Basic Information

Standard ID: SJ/T 10033-1991

Standard Name:Hydrogen thyratron,Type ZQM1-325/16

Chinese Name: ZQM1-325/16型氢闸流管

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1991-04-08

Date of Implementation:1991-07-01

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ/T 10033-1991 ZQM1-325/16 Hydrogen Thyratron SJ/T10033-1991 Standard download decompression password: www.bzxz.net



Some standard content:

Industry Standard of Electronic Industry of the People's Republic of China SJ/T10033-91
Detailed Specification for Electronic Components
ZO M1-325/16 Type Hydrogen Thyratron
(Available for certification)
Published on April 8, 1991
Implemented on July 1, 1997
Published by the Ministry of Machinery and Electronics Industry of the People's Republic of China Industry Standard of Electronic Components of the People's Republic of China Detailed Specification for Electronic Components
ZQM1-:-325/16 Type Oxygen Thyratron
All specifications are for oxygen thyratron of type Z0M11-325/16 (Available for certification)
ST/I 10033-91
This standard applies to hydrogen thyratron of type ZQM1325/16. It is formulated according to GB/12B47 pulse induction tube blank specification and meets the requirements of GB/T13B16 pulse induction tube general specification. China Electronic Components Certification Committee Standard Organization is China Electronic Technology Standardization Institute, Ministry of Machinery and Electronics Industry of the People's Republic of China 1991-04-082991-07-01 Frequency
Ministry of Mechanical and Electronics Industry of the People's Republic of China
s3/r 10033---$
Performance discussion according to /T12843-01 Bed flushing pipe general view detailed specification, 7QM-325/6 type hydrogen centimeter distance color content must say alliance:
S:/T 13133-31
Record missing and gold same request agent record city light, actual technical formula and its chemical limit teaching, related hydrogen cultivation device allowable weight one board temporary, type of
natural point
? Related graphics
color and size limit
2 Appendix A1
Wait for wiring diagram
Meanwhile, A2.
5 Characteristics (not for inspection 1
Specialized
Table position: Shengsheng
: 130
5.2 Working environment
: 5573
b, relative to the seat, 4 yuan ~ 80%
Gas, 70 ~ 10% kPm
bs3 Electrical sustainability
The potential added to each circuit board is based on the circuit board voltage as the service preset point 5. 3. 1. Durable
Used as a switch in the ball-type electric group of radar, missile and other equipment,
Quality evaluation
Steel double hot wire electric jade
I store heat (A)
Cathode hot wire electric liquid
Oxygen storage hot wire electric jade (Type A)
Only positive electrode electric day
Only boundary conduction sequence electrode electric
Garbage output
P inquiry device
Electrical root mean square current
Critical conduction plate electric soil
Pregnant jade average rise rate
Electrical starting electric bed
Anode normal fire retreat time
Any test fire delay time
Xi Chong Pu Yu fall
Cathode preheating time||tt ||Heat-resistant products
Authorized limit value (absolute maximum value system)
Except heating wire
Hydrogen condition heating wire type 1
Preheating time
Value of the main board
Critical conduction positive voltage
Appropriate pole current
Average positive battery
Root mean square current
Distribution board rubber tank current half average start
Precautionary value of positive no-load voltage
Light pole starting voltage
Phase output
Regulated average start
Peak output power
Working joy
The product should have a clear mark
Manufacturer's trademark:
SI/T 10033—91
3. 9 ×13°
Manufacturing number and year, month
7Ordering information
SJ/110033—91
The ordering party shall specify the following contents on the order form:-
Product model:
Detailed specification of delivery and release date
Required product quantity and delivery date:
Manufacturing plant name
Others.
8Related documents
GH/T128-16
G8/12817
9Structural similarity
General specification for gate pipes.
Snow flow pipe blank detailed specification,
This pipe type is similar to 2QM1-130/10,7QM1—40 0/16 When more than one type of tube is produced at the same time [including one type of tube, the common inspection items are as follows:
Coating and marking
h kidney base bonding and strengthening,
10 Safety requirements
11 Additional information
12 Inspection requirements and inspection requirements
Group A · Remote batch inspection
General inspection case (code TC\)
Threshold potential time (seat)www.bzxz.net
Value of positive anode voltage
Peak anode current
Average anode current
Anode current density
Value of positive internal light fast balance voltage
Anode impulse
Average upper opening voltage
Grid voltage
ty= jeruin
Ua-16kv
Ja-325A
fp=150Hz
Cg200V
Ian - 0. 3A
de/m-500v/ps
A1 group
-Five-source inspection
Cathode heat supply
-Hydrogen storage device heat terminal shell
-Research preheating time
Work price fast qualitative (1>
·Overheating work party qualitative
Undervoltage work net qualitative
2 group
-Response Jiehutong (memory voltage
