Some standard content:
IC 61.080
Classification number: ¥17
Reservation number: 14278-2CC4
Light Industry Standard of the People's Republic of China
.QB 1175-2004
Household sewing machine
Zigzag lurkstitch sewing machine head
Household sewing machine
Zigzag lurkstitch sewing machine Published on August 15, 2004
National Development and Reform Commission of the People's Republic of China Implemented on January 1, 2005
5.5.4 and 5.5.5 of this standard are mandatory, and the rest are recommended. This standard is for QR1175-1999 household whole-line seam feed velvet stitch machine head 3. Compared with Q/T1175-1991, this standard has the following technical changes: The same as the standard is recommended:
QB1175-200≤
The degree of sensitivity of the product chain is increased, and the "product If a special zero requirement is required, the manufacturer shall provide a technical requirement for the product description. The operating noise shall be increased according to the "standard motor model, and the maximum width of the seam correction line shall not exceed mn. The maximum width of the seam correction line shall not exceed 7SBIA)\
The technical requirement for the average electrical performance of several types of devices is increased: · The "test method" has been added and modified, and the inspection rules are based on GB/T2828-1987 and GH/12829-2 (2). This standard is provided by the China National Standardization Association for Sewing Machines.
This standard is issued by: China National Standardization Association for Sewing Machines. 1. This standard is issued by: The company has a model: , Gonggong Co., Ltd.: 1 Haishi Machine Research Institute. Du standard ten pairs of outstanding people: Ye Lv, quality jade, Zhang, Jie Huai. Bai into the standard implementation of the H, the original light industry ministry issued the city's light industry standard QB/1175-199! Home several end engraved mountain velvet lock type machine head degree 1
: Fan Yu
Household sewing machine curved line lock stitch machine head Q61:75-200:
The standard determines the home old loom force line sleep or practice loss, open product points, check, test method, replacement, printing mark, table, pull, clothing
This mark is used for home use Use the machine shape test seam mold to form a rainbow machine head to move the anti-head. Electric used for domestic pressure-resistant iron type management and mouth, control, machine
2 normative reference documents
the following state document production can be less than the point of the war as the terms of this standard, Sichuan note a time and meaning, build the common you government year (not included in the station model plan as the existence: or revised version consultation not certified, not standard, wine matching, I root system standard reached an agreement on the abandonment of the product see the violation of this industry document new: any reference document not noted in the validity period of the office, the latest service this applies to the certificate: G0/T19120 packaging K mark
Swiss original color
GH/T 40-1593
GH/T 2828[987
GB·T 2829 -2002
GB/T 4S15:-[0&4
iT 45161995
GB:T 4518-1984
GB 4706. 1-:993
GD/T 68.151G0?
G8/T0836-3997
.3 99(9.11998
G0:T 16460 1906
QB/1 1177-199]
QH:[ 1514-1992
QU/r 1572 -1992
QH:T 2251 -JG
QR/T 2252-1996
3 Definition
Batch loose consultation counting fairy single obstacle detailed limit selection table (use continuous support inspection and: period just give counting money use program and table suitable for hourly rate stability inspection; trace external case rental technical words
Enjoy the continuous machine training library to test the speed
Home's new machine layer sneak move suspension training test method
Secret history with the first part of the safety of the device School, general demand report warp thread
polyester sewing sword thread
industry product printing and general test
following the next gas installation
, industry health sewing machine limit strict test strong wine
home drop machine
sewing and other Renminchuan technology system
5 product model construction production purchase center
detailed loom machine meaning control test method
one hundred meters including and light meaning transport pressure this standard.
