GBJ 310-1988 Elevator installation project quality inspection and assessment standard GBJ310-88

Basic Information

Standard ID: GBJ 310-1988

Standard Name: Elevator installation project quality inspection and assessment standard GBJ310-88

Chinese Name: 电梯安装工程质量检验评定标准GBJ310-88

Standard category:National Standard (GB)

state:Abolished

Date of Release1988-11-05

Date of Implementation:1989-09-01

Date of Expiration:2002-06-01

standard classification number

Standard Classification Number:Building Materials>>Building Components and Equipment>>Q78 Elevator

associated standards

alternative situation:Replaced by GB 50310-2002

Publication information

other information

Introduction to standards:

GBJ 310-1988 Elevator Installation Engineering Quality Inspection and Assessment Standard GBJ310-88 GBJ310-1988 Standard download decompression password: www.bzxz.net

Some standard content:

Engineering Construction Standard Full-text Information System
National Standard of the People's Republic of China
Elevator Installation Project
Quality Inspection and Evaluation Standard
GBJ310-88
1989
Engineering Construction Standard Full-text Information System
Engineering Construction Standard Full-text Information System
National Standard of the People's Republic of China
Elevator Installation Project
Quality Inspection and Evaluation Standard
GBJ310-88
Editor Department: Former Ministry of Urban and Rural Construction and Environmental Protection of the People's Republic of China Approval Department Ministry of Construction of the People's Republic of China Implementation Date: 198
September
Engineering Construction Standards Full-text Information System
Engineering Construction Standards Full-text Information System
Notice on the Release of the National Standard "Uniform Standard for Inspection and Assessment of Construction and Installation Project Quality" and Other Six Inspection and Assessment Standards (88) Jianbiao No. 335
According to the former State Construction Commission (79) Jianfa Shi Zi No. 168 document and the former Ministry of Urban and Rural Construction and Environmental Protection (85) Chengke Zi No. 293 notice, the six inspection and assessment standards including "Uniform Standard for Inspection and Assessment of Construction and Installation Project Quality" revised by the former Ministry of Urban and Rural Construction and Environmental Protection have been reviewed by relevant departments and are now approved as national standards for implementation on September 1, 1989. The provisions on elevators in the former national standards "Standard for Inspection and Assessment of Quality of Building Installation Projects" (Building Projects) TJ301-74, "Standard for Inspection and Assessment of Quality of Building Installation Projects" (Pipeline Projects) TJ302-74,
"Standard for Inspection and Assessment of Quality of Building Installation Projects" (Electrical Projects) TJ303-75,
"Standard for Inspection and Assessment of Quality of Building Installation Projects" (Ventilation Projects) TJ304-74 and "Standard for Inspection and Assessment of Quality of Building Installation Projects" (General Machinery and Equipment Installation Projects) TJ305-75 shall be abolished at the same time.
The six approved inspection and assessment standards are managed by the Construction Supervision Department of the Ministry of Construction. The names, numbers and interpretation units of each item are as follows: 1. "Uniform Standard for Inspection and Assessment of Quality of Building Installation Projects" GBJ300-88. The specific interpretation and other work shall be undertaken by the China Academy of Building Research. 2. "Standard for Inspection and Assessment of Quality of Building Projects" GBJ301-88. The specific interpretation and other work shall be undertaken by the China Academy of Building Research. 3. The "Quality Inspection and Assessment Standard for Building Heating, Sanitation and Gas Engineering" GBJ302-88, its specific interpretation and other work shall be the responsibility of Shenyang Construction Engineering Management Bureau. 4. The "Quality Inspection and Assessment Standard for Building Electrical Installation Engineering" GBJ303-88, its specific interpretation and other work shall be the responsibility of Zhejiang Provincial Construction Engineering Corporation Industrial Equipment Installation Company.
Engineering Construction Standard Full Text Information System
W. Engineering Construction Standard Full Text Information System
5. The "Quality Inspection and Assessment Standard for Ventilation and Air Conditioning Engineering" GBJ304-88, its specific interpretation and other work shall be the responsibility of Shanghai Industrial Equipment Installation Company. 6. The "Quality Inspection and Assessment Standard for Elevator Installation Engineering" GBJ310-88, its specific interpretation and other work shall be the responsibility of Beijing Equipment Installation Engineering Company. The publication and distribution of the above six inspection and assessment standards shall be the responsibility of China Construction Industry Press. Ministry of Construction of the People's Republic of China
November 5, 1988
Engineering Construction Standards Full Text Information System
Engineering Construction Standards Full Text Information System
Revision Notes
