Standard Classification Number:Petroleum>>Petroleum Exploration, Development, Gathering and Transportation Equipment>>E92 Petroleum Drilling Equipment and Instruments
SY 5471-1992 Technical requirements for well repair drilling platformsSY5471-1992 Standard download decompression password: www.bzxz.net
Some standard content:
Petroleum and Natural Gas Industry Standard of the People's Republic of China SY Technical Conditions for Workover Drilling Platforms Published on 1993-02-22 Ministry of Energy of the People's Republic of China 5471--92 Implemented on 1993-08-01 1 Subject Content and Applicable Scope Petroleum and Natural Gas Industry Standard of the People's Republic of China Technical Conditions for Workover Drilling Platforms SY 5471--92 This standard specifies the technical requirements, test methods, inspection rules, marking, packaging and transportation of workover drilling platforms (hereinafter referred to as drilling platforms). This standard applies to the design, manufacture and acceptance of drilling platforms supporting workover rigs. 2 Reference standards GB 5117 Carbon steel welding rodwww.bzxz.net GB 5118 GB 986 Low alloy steel welding rod Basic types and dimensions of weld grooves for gas welding, manual arc welding and gas shielded weldingBasic types and dimensions of weld grooves for submerged arc weldingSY5305 General technical conditions for welded parts for petroleum drilling and production machinery productsSY5308 General technical conditions for paint for petroleum drilling and production machinery productsJB 8 3 Technical requirements Product nameplate 3.1 The manufacture of the drilling platform shall comply with the requirements of this standard and be manufactured according to drawings and technical documents approved through the prescribed procedures. 3.2 Various steel materials used for the drilling platform shall comply with the corresponding national standards and industry standards. The mechanical properties of the materials used in the design shall take the minimum values of the material specifications recommended by the national standards or industry standards. 1 The main bearing parts shall not use steel with a minimum yield limit less than 231MPa and steel pipe with a minimum yield limit less than 245MPa. The ratio of shear yield limit to tensile yield limit is 0.58. Various steel materials used for drilling platforms should have quality certificates from the original manufacturers, otherwise they should be subjected to chemical composition analysis and mechanical property tests before they can be used. 3.3 Materials specified in the drawings may be substituted, but it should be ensured that the product performance will not be reduced after substitution. 3.4 Fasteners and connectors used in drilling platforms shall comply with the requirements of the drawings. 3,5 Steel and steel plates and cutting surfaces shall meet the requirements of the drawings. Electric welding rods shall comply with the provisions of GB5117 and GB5118. 3.6 3.7 Welding heads shall comply with the provisions of GB985 and GB986. The welding of drilling platforms shall comply with the provisions of SY5305. 3.8 3.9 The deformation of components after assembly welding is allowed to be corrected. After correction, the flatness tolerance of the plane on the turntable beam is 6mm. 3.10 Unqualified holes can be repaired with electric welding rods once, and the surface can be re-drilled after grinding. 3.11 All fasteners and connectors should be able to be installed smoothly, and it is not allowed to be assembled by strong methods such as chain beating and jack. 3.12 All threaded fastener connections are not allowed to be loose, and anti-loosening devices must not be missing. 3.13 The movable railing should be able to be smoothly installed in the railing socket. 3.14 The painting should comply with the provisions of SY5308. Approved by the Ministry of Energy of the People's Republic of China on February 22, 1993, and approved on August 1, 1993. 4 Test methods and inspection rules 4.1 Factory inspection SY 5471--92 Each drilling rig should be inspected before leaving the factory, and can only leave the factory after passing the inspection. Check the flatness of the plane on the turntable beam, which shall comply with the provisions of Article 3.9. 4.1.1 4.1.2 Check the installation of all fasteners and connectors, which shall comply with the provisions of Article 3.11. 4. Straight, 3 Check all threaded fastener connections, which shall comply with the provisions of Article 3.12. 4.1.4 Check the installation of movable railings, which shall comply with the provisions of Article 3.13. 4.1.5 Check the appearance quality of the drilling platform, which shall comply with the provisions of Article 3.14. 4.2 Type inspection 4.2.1 Carry out type inspection on the first prototype of a new product or a major structural change. 1.2.2 For products subject to type inspection, load the turntable beam and the root box to the maximum test load value respectively. Loading shall be carried out in stages, and each load level shall be repeated at least once. The maximum test load value is equal to the maximum load of the drilling platform. The loading time of the maximum test load shall not be less than 15 minutes, and the loading time of the other levels of test loads shall not be less than 3 minutes. 4.2.3 For the parts with high stress on the test product, strain gauge shall be used to test the stress values under various test loads. All measured stress values shall be less than the design allowable value. 5 Marking, packaging and transportation 5.1 Marking The product nameplate of the drilling platform shall be fixed at the position specified in the drawing. The nameplate shall comply with the provisions of JB8. The content of the nameplate is as follows: a. Product name and model b. Maximum load c. Height of the upper plane of the turntable beam from the ground! d. Stand capacity* e. Drilling platform quality f. Factory date and number g. Manufacturer name. 5.2 The fasteners and connectors of the drilling platform shall be shipped in boxes. 5.3 The drilling platform shall not be dragged on the ground when being transported. 5.4 Each drilling platform shall be accompanied by the following technical documents, which shall be placed in a waterproof bag and packed in the box. a: Product certificate: b. User manual: c. Delivery list, d. Packing list. 5.5 Under the conditions of transportation, use and maintenance specified by the manufacturer, within 18 months from the date of shipment from the manufacturer, if the equipment is damaged or cannot be used normally due to poor quality, the manufacturer shall be responsible for free repair or replacement. Additional remarks This standard was proposed and coordinated by the National Technical Committee for Standardization of Petroleum Drilling and Production Equipment and Tools. This standard was drafted by the Second Oil Machinery Division of China National Petroleum Corporation. The main drafter of this standard is Wen Liancheng. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.