line speed length
I must car pass the bottom city projection length (Figure 1
continued trace width
warp trace feeding side and the projection of the velvet man (ratio): QB 11752004
Quickly made collection
I won the zone
Stitch length
Machine link two information inspection state statistics new section of the count trace in the material side is still across the stock fancheng (light map: 3.4
Stitch width
Hole count link-stroke chain obtained count trace on the feed side average level of the load projection distance (map 2) constant material line
Needle over the question length should||tt| |Outer width
When the side position is zero, the intersection of the machine axis and the needle plate plane. OR1:75-2002
There are five points for the design of the change of the installation, the weight of the small ... It is designed with flat plate opening and other machines, and the rod is used to arrange the wire, the rod difference, the density error or the rotation mold line, and the material convergence center is formed to form the 301 and 304 stitches of GR/T4515-1P8 specification 4.3. The upper shape line: not less than S00 needles/min: curved line: less than needles/min (if the product requires a:
, it shall be determined according to the product manual provided by the production enterprise or the technical requirements) ; Maximum line length: not less than 3.6mm
Maximum line thickness: not less than 104mm
Chain: upper layer sand
Type of safety: limited to five exceptions:
Adopting machine: QB/T1514-1902 from within Nm75~Vml10 Adopting chain test: 14.5x/37.5tcx/362 Verification line (according to the month/6835-1997) or signing similar wheel sewing line GB 68361997
14 Product model
Press QR225! The current name of 199 is: Book Hong Enterprise abandons the national sewing machine model standardization center registration and registration details deletion compilation: 5 requirements
5.1 Appearance quality to
5.1.1 The head surface should meet the following requirements, the road layer is attached if it is semi-solid, this is a:
5) The surface of the machine should be clearly visible, the paint should be visible, the paint should be visible, and there should be no external measurement phenomenon: 5) The decorative patterns and cultural products should be strictly controlled, high-end sales, and obvious coordination evidence should be shown, d) The surface of the group parts is smooth and the luster is not "valued", and there is no obvious worry: 5.1.2 The surface of the parts is plated with 2 pieces. QB/January 572-19926.1.1 It is required to specify 5.1.3 and the sewing thread, sewing material, etc. The surface of the parts should be smooth and smooth: 5.2 Machine performance
5.21 The weaving speed should meet the requirements of 4.3a. 5.2.2 The maximum warp track length and the maximum vibration track width should meet the requirements of 4.3b) and 4.3c. 5.2.3 The push plate (flip plate) should be raised and closed, and the needle plate should not be lower than 1 working surface of the machine head. 5.2.4 (N110. When feeding: the needle plate should not be broken and the needle should not be rubbed. 5.2.5 The foot should be lifted and the force should be relaxed. 5.2.6 The system can be good. The line is, and all special line devices are fully equipped. The outer diameter of the line should be 753-95%. It should be able to stop automatically when the line is 2 [limited.
QB1175-2904
5.2. The new method is long and the line edge needs to be designed. The tension of the shuttle line is conducive to the internal force of the whole material, and the strong ground section is strengthened. The word indicates the automatic effect of the change of the environment. Practice,
52.! Design point, single method, single, for the model equipped in the method, style learning 5.2.9 The needle base point change position should not have a dynamic change of the near
5.2.9.1 The needle is called for warning, : the symmetry of the mark is not 0.5mm5.29.2 The calculation point change position is divided into points, and the calculation must be based on the technical research of the base point: 0~:
5.2.9.3 The needle is forbidden to point the needle position in the production point, and the needle is in the middle of the revolution point 710.2mm
57: The light point must be written in the machine lead: the time is the time, and the needle mark is too large for the base point. 4mn
5.2.1F point of the South system rate should be people" -0.1m75.2.2 I speed length of the stock in 2.5mm, leading to! Question - the length of the line should be obtained, its payment voucher adult card 15 add 5.3 sewing performance || tt || 5.3.1 empirical system, the lower degree of non-inner line, needle row floating line and other current contention. Avoid longitudinal: no self-swimming, velvet, jumping, and other phenomena: 5.3.2
Solution: Strictly sign 4.3 Dynamic inner table
Continuous solution: There are needle repair sequences, broken thread, bamboo balls and floating line and other phenomena. 5341
5.3.5 Actual pure specifications, 4 should be broken, broken thread and can be calculated, the area should be neat and tidy, 5.3.6 Price control system: There should be no: "missing seams": no broken, broken and jumping, etc., the stitches should be neat and tidy. 5.3.8 Read the tour, the original, the basic effect of the trace length, its relative × recognition is not complete, 5.3.9 Material potential specification: 50mm should be 15mm 5.1 Running performance
5.41 Running noise
) Maximum special operation, this special requirement should be in the automobile, guide the normal requirements, b)
No-load version: No internal motor: 21 Modify the machine with internal excitation, the occupancy rate is 1 person 600m when the line dimension is 1 person: 78: 4: 5.4.2 Running torque
The machine is equipped with a modified transmission, and the speed is smooth. The motor and external motor type are newly imported.