This standard is revised by Beijing Equipment Installation Engineering Company on the basis of the "Elevator Installation" chapter in the "Standards for Quality Inspection and Assessment of Building Installation Projects - General Machinery and Equipment Installation Projects" TJ305-75, based on the former National Construction Committee (79) Jianfa Shizi No. 168 and the former Ministry of Urban and Rural Construction and Environmental Protection (85) Chengke Zi No. 293. After the revision, it is named "Elevator Installation Project Quality Inspection and Assessment Standards", with a total of two chapters, six sections and 45 articles.
In order to meet the needs of the rapid development of elevator installation in my country, this revision has made major supplements and modifications, adding 35 new articles, highlighting the requirements of "safe operation", "functional use" and "appearance quality". At the same time, according to the provisions of the "Uniform Standard for Inspection and Assessment of Construction Installation Engineering Quality", this standard divides the sub-projects into "guaranteed projects", "basic projects" and "allowable deviation projects". The quantity requirements for each project are put forward as much as possible. At the same time, two quality grade standards of "qualified" and "excellent" are stipulated in the "basic projects".
During the revision process, extensive investigations and studies were conducted, and opinions from all aspects of the installation industry and the elevator industry were integrated. After writing the "first draft", "draft for soliciting opinions" and "draft for review", relevant experts were invited to study and modify the technical provisions, and a trial was organized. It was reviewed and approved at the national review meeting held in Guiyang in March 1987. During the implementation process, please send your opinions and relevant materials to Beijing Equipment Installation Engineering Company for reference in future revisions. Construction Supervision Department of the Ministry of Construction
October 24, 1988
Engineering Construction Standards Full Text Information System
W. Engineering Construction Standards Full Text Information System
Chapter 1
Chapter 2
General Principles·
Elevator Installation Engineering
Section 1 Traction Device Assembly
Section 2
Guide Rail Assembly.
Car and Landing Door Assembly
Section 3
Section 4
Section 5
Electrical Device Installation
Safety Protection Device
Section 6
Trial operation
Appendix 1
Appendix 3
Appendix 3
Elevator project quality assurance data verification table
Inspection equipment table
Terms used in this standard
Additional instructions
Engineering construction standard full text information system
W Engineering construction standard full text information system
Chapter 1 General Provisions
Article 1.0.1 In order to unify the inspection and evaluation methods of elevator installation engineering quality, promote enterprises to strengthen management, and ensure engineering quality, this standard is specially formulated. Article 1.0.2 This standard applies to the installation projects of various types of domestic electric-driven elevators with a rated load of 5000Kg and below and a rated speed of 3m/s and below. Article 1.0.3 The main indicators and requirements of this standard are based on the provisions of "Elevator Installation" in Volume 4 TJ231 (IV)-78 of "Specifications for Construction and Acceptance of Mechanical Equipment Installation Engineering" and "Elevator Electrical Installation" in Chapter 9 GBJ232-82 of "Specifications for Construction and Acceptance of Electrical Installation Engineering". The provisions of the "Uniform Standard for Quality Inspection and Assessment of Building Installation Engineering" should be followed when implementing this standard.
Article 1.0.4
The quality inspection and assessment of the sub-projects of elevator installation should be fully inspected and the quality of a single elevator should be assessed on the basis of the sub-item assessment. Its quality level should meet the following requirements:
Qualified:
1. All sub-projects are qualified.
2. The quality assurance materials basically meet the requirements. Excellent:
1. All sub-projects are qualified, of which 50% or more are excellent, and the excellent items must include "safety protection device" and "trial operation" sub-items.
2. The quality assurance data meet the requirements.
Article 1.0.5 The quality level of the elevator installation sub-project shall meet the following requirements: Qualified:
1. The quality of all the elevators included is qualified; 2. The quality assurance data basically meets the requirements. Engineering Construction Standard Full Text Information System
W.bzsoso.coI Engineering Construction Standard Full Text Information System
Excellent:
1. The quality of all the elevators included is qualified, and 50% or more of the single units and sub-items are excellent. And the "safety protection device" and "trial operation" sub-items of each unit must be excellent.
2. The quality assurance data meet the requirements.
Chapter 2
Elevator Installation Engineering
Section 1
Electric Hoisting Device Assembly
(1) Guarantee Items
Article 2.1.1 The installation of the electric hoisting machine load-bearing beam must comply with the design requirements and construction specifications.
