Some standard content:
JB | |tt||Water chestnut type coating machine
Swing granulator
Released on 2004-02-05
Implemented on 2004-06-01
National Development and Reform Commission Release
ICS11.120.30
C92
JB
Pharmaceutical Machinery Industry Standard of the People's Republic of China JB20017—2004
replaces YY0222—1995
Water chestnut type sugar coating machine
Water chestnut type sugar coating machine2004-02-05 release
2004-06-01 implementation
National Development and Reform Commission release
Foreword| |tt||1
Scope
2 Normative reference documents
3 Classification and labeling
4 Requirements
Test methods
5
6 Inspection Rules
7 Marks, Instructions for Use, Packaging, Transportation and Storage 7
Item
Times
JB20017—2004
40
41
41
41
42
43
44
39
JB20017— 2004 | Revised in 1995. This standard replaces YY0222-1995 from the date of implementation. Compared with YY0222-1995, the main technical content changes of this standard are as follows: a) Some chapters and clauses in YY(222-1995) have been deleted: Normative reference documents: GB5231 "Processed Copper, Chemical Composition and Product Shape", YY0076 " Technical Conditions for Coating Classification of Metal Parts";
Requirements (4.5, 4.13.4.14)
b) Revised some chapters and articles in YY0222-1995: 1 Preface; ||tt| |Normative reference documents;
Classification and labeling (Chapter 3, 3.2);
Requirements (Chapter 4, 4.1~4.5);
Test methods (5.2~5.3, 5.6.3);
inspection rules (6.2.1.1~6.2.1.2, 6.2.2.1~6.2.2.3); marking, instructions for use, packaging, transportation, and storage (Chapter 7). e) Some chapters and articles added to this standard:
Normative reference documents: GB/T16769 "Measurement method of noise and sound pressure level of metal cutting machine tools": GB/T6060.4 "Surface roughness comparison sample polishing processing" Surface": "Good Manufacturing Practice for Pharmaceuticals" (1998 revised edition); electrical system safety performance requirements (see 4.8.1~4.8.8); electrical system safety performance test (see 5.3.1, 5.3.2); instructions for use (See 7.2).
This standard is proposed by China Pharmaceutical Equipment Industry Association. This standard is under the jurisdiction of the Pharmaceutical Equipment Industry Standardization Technical Committee. This standard was drafted by: Baoji Pharmaceutical Machinery Factory. The main drafters of this standard: Zhang Baoshun, Zhang Nailing, and Li Ping. The previous versions of the standard replaced by this standard are: ZBC92001-1986.YY0222-1995. 40
1 scope
Palm-type coating machine
JB20017-2004||tt ||This standard specifies the classification and labeling, requirements, test methods, inspection rules and signs, instructions for use, packaging, transportation and storage of shepherd's purse coating machines.
This standard applies to the shepherd's purse type coating machine (hereinafter referred to as the coating machine) for coating compressed tablets, pills and granules. 2 Normative reference documents
The provisions in the following documents become provisions of this standard through reference in this standard. For referenced documents during the attention period, all subsequent changes (excluding corrigenda) or revisions do not apply to this standard. However, parties that reach an agreement based on this standard are encouraged to study whether to use the latest versions of these documents. For undated referenced documents, the latest edition applies to this standard. GB/T191 Packaging, storage and transportation pictorial mark
GB/T3280 stainless steel cold-rolled steel plate
GB5226.1-2002 Mechanical safety mechanical and electrical equipment Part 1: General technical conditions CB/T6060.4 Surface roughness Threshold comparison sample polished surface GB/T10111 Random sampling method using random number segments GB/T13306 Labeling
General technical conditions for mechanical and electrical product packaging
GB/T13384
GB/ T16769
Measurement method of noise sound pressure level of metal cutting machine tools YY/T0216 Pharmaceutical machinery product model compilation method 3 classification and labeling
3.1 model
Model representation method is compiled according to the provisions of YY/T0216 . BOOD
Improved design Gu serial number (A, B-)
Main parameters: pot diameter, mm
Type and feature code: Indicates seasonal maintenance type
Product function Code: Coating Machinery
Marking Example
BQ1000 Type: Indicates a school-style coating machine with a pot diameter of 1000mm. 41
JB20017-2004
3.2 Basic parameters
The basic parameters of the shepherd's purse coating machine are shown in Table 1.
