title>JB/T 8494-1996 Technical requirements for hydraulic presses for metal baling - JB/T 8494-1996 - Chinese standardNet - bzxz.net
Home > JB > JB/T 8494-1996 Technical requirements for hydraulic presses for metal baling
JB/T 8494-1996 Technical requirements for hydraulic presses for metal baling

Basic Information

Standard ID: JB/T 8494-1996

Standard Name: Technical requirements for hydraulic presses for metal baling

Chinese Name: 金属打包液压机 技术条件

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release1996-11-07

Date of Implementation:1997-01-01

standard classification number

Standard Classification Number:Machinery>>General Processing Machinery and Equipment>>J62 Forging Machinery

associated standards

alternative situation:ZB J62013-87

Publication information

other information

Focal point unit:Jinan Foundry and Forging Machinery Research Institute

Publishing department:Jinan Foundry and Forging Machinery Research Institute

Introduction to standards:

This standard specifies the technical requirements, inspection rules and test methods, packaging, storage and transportation, and marking of metal baling hydraulic presses. This standard applies to metal baling hydraulic presses. JB/T 8494-1996 Technical requirements for metal baling hydraulic presses JB/T8494-1996 Standard download decompression password: www.bzxz.net

Some standard content:

Mechanical Industry Standard of the People's Republic of China
JB/T 8494-96
Metal Baling Hydraulic Press
1996-11-07 Issued
Technical Conditions
1997-1-01 Implementation
Ministry of Machinery Industry of the People's Republic of China
JH/T8494-96
Production Standard is the "Original 2B62C137 Metal Baling Hydraulic Press" proposed by the Machine Tool Industry Industry Standard Market Inspection Committee in 2015. The technical requirements of the machine should be included in the technical conditions of the product before the production. This standard is based on the technical conditions of J38R-4 liquid layer machine, combined with the enterprise's use requirements for packaging liquid tablet machines, the "witness fee requirements, test methods and inspection rules, packaging, storage and transportation" in the standard are all carried out according to the provisions of the door diagram to ensure the various functions of the hydraulic press! "National product performance protection standard, technical requirements are not required, this standard is effective from January 1, 1997, the full speed standard of the packaging press is effective from January 1, 1997,
This standard was proposed by the Jinan Machinery Association's Jinan Securities Research Institute, and the unit that funded this standard was the Ji'nan Machinery Co., Ltd. This standard specifies the technical requirements, inspection conditions and test methods of metal baling hydraulic presses, as well as the packaging, storage and transportation markings of metal baling hydraulic presses. This standard applies to metal baling hydraulic presses (hereinafter referred to as balers). 2 Referenced standards The texts contained in the following standards constitute the provisions of this standard by being referenced in this standard. When this standard is published, the versions shown are valid. All the standards are subject to revision, and the parties using this standard should consider the possibility of using the latest version marked with the underline. G191-
GB 3766—R
GR422384
GB/T 5226.1—1S96
GR7935-87
GB/T13506—91
GH/T1336492
JB3240-83
J133623-84
JB3AR-
JB391585
ZBJ50 0118
J13-39
ZTJ5001
ZB16200186
ZBJ62 DD6—87
7.R J62 025-B9
3 Technical requirements
Illustration of installation, storage and transportation
General technical requirements for screening and pressing systems
Technical conditions for carbon gray steel transformer wire
1 Mechanical and electrical equipment for industry Part 1: General technical requirements General technical requirements for micro-pressure components
General technical requirements for packaging of electromechanical products
Visual symbols for forging machinery operation instructions
Method for measuring noise of forging machines
Technical requirements for hydraulic presses|| tt||Safety technical provisions for pressed machines
Technical conditions for machine tool contamination rate
Rust prevention technical provisions
Technical conditions for machine tool packaging
Activity of mechanical excitation system
Noise limit for forging machine
Technical conditions for welding of eye pressure machine
3.1 The type and technical parameters of the baler shall comply with the provisions of the general technical parts of the approved drawings in the prescribed sequence. 3.3 The baler shall have sufficient strength, and its strength value shall comply with the relevant provisions. 3.3 The baler shall have a limited block, and its density shall comply with the provisions of GB422. 3.4 Matching requirements