Inspection Method Observation inspection or inspection of installation records. Article 2.1.2 When the counterweight fully compresses the buffer, the free space above the car must not be less than the value specified in Formula 2.1.2. h=0.6+0.035V2
Where h—minimum free space height (m);
—rated speed of the elevator (m/s).
The free space of the car and counterweight of a small utility elevator must not be less than 0.3m. Inspection Method Measurement inspection.
Article 2.1.3 When the car is unloaded, the verticality deviation of the traction wheel must be less than or equal to 0.5mm; the parallelism deviation between the end face of the guide wheel and the end face of the electric traction wheel must not exceed 1mm.
Inspection method: Hanging wire and measuring with ruler.
Article 2.Article 1.4 The speed limiter rope wheel, steel belt wheel and guide wheel must be installed firmly and rotate flexibly. The vertical deviation is strictly prohibited to be greater than 0.5mm. Inspection method Observation and hanging wire, measurement and inspection. Article 2.1.5 The wire rope should be wiped clean, and dead bends, loose strands and broken wires are strictly prohibited.
Engineering Construction Standard Full Text Information System
W.bzsoso.coIEngineering Construction Standard Full Text Information System
Inspection method Observation and inspection.
(I) Basic items
Article 2.1.6 The difference between the tension of the ropes shall meet the following requirements: Qualified: The difference between the tension of each rope is not more than 10%. Excellent: The difference between the tension of each rope is not more than 5%. Inspection method At the 2/3 height of the car, use a 50~100N (~5~10Kg) spring scale to measure the tension of each electric rope on the counterweight side at the same distance on the car, and take the average value. Then compare the mutual difference of each rope tension with the average value. Article 2.1.7 The brake shoe adjustment shall meet the following requirements: Qualified: The brake shoe shall fit tightly on the working surface of the brake wheel; there is no friction when the brake is released.
Excellent: The brake shoe shall fit tightly on the working surface of the brake wheel; the gap is uniform and not more than 0.7mm when the brake is released.
Inspection method Observation and inspection with a feeler gauge.
Article 2.1.8 The production of the rope head of the electric traction steel rope shall meet the following requirements: Qualified: The Babbitt alloy is poured densely and poured flat with the cone sleeve at one time, and the bending of the rope strands can be observed, and the bending meets the requirements.
Excellent: The bending of the rope strands meets the requirements, and the Babbitt alloy is poured densely, full, flat and consistent.
Inspection method Observation and inspection.
Section 2 Guide Rail Assembly
(1I) Guarantee Items
Article 2.2.1 The guide rails are firmly installed, and the deviation of the distance between the relative inner surfaces and the mutual deviation of the two guide rails must comply with the provisions of Table 2.2.1. Article 2.2.2 When the counterweight (or car) fully compresses the buffer, the length of the car (or counterweight) guide rail must have a further guide travel of not less than 0.1 + 0.035V (expressed in meters).
Inspection method Measurement inspection.
Engineering Construction Standards Full-text Information System
W.bzsosO.coI Engineering Construction Standards Full-text Information System
Track gauge deviation and mutual deviation of guide rails
Relative
Distance between inner surfaces of three guide rails
(Full height)
Mutual deviation of two guide rails (Full height)
Note: The rated speed of elevators is divided into three categories:
A-ladder: 2, 2.5, 3m/s (referred to as high-speed elevators). B-ladder: 1.5, 1.75m/s (referred to as fast elevators) Deviation value
C-ladder: 0.25, 0.5, 0.75, 1m/s (referred to as low-speed elevators). (I) Basic items
Article 2.2.3 The installation of the guide rail frame shall comply with the following provisions: Table 2.2.1
Inspection method
On the inner surface of the two guide rails, use
Guide rail inspection ruler and feeler gauge to check one point every 2
~3m
Check the installation record or use
special tools to check
Qualified: Firmly installed and in the correct position. When welding, double-sided welding is firm and the weld is full. Excellent: Firmly installed, in the correct position, horizontally and vertically straight. When welding, double-sided welding is firm and the weld is full, and the weld wave is even.
Allowable deviation, dimensional requirements and inspection methods for guide rail assembly Item
Verticality of guide rail (every 5m)
Local clearance
Finishing length
B, C
Distance between the top guide frame and the top of the guide rail
Engineering Construction Standard Full-text Information System
Allowable deviation or dimensional requirements
《500
Inspection method
Inspect with hanging line and ruler
Inspect with feeler gauge
Inspect with steel ruler and feeler gauge
Inspect with ruler
Inspect with ruler
Inspect with ruler
WEngineering Construction Standard Full-text Information System
Inspection method Observation and inspection.
(III) Allowable Deviation Items
Article 2.2.4 The allowable deviation, dimension requirements and inspection methods of guide rail assembly shall comply with the provisions of Table 2.2.4.
Section 3 Car and Floor Door Assembly