Table 1
Model
BQ200
BQ300
BQ400
BQ500
BQ630
BQ800| |tt||BQ1000
Coating pot
Nominal diameter, mm
Rotation speed, r/min
200
300
400
500
630
800
1000
40~90
36~ 45
25 ~ 36|| tt | ()
Adjustable
20°~40g
Fixed
30°
4.1 The materials used in the coating machine must have a material certificate. kgr drink
1~2
3~4
4-12
15 ~ 30
30 ~50
50 ~ 70
Main motor power
kw
0.55
0.75
$1.1
Hot air volume
n?/min|| tt||0.4-1
2
3
4.2 The stainless steel material used in the coating machine must be austenitic stainless steel and should comply with the requirements of GB/T3280. 4.3 The edge of the pot ring should be smooth and there should be no obvious wrinkles. 4.4 The color of the inner and outer surfaces of the pot should be light-filled. The surface roughness Ra value should not be greater than 0.8um. Hot air temperature
50
50~60
4.5 Non-machined surfaces of castings and carbon steel parts should be coated with anti-rust paint. The interface between the painted surface and the non-coated surface should be clear, and there should be no Defects such as pores, wrinkles and tumors.
4.6 When covering the appearance of the entire machine, the surface of the covering layer should be flat, smooth and beautiful, without obvious unevenness and other appearance defects, and should be easy to clean. 4.7 After the pick body is connected to the pot support, the radial circular runout of the maximum outer diameter of the pot body and pot mouth ring relative to the center of rotation should comply with the requirements in Table 2.
Table 2 Coating machine specifications for radial runout of pot body and pot mouth ring
radial circular runout of pot body
radial runout of steel mouth ring||tt ||200,300
2
s2
4.8 Electrical system safety performance requirements
400,500
3
2.5
630,800
4
3
4.8.1 The continuity of the protective grounding circuit of the electrical system shall comply with the provisions of 19.2 in GB5226.1-2002. 4.8.2 The insulation resistance of the electrical system should comply with the provisions of 19.3 in GB5226.1-2002. 4.8.3 The withstand voltage of the electrical system shall comply with the provisions of 19.4 in GB5226.1-2002. 4.8.4 The protective grounding circuit of the electrical system should comply with the provisions of 8.2 in CB5226.1--2002. 4.8.5 The buttons of the electrical system should comply with the provisions of 10.2 in CB5226.12002. 4.8.6 The indicators and displays of the electrical system should comply with the provisions of 10.3 in GB5226.1-2002. 42
1000
5
mm
4.8.7 The wiring of the electrical system shall comply with the provisions of Chapter 14 of CB5226.12002. JB20017-2004
4.8.8 The markings, warning signs and project codes of electrical systems shall comply with the provisions of Chapter 17 of GB5226.1-2002. 4.9 The shaft seals at both ends of the worm gear reducer and the joints of the sealing surfaces should be sealed reliably and there should be no leakage. 4.10 Each operating part of the machine is flexible and light, and the transmission system operates smoothly and reliably. 4.11 When the whole machine is running without load, the noise sound pressure level shall not be greater than 75dB(A). 4.12 The motor operating current shall not exceed the motor rating. 5 Test methods
5.1 Materials and appearance
5.1.1 Check the material certificate of the materials used. If there is any objection, the inspection should be carried out according to the relevant standards. 5.1.2 Surface roughness shall be tested according to CB/T6060.4 using a comparison sample. 5.1.3 Visual inspection of machine appearance.