3.4.1 When the baler is shipped, its integrity shall be guaranteed, and special spare parts and spare wearing parts specified in the technical documents shall be available. Special accessories shall be agreed upon by the center and the manufacturer, or supplied as part of the machine or ordered separately. 3.4.2 The manufacturer shall ensure that the purchased parts of the baler (such as pressure relief, electrical components) meet the regulations and obtain the certificate of qualification, and the pressure relief shall be installed on the machine for operation test.
3.5 Safety and protection
Approved by the Ministry of Machinery Industry on November 1, 1996
Implementation on January 1, 1997
JD/T849496
3.5.1 The baler must have reliable safety protection devices and meet the regulations of JB3915. 3.5.2 The lifting mechanism shall be reliable, and the continuous action of the lower ring shall not occur when the baler is in a strict cycle. 3.5.1 The baler shall have a gear to stop the baler from falling. 3.5.4 The baler shall be equipped with a safety gear to stop the baler from falling. The minimum number of contaminations in the system should comply with the provisions of GH3766. 3.5.5 The safety and protection of the gas equipment in the baler should comply with the provisions of B/525.1. 3.6: Lubrication
The baler should have a standard setting. Lubrication pipelines and standard points should have corresponding numbered labels to ensure that all operating parts can be operated normally. 3.7 Signs
The machine should have a nameplate, indicating lubrication belts, replacement of double safety requirements, etc. Signs and signs: The sign should comply with the provisions of B13306. The shape of the sign will meet the requirements of B321. The model is fixed on the correct date and appropriate. 3.8 Forging and Identification Parts
3.8.1 Castings, inserts, spare parts, joint parts, workpieces and color parts shall all meet the current standard requirements. For castings, forgings and welded parts, defects, loss and appearance quality shall be guaranteed according to the relevant standard specifications. 3.8.2 For packaging machines, the stopping and forging of the machine shall be reversed to eliminate the internal defects. 3. Quality List
3.91 The quality of the machine shall meet the requirements of the design drawings and relevant technical specifications. The time value is not specified or the production is not completed. All defects shall be used except for special effects. 3.9.2 The cutting and processing size not specified on the whole sample shall meet the specified specifications. 1. Assembly quality
310. The baler shall be assembled with precision, and the method specified in the drawings shall not be used. 3.10.2. The parts and components (package specifications) of the baler shall meet the quality requirements. The body shall be inspected with a 5m ruler. The insertion of personnel is allowed. The insertion length shall not exceed 20 mm. The cumulative length of the insertion shall be inspected by two personnel. 3.10. The front and rear guards of the baler shall be measured. The principle of using the shrinkage should comply with the provisions of Table 1. Female
Level 4
Care and shrinkage
According to the company's system of market
Service
-16x--25-2.5
According to the source method
When entering the room in the
up before the task, the center after a
standard, the type of measurement after the child,
limit, the performance in the most extreme position as the legacy
JB/T849496
3.10.5 hydraulic, All the pipes, joints, radiators and other fixings of the cooling system shall be properly connected to the main belt, well sealed and without any sag. 3.11 The quality of hydraulic assembly and pressure equipment of the packing machine shall comply with the provisions of JF38-8. 3.12 The quality of electrical equipment of the packing machine shall comply with the provisions of H/F5226.1. 3.13 Appearance quality
3, 3.1 Sweep the outer surface of the plan, the small degree is as specified in the drawing, the twist is not in accordance with the case and other damage analysis 3.13.2 The bottom channel, side frame, front frame, rear frame, door frame, support frame and other integrated parts should be neat, without obvious gaps 3.13.3 The exposed probe chain should be neat, uniform, and open in accordance with the relevant standards. 3.13.4 When the liquid transport, lubrication and gas road are installed, they should be neat and beautiful, and should not lead to the relative operation of the front parts.
3, 13. 5 The head of the nail should be out of the season; the end of the urine should be small, but it should not be too long and not included in the call. 3.13.6 The various nameplates, signs, and fixed positions of the machine should be adjusted, flat, and solid. 3.14 Lithium 5 configuration
3.14. The selection of charter machines shall meet the requirements of the quality list of the famous Taiwan 2350. 3.14.2 The color machine evaluation shall comply with the requirements of 2B, 5014.4 Inspection