state supervisor starts mountain construction
GB/T13816
864362
64282
CB6423
CB64285
GB54285
B64285
814
SF/T10033 -9F
In the factory normal temperature, non-working condition is dangerous
-/-G. 3V
tyt-5min
5y=Snsih
.-1-6.3V
Continuous working stability (1) After the environment has passed, the work is stable
stop.T.Work for 5mdn
Ur--b. 3Y
J-6n=6.3V
Total (-10kV
Note: After slow preheating for 5 minutes, add other general inspection items, minimum
See Appendix
Yuan Appendix B3
Test Items
11 Group
Nan Shangyin Total Height Block
Production Management Personnel Straight Street
-Supervision Institute
-Notice Agent Position Size
Reference Document
[H12846 4. 4
New test conditions
Together A:
Test with mark (D>) is acid-damaged
Item acid function
C1 group
-critical near anode voltage
-backfire delay time
-pulse rate
engineering quality (Z)
SI/T10033-91
Group B-batch inspection
Inspection record
non-secondary type
referenced document
GB 42B 21
GB6428 22
periodic inspection
Li-1n=t. 0V
1=Smia
WCm—6.3V:
Peiyangling Campfire Jiangyun
After time test
I=325A
F=150Hz
t-Sminl
After pulse power is turned on
-0--63V
T.Fp is 750Hr, 2s, strong acid, gastric requirement, minimum and maximum unit, minimum and maximum, see Appendix B3, test items, high pressure, bottom cavity, constant heating, blood short material, aviation Sealing strength between ground and glass, glass and metal mesh, pipe ink adhesion, reference, 2133.3 points, 2423.1 test object, S5/T10033-91, exchange conditions, T-tat:, 2h, tt, t-[--6. 3V
ta Fimln
T=-55IAC
Waiting to read the company's introduction
M(—- 5. sV
t— Sumin
B2423.13 Wujian F
GB2423.5 Test
GB2423.15 Discussion G4
G2423. Style Test Ga
G128495.1
(r-Um-s.3V
Horizontal Season Straight
Production Stit:
WV-6,3V
Heavy to ~21
t'r-th. 9v
Horizontal vertical square purchase
mFr
—40-+2:
Phase 2 degree 93±
Gage=4a
Gage-4
Course 5055
Drilling cooling 1h
Auxiliary items
Induced by sound intensity (D)
G3 sub-topic
Small
One win test conditions:
Induced female parts
S3/T10033—91
Inspection registration
Transfer 4.6NL
GB2423.28 test U.
CB 2846 4. 4
Wheel torque 0.5N·JI
Working fast
Large quantity! Reverse position
See Appendix 4
Civil case A1
Group D--One identification and approval pull test
·Same as Group A
The test with reverse (D) is acid damage:
Inspection and supervision items
Working pill resistance (D)
3 packs 13.1 Packing test and pig storage
13.1 Packing test
Test policy
t'r-5u-6.3v
Except for energy
Although small and large units
Yuan Appendix B5
t3.1.1 According to the packaging requirements, put the gate screen into the packing box, collect 2 packing boxes for transportation test, and change the structure and material of the packing box when the transportation test is required.
13.1.2 Under the transportation test, put the packed packs in the transport truck and drive the goods for 200km at a speed of km per hour on the road surface. There should be no mechanical damage after the test. Perform the extreme heat lifting current working blanket qualitative (1) test. 13.2 Storage
13.2.7 The flow tube should be stored at a temperature not lower than 5℃ and the relative humidity not greater than 80%. 13-2-2 The storage guarantee period is three years from the date of manufacture. A1 Appearance and dimension inspection take
19±0,2
S/T 10033:-91
There is a beautiful shape
(supplement)
Telegraph carrying line diagram
SJ/T 1003391
Telegraphic name
Open stock investment hot contract
Hydrogen storage device hot baking
System temperature control
Storage hot wire
Telegraphic name
Screen plate negative heat
Oxygen station hot wire
Use hot wire
Hydrogen storage hot pad
B1 Inspection requirements
The following products are unqualified.
D1.1 Appearance and processing quality of a stock
SJ/T 10033-91
Inspection requirements
(supplement)
The pipe surface has obvious oil stop, rich mark and spot, etc. b.
Glass crack:
The gold screen has cracks +
weld stagnation,
There is obvious glass stacking on the sealing line;
There is one 1.5mm×1.5mm gas pool on the sealing line, and there are more than 5 0.5mm×0.5mm gas pools or more than 10 Upper dense dyeing gas range:
Compensation resistor falls off
The welding of the feet is not round, not full, and the welding is virtual;
B1.2 Activity fragments
There are active metal bureaus in the replacement:
There are powder particles in the tube that are larger than 1.5mm×1.5num, and the residual pieces in the tube are larger than 2.amm×2.mm,
Other sundries.
BI.3 Screen base
The distance between the tube base and the body is not straight!
The tube base is loose,
The skin and the surface are obviously not straight,
The tube feet are loose.
1.4 The position of the logo
The trademark, model, and number do not meet the requirements: The trademark, model, and number are not clear and accurate. .
B1.5 Alignment and straightness of anode lead-out terminal "The anode lead-out terminal is obviously not straight;
3 The anode lead-out terminal is obviously aligned.
BT.6 Remove the double layer
, the electroplating urine peeling, blistering rain signal is greater than 2mm×2mlb. The electroplating is uneven, the bottom of the monument will be screened,