5.5 There is a bar device Safety performance of the installed head
5.1 The power supply is safe and the connection parts can reach six levels: 5.5.2 The length of the line from the power plug to the machine-selected type controller is 1.2m short: 5.5.3 The controller is flexible and can be turned on and off. The power is sent and the controller is in the initial state. The machine is switched on and off. There is a continuous visual connection. It should be able to eliminate the power supply
5.5.4 The insulation resistance is greater than 2M12
5.5.5 The voltage resistance performance should be able to withstand a sine wave voltage of 50Hx or 601Ix/min. The test and the voltage application position are shown in Table 1.
Proof position measurement
Electrical parts and components
Only use the basic wood to operate the high
-during the card to strengthen the continuous two high
reduced test electric soil
5.5.6! Dynamic characteristics: rated voltage is ±% for the change, can be normal 5.5.7 Special: rated voltage 9%, should be able to velvet machine 5.6 with electronic control function model of additional performance in addition to the full 55 fee requirements, should not meet the following requirements. Please be able to be good, the most active to the God is inseparable from m5.6.-
5.6.2 finger current times and not normal frequency clear mouth:
5.6.31 dynamic position should be accurate, you can not form a person 1 +7.5.7 Items of knowledge
Original accessories of the original machine head shall be tested in accordance with the provisions of the instruction manual or the specification sheet
6.1 Appearance quality
Under the light system, the light shall be used for 0.2 days to test the performance of the instrument
6.2.1 Maximum Wiener speed
According to the provisions of Table 2, the high speed chain shall be installed in the test item pressure, and the crimping speed test shall be conducted. 6.2.2 Maximum stitch length and maximum stitch width QB 1175: 203-1
Other instruments only
Technical Table 2 is the test condition to avoid, and the two layers of test materials shall be made on the self-color and mountain shape shallow absolutely, not less than 0 milk Tan standard card! On the straight line, take the shortest continuous line traces, and use the water level technique to reduce the trace degree as much as possible: in the mountain shape, also take the three smallest width traces, and the line should not be flat or straight. 6.2.3 The needle plate, push plate opening and closing, and needle plate should not be lower than the working surface of the machine.
6.2.1 The gap between the needle and the needle hole of the needle plate
Turn the upper wheel by hand, whether the machine is at the output or the platform point, it is a relatively designed move, 6.2.5 The effect of loosening the line
is to turn the upper wheel to a higher point or a higher point, according to the instructions for keeping the needle hot, when the needle passes around the control line, the line is pulled down, and the line is locked. When the line is inserted and pulled, the distance between the bottom dial plane and the wire segment is at least 20m. It is determined by cutting the wire nail and the hook on the head with a real object. The silicon code can travel away from the platform. 6.26 Winding performance
With the most pure selection test, the final line diameter is measured with a vernier of not less than ±0m. 6.2.7 Adjust the machine plan
In the "approximate performance test" item, the control production is not complete. 2.8 With needle base point displacement, flower spring selection, buttonhole device mechanism adjustment in the "actual performance test" change, according to the "product actual performance test book provisions of the law. 6
0175-2004
civilian temporary project"
! Heart-shaped class
Yin Di continued to discuss
Curved rolling seam
Pass the hope
Meeting the training example
Avoid the risk method
Check and correct
Numerical chain sewing
Real fast follow-up time
Through the relevant internal learning
New Qiu method to move the length
Poly adopt
China
The most standard long row station
Stitch grams!
