title>JB/T 8536-1997 Technical requirements for mechanical installation of electrostatic precipitator - JB/T 8536-1997 - Chinese standardNet - bzxz.net
Home > JB > JB/T 8536-1997 Technical requirements for mechanical installation of electrostatic precipitator
JB/T 8536-1997 Technical requirements for mechanical installation of electrostatic precipitator

Basic Information

Standard ID: JB/T 8536-1997

Standard Name: Technical requirements for mechanical installation of electrostatic precipitator

Chinese Name: 电除尘器机械安装技术条件

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release1997-04-15

Date of Implementation:1998-01-01

standard classification number

Standard Classification Number:Machinery>>General Machinery and Equipment>>J88 Environmental Protection Equipment

associated standards

alternative situation:ZB J88008-89

Publication information

other information

Focal point unit:Environmental Protection Machinery Standardization Technical Committee of the Ministry of Machinery

Publishing department:Environmental Protection Machinery Standardization Technical Committee of the Ministry of Machinery

Introduction to standards:

JB/T 8536-1997 This standard is a revision of ZB J88 008-89 "Technical Conditions for Mechanical Installation of Electrostatic Precipitators". This standard specifies the mechanical installation conditions, installation technical requirements, installation inspection rules, etc. of electrostatic precipitators. This standard applies to the mechanical installation of electrostatic precipitators specified in JB/T 5910-1997. It can also be used as a reference for technical transformation and overhaul of electrostatic precipitators. JB/T 8536-1997 Technical Conditions for Mechanical Installation of Electrostatic Precipitators JB/T8536-1997 Standard download decompression password: www.bzxz.net

Some standard content:

The Machinery Industry Standard of the People's Republic of China
JB/T8536-1997
Electrostatic precipitator
Published on April 15, 1997
Technical conditions for mechanical installation
Implementation on January 1, 1998
The Ministry of Machinery Industry of the People's Republic of China
JB/T8536-1997 9T
Standard is a revision of ZBJ88008-896 Technical Conditions for Installation of Electrostatic Precipitator 3. When this standard was revised, the original 4.7.6 (now 4.6.6..7m.) in the original standard was revised. The limit deviation of the anode was changed to \±?mm\; the original 4.10.9 (now 4.S.>... should be greater than 1CCCM\, and the actual need of the root belt working song was changed to . Should be greater than 200M\. The cancellation of 4.4 is part of the standard, and it is necessary to single this item first.
This standard replaces group 188008-R9 from the effective date of the user This standard is issued by the Technical Committee of the Environmental Protection Machinery Standardization Technical Committee of the Ministry of Machinery Industry. The drafting unit of this standard is Jiangfeida Electromechanical Group Co., Ltd. The drafters of the technical standard are Shi Peigen and Liang Qijin. This standard was first issued on March 3, 1989. Scope: Machinery Industry Standard of the People's Republic of China. Electrostatic precipitator, mechanical installation technical requirements. This standard specifies the installation conditions, installation technical requirements, installation inspection regulations, etc. of the dust collector. JBTSS36
Generation ZJ (IX ·
This standard applies to the mechanical installation and technical transformation of electrostatic precipitators in accordance with the standard +S1C·1. It can also be used as a substitute for the overhaul of electrostatic precipitators.
2 Reference standards
The following standards contain provisions that are not used in this standard and are considered as provisions of this standard. The versions shown are valid at the time of publication of this standard. All standards are subject to revision, and parties using the standards should consider the possibility of using the latest version of the following standards. GB/T13931-92
JI/T591G -1997
3 Installation Case
Electrostatic Precipitator Performance Test Method
Electrostatic Precipitator
31. The work order should be familiar with the equipment structure, performance and related detailed drawings and technical documents, and prepare the design plan for the work order. 3.3 Check the parts when receiving the delivery order.
3.3 All electric porcelain products should be tested for resistance and continuous performance before installation. 3.+ Construction site, "three roads and one level" means water access, Fengguan, road reverse, main ground level. And have various protection measures. 3.5 The equipment can be installed after the steel reinforcement foundation has been accepted and the pressure test report has been submitted. 3. The main parts should be installed during the construction period. Technical guidance: 4 Technical requirements for installation
4.1 Before lifting the steel support, the foundation should be inspected and the small flat dimensions of the vertical, horizontal and diagonal forces and the elevation of the base should be measured. The standard is +3m. If the coordinates of the middle support are out of tolerance, steel plates can be used to pad them. All parts must be installed before installation. According to the drawings, if deformation and dimensional changes are found during transportation, loading and unloading, and maintenance, plastic and correction should be made.
.2 The small deviation of the water level of the bearing point in the fruit position is +3m, and the tolerance of the water level in the direction of the bearing point is m. It should be reversed, and then the support parts should be installed.
4.3 Support bearing and bottom joint
4.3.1 The difference between the installation and elevation of the bearing is =3mml, 4.3.2 After the bottom frame is installed, its diagonal load dimensional deviation should meet the requirements of Example 1. Approved by the Ministry of Machinery Industry on January 15, 1997, implemented in 198011, JR/T 8536- 1997, and are one electric field and two electric fields respectively. 4.3.3 The empty diagonal tolerance of the ash hopper is ±8m. 4.4 Tiger parts, two electric fields, and five electric field bottom cases are installed after the negative line size is stored. National 1, 4.4.1 The beams and related parts in the competition body must be inspected and the corresponding ten Ning center lines must be marked. 4.4.2 The tolerance value of the shell after basking shall be checked according to the drawing requirements. The whole shell is welded in parallel. The quality of wet joints shall meet the requirements of Table 1. All positioning and penetration of the shell shall be welded in reverse order after tightening, and the sealing performance of the joint shall be tested by the tearing method. 4.4.3 The center value of the joint between the main beam and the center of the bottom beam is 25mm. 4.4.4 The joint gap between the bottom of the main beam and the upper surface of the vertical beam should not be more than -2mm. 4.4.5
When falling, install the positioning device. The center line size of the two positioning measures is adjusted to ±1am. After the attached plates are installed, they are hoisted around the table 1
number of traps
mold upward
sea material metal minus
deep seam environment weld
defects and size reporting limit image book
length growth does not exceed 1.5% of the seam length
the detection sequence does not exceed the lower delivery machine determination:
os1o..conm
& >urmat.as.Imm.
540mm.21.3mm.bzxZ.net
Home review
Accumulated winter weight
Each size is not less than
No matter you are wrong
Carbon surface pores
4.5 plate Xing score
JE/I8536--1997
Thailand (finished)
Quickly sink and change the size of the stop pad
mm, k-
When> 4mm, ak
is not allowed to be
in any single key 100nm year
more than one,
in the maximum
length shall not be more than two
4.5.1 During installation, the flatness difference of the single pole and F is not required to be greater than 3%m, and the error of the residual line is not greater than 10mm. 4.5.2 The distance difference between the support points on the anode row is 1mm, 4.6 The deviation between the end sleeve section, dust cover and hanging guard is 5mm. 4.6.7 The flatness tolerance of the cathode frame is 15m. The overall diagonal tolerance is 10mm. 4.6.3 The distance between the main beam surface and the inner shell of the shell and the negative suction case is 5m1m4.4 The same electric field is attached to the center line of the household wire and the deviation is also 10m. 4.6.5 The average tolerance of the positive and negative electrodes is 5mm, and the diagonal error is not more than 10mm. 4. After the installation and adjustment of the electrostatic precipitator, the limit distance is 1m. For example, the limit distance of the electrostatic precipitator with a plate height of 7m is 1m. For example, the limit difference of the thickness of the four slow-moving precipitators is 10mm. 4.7.1 The anode should be 5m below the horizontal centerline of the dragging station, and the horizontal deviation should be ±mm. 2 The tolerance of the two adjacent hammer heads should be strictly controlled. The hammer heads should be correct in the direction of the station, and the vibration head and the bamboo head should be kept in good condition. The length of the connection should be greater than 0.C of the thickness of the head. 4.7.3 When replacing the cat, the auxiliary tolerance is 4.B. The grounding of the electrostatic precipitator and the auxiliary equipment should be reliable. The grounding voltage should be less than 2% under various climatic conditions: 4.9 Post-installation inspection JB/T8536-1997 4.9.1 Remove the temporary brackets and scaffolding used during the installation, and install the three holes without welding. 4.9.2 Ground the frequency bolts and regular bolts, and tighten the end of the fuel bolts. The parts must be well insulated: Use 2500 megohmmeter to measure the insulation resistance of each high circuit. It should be greater than 2MM2. Use 500 megohmmeter to check the low circuit. Its insulation resistance should be greater than 0.5M. Safety inspection rules: The no-load power-on test of the electrostatic precipitator should meet the requirements of 5.4J/T551C in GB/T1383192. 5.2 The measurement of the inter-pole distance error of the electrostatic precipitator should meet the requirements of 5.3 of GB/T 13931-92 and 7.4 of JB/T 591C-1997. 5.3 All low-voltage return-to-ground tests (including carbon heating, insulator heater, motor, etc.) should meet the relevant technical requirements. 5.4 The actual adjustment of air flow distribution should meet the requirements of 5.1 of GB/T13931-52 and JB/T5910. 5.5. The leakage rate of the whole electric eliminator is greater than that of the equipment. In case of special requirements or special needs, the parties shall agree on the technical agreement separately. 5.6 The limit deviation of the installation length shall comply with the provisions of Table 2. The limit deviation of the installation length shall comply with the provisions of Table 2.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.