e. The surface of the electroplating layer is oxidized,
132 Inspection requirements for cathode drag heat time test -2 Under the transportation test, the packaged package shall be packed in a transport vehicle and driven for 200 km on a three-jaw road at a speed of km/h. There shall be no mechanical damage after the test. Perform the extreme heat lifting current qualitative test (1). 13.2 Storage 13.2.7 The flow tube shall be stored at a temperature not lower than 5℃ and a relative humidity not greater than 80%. 13-2-2 The storage warranty period is three years from the date of manufacture. A1 Appearance and dimension inspection: 19±0.2 S/T 10033:-91 (supplement) Telegraph line diagram SJ/T 1003391
Telegraphic name
Open stock investment hot contract
Hydrogen storage device hot baking
System temperature control
Storage hot wire
Telegraphic name
Screen plate negative heat
Oxygen station hot wire
Use hot wire
Hydrogen storage hot pad
B1 Inspection requirements
The following products are unqualified.
D1.1 Appearance and processing quality of a stock
SJ/T 10033-91
Inspection requirements
(supplement)
The pipe surface has obvious oil stop, rich mark and spot, etc. b.
Glass crack:
The gold screen has cracks +
weld stagnation,
There is obvious glass stacking on the sealing line;
There is one 1.5mm×1.5mm gas pool on the sealing line, and there are more than 5 0.5mm×0.5mm gas pools or more than 10 Upper dense dyeing gas range:
Compensation resistor falls off
The welding of the feet is not round, not full, and the welding is virtual;
B1.2 Activity fragments
There are active metal bureaus in the replacement:
There are powder particles in the tube that are larger than 1.5mm×1.5num, and the residual pieces in the tube are larger than 2.amm×2.mm,
Other sundries.
BI.3 Screen base
The distance between the tube base and the body is not straight!
The tube base is loose,
The skin and the surface are obviously not straight,
The tube feet are loose.
1.4 The position of the logo
The trademark, model, and number do not meet the requirements: The trademark, model, and number are not clear and accurate. .
B1.5 Alignment and straightness of anode lead-out terminal "The anode lead-out terminal is obviously not straight;
3 The anode lead-out terminal is obviously aligned.
BT.6 Remove the double layer
, the electroplating urine peeling, blistering rain signal is greater than 2mm×2mlb. The electroplating is uneven, the bottom of the monument will be screened,
e. The surface of the electroplating layer is oxidized,
132 Inspection requirements for cathode drag heat time test -2 Under the transportation test, the packaged package shall be packed in a transport vehicle and driven for 200 km on a three-jaw road at a speed of km/h. There shall be no mechanical damage after the test. Perform the extreme heat lifting current qualitative test (1). 13.2 Storage 13.2.7 The flow tube shall be stored at a temperature not lower than 5℃ and a relative humidity not greater than 80%. 13-2-2 The storage warranty period is three years from the date of manufacture. A1 Appearance and dimension inspection: 19±0.2 S/T 10033:-91 (supplement) Telegraph line diagram SJ/T 1003391
Telegraphic name
Open stock investment hot contract
Hydrogen storage device hot baking
System temperature control
Storage hot wire
Telegraphic name
Screen plate negative heat
Oxygen station hot wire
Use hot wire
Hydrogen storage hot pad
B1 Inspection requirements
The following products are unqualified.
D1.1 Appearance and processing quality of a stock
SJ/T 10033-91
Inspection requirements
(supplement)
The pipe surface has obvious oil stop, rich mark and spot, etc. b.
Glass crack:
The gold screen has cracks +
weld stagnation,
There is obvious glass stacking on the sealing line;
There is one 1.5mm×1.5mm gas pool on the sealing line, and there are more than 5 0.5mm×0.5mm gas pools or more than 10 Upper dense dyeing gas range:
Compensation resistor falls off
The welding of the feet is not round, not full, and the welding is virtual;
B1.2 Activity fragments
There are active metal bureaus in the replacement:
There are powder particles in the tube that are larger than 1.5mm×1.5num, and the residual pieces in the tube are larger than 2.amm×2.mm,
Other sundries.
BI.3 Screen base
The distance between the tube base and the body is not straight!
The tube base is loose,
The skin and the surface are obviously not straight,
The tube feet are loose.
1.4 The position of the logo
The trademark, model, and number do not meet the requirements: The trademark, model, and number are not clear and accurate. .
B1.5 Alignment and straightness of anode lead-out terminal "The anode lead-out terminal is obviously not straight;
3 The anode lead-out terminal is obviously aligned.
BT.6 Remove the double layer
, the electroplating urine peeling, blistering rain signal is greater than 2mm×2mlb. The electroplating is uneven, the bottom of the monument will be screened,
e. The surface of the electroplating layer is oxidized,
132 Inspection requirements for cathode drag heat time test -