5.2 Radial circular runout
Use a dial indicator to measure within a range of no more than 10mm from the maximum diameter of the pot. 5.3 Electrical system safety performance
5.3.1 The continuity, insulation resistance and withstand voltage tests of the protective grounding circuit of the electrical system shall be tested in accordance with the provisions of 19.2, 19.3 and 19.4 in GB5226.1-2002 respectively.
5.3.2 The protective grounding circuit, buttons, indicators and displays, wiring, markings, warning signs and project codes of the electrical system shall be in accordance with 8.2, 10.2, 10.3 and Chapter 14 of GB5226.1--2002 respectively. Check with the provisions of Chapter 17. 5.4 Sealing and assembly quality
Continuous dry operation for not less than 1 hour, visual inspection and manual inspection of sealing and assembly quality. 5.5 Noise
Measure the noise of the machine under load according to the method specified in GB/T16769. 5.6 Load test
5.6.1 The load test shall be carried out after passing the dry running test. 5.6.2 The load must be operated continuously for no less than 2 hours.
5.6.3 The raw materials for the test machine can be substituted with granular materials similar to tablets, and the weight should be 1.5 times the maximum dosage before coating. 5.6.4 Coating pot inclination angle: 30°.
5.6.5 Load detection items:
a) Use a wrong-shaped ammeter to measure the current of each phase separately, and take its arithmetic average; use a thermometer to measure the air temperature at a distance of 100mm from the air supply pipe mouth: b)
Use a tachometer to detect the rotation speed;
c
d) Power (P) is calculated according to formula (1):
P=/3Ulcosd||tt| |In the formula:
P—three-phase electric power, W;
U—line voltage, V;
(1)
43
JB20017 —2004
——line current, A
——-the phase difference between phase voltage and phase current. 6 Inspection Rules
6.1 Each coating machine must pass the inspection by the quality inspection department of the manufacturing unit and be accompanied by a product certificate before it can leave the factory. 6.2 The coating machine is divided into factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 Product factory inspection shall be carried out one by one according to Table 3. Table 3 Factory inspection items of coating machine
Item category
Appearance
General performance
Main performance
Inspection items
4.3, 4.4 , 4.5, 4.6
4.7
4.8,4.9,4.10,4.11,4.12
6.2.1.2 If any unqualified product is found during the acceptance process, it should be returned for repair and re-inspection. . If the re-inspection still fails, the product will be deemed to be unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out in one of the following situations: a) When the product is trial-made or transferred to a factory for production; b) Product design, material or process When there are major changes: c) When the product resumes production after 2 years of discontinuation: d) When the factory inspection results are significantly different from the last type inspection results: when the national quality supervision agency proposes a requirement for type inspection. e)
6.2.2.2 Type inspection items shall test all requirements of this standard. 6.2.2.3 Type inspection prototypes shall be selected from 10% of the products that have passed the factory inspection. The sampling method shall be carried out in accordance with GB/T10111, and one unit shall be tested.
6.2.2.4 During the inspection, if any of the electrical safety performance of protective grounding circuit continuity, insulation resistance, and withstand voltage fails, the product will be deemed to have failed the type inspection. If one of the main properties is unqualified, the retest should be doubled. If it is still unqualified, the batch of products will be judged to be unqualified.
7 Logo, instructions for use, packaging, transportation and storage 7.1 Logo
7.1.1 Each coating machine has a product label fixed at the position specified on the drawing. The label should comply with the regulations of GB/T13306. The content is as follows: a) Product name and model:
b) Manufacturer’s name:
e) Factory serial number and date;
d) Main technical parameters;
44
e) This standard number.
7.1.2 The text and signs on the outer wall of the packaging box should be clear, comply with the regulations of CB/T191, and have the following content: a) Product name and model;
b) Delivery date: || tt||e) Shipping and receiving station names:
d) Shipping and receiving units and addresses:
e) Gross weight and overall dimensions;
f) Storage and transportation symbols should be Indicate "upward", "afraid of rain", "no rolling" and "suspended from here". 7.2 Instructions for use
The instructions for use should comply with the regulations of CB/T9969.1, and the content should include: a) product name, production unit, address, postal code and contact number; b) implemented product standards;
JB 200172004
e) The main structure, performance, specifications, product purpose, scope of use, precautions, warnings and reminder instructions, and safety measures of the product;
d) Graphics, symbols, and abbreviations of the logo Explanation of content such as: e) installation instructions and illustrations;
f) correct product lifting methods, product maintenance and care methods, and special storage methods. 7.3 Packaging
The packaging of domestic products should comply with the regulations of GB/T13384, and the following documents should be included in the packaging box: a) Product certificate;
b) Product instruction manual;
c) Packing List.