(unXmm:
IILX III
Number of obstacles-1
Sha H#4/T4/16-1999
50K)100
50gX100
Monthly average
500X100
Effective you have done the dense seat/prove the initial length/through the system speed/(91/mun)
Choose three-piece
The final three
=one long
China Sea also
GB/518
200 >;6(
Mutual color red fiber: technology for shadow line dimension increase wear certificate: shape energy bee, the shape war super highest certificate this. All the material specifications GB 5 4C5-1993 heat control only sample control flower: information sub-breeding machine model, the product description of the horse's requirements, E.2.9 needle base point empty position calculation
maximum connection
adjust the appropriate material teeth to the lowest needle plate surface (no air tight line length set to zero position). Install the special machine needle (see inside, cattle at the "limit" when the needle tip layer low -t report 10.5mm1.5mm, use 130g/m strands or other gear bed Wangchuan Yueyu foot to press the line, combustion effect 6.2.9., 6.2.9.26.2.9.3 method to test, with a correction width not less than 02mm talk except the ruler measurement (see Table 3.|| tt||Changsaochang7
The symmetry degree of the left and right base points to the center base point
: The symbol "0" is not true
2: "Number" is close
: Card "" indicates the base and.
The reliability of each measurement is relatively unrelated
6.2.9.1 The symmetry density of the left and right base points to the center base point (see Table 3) is adjusted to zero and remains unchanged. a
QH1175—2004
The maximum needle change time is abandoned, and the needle track is used to mark the needle
When the needle is divided into the left, center and right needle positions, the upper wheel is rotated to pierce the left, center and right base points on the sample. The distance from the center and right points to the base point is calculated by the formula (). f- .
—Left, there is a base point to the center point symmetry: the left base point can be used to find the distance between the base point and the exit point
—The current room from the base point to the exit point
6.2.9.2 The width of each needle position is relatively large (5. Table 3 Chinese medicine) a) Adjust the needle to the left sealing point:
The width of the stitches is adjusted to the maximum and kept unchanged: Turn the upper wheel, pierce the left and right sides of the sample, and select the needle to measure the width of the stitches: move the sample forward along the feed and the original height of the section, and adjust the needle to the middle needle position, press b) or the force method test, then measure the maximum needle position and the maximum needle track interval:
move the sample forward in the feeding direction for a period of time, and the center of the machine will not recognize the right position. Press b) to test, and you will measure the maximum needle position and the width of the center:
. The error between the maximum needle position and the maximum needle track interval is:
, the maximum value among Dm and h is:
, and the minimum value among Dm and h is:
, 6.2.9.3 needle flow between the maximum solidity, left, needle trace to the center base point symmetry: 2 table 3 / figure:) ": please pass the solidity of the year, the new exchange at eleven, turn the second pin, in the test material pierced ten points) needle this same completion this is called ten most people, rotate on the grab, the city test subject piercing the symbol in, heart trace. Measure Landong, heart plan to the middle base six away and, recruit public into (3) school
Qu people when the old trace is called:, year trace to the middle point of the point: needle city English point room:
let create reverse business,
6210 without needle base point displacement device model, needle trace width maximum, left, needle trace to the needle base point symmetry according to 6.2.9.3 stipulated Shang reading method || tt||6.2.11 Offset of needle base point
a) Adjust the speed of the counter, and use the counter rod: the limit is in the production, the counter is installed at the intersection of the counter and the machine model, and the machine head is connected to the feeder: the shaft is rotated, the number of rotations is confirmed, and the minimum value of the receiving plate is removed. 6.2.12 Dry, the error of the stitch length bar is reduced to the rate of error, the stitch is 25mm, and the stitch is 500 stitches. The inner and outer parts are divided into straight and extended. Thank you, the stitch length is changed! Visit the stem according to formula 4. t.
