title>JB/T 9023.2-1999 KQJ down-the-hole drilling rig - JB/T 9023.2-1999 - Chinese standardNet - bzxz.net
Home > JB > JB/T 9023.2-1999 KQJ down-the-hole drilling rig
JB/T 9023.2-1999 KQJ down-the-hole drilling rig

Basic Information

Standard ID: JB/T 9023.2-1999

Standard Name: KQJ down-the-hole drilling rig

Chinese Name: KQJ潜孔钻机

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release1999-06-28

Date of Implementation:2000-01-01

standard classification number

Standard ICS number:Mining and mineral products>>Mining equipment>>73.100.30 Drilling and excavation equipment

Standard Classification Number:Mining>>Mining Machinery and Equipment>>D92 Mining Equipment

associated standards

alternative situation:ZB D92002-1988

Publication information

other information

Focal point unit:National Technical Committee for Standardization of Mining Machinery

Introduction to standards:

JB/T 9023.2-1999 JB/T 9023.2-1999 KQJ down-the-hole drill JB/T9023.2-1999 Standard download decompression password: www.bzxz.net

Some standard content:

ICS 73.100.30
Machinery Industry Standard of the People's Republic of China
JB9023.2—1999
KOJ down-the-hole drill
KQJ series downholedrill
1999-06-28 Issued
National Bureau of Machinery Industry
2000-01-01 Implementation
JB/T9023.2—1999
This standard is a replacement of ZR92002-KQI series downhole drill. The original standard has been unified and the main technical content has not changed.
From the date of implementation, this standard replaces ZBD9200288. This standard was proposed by the Technical Committee for Standardization of Mining Machinery. The responsible drafting unit is Xuanhua Mining Machinery Factory. This standard card main contributors: Xi Mei, Liu Jie: Yang Xianli, Li Yongquan, ■ Scope
Machinery Industry Standard of the People's Republic of China
KOI down-the-hole drill
KQ.I series down-the-hole drill
JB/T9023.2-1999
ZB D 2--8
Technical standard specifies the type, basic specifications, technical requirements, installation requirements, test methods, inspection rules: marking, packaging, installation and storage of KQ factory down-the-hole drill rigs.
This standard is applicable to non-travel substation machines (hereinafter referred to as drilling rigs) 2 Reference standards
The following standards contain the following documents, which are referenced in the standards and become standard documents. The versions shown are valid when the standards are published. All standards will be revised. To make sure that all parties in this standard use the latest technical versions of the following standards, please consult. GD.T 4879—1985
GB:T 6921-..1986
Anti-inducement packaging
Atmospheric dust concentration measurement film
GBT10095—1988 Technical specifications for packaging and use of new electric products
GBT13384—1992
JB.T1604—1998
3 Type, basic parameters
Mining machine vibration product model compilation method
3.1 The drilling rig is a bracket-type perforating equipment, rotating impact 3. The drilling rig model shall be in accordance with the provisions of J0T16(A): K
Drilling diameter, mm
Down (#
Downhole (diving)
Perforation pillow (hole)
3.3 The basic parameters of the drilling rig shall comply with the provisions of Table ", the National Cable Machinery Bureau changed 9-06-2 standard
2000-01-01 implementation
Station hole point diameter
Harmony hole depth
Station hole direction
Drilling property Industry small size"
Width × business 1
Technical requirements
JB/T9023.2—1999
Down 30
Down 30bZxz.net
Towards 1:60
Key Encyclopedia Before the peace, the network seal company
4.1 Drilling rig quality meets the requirements of this standard, and is designed and manufactured in accordance with the sample design technical documents approved by the prescribed procedures, 4.2-Technical requirements
KQ:-120
4.2.! Technical standards The technical requirements of the parts, plating, welding, mechanical processing, heat treatment and painting, etc., shall comply with the provisions of national standards and relevant industry standards. 4.2.2 Purchased parts and outsourced parts must be inspected and assembled before assembly. 4.3 The control of the drilling rig shall comply with the following provisions: a) The drilling direction alarm is fixed in the west; b) The impactor is sent to the bottom of the hole with the adjustment force. 4.4 The viscosity of the gear of the rotary mechanism shall not be lower than the provisions of GB.T11095 8GL. 4.5 The rotary reducer shall be tested for 1h without load after installation: its temperature rise shall not exceed 30T. 4.6 The temperature value of the rotary reducer pillow shall not exceed 960mg. 4. The test of the machine shall not exceed 1900h before the first overhaul. 4. The service life of the drilling rig shall not be less than 2.a in total in the case of single row. 4.9 Transformation
)tmachine:
) Hong Kong and Shanghai;
c) Special T others;
d) Spare parts, new parts;
Random technical documents:
5 Safety requirements
The noise to which the driver is subjected at the operating position shall not exceed 90A)s.
5.2 The dust content at the operating position of the machine shall not exceed 2mg/m6 Test method
6.1 Lift
JB/T 9U23.2-1959
Put the carriage horizontally on the ground, and test it with an electronic force meter without drilling rods and impact screens. The value in the table should be in accordance with the performance value (test under a force of (. stone MPa). 2 Temperature rise of rotary reducer
After the rotary reducer runs for [h, use a thermometer to test the bearing part. 6.3 Noise
Test it with an ordinary sound level meter at the working position of the machine. 6.4 Cleanliness of the rotary reducer box
Pull out the lean gas from the filter, and then inject steam into the box. Use a brush to clean all parts, and remove the living micro-water. Figure 2 Size 1.075mm (2 screen mesh) The sieve is melted, the filtered evidence together with the filter are dried in a box (temperature 130°C for 1h), and then cooled in a desiccant for 20m. The weight of the cut and taken out shall not exceed 960mg. 6.5 Dust content is specified in GB:1692. 7 Inspection rules 7.1 Each pinning machine must be inspected by the factory technical inspection department in accordance with the requirements of this standard before it can be used! And it must be accompanied by a product certificate of qualification 7.2 Each pinning machine shall be subjected to an empty load test for no less than 0.5h: 7.3 The empty load test shall meet the requirements of; a) 4.2, 4.3, 4.4 and 45: 6) The basic parameters shall comply with the provisions of 33: All rotating parts shall rotate flexibly and the fasteners shall be firm. 8 Marking, packaging, transportation and storage
8.1 The outer surface of the packaging box should have obvious box markings, including: a) name of manufacturer; b) product name and model; c) product number; d) manufacturing date. A.2 The packaging and transportation of the drilling rig should comply with GB/T133B4: 3 The anti-rust of the drilling rig should comply with GB4879. 4 The drilling rig and its spare parts should be stored in a rain-proof and moisture-proof warehouse with a shelf life of 1 year.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.