7.4 Transportation
Transportation According to the provisions of the order contract, the packaging equipment should be firmly fixed on the transportation vehicle during transportation, and rolling and silicon collision are strictly prohibited. 7.5 Storage
After packing the coating machine, it should be stored in a dry and well-ventilated room without corrosive gas or in a filtered place. 45
10. Each operating part of the machine is flexible and light, and the transmission system operates smoothly and reliably. 4.11 When the whole machine is running without load, the noise sound pressure level shall not be greater than 75dB(A). 4.12 The motor operating current shall not exceed the motor rating. 5 Test methods
5.1 Materials and appearance
5.1.1 Check the material certificate of the materials used. If there is any objection, the inspection should be carried out according to the relevant standards. 5.1.2 Surface roughness shall be tested according to CB/T6060.4 using a comparison sample. 5.1.3 Visual inspection of machine appearance.
5.2 Radial circular runout
Use a dial indicator to measure within a range of no more than 10mm from the maximum diameter of the pot. 5.3 Electrical system safety performance
5.3.1 The continuity, insulation resistance and withstand voltage tests of the protective grounding circuit of the electrical system shall be tested in accordance with the provisions of 19.2, 19.3 and 19.4 in GB5226.1-2002 respectively.
5.3.2 The protective grounding circuit, buttons, indicators and displays, wiring, markings, warning signs and project codes of the electrical system shall be in accordance with 8.2, 10.2, 10.3 and Chapter 14 of GB5226.1--2002 respectively. Check with the provisions of Chapter 17. 5.4 Sealing and assembly quality
Continuous dry operation for not less than 1 hour, visual inspection and manual inspection of sealing and assembly quality. 5.5 Noise
Measure the noise of the machine under load according to the method specified in GB/T16769. 5.6 Load test
5.6.1 The load test shall be carried out after passing the dry running test. 5.6.2 The load must be operated continuously for no less than 2 hours.
5.6.3 The raw materials for the test machine can be substituted with granular materials similar to tablets, and the weight should be 1.5 times the maximum dosage before coating. 5.6.4 Coating pot inclination angle: 30°.
5.6.5 Load detection items:
a) Use a wrong-shaped ammeter to measure the current of each phase separately, and take its arithmetic average; use a thermometer to measure the air temperature at a distance of 100mm from the air supply pipe mouth: b)
Use a tachometer to detect the rotation speed;
c
d) Power (P) is calculated according to formula (1):
P=/3Ulcosd||tt| |In the formula:
P—three-phase electric power, W;
U—line voltage, V;
(1)
43
JB20017 —2004
——line current, A
——-the phase difference between phase voltage and phase current. 6 Inspection Rules
6.1 Each coating machine must pass the inspection by the quality inspection department of the manufacturing unit and be accompanied by a product certificate before it can leave the factory. 6.2 The coating machine is divided into factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 Product factory inspection shall be carried out one by one according to Table 3. Table 3 Factory inspection items of coating machine
Item category
Appearance
General performance
Main performance
Inspection items
4.3, 4.4 , 4.5, 4.6
4.7
4.8,4.9,4.10,4.11,4.12
6.2.1.2 If any unqualified product is found during the acceptance process, it should be returned for repair and re-inspection. . If the re-inspection still fails, the product will be deemed to be unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out in one of the following situations: a) When the product is trial-made or transferred to a factory for production; b) Product design, material or process When there are major changes: c) When the product resumes production after 2 years of discontinuation: d) When the factory inspection results are significantly different from the last type inspection results: when the national quality supervision agency proposes a requirement for type inspection. e)
6.2.2.2 Type inspection items shall test all requirements of this standard. 6.2.2.3 Type inspection prototypes shall be selected from 10% of the products that have passed the factory inspection. The sampling method shall be carried out in accordance with GB/T10111, and one unit shall be tested.
