title>JB/T 6033-1992 Crawler bulldozer thermal balance performance test method - JB/T 6033-1992 - Chinese standardNet - bzxz.net
Home > JB > JB/T 6033-1992 Crawler bulldozer thermal balance performance test method
JB/T 6033-1992 Crawler bulldozer thermal balance performance test method

Basic Information

Standard ID: JB/T 6033-1992

Standard Name: Crawler bulldozer thermal balance performance test method

Chinese Name: 履带式推土机 热平衡性能 试验方法

Standard category:Machinery Industry Standard (JB)

state:Abolished

Date of Release1992-05-28

Date of Implementation:1993-01-01

Date of Expiration:2008-01-01

standard classification number

Standard Classification Number:Engineering Construction>>Construction Machinery and Equipment>>P97 Construction Machinery for Building Engineering

associated standards

alternative situation:Replaced by JB/T 6033-2007

Publication information

other information

Focal point unit:Tianjin Engineering Machinery Research Institute

Publishing department:Tianjin Engineering Machinery Research Institute

Introduction to standards:

This standard specifies the conditions for the thermal balance performance test of crawler bulldozers, the instruments and equipment used, the measuring parts, essentials, test methods, judgment methods and the format of the test record sheet. This standard is applicable to the thermal balance test of crawler bulldozers with new designs, modifications, conversions, and major changes in structure or performance. The thermal balance test of crawler loaders and crawler tractors can also be used as a reference. JB/T 6033-1992 Crawler Bulldozer Thermal Balance Performance Test Method JB/T6033-1992 Standard Download Decompression Password: www.bzxz.net

Some standard content:

Mechanical Industry Standard of the People's Republic of China
JB/T6033-92
Crawler bulldozer
Thermal balance performance test method
Published on May 28, 1992
Implementation by the Ministry of Machinery and Electronics Industry of the People's Republic of China on January 1, 1993
Mechanical Industry Standard of the People's Republic of China
Crawler bulldozerbZxz.net
Thermal balance performance test method
Subject content and scope of application
JB/T6033-92
This standard specifies the conditions for the thermal balance performance test of crawler bulldozers, the instruments and equipment used, the measuring parts, essentials, test methods, judgment methods and the format of the test record sheet.
This standard is applicable to the thermal balance test of crawler bulldozers with new designs, modifications, conversions, and major changes in structure or performance. The thermal balance test of crawler loaders and crawler tractors can also be used for reference. 2
Reference standard
JB1666
3Test purpose
Crawler bulldozer
Type test method
Check and verify whether the thermal balance performance of crawler bulldozers during idling and load operation meets the requirements. Test conditions
The test sample must be run-in for no less than 50 hours. The engine speed and fan speed should be adjusted within the specified range. Antifreeze is not allowed to be added to the cooling water, and the water level should be within the specified range of the radiator. The hydraulic oil tank should be filled to the maximum allowable oil level, and the rest of the parts should be filled within the specified range. Fix the thermostat in the fully open state.
The door in the test is opened to the maximum state.
The temperature sensor should be installed at the oil flow part. When the temperature sensor is placed at the oil dipstick position for measurement, the sensor should be 100mm from the tip of the dipstick.
Before the test, the bulldozer attachments and accessories should be recorded, and the soil on the crawler should be cleared. 4.8
This test cannot be carried out on rainy days and when the wind speed is greater than or equal to 6m/s. The test time should be selected within the range of 10 am to 4 pm, and the climate, temperature and air pressure should be recorded. During the entire test, a dedicated person should be responsible for measuring the readings. Test equipment
The test equipment refers to the provisions of Article 6.2 of JB166G. 6 Test location
The test measurement locations are shown in Tables 1 and 2.
Approved by the Ministry of Machinery and Electronics Industry on May 28, 1992 and implemented on January 1, 1993
Machine model
Test location
Use level
Mound N value
JB/T6033-92
Table 1 Mechanical drive bulldozer thermal balance test data sheet Factory number
Air temperature and wind speed
Bulldozer gear, reverse gear
Times/100mm
Measurement location
Water tank rubber heat
Water temperature of the device
Engine lubricating oil temperature
Main Clutch oil temperature
Gearbox oil temperature
Rear axle box oil temperature
Final drive
Steering cooler
Main clutch
Cooler oil temperature
1Operating device oil temperature
Machine model
Test location
Use grade
Soil fill N value
Pre-test temperature
Maximum idling speed
1Soil moisture content
Test period
Test start time
Test personnel
40℃ conversion value
Table 2 Hydraulic machine Mechanical transmission pusher heat balance test data sheet Factory number
Bulldozing second gear, reverse second gear
Times/100mm
Test location
Radiator cooling
Water temperature of the radiator
Engine lubricating oil temperature
Transformer oil temperature
Power transmission oil temperature
Rear axle box temperature
Final drive
Transformer
Cooler oil temperature
Torque converter
Cooler water temperature
Working device oil temperature
Pre-test temperature
Air temperature and wind speed Speed
Maximum idling speed
E-fill moisture content
Test period
Test start time
Tester
40℃ conversion value
Qualified value
≤100
Qualified value
7 Measurement essentials
JB/T6033--92
7.1 Water temperature and oil temperature should be measured with a thermistor thermometer, which should be carried out at half the distance of bulldozing (or running). If it cannot be measured during operation, it should be measured after stopping the engine and when the engine speed drops to a low speed. However, the measurement time shall not exceed 5 minutes. 7.2 When measuring, the thermistor sensor element should be inserted into the flow part of water or oil. If an expansion thermometer is used for measurement, the thermal sensitive part should be fully immersed in water or in the oil.
7.3 The torque converter and water tank cooler must be measured during operation. The temperature difference between the door and the outlet is the temperature of the water tank cooling. 7.4 The temperature measurement interval is once at the beginning of the test, once after 1 hour of the test, and once every half an hour thereafter, until the whole machine reaches a thermal equilibrium state.
5 The number of measurement points for each test location should be more than 1 point, and the temperature measurement accuracy is ±0.5℃. 7.5
8 Test method
8.1 Idle running test method
On the 3-shaped runway 1: Circulate at the highest speed, measure the temperature once at the beginning of the test, measure it again after 1 hour, and measure it every half an hour thereafter, until the whole machine reaches a thermal equilibrium state. 8.2 Test method during operation
The operator can choose two skilled drivers to rotate once every hour. When moving forward, use the first gear to push the earth, and require full shovel operation. When moving backward, use the gear to return. The pushing and transporting range should be within the range of 20 to 40m, and the operation should be repeated. When the pushing depth is greater than the height of the shovel, fill in the opposite direction to prevent the temperature from dropping. The measurement should be carried out halfway through the pushing. The measurement interval is the same as Article 8.1 until the whole machine reaches a state of thermal equilibrium.
Note: If the temperature is overheated or overcooled during operation, the tension of the wind belt, the air volume of the wind braid and the function of the cooler should be checked for normality. Determination method
Determination method of thermal balance test temperature If the temperature rise of three consecutive measuring points (such as 2h, 2.5h.3h) of each component does not exceed ±1°C, the whole machine is considered to have reached a state of thermal equilibrium (based on the replacement screen value). 40℃ conversion value formula: measured temperature + (40℃ - measured atmospheric temperature) 10
Test record
Measured data of mechanical drive type pusher shall be recorded in the format of Table 1, and measured data of hydraulic mechanical drive type bulldozer shall be recorded in the format of Table 2. Additional remarks:
This standard was proposed and drafted by Tianjin Engineering Machinery Research Institute of the Ministry of Machinery and Electronics Industry. This standard was drafted by Tianjin Engineering Machinery Research Institute of the Ministry of Machinery and Electronics Industry. The main drafter of this standard is named Xiang.
People's Republic of China
Mechanical Industry Standard
Crawler Pusher
Test Method for Thermal Balance Performance
JB/T603392
Published by the Mechanical Standardization Research Institute of the Ministry of Machinery and Electronics Industry Printed by the Mechanical Standardization Research Institute of the Ministry of Machinery and Electronics Industry (PO Box 8144, Beijing 100081)
Copyright reserved. No reproduction allowed
1/16 Printing Sheet 1/2 Number of Words 6.000
Format 880×1230
First Edition in October 1992
First Printing Week in October 1992
Print Quantity 00.001-500
Price 1.60 Yuan
No. 0967
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.