(I) Guarantee Items
Article 2.3.1 The deviation between the car sill and the door sills of each floor is strictly prohibited from exceeding mm.
Inspection Methods Measure and check.
Article 2.3.2 The gap between the door opening knife and the door sills of each floor and the gap between the roller of the door opening device of each floor and the car sill must be within the range of 5 to 8 mm. Inspection Methods Measure and check.
(I) Basic Items
Article 2.3.3 The car assembly shall comply with the following provisions: Qualified: The assembly is firm, the joint of the car wall is flat, and the verticality deviation of the car wall on the door opening side is not greater than 1/1000.
Excellent: Firm assembly, flat joints of car walls, verticality deviation of car wall on the door opening side is not more than 1/1000. The car is clean and undamaged. Inspection method Observation and hanging wire, measurement and inspection. Article 2.3.4 The guide shoe assembly shall comply with the following provisions: 1. Adopting a rigid structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and the sum of the gaps between the top surface of the car guide rail and the inner surfaces of the two guide shoes is not more than 2.5mm.
2. Adopting an elastic structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and there is no gap between the top surface of the guide rail and the surface of the guide shoe slider, and the expansion and contraction range of the guide shoe spring is not more than 4mm. 3. Use roller guide shoes
Qualified: The roller is not skewed to the guide rail, and the pressure is basically uniform. Excellent: The roller is not skewed to the guide rail, the pressure is uniform, the center is close to the same, and it is in uniform contact with the guide rail working surface over the entire wheel flange width. Inspection method Observation and measurement inspection.
Article 2.3.5 The installation of the floor door indicator box and call box shall comply with the following provisions:
Qualified: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically. Excellent: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically, clean and beautiful. Inspection method Observation and inspection.
Article 2.3.6 The installation and adjustment of the door leaf shall meet the following provisions: Qualified: The door leaf is flat, and there is no swing, collision or obstruction when opening and closing. When the center-split door is closed, the upper and lower parts close at the same time.
Excellent: The door leaf is flat, clean and undamaged. Opening and closing is light and stable. When the center-split door is closed, the upper and lower parts close at the same time, and the door gap is consistent. Inspection method: Observe and inspect the opening and closing.
(III) Allowable deviation items
Article 2.3.7 The dimensional requirements, allowable deviations and inspection methods for the installation of floor door sills and door frames shall comply with the provisions of Table 2.3.7. Dimension requirements, allowable deviations and inspection methods for floor door sills and door frames Table 2.3.7
The height of the floor sill above the final ground (mm)
Horizontal degree of floor door sill
Vertical degree of floor door door frame
The gap of the center-split door when closed is not greater than (mm) Engineering Construction Standard Full-text Information System
Allowable deviation or
Dimension requirements
1/1000
1/1000
Inspection method
Measurement inspection
Measurement inspection
Line and measurement inspection
Measurement inspection8. The production of the rope head of the electric traction rope shall comply with the following provisions: Qualified: The Babbitt alloy is poured densely and leveled with the cone sleeve at one time, and the bending of the rope strands can be observed, and the bending meets the requirements.
Excellent: The bending of the rope strands meets the requirements, and the Babbitt alloy is poured densely, full, flat and consistent.
Inspection method Observation and inspection.
Section 2 Guide rail assembly
(1I) Guarantee items
Article 2.2.1 The guide rail is firmly installed, and the deviation of the distance between the relative inner surfaces and the mutual deviation of the two guide rails must comply with the provisions of Table 2.2.1. Article 2.2.2 When the counterweight (or car) fully compresses the buffer, the length of the car (or counterweight) guide rail must have a further guide travel of not less than 0.1 + 0.035V (expressed in meters).
Inspection method Measurement and inspection.
Engineering Construction Standards Full-text Information System
W.bzsosO.coI Engineering Construction Standards Full-text Information System
Track gauge deviation and mutual deviation of guide rails
Relative
Distance between inner surfaces of three guide rails
(Full height)
Mutual deviation of two guide rails (Full height)
Note: The rated speed of elevators is divided into three categories:
A-ladder: 2, 2.5, 3m/s (referred to as high-speed elevators). B-ladder: 1.5, 1.75m/s (referred to as fast elevators) Deviation value
C-ladder: 0.25, 0.5, 0.75, 1m/s (referred to as low-speed elevators). (I) Basic items
Article 2.2.3 The installation of the guide rail frame shall comply with the following provisions: Table 2.2.1
Inspection method
On the inner surface of the two guide rails, use
