JB/T 8811.1-1998 This standard specifies the model, basic parameters and dimensions, technical requirements, test methods, inspection rules and markings, packaging, transportation and storage of electric refueling pumps 4MPa. This standard applies to single-line lubrication pumps that add grease and oil to lubrication pumps with a nominal pressure of 4MPa. (Note: From the date of implementation of this standard, JB/ZQ 4545-86 "Electric Refueling Pumps (4MPa)" will be invalid.) JB/T 8811.1-1998 Electric Refueling Pumps 4MPa JB/T8811.1-1998 Standard download decompression password: www.bzxz.net
Some standard content:
FCS21260 Machinery Industry Standard of the People's Republic of China JB/T 8811.1—1998Www.bzxZ.net Electrical oil pumps 4MPa Electrical oil pumps 4MPaPublished on September 30, 1998 National Bureau of Machinery Industry Implementation on December 1, 1998 JD/T 8811,1-199B This standard is reviewed and supervised by the Metallurgical Equipment Standardization Technical Committee of the Ministry of Machinery. The responsible drafting unit of this standard is Shanghai Bunhua Machinery Factory. The main drafter of this standard is Jiu Zhenghuan. 1 Scope Mechanical Industry Standard of the People's Republic of China Electric refueling pump 4MPa Eleetrical pil or grease pureps 4 MPa.IB/I8811.11998 This standard specifies the type, basic parameters and dimensions, technical requirements, test methods, inspection and adjustment rules, markings, packaging, and remote transmission of automatic refueling pumps MT. This standard applies to electric refueling pumps (hereinafter referred to as refueling pumps) with a nominal pressure of 4MPa and lubricating grease pureps MT. 2 Referenced Standards The following standards contain the relevant provisions of this standard and are applicable to this standard. The versions shown are all effective when this standard is published. Civilian standards will be revised before they are used, and the parties using the standards should explore the possibility of using the latest versions of the following standards as soon as possible GB/TI538492 General technical requirements for packaging of electromechanical products 3 Models, basic specifications and dimensions 3.2 No multiple Rated oil supply, L/rain Pressure level code, 4MP Electric pumps such as pool pumps and other specifications shall comply with the provisions of 1. Nominal positive force Suitable for the chain penetration of 255~~285(75:150g1/1amm: the stand is not less than 61.mm 3.3 External length The external dimensions of the refueling object meet the requirements of the first national standard. 3.4 Example of refueling Rated oil quality The rated pressure is 2MPa, and the rated speed is 1.6L/min. Electric refueling ticket: oiling stem and DJB- 1.JIR/T8811.1-1998 Approved by Fujian Machinery and Fuel Industry Bureau in 1998-0930 Motor power Implemented on 1998-12-01 4 Technical requirements 4.1 Running performance The oil-softening operation should be stable without abnormal phenomena. 4.2 Endurance J8811.11 No. 98 The oil-filling case should be free of abnormal phenomena such as parts damage under a pressure 1.1 times the nominal pressure. 4. 3 Sealing performance The system should not leak at any joint under 1.15 times the nominal pressure. 4.4 Oil flow t The oil flow should not be less than 16L/tnin under the pressure of the public money. 4.5 The oil outlet and the refueling table should comply with the relevant standards. The surface of the oil storage channel should be smooth and no chain phenomenon is allowed. 4.6 The vertical length of the bacteria washed out by the foaming should not be more than 4m. 4.1 Life span The life span should not exceed 10CC under the use conditions. When the oil flow is set to a certain value, it can be regarded as the actual service life limit 5 Test method 5.1 Test operation JB/TB81I.1- The factory test is for lubricating oil with a viscosity of 1.2~74.8mm/g, and the life test medium is a cone penetration of 265~29525C, 15g>1/10n fat. The basic range of the pressure gauge used for the test is 0-6MPa and the accuracy level is 2.5. 5.2 Principle diagram of the test system as shown in Figure 3 Test system: 8 positive pressure gauge: 3-adjustment bed reading 53 running test The oil outlet pressure is measured to 94MPa. It is run for 5min and its running performance should comply with the provisions of 4.1. s.4 Performance test The oil outlet pressure of the oil pump is adjusted to MTa, and its durability is tested for 5min. The pressure performance should meet the requirements of 2. 5. Width test questions Pressure resistance test rating · Daily inspection of each connection + its sealing performance as specified in 4.3, S.6 state gasket test will add sleeve spring out: 1 pressure is reduced to 4MFa. Measure the oil volume of the mountain contact 3n. Its half value is in accordance with the provisions of 4.4. 5, the surface coating Ji monthly visual inspection plus independent surface &, its quality should meet the requirements of 4.5. 5.8 Cleanliness inspection will be as mentioned above, the whole specification of all parts such as the oil through the oil (body part hidden), will be washed with the oil with the new oil stop temperature of 12C drying flat 60mm and you weight of the fixed paper through the paper model into the group (the building of the following baking m). The filter is weighed again after ten days. The difference between the amount of impurities and the amount before and after the re-weighing is T, and its value should meet the requirements of 1.5.9 life point Inject the core oil to 11 positive pressure to 4MPa, and it must be 5h later. The fixed outlet lubrication volume should meet the requirements of 4.5. Inspection regulations . Position inspection JI/T811.1-199K For example, the pump record control test technology 5.3, 5.4, 6.2, 5.6 and 5.7 shall be carried out. 2 Type inspection 5.2.1 Type inspection shall be conducted in any of the following cases: a) When the product is first modified and tested: b) When there are significant changes in the structure, material or process that may affect the product performance: ) When the product is completed and finished for 6 years normally 6.2.2 Type inspection products shall be selected from the finished products that have been inspected and put into storage, and the number shall not be less than two. 6.2.3 Type inspection shall be conducted in accordance with the provisions of Section 5. 3. If the type inspection fails, a scratch inspection shall be conducted. If there are still items that fail to meet the requirements, the product shall be classified as a defective product. Labeling, packaging, transportation and storage The unpacking, packaging, inspection and storage of the pump shall comply with the provisions of GBT13384. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.