4. The core of the inspection
The basic parameters of the machine shall comply with the current table 2"
Winter
Pressure head volume
Middle kidney transfer single fine teacher leaf
Heart decision density
4.The inspection of the system reliability of the baler should be carried out in combination with the inspection of the running and negative operation test products, and the special test specifications in the product manufacturing and installation technology cases should be carried out: 1) Starting and other tests. 2) The operation test of each movement machine of the door should be carried out continuously, 3 times, the action should be stable and firm, 3) The reliability of the safety installation; 4) Lubrication and heating of the sealing of the installation. 4. Inspection of assembly quality
The baler should be inspected for assembly sensitivity under 10 key conditions. 4.4 Inspection of assembly quality
Before the baler is put into operation test, during the actual operation test, the following items of assembly quality should be monitored: 1) Safety requirements of the filtration system, which shall comply with the relevant provisions of JB3818; 3) JBT 8494-96; b) Flexibility and reliability of various counters and indicators; Stability and reliability of the filter pressure system during positive force adjustment; 4.5 Inspection of assembly quality
The baler should be inspected for assembly quality under 10 key conditions. 4.6 Inspection of assembly quality
The baler should be inspected for assembly quality under the following conditions: 1) Safety requirements of the filtration system, which shall comply with the relevant provisions of JB3818; 2) Flexibility and reliability of various counters and indicators; 3) Stability and reliability of the filter pressure system during positive force adjustment; 4.7 Inspection of assembly quality
The baler should be inspected for assembly quality under the following conditions: 1) Safety requirements of the filtration system, which shall comply with the requirements of JB3818; 1) Flexibility and operability of various linked devices; 2) Decompression and system uniformity; 3) Operability of the acid pressure system; 4.8 Inspection of assembly quality
The baler should be inspected for assembly quality under the following conditions: 1) Safety requirements of the filtration system, which shall comply with the requirements of JB3818; 1) Flexibility and operability of various linked devices; 1) Decompression and system uniformity; 1) Operability of the acid pressure system; 1) Random inspection of liquid conditions, which shall comply with the requirements of 2BJ52001. 4.5 Inspection of electrical equipment quality Before and during the no-load test of the baler, the electrical equipment of the machine should be tested and inspected according to the following items: i) Safety and reliability of electrical equipment operation; i) Polarity and reliability of components; j) Coordination and reliability of electrical equipment and liquid system; ii) Insulation test; j) Continuity inspection of protective wires.
4.6 Idle operation test
The baler is to be tested under variable load to avoid any damage to the foundation, length change, account page and other items. The idle operation test of the baler must be carried out for 10 consecutive hours. Each cycle test should be no less than 2h. A single cycle test can be carried out to test the action of a single cylinder. 46.2 The operation effect should be stable and reliable. The pressure parts should not cause any impact. The action of the mechanism and the pressure head should be smooth and reliable. 4.6.4 The entire high-pressure and low-pressure hydraulic system, lubrication system, cooling system pipelines, joints, flanges and other joints of the baler should be in good condition without any seams, water mixing, etc. 4.5 During the empty operation test, the oil temperature at the oil tank inlet (or tank tank re-) exceeds 604.6%. During the empty operation test, the noise limit of the operating position of the baler shall meet the requirements of ZR 6200%.1. 4.7 Load operation test
The load operation test shall be carried out after the military test is qualified. The test method can be metal baling or other auxiliary or harmonic. 4.7.1 When the baler is loaded, a step-by-step test shall be carried out. The action shall be stable and reliable under various specifications. 4.7.3 The temperature of the tank shall meet the requirements of 1.6. 4.7.3 The average temperature of each system shall meet the requirements of 4.6.4. 4.7.4 The noise limit shall meet the requirements of 1.5.6. 4.7.5 The rated voltage of the blower and the protection rate of the main motor shall comply with the requirements of the design documents and relevant standards. 4.8 Pre-inspection