Guide rail inspection ruler and feeler gauge to check one point every 2
~3m
Check the installation record or use
special tools to check
Qualified: Firmly installed and in the correct position. When welding, double-sided welding is firm and the weld is full. Excellent: Firmly installed, in the correct position, horizontally and vertically straight. When welding, double-sided welding is firm and the weld is full, and the weld wave is even.
Allowable deviation, dimensional requirements and inspection methods for guide rail assembly Item
Verticality of guide rail (every 5m)
Local clearance
Finishing length
B, C
Distance between the top guide frame and the top of the guide rail
Engineering Construction Standard Full-text Information System
Allowable deviation or dimensional requirements
《500
Inspection method
Inspect with hanging line and ruler
Inspect with feeler gauge
Inspect with steel ruler and feeler gauge
Inspect with ruler
Inspect with ruler
Inspect with ruler
WEngineering Construction Standard Full-text Information System
Inspection method Observation and inspection.
(III) Allowable Deviation Items
Article 2.2.4 The allowable deviation, dimension requirements and inspection methods of guide rail assembly shall comply with the provisions of Table 2.2.4.
Section 3 Car and Floor Door Assembly
(I) Guarantee Items
Article 2.3.1 The deviation between the car sill and the door sills of each floor is strictly prohibited from exceeding mm.
Inspection Methods Measure and check.
Article 2.3.2 The gap between the door opening knife and the door sills of each floor and the gap between the roller of the door opening device of each floor and the car sill must be within the range of 5 to 8 mm. Inspection Methods Measure and check.
(I) Basic Items
Article 2.3.3 The car assembly shall comply with the following provisions: Qualified: The assembly is firm, the joint of the car wall is flat, and the verticality deviation of the car wall on the door opening side is not greater than 1/1000.
Excellent: Firm assembly, flat joints of car walls, verticality deviation of car wall on the door opening side is not more than 1/1000. The car is clean and undamaged. Inspection method Observation and hanging wire, measurement and inspection. Article 2.3.4 The guide shoe assembly shall comply with the following provisions: 1. Adopting a rigid structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and the sum of the gaps between the top surface of the car guide rail and the inner surfaces of the two guide shoes is not more than 2.5mm.
2. Adopting an elastic structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and there is no gap between the top surface of the guide rail and the surface of the guide shoe slider, and the expansion and contraction range of the guide shoe spring is not more than 4mm. 3. Use roller guide shoes
Qualified: The roller is not skewed to the guide rail, and the pressure is basically uniform. Excellent: The roller is not skewed to the guide rail, the pressure is uniform, the center is close to the same, and it is in uniform contact with the guide rail working surface over the entire wheel flange width. Inspection method Observation and measurement inspection.
Article 2.3.5 The installation of the floor door indicator box and call box shall comply with the following provisions:
Qualified: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically. Excellent: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically, clean and beautiful. Inspection method Observation and inspection.
Article 2.3.6 The installation and adjustment of the door leaf shall meet the following provisions: Qualified: The door leaf is flat, and there is no swing, collision or obstruction when opening and closing. When the center-split door is closed, the upper and lower parts close at the same time.
Excellent: The door leaf is flat, clean and undamaged. Opening and closing is light and stable. When the center-split door is closed, the upper and lower parts close at the same time, and the door gap is consistent. Inspection method: Observe and inspect the opening and closing.
(III) Allowable deviation items
Article 2.3.7 The dimensional requirements, allowable deviations and inspection methods for the installation of floor door sills and door frames shall comply with the provisions of Table 2.3.7. Dimension requirements, allowable deviations and inspection methods for floor door sills and door frames Table 2.3.7
The height of the floor sill above the final ground (mm)
Horizontal degree of floor door sill
Vertical degree of floor door door frame
The gap of the center-split door when closed is not greater than (mm) Engineering Construction Standard Full-text Information System
Allowable deviation or
Dimension requirements
1/1000
1/1000
Inspection method
Measurement inspection
Measurement inspectionbzxz.net
Line and measurement inspection
Measurement inspection8. The production of the rope head of the electric traction rope shall comply with the following provisions: Qualified: The Babbitt alloy is poured densely and leveled with the cone sleeve at one time, and the bending of the rope strands can be observed, and the bending meets the requirements.
Excellent: The bending of the rope strands meets the requirements, and the Babbitt alloy is poured densely, full, flat and consistent.
Inspection method Observation and inspection.
Section 2 Guide rail assembly
(1I) Guarantee items
