 3:
Blow bucket count minutes book hot steam main, min: total mass of evaporation products, g:
Add emission road total point,
Continuous emission time, min:
6.3./Evaporation performance
Will hang makeup mountain hot spirit bucket I state full output, state thermostat applied to the high-end setting position, get the indication to chase the fire, open the hot steam count small valve. Follow the absolute steam 1 mm, should meet the provisions of 5.3.7. 6. 3. 8 Symptoms standard road layer
0.3.8., the wear resistance of the bottom plate coating
Put the history on the durable machine, the effect bucket is happy to raise the store 1, the corresponding lower volume cotton, the thickness should not be less than 5, the door plus 122, (weekly volume and forget not less than
2.sk several buckets of water half a hundred or moving, purple count 1 m. Speed ​​10mi-2m/. 0.25m1.0
20×(2:2) support, 4 original meters need 28×24 sand (and 4 test time) test yuan, test time:
Before the test, the predetermined electric current should be applied, and the suction current should be controlled within the range of 00℃-125℃. Note that the temperature should be lowered quickly, but the temperature that does not cause browning is the test temperature. 6.3.8.2 Physical properties of the base plate before coating
6.3.8.2.1 On the base plate 1 about 1% strong 11 cables (cable interval is 1mm, depth of light must be able to contain blood 1, shape consideration 100. Supply grid, stand 112mm release fee stock, this repeat 10 times of adhesive tape replacement, again! Period, glue back single system fast, 5.3.8.2.2 Use high frequency flow film sequence to measure the actual 5-point film thickness value, calculate the average thickness. 3.R.2.3. Heat-resistant film coating, need to be placed in the oven, 250 degrees Celsius, minimum 30 minutes test, 5 can wait for the relevant regulations of 5.3.8.2.3
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.