The overload test shall be carried out on the charter machine, and the working cycle shall not be less than once a day. The test method may adopt metal oxygen packing or other loading measures. 4.8.1 The overload test shall be carried out in conjunction with the adjustment inspection of the safety net. The overload test pressure shall generally comply with the provisions of the table. 3
Body work
Test force
4.8.2 During and after the overload test, the parts and components of the strapping machine shall not have any peeling or deformation, and the hydraulic system shall not have any abnormal phenomenon of its components.
4. 9 Working test
JB/T 8494-96
Each strapping machine shall be subjected to working test according to the specified metal material. The working test can be combined with the long test. The strapping is not completed, and the density shall also meet the requirements of 3.3. 4.10 Sound pressure
4.10.1 The measuring station of the strapping machine shall comply with the provisions of 3623. 4.1. When the strapping machine is operated continuously without load and fully loaded, the sound pressure level pLA (A) before changing positions shall meet the requirements of 7PJ62006.1.
4.11 Inspection of appearance quality
The appearance quality of the packaged machine shall comply with the regulations.
4.12 Packaging inspection
The packaging inspection of the package shall be carried out from the 6th day of the twelfth month. S Acceptance rules
5.! The baler is divided into return inspection and post-production inspection. 5.2 Delivery inspection
Each baler shall be inspected by the quality control department of the manufacturer, and only qualified ones can be shipped out of the factory. The baler shall be inspected and tested in the following items: a) Inspection of basic parameters: b) Inspection of basic performance: c) Inspection of assembly quality: d) Inspection of pressure assembly quality: d) Inspection of electrical equipment: e) Transmission test; f) Diagram! 1. Operation test:
) Overload operation test:
1. Operation test,
1) Noise will be tested by the ridge:
) Appearance quality inspection:
chuan) Position inspection.
5.1 Type comparison inspection
The following situations must be carried out for the product of the washing machine. The type test can only be formally produced after the integration of the type test:) New products or products are tested for production. The test is formulated for the type of inspection. 5) After the formal production, the station, materials, and process have also changed greatly, which may affect the product:) Normal production, after a certain period of accumulation of production, a periodic inspection should be carried out: d) When the product is resumed after a long period of suspension:) The factory inspection station results are different from the results of the type test! The quality monitor selects the type test in the machine. The packaging machine is required to be tested, except for the type test! In addition to all the items of inspection, the following items of inspection and testing are also required: 1) Inspection of the cleanliness of the parts and components, 2) Inspection of the oil flow rate, 3) Inspection of the oil flow rate, 4) Inspection of the oil flow rate, 5) Inspection of the parts, components, accessories and spare parts, 6) Inspection of the parts and components, 7) Inspection of the oil flow rate, 8) Inspection of the oil flow rate, 9) Inspection of the oil flow rate, 10) Inspection of the oil flow rate, 11) Inspection of the oil flow rate, 12) Inspection of the oil flow rate, 13) Inspection of the oil flow rate, 14) Inspection of the oil flow rate, 15) Inspection of the oil flow rate, 16) Inspection of the oil flow rate, 17) Inspection of the oil flow rate, 18) Inspection of the oil flow rate, 19) Inspection of the oil flow rate, 20) Inspection of the oil flow rate, 21) Inspection of the oil flow rate, 22) Inspection of the oil flow rate, 23) Inspection of the oil flow rate, 24) Inspection of the oil flow rate, 25) Inspection of the oil flow rate, 26) Inspection of the oil flow rate, 27) Inspection of the oil flow rate, 28) Inspection of the oil flow rate, 29) Inspection of the oil flow rate, 30) Inspection of the oil flow rate, 31) Inspection of the oil flow rate, 32) Inspection of the oil flow rate, 33) Inspection of the oil flow rate, 34) Inspection of the oil flow rate, 35) Inspection of the oil flow rate, 36) Inspection of the oil flow rate, 37) Inspection of the oil flow rate, 38) Inspection of the oil flow rate, 39) Inspection of the oil flow rate, 40) Inspection of the oil flow rate, 41) Inspection of the oil flow rate, 42) Inspection of the oil flow rate, 43) Inspection of the oil flow rate, 44) Inspection of the oil flow rate, 45) Inspection of the6 Idle operation test