Article 2.2.1 The guide rail is firmly installed, and the deviation of the distance between the relative inner surfaces and the mutual deviation of the two guide rails must comply with the provisions of Table 2.2.1. Article 2.2.2 When the counterweight (or car) fully compresses the buffer, the length of the car (or counterweight) guide rail must have a further guide travel of not less than 0.1 + 0.035V (expressed in meters).
Inspection method Measurement and inspection.
Engineering Construction Standards Full-text Information System
W.bzsosO.coI Engineering Construction Standards Full-text Information System
Track gauge deviation and mutual deviation of guide rails
Relative
Distance between inner surfaces of three guide rails
(Full height)
Mutual deviation of two guide rails (Full height)
Note: The rated speed of elevators is divided into three categories:
A-ladder: 2, 2.5, 3m/s (referred to as high-speed elevators). B-ladder: 1.5, 1.75m/s (referred to as fast elevators) Deviation value
C-ladder: 0.25, 0.5, 0.75, 1m/s (referred to as low-speed elevators). (I) Basic items
Article 2.2.3 The installation of the guide rail frame shall comply with the following provisions: Table 2.2.1
Inspection method
On the inner surface of the two guide rails, use
Guide rail inspection ruler and feeler gauge to check one point every 2
~3m
Check the installation record or use
special tools to check
Qualified: Firmly installed and in the correct position. When welding, double-sided welding is firm and the weld is full. Excellent: Firmly installed, in the correct position, horizontally and vertically straight. When welding, double-sided welding is firm and the weld is full, and the weld wave is even.
Allowable deviation, dimensional requirements and inspection methods for guide rail assembly Item
Verticality of guide rail (every 5m)
Local clearance
Finishing length
B, C
Distance between the top guide frame and the top of the guide rail
Engineering Construction Standard Full-text Information System
Allowable deviation or dimensional requirements
《500
Inspection method
Inspect with hanging line and ruler
Inspect with feeler gauge
Inspect with steel ruler and feeler gauge
Inspect with ruler
Inspect with ruler
Inspect with ruler
WEngineering Construction Standard Full-text Information System
Inspection method Observation and inspection.
(III) Allowable Deviation Items
Article 2.2.4 The allowable deviation, dimension requirements and inspection methods of guide rail assembly shall comply with the provisions of Table 2.2.4.
Section 3 Car and Floor Door Assembly
(I) Guarantee Items
Article 2.3.1 The deviation between the car sill and the door sills of each floor is strictly prohibited from exceeding mm.
Inspection Methods Measure and check.
Article 2.3.2 The gap between the door opening knife and the door sills of each floor and the gap between the roller of the door opening device of each floor and the car sill must be within the range of 5 to 8 mm. Inspection Methods Measure and check.
(I) Basic Items
Article 2.3.3 The car assembly shall comply with the following provisions: Qualified: The assembly is firm, the joint of the car wall is flat, and the verticality deviation of the car wall on the door opening side is not greater than 1/1000.
Excellent: Firm assembly, flat joints of car walls, verticality deviation of car wall on the door opening side is not more than 1/1000. The car is clean and undamaged. Inspection method Observation and hanging wire, measurement and inspection. Article 2.3.4 The guide shoe assembly shall comply with the following provisions: 1. Adopting a rigid structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and the sum of the gaps between the top surface of the car guide rail and the inner surfaces of the two guide shoes is not more than 2.5mm.
2. Adopting an elastic structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and there is no gap between the top surface of the guide rail and the surface of the guide shoe slider, and the expansion and contraction range of the guide shoe spring is not more than 4mm. 3. Use roller guide shoes
Qualified: The roller is not skewed to the guide rail, and the pressure is basically uniform. Excellent: The roller is not skewed to the guide rail, the pressure is uniform, the center is close to the same, and it is in uniform contact with the guide rail working surface over the entire wheel flange width. Inspection method Observation and measurement inspection.
Article 2.3.5 The installation of the floor door indicator box and call box shall comply with the following provisions:
Qualified: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically. Excellent: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically, clean and beautiful. Inspection method Observation and inspection.
Article 2.3.6 The installation and adjustment of the door leaf shall meet the following provisions: Qualified: The door leaf is flat, and there is no swing, collision or obstruction when opening and closing. When the center-split door is closed, the upper and lower parts close at the same time.
Excellent: The door leaf is flat, clean and undamaged. Opening and closing is light and stable. When the center-split door is closed, the upper and lower parts close at the same time, and the door gap is consistent. Inspection method: Observe and inspect the opening and closing.
(III) Allowable deviation items