I:
length, the stitch is 3.| |tt||6.3 Performance defects
Company) Before the test, the appearance of the company head should be cold, and the needle should be removed. The dirt on the feeding, probe or compensation line should be added to the lubrication oil. The test speed should be 8 mils at the maximum. The report? Regarding the specified test conditions, the following test conditions are used for the reverse meal test. The test speed is divided into two parts: b
) Before the production of steam, the adjustment of the production tension is completed, and the production is carried out. The stop steam inspection is not without the surface thank you
6.3.1 Ordinary calcium
gauge specification, elimination plan s00, test state:
6.3.2 Sea material - continued sewing
love gauge 2 , sewing 0m:
0.3.3 strong thickness
double G45161995 effective determination
6.3.4 try to sleep pure
sewing material total 4 shown in the warp. Report provisions of the sewing system door, daily measurement from the figure 4
8.3.5 wear bee continuous movement
according to the 2 specifications, the engraving 0mm, the factory measurement agent determination 6.3.6 decorative maintenance plan
effective 2 ground, in the wash a chemical mixing, the value of a flower 50, daily measurement state light 6.3.7 lock group hole strength sewing
table 2 determination "measurement for the production
63.B lock red hole sewing, reverse stitch length relative error QR 1175-2004
respectively measure the tools and examples, and use the time to form a new connection industry shape assumed the total national point, the formula is the goods formula (4) counting piece. 3.9 Material layer migration
G:T418-18 said method
6.4 Operation performance
6.4. 1 Operation depth
a) Select the line seat K to adjust a 3.6mm: line installation adjustment rate 4m: improve. Card welcome certificate: with the stock speed space I reach, eliminate H listening method to determine:
Zhang Shishu finished measuring
1): I prove to 3.6mm: line start to adjust a 4mrr:2 turn to cast shape I choose or still 90% of the sewing speed:
2, price full! 1-Test requirements: Other technical QH/T1177-1901 related test methods: 64.2 Operating torque
a) a business also know the city please test, test all light, there are corrections, b) special B/T22521996 test: 6.5 Electrical test
6. 5. 1 Warehouse. Equipment installation
on the test to? Ning, the lake line oil heart can mountain goods goods business rate position guarantee. 6.5.2 Power supply or some requirements
power line length precision low one m and steel ruler
6.5.3 Controller performance
Sincerely create the machine heart according to the sinking, governance ruler, around the monitoring factory, I benefit the people and the best interest to say the most people's installation you, miscellaneous weaving device [test share
QB 1175-2CC4
6.54. Insulation
(rH4706.1-1998 specified test force method R55 withstand voltage
according to 4706.1-1999 standard test stock certification. 6.56 Voltage change resistance
Set the voltage of the power supply to 10% of the range, the micro-shaped line continues to list: Table 2) Type 30mm16.5.7 Starting characteristics
Set the power supply to 90% of the rated value, according to the wide (according to the seam condition 2) or reason 300. 6.6 Electric: Control kinetic energy
6.6.1 Electronic speed regulation performance
The speed regulator is adjusted to the expansion height, running, adjustable The speed of the food is low and the width is measured), and the length of the chain is 4 high 150/min:
b) according to the shape load training case (point 2: [and the red speed of the sewing case is completed and ... case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the 1 Factory conditions www.bzxz.net
The factory inspection department must pass the inspection before it can be used. 7.2 Inspection categories
Product inspection, environment inspection, and type inspection 7.2.1 Factory inspection
When the product is delivered, the goods are received according to the highest standards! ! The factory inspection is pre-certified for acceptance. 7.2.2 Type inspection
The following are the requirements: Thank you for the production! After the whole mountain and calibration, the card is stopped after production. If there are major changes in quality, materials, and environment that can affect the normal production of the product: output Long-term product quality information:
When the factory inspection results are too different from the previous one: The national quality supervision and inspection agency formulates the requirements for the inspection! : 7.2.3 Product quality characteristics and inspection classification
Product quality characteristics and inspection results are shown in Table 4.73 Factory inspection rules
7.3.1 Sample extraction
Samples should be deducted from the long-term standard. 7.3.2 Residual reduction plan and strictness
The first batch of samples is checked and the sixth batch is checked. See this 5 production standard GD/T2%2H-[9874.6 year cut6mm: line start with adjustment of 4mrr: 2 turn into shape I choose or still sew speed 90%:
2, price full! 1 - test will require the rest: the rest of the technical QH/T1177-1901 on the method of test: 64.2 operating torque
a) a business also chain know the city please test, measure all light, there is the following correction case, b) special B/T22521996 paragraph test: 6.5 electrical test
6. 5. 1 warehouse. Equipment installed heavy
on the test to? Ning, the lake line oil center can be mountain goods cargo merchant rate position transportation insurance. 6.5.2 Power supply or some requirements
Power line length is less than one meter and steel ruler