The baler is carried out into operation test under variable load condition, and the basic conditions, length changes, account pages and other items shall be tested. The idle operation test of the baler must be carried out for 10 consecutive hours. Each cycle of the test shall be no less than 2h. A single cycle test can be carried out to test the action of a single cylinder. 46.2 The operation effect should be stable and reliable. 4,6,3 The pressure wave should not cause any impact phenomenon. The action of the mechanism and the pressure head should be smooth and reliable. 4.6.4 The entire high-pressure and low-pressure hydraulic system, lubrication system, cooling system, pipes, joints, flanges and other joints of the baler should be in good condition without seams, water mixing, etc. 4.5 During the empty operation test, the oil temperature at the oil tank inlet (or tank tank re-) exceeds 604.6%. During the empty operation test, the noise limit of the operating position of the baler shall meet the requirements of ZR 6200%.1. 4.7 Load operation test
The load operation test shall be carried out after the military test is qualified. The test method can be metal baling or other auxiliary or harmonic. 4.7.1 When the baler is loaded, a step-by-step test shall be carried out. The action shall be stable and reliable under various specifications. 4.7.3 The temperature of the tank shall meet the requirements of 1.6. 4.7.3 The average temperature of each system shall meet the requirements of 4.6.4. 4.7.4 The noise limit shall meet the requirements of 1.5.6. 4.7.5 The rated voltage of the blower and the protection rate of the main motor shall comply with the requirements of the design documents and relevant standards. 4.8 Pre-inspection
The overload test shall be carried out on the charter machine, and the working cycle shall not be less than once a day. The test method may adopt metal oxygen packing or other loading measures. 4.8.1 The overload test shall be carried out in conjunction with the adjustment inspection of the safety net. The overload test pressure shall generally comply with the specifications in the table. 3
Body work
Test force
4.8.2 During and after the overload test, the parts and components of the strapping machine shall not have any peeling or deformation, and the hydraulic system shall not have any abnormal phenomenon of the parts and components.
4. 9 Working test
JB/T 8494-96
Each strapping machine shall be subjected to working test according to the specified metal material. The working test can be combined with the long test. The strapping is not completed, and the density shall also meet the requirements of 3.3. 4.10 Sound pressure
4.10.1 The measuring station of the strapping machine shall comply with the provisions of 3623. 4.1. When the strapping machine is operated continuously without load and fully loaded, the sound pressure level pLA (A) before changing positions shall meet the requirements of 7PJ62006.1.
4.11 Inspection of appearance quality
The appearance quality of the packaged machine shall comply with the regulations.
4.12 Packaging inspection
The packaging inspection of the packaged machine shall be carried out from the 6th day of the 6th month. S Acceptance rulesbzxz.net
5.! The baler is divided into return inspection and next inspection. 5.2 Delivery inspection
Each baler shall be inspected by the quality control department of the manufacturer, and only qualified ones can be shipped out of the factory. The baler shall be inspected and tested in the following items: a) Inspection of basic parameters: b) Inspection of basic performance: c) Inspection of assembly quality: d) Inspection of pressure assembly quality: d) Inspection of electrical equipment: e) Transmission test; f) Diagram! 1. Operation test:
) Overload operation test:
1. Operation test,
1) Noise will be tested by the ridge:
) Appearance quality inspection:
chuan) Position inspection.
5.1 Type comparison inspection
The following situations must be carried out for the product of the washing machine. The type test can only be formally produced after the integration of the type test:) New products or products are tested for production. The test is formulated for the type of inspection. 5) After the formal production, the station, materials, and process have also changed greatly, which may affect the product:) Normal production, after a certain period of accumulation of production, a periodic inspection should be carried out: d) When the product is resumed after a long period of suspension:) The factory inspection station results are different from the results of the type test! The quality monitor selects the type test in the machine. The packaging machine is required to be tested, except for the type test! In addition to all the items of inspection, the following items of inspection and testing are also required: 1) Inspection of the cleanliness of the parts and components, 2) Inspection of the oil flow rate, 3) Inspection of the oil flow rate, 4) Inspection of the oil flow rate, 5) Inspection of the parts, components, accessories and spare parts, 6) Inspection of the parts and components, 7) Inspection of the oil flow rate, 8) Inspection