Article 2.3.7 The dimensional requirements, allowable deviations and inspection methods for the installation of floor door sills and door frames shall comply with the provisions of Table 2.3.7. Dimension requirements, allowable deviations and inspection methods for floor door sills and door frames Table 2.3.7
The height of the floor sill above the final ground (mm)
Horizontal degree of floor door sill
Vertical degree of floor door door frame
The gap of the center-split door when closed is not greater than (mm) Engineering Construction Standard Full-text Information System
Allowable deviation or
Dimension requirements
1/1000
1/1000
Inspection method
Measurement inspection
Measurement inspection
Line and measurement inspection
Measurement inspection1
Inspection method
Use
guide rail inspection ruler and feeler gauge to check one point every 2
~3m on the inner surface of the two guide rails
Check the installation record or use
special tools to check
Qualified: Firmly installed and in the correct position. When welding, both sides are welded firmly and the weld is full. Excellent: Firmly installed, in the correct position, and straight in horizontal and vertical directions. When welding, both sides are welded firmly, the weld is full and the weld wave is even.
Allowable deviation, dimensional requirements and inspection methods for guide rail assembly Item
Verticality of guide rail (every 5m)
Local clearance
Finishing length
B, C
Distance between the top guide frame and the top of the guide rail
Engineering Construction Standard Full-text Information System
Allowable deviation or dimensional requirements
《500
Inspection method
Inspect with hanging line and ruler
Inspect with feeler gauge
Inspect with steel ruler and feeler gauge
Inspect with ruler
Inspect with ruler
Inspect with ruler
WEngineering Construction Standard Full-text Information System
Inspection method Observation and inspection.
(III) Allowable Deviation Items
Article 2.2.4 The allowable deviation, dimension requirements and inspection methods of guide rail assembly shall comply with the provisions of Table 2.2.4.
Section 3 Car and Floor Door Assembly
(I) Guarantee Items
Article 2.3.1 The deviation between the car sill and the door sills of each floor is strictly prohibited from exceeding mm.
Inspection Methods Measure and check.
Article 2.3.2 The gap between the door opening knife and the door sills of each floor and the gap between the roller of the door opening device of each floor and the car sill must be within the range of 5 to 8 mm. Inspection Methods Measure and check.
(I) Basic Items
Article 2.3.3 The car assembly shall comply with the following provisions: Qualified: The assembly is firm, the joint of the car wall is flat, and the verticality deviation of the car wall on the door opening side is not greater than 1/1000.
Excellent: Firm assembly, flat joints of car walls, verticality deviation of car wall on the door opening side is not more than 1/1000. The car is clean and undamaged. Inspection method Observation and hanging wire, measurement and inspection. Article 2.3.4 The guide shoe assembly shall comply with the following provisions: 1. Adopting a rigid structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and the sum of the gaps between the top surface of the car guide rail and the inner surfaces of the two guide shoes is not more than 2.5mm.
2. Adopting an elastic structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and there is no gap between the top surface of the guide rail and the surface of the guide shoe slider, and the expansion and contraction range of the guide shoe spring is not more than 4mm. 3. Use roller guide shoes
Qualified: The roller is not skewed to the guide rail, and the pressure is basically uniform. Excellent: The roller is not skewed to the guide rail, the pressure is uniform, the center is close to the same, and it is in uniform contact with the guide rail working surface over the entire wheel flange width. Inspection method Observation and measurement inspection.
Article 2.3.5 The installation of the floor door indicator box and call box shall comply with the following provisions:
Qualified: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically. Excellent: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically, clean and beautiful. Inspection method Observation and inspection.
Article 2.3.6 The installation and adjustment of the door leaf shall meet the following provisions: Qualified: The door leaf is flat, and there is no swing, collision or obstruction when opening and closing. When the center-split door is closed, the upper and lower parts close at the same time.
Excellent: The door leaf is flat, clean and undamaged. Opening and closing is light and stable. When the center-split door is closed, the upper and lower parts close at the same time, and the door gap is consistent. Inspection method: Observe and inspect the opening and closing.
(III) Allowable deviation items
Article 2.3.7 The dimensional requirements, allowable deviations and inspection methods for the installation of floor door sills and door frames shall comply with the provisions of Table 2.3.7. Dimension requirements, allowable deviations and inspection methods for floor door sills and door frames Table 2.3.7
The height of the floor sill above the final ground (mm)
Horizontal degree of floor door sill
Vertical degree of floor door door frame