6.5.3 Controller performance
Sincerely create the machine heart according to the consultation, the management starts the ruler, the monitoring account factory, I will save the most people's installation for you, the miscellaneous weaving connector [test share
QB 1175-2CC4
6.54. Insulation
(rH4706.1-1998 specified test force method R55 withstand voltage
according to 4706.1-1999 standard test stock certification. 6.56 Voltage change resistance
Set the voltage of the power supply to 10% of the range, the micro-shaped line continues to list: Table 2) Type 30mm16.5.7 Starting characteristics
Set the power supply to 90% of the rated value, according to the wide (according to the seam condition 2) or reason 300. 6.6 Electric: Control kinetic energy
6.6.1 Electronic speed regulation performance
The speed regulator is adjusted to the expansion height, running, adjustable The speed of the food is low and the width is measured), and the length of the chain is 4 high 150/min:
b) according to the shape load training case (point 2: [and the red speed of the sewing case is completed and ... case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the 1 Factory conditions
The factory inspection department must pass the inspection before it can be used. 7.2 Inspection categories
Product inspection, environment inspection, and type inspection 7.2.1 Factory inspection
When the product is delivered, the goods are received according to the highest standards! ! The factory inspection is pre-certified for acceptance. 7.2.2 Type inspection
The following are the requirements: Thank you for the production! After the whole mountain and calibration, the card is stopped after production. If there are major changes in quality, materials, and environment that can affect the normal production of the product: output Long-term product quality information:
When the factory inspection results are too different from the previous one: The national quality supervision and inspection agency formulates the requirements for the inspection! : 7.2.3 Product quality characteristics and inspection classification
Product quality characteristics and inspection results are shown in Table 4.73 Factory inspection rules
7.3.1 Sample extraction
Samples should be deducted from the long-term standard. 7.3.2 Residual reduction plan and strictness
The first batch of samples is checked and the sixth batch is checked. See this 5 production standard GD/T2%2H-[9874.6 year cut6mm: line start with adjustment of 4mrr: 2 turn into shape I choose or still sew speed 90%:
2, price full! 1 - test will require the rest: the rest of the technical QH/T1177-1901 on the method of test: 64.2 operating torque
a) a business also chain know the city please test, measure all light, there is the following correction case, b) special B/T22521996 paragraph test: 6.5 electrical test
6. 5. 1 warehouse. Equipment installed heavy
on the test to? Ning, the lake line oil center can be mountain goods cargo merchant rate position transportation insurance. 6.5.2 Power supply or some requirements
Power line length is less than one meter and steel ruler
6.5.3 Controller performance
Sincerely create the machine heart according to the consultation, the management starts the ruler, the monitoring account factory, I will save the most people's installation for you, the miscellaneous weaving connector [test share
QB 1175-2CC4
6.54. Insulation
(rH4706.1-1998 specified test force method R55 withstand voltage
according to 4706.1-1999 standard test stock certification. 6.56 Voltage change resistance
Set the voltage of the power supply to 10% of the range, the micro-shaped line continues to list: Table 2) Type 30mm16.5.7 Starting characteristics
Set the power supply to 90% of the rated value, according to the wide (according to the seam condition 2) or reason 300. 6.6 Electric: Control kinetic energy
6.6.1 Electronic speed regulation performance
The speed regulator is adjusted to the expansion height, running, adjustable The speed of the food is low and the width is measured), and the length of the chain is 4 high 150/min:
b) according to the shape load training case (point 2: [and the red speed of the sewing case is completed and ... case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the red speed of the case is completed and the 1 Factory conditions
The factory inspection department must pass the inspection before it can be used. 7.2 Inspection categories
Product inspection, environment inspection, and type inspection 7.2.1 Factory inspection
When the product is delivered, the goods are received according to the highest standards! ! The factory inspection is pre-certified for acceptance. 7.2.2 Type inspection
The following are the requirements: Thank you for the production! After the whole mountain and calibration, the card is stopped after production. If there are major changes in quality, materials, and environment that can affect the normal production of the product: output Long-term product quality information:
When the factory inspection results are too different from the previous one: The national quality supervision and inspection agency formulates the requirements for the inspection! : 7.2.3 Product quality characteristics and inspection classification
Product quality characteristics and inspection results are shown in Table 4.73 Factory inspection rules
7.3.1 Sample extraction
Samples should be deducted from the long-term standard. 7.3.2 Residual reduction plan and strictness
The first batch of samples is checked and the sixth batch is checked. See this 5 production standard GD/T2%2H-[9874.6 year cut
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.