of the oil flow rate, 9) Inspection of the oil flow rate, 10) Inspection of the oil flow rate, 11) Inspection of the oil flow rate, 12) Inspection of the oil flow rate, 13) Inspection of the oil flow rate, 14) Inspection of the oil flow rate, 15) Inspection of the oil flow rate, 16) Inspection of the oil flow rate, 17) Inspection of the oil flow rate, 18) Inspection of the oil flow rate, 19) Inspection of the oil flow rate, 20) Inspection of the oil flow rate, 21) Inspection of the oil flow rate, 22) Inspection of the oil flow rate, 23) Inspection of the oil flow rate, 24) Inspection of the oil flow rate, 25) Inspection of the oil flow rate, 26) Inspection of the oil flow rate, 27) Inspection of the oil flow rate, 28) Inspection of the oil flow rate, 29) Inspection of the oil flow rate, 30) Inspection of the oil flow rate, 31) Inspection of the oil flow rate, 32) Inspection of the oil flow rate, 33) Inspection of the oil flow rate, 34) Inspection of the oil flow rate, 35) Inspection of the oil flow rate, 36) Inspection of the oil flow rate, 37) Inspection of the oil flow rate, 38) Inspection of the oil flow rate, 39) Inspection of the oil flow rate, 40) Inspection of the oil flow rate, 41) Inspection of the oil flow rate, 42) Inspection of the oil flow rate, 43) Inspection of the oil flow rate, 44) Inspection of the oil flow rate, 45) Inspection of the6 Idle operation test
The baler is carried out into operation test under variable load condition, and the basic conditions, length changes, account pages and other items shall be tested. The idle operation test of the baler must be carried out for 10 consecutive hours. Each cycle of the test shall be no less than 2h. A single cycle test can be carried out to test the action of a single cylinder. 46.2 The operation effect should be stable and reliable. 4,6,3 The pressure wave should not cause any impact phenomenon. The action of the mechanism and the pressure head should be smooth and reliable. 4.6.4 The entire high-pressure and low-pressure hydraulic system, lubrication system, cooling system, pipes, joints, flanges and other joints of the baler should be in good condition without seams, water mixing, etc. 4.5 During the empty operation test, the oil temperature at the oil tank outlet (or tank tank re-) exceeds 604.6%. During the empty operation test, the noise limit of the operating position of the baler shall meet the requirements of ZR 6200%.1. 4.7 Load operation test
The load operation test shall be carried out after the military test is qualified. The test method can be metal baling or other auxiliary or harmonic. 4.7.1 When the baler is loaded, a step-by-step test shall be carried out. The action shall be stable and reliable under various specifications. 4.7.3 The temperature of the tank shall meet the requirements of 1.6. 4.7.3 The average temperature of each system shall meet the requirements of 4.6.4. 4.7.4 The noise limit shall meet the requirements of 1.5.6. 4.7.5 The rated voltage of the blower and the protection rate of the main motor shall comply with the requirements of the design documents and relevant standards. 4.8 Pre-inspection
The overload test shall be carried out on the charter machine, and the working cycle shall not be less than once a day. The test method may adopt metal oxygen packing or other loading measures. 4.8.1 The overload test shall be carried out in conjunction with the adjustment inspection of the safety net. The overload test pressure shall generally comply with the provisions of the table. 3
Body work
Test force
4.8.2 During and after the overload test, the parts and components of the strapping machine shall not have any peeling or deformation, and the hydraulic system shall not have any abnormal phenomenon of the parts and components.
4. 9 Working test
JB/T 8494-96
Each strapping machine shall be subjected to working test according to the specified metal material. The working test can be combined with the long test. The strapping is not completed, and the density shall also meet the requirements of 3.3. 4.10 Sound pressure
4.10.1 The measuring station of the strapping machine shall comply with the provisions of 3623. 4.1. When the strapping machine is operated continuously without load and fully loaded, the sound pressure level pLA (A) before changing positions shall meet the requirements of 7PJ62006.1.
4.11 Inspection of appearance quality
The appearance quality of the packaged machine shall comply with the regulations.
4.12 Packaging inspection
The packaging inspection of the packaged machine shall be carried out from the 6th day of the 6th month. S Acceptance rules
5.! The baler is divided into return inspection and next inspection. 5.2 Delivery inspection
Each baler shall be inspected by the quality control department of the manufacturer, and only qualified ones can be shipped out of the factory. The baler shall be inspected and tested in the following items: a) Inspection of basic parameters: b) Inspection of basic performance: c) Inspection of assembly quality: d) Inspection of pressure assembly quality: d) Inspection of electrical equipment: e) Transmission test; f) Diagram! 1. Operation test:
) Overload operation test:
1. Operation test,
1) Noise will be tested by the ridge:
) Appearance quality inspection:
chuan) Position inspection.
5.1 Type comparison inspection
The following situations must be carried out for the product of the washing machine. The type test can only be formally produced after the integration of the type test:) New products or products are tested for production. The type test is formulated for the inspection. 5) After the formal production, the station, materials, and process have also changed greatly, which may affect the product:) Normal production, after a certain period of accumulation of production, a periodic inspection should be carried out: d) When the product is resumed after a long period of suspension:) The factory inspection station results are different from the results of the type test! The quality monitor selects the type test in the machine. The packaging machine is required to be tested, except for the type test! In addition to all the items of inspection, the following items of inspection and testing are also required: 1) Inspection of the cleanliness of the parts and components, 2) Inspection of the oil flow rate, 3) Inspection of the oil flow rate, 4) Inspection of the oil flow rate, 5) Inspection of the parts, components, accessories and spare parts, 6) Inspection of the parts and components, 7) Inspection of the oil flow rate, 8) Inspection of the oil flow rate, 9) Inspection of the oil flow rate, 10) Inspection of the oil flow rate, 11) Inspection of the oil flow rate, 12) Inspection of the oil flow rate, 13) Inspection of the oil flow rate, 14) Inspection of the oil flow rate, 15) Inspection of the oil flow rate, 16) Inspection of the oil flow rate, 17) Inspection of the oil flow rate, 18) Inspection of the oil flow rate, 19) Inspection of the oil flow rate, 20) Inspection of the oil flow rate, 21) Inspection of the oil flow rate, 22) Inspection of the oil flow rate, 23) Inspection of the oil flow rate, 24) Inspection of the oil flow rate, 25) Inspection of the oil flow rate, 26) Inspection of the oil flow rate, 27) Inspection of the oil flow rate, 28) Inspection of the oil flow rate, 29) Inspection of the oil flow rate, 30) Inspection of the oil flow rate, 31) Inspection of the oil flow rate, 32) Inspection of the oil flow rate, 33) Inspection of the oil flow rate, 34) Inspection of the oil flow rate, 35) Inspection of the oil flow rate, 36) Inspection of the oil flow rate, 37) Inspection of the oil flow rate, 38) Inspection of the oil flow rate, 39) Inspection of the oil flow rate, 40) Inspection of the oil flow rate, 41) Inspection of the oil flow rate, 42) Inspection of the oil flow rate, 43) Inspection of the oil flow rate, 44) Inspection of the oil flow rate, 45) Inspection of theWhen the type test results are different, the quality supervisor shall select the type test for the baler. In addition to all the items of the inspection, the following items of inspection and test shall be carried out: 1. Inspection of the cleanliness of the parts and components, and 2. Inspection of the oil flow rate and change of the oil flow rate. 3. Packaging, storage and transportation and marking. 4. The parts, components, accessories and spare parts shall be processed and rust-free before being installed. 5. JB/T 8494-96 6.2 When the packaging is in the box, it shall comply with the provisions of 2BJ50014. When the packaging system is in the form of pressure packaging, it shall comply with the provisions of GB/T13224. 3. The packaging, storage and transportation of the baler shall comply with the provisions of GB151. 6.4 Technical documents that must be attached to the baler: 1. Certificate of conformity:
2. Product instructions:
3. Packing list.When the type test results are different, the quality supervisor shall select the type test for the baler. In addition to all the items of the inspection, the following items of inspection and test shall be carried out: 1. Inspection of the cleanliness of the parts and components, and 2. Inspection of the oil flow rate and change of the oil flow rate. 3. Packaging, storage and transportation and marking. 4. The parts, components, accessories and spare parts shall be processed and rust-free before being installed. 5. JB/T 8494-96 6.2 When the packaging is in the box, it shall comply with the provisions of 2BJ50014. When the packaging system is in the form of pressure packaging, it shall comply with the provisions of GB/T13224. 3. The packaging, storage and transportation of the baler shall comply with the provisions of GB151. 6.4 Technical documents that must be attached to the baler: 1. Certificate of conformity:
2. Product instructions:
3. Packing list.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.