The gap of the center-split door when closed is not greater than (mm) Engineering Construction Standard Full-text Information System
Allowable deviation or
Dimension requirements
1/1000
1/1000
Inspection method
Measurement inspection
Measurement inspection
Line and measurement inspection
Measurement inspection1
Inspection method
Use
guide rail inspection ruler and feeler gauge to check one point every 2
~3m on the inner surface of the two guide rails
Check the installation record or use
special tools to check
Qualified: Firmly installed and in the correct position. When welding, both sides are welded firmly and the weld is full. Excellent: Firmly installed, in the correct position, and straight in horizontal and vertical directions. When welding, both sides are welded firmly, the weld is full and the weld wave is even.
Allowable deviation, dimensional requirements and inspection methods for guide rail assembly Item
Verticality of guide rail (every 5m)
Local clearance
Finishing length
B, C
Distance between the top guide frame and the top of the guide rail
Engineering Construction Standard Full-text Information System
Allowable deviation or dimensional requirements
《500
Inspection method
Inspect with hanging line and ruler
Inspect with feeler gauge
Inspect with steel ruler and feeler gauge
Inspect with ruler
Inspect with ruler
Inspect with ruler
WEngineering Construction Standard Full-text Information System
Inspection method Observation and inspection.
(III) Allowable Deviation Items
Article 2.2.4 The allowable deviation, dimension requirements and inspection methods of guide rail assembly shall comply with the provisions of Table 2.2.4.
Section 3 Car and Floor Door Assembly
(I) Guarantee Items
Article 2.3.1 The deviation between the car sill and the door sills of each floor is strictly prohibited from exceeding mm.
Inspection Methods Measure and check.
Article 2.3.2 The gap between the door opening knife and the door sills of each floor and the gap between the roller of the door opening device of each floor and the car sill must be within the range of 5 to 8 mm. Inspection Methods Measure and check.
(I) Basic Items
Article 2.3.3 The car assembly shall comply with the following provisions: Qualified: The assembly is firm, the joint of the car wall is flat, and the verticality deviation of the car wall on the door opening side is not greater than 1/1000.
Excellent: Firm assembly, flat joints of car walls, verticality deviation of car wall on the door opening side is not more than 1/1000. The car is clean and undamaged. Inspection method Observation and hanging wire, measurement and inspection. Article 2.3.4 The guide shoe assembly shall comply with the following provisions: 1. Adopting a rigid structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and the sum of the gaps between the top surface of the car guide rail and the inner surfaces of the two guide shoes is not more than 2.5mm.
2. Adopting an elastic structure
Qualified: Can ensure the normal operation of the elevator.
Excellent: Can ensure the normal operation of the elevator, and there is no gap between the top surface of the guide rail and the surface of the guide shoe slider, and the expansion and contraction range of the guide shoe spring is not more than 4mm. 3. Use roller guide shoes
Qualified: The roller is not skewed to the guide rail, and the pressure is basically uniform. Excellent: The roller is not skewed to the guide rail, the pressure is uniform, the center is close to the same, and it is in uniform contact with the guide rail working surface over the entire wheel flange width. Inspection method Observation and measurement inspection.
Article 2.3.5 The installation of the floor door indicator box and call box shall comply with the following provisions:
Qualified: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically. Excellent: The position is correct, the panel is firmly attached to the wall, and it is straight horizontally and vertically, clean and beautiful. Inspection method Observation and inspection.
Article 2.3.6 The installation and adjustment of the door leaf shall meet the following provisions: Qualified: The door leaf is flat, and there is no swing, collision or obstruction when opening and closing. When the center-split door is closed, the upper and lower parts close at the same time.
Excellent: The door leaf is flat, clean and undamaged. Opening and closing is light and stable. When the center-split door is closed, the upper and lower parts close at the same time, and the door gap is consistent. Inspection method: Observe and inspect the opening and closing.
(III) Allowable deviation items
Article 2.3.7 The dimensional requirements, allowable deviations and inspection methods for the installation of floor door sills and door frames shall comply with the provisions of Table 2.3.7. Dimension requirements, allowable deviations and inspection methods for floor door sills and door frames Table 2.3.7
The height of the floor sill above the final ground (mm)
Horizontal degree of floor door sill
Vertical degree of floor door door frame
The gap of the center-split door when closed is not greater than (mm) Engineering Construction Standard Full-text Information System
Allowable deviation or
Dimension requirements
1/1000
1/1000
Inspection method
Measurement inspection
Measurement inspection
Line and measurement inspection
Measurement inspection