6.2.2.4 During the inspection, if any of the electrical safety performance of protective grounding circuit continuity, insulation resistance, and withstand voltage fails, the product will be deemed to have failed the type inspection. If one of the main properties is unqualified, the retest should be doubled. If it is still unqualified, the batch of products will be judged to be unqualified.
7 Logo, instructions for use, packaging, transportation and storage 7.1 Logo
7.1.1 Each coating machine has a product label fixed at the position specified on the drawing. The label should comply with the regulations of GB/T13306. The content is as follows: a) Product name and model:
b) Manufacturer’s name:
e) Factory serial number and date;
d) Main technical parameters;
44
e) This standard number.
7.1.2 The text and signs on the outer wall of the packaging box should be clear, comply with the regulations of CB/T191, and have the following content: a) Product name and model;
b) Delivery date: || tt||e) Shipping and receiving station names:
d) Shipping and receiving units and addresses:
e) Gross weight and overall dimensions;
f) Storage and transportation symbols should be Indicate "upward", "afraid of rain", "no rolling" and "suspended from here". 7.2 Instructions for use
The instructions for use should comply with the regulations of CB/T9969.1, and the content should include: a) product name, production unit, address, postal code and contact number; b) implemented product standards;
JB 200172004
e) The main structure, performance, specifications, product purpose, scope of use, precautions, warnings and reminder instructions, and safety measures of the product;
d) Graphics, symbols, and abbreviations of the logo Explanation of content such as: e) installation instructions and illustrations;
f) correct product lifting methods, product maintenance and care methods, and special storage methods. 7.3 Packaging
The packaging of domestic products should comply with the regulations of GB/T13384, and the following documents should be included in the packaging box: a) Product certificate;
b) Product instruction manual;
c) Packing List.
7.4 Transportation
Transportation According to the provisions of the order contract, the packaging equipment should be firmly fixed on the transportation vehicle during transportation, and rolling and silicon collision are strictly prohibited. 7.5 Storage
After packing the coating machine, it should be stored in a dry and well-ventilated room without corrosive gas or in a filtered place. 45
10. Each operating part of the machine is flexible and light, and the transmission system operates smoothly and reliably. 4.11 When the whole machine is running without load, the noise sound pressure level shall not be greater than 75dB(A). 4.12 The motor operating current shall not exceed the motor rating. 5 Test methods
5.1 Materials and appearance
5.1.1 Check the material certificate of the materials used. If there is any objection, the inspection should be carried out according to the relevant standards. 5.1.2 Surface roughness shall be tested according to CB/T6060.4 using a comparison sample. 5.1.3 Visual inspection of machine appearance.
5.2 Radial circular runout
Use a dial indicator to measure within a range of no more than 10mm from the maximum diameter of the pot. 5.3 Electrical system safety performance
5.3.1 The continuity, insulation resistance and withstand voltage tests of the protective grounding circuit of the electrical system shall be tested in accordance with the provisions of 19.2, 19.3 and 19.4 in GB5226.1-2002 respectively.
5.3.2 The protective grounding circuit, buttons, indicators and displays, wiring, markings, warning signs and project codes of the electrical system shall be in accordance with 8.2, 10.2, 10.3 and Chapter 14 of GB5226.1--2002 respectively. Check with the provisions of Chapter 17. 5.4 Sealing and assembly quality
Continuous dry operation for not less than 1 hour, visual inspection and manual inspection of sealing and assembly quality. 5.5 Noise
Measure the noise of the machine under load according to the method specified in GB/T16769. 5.6 Load test
5.6.1 The load test should be carried out after passing the dry running test. 5.6.2 The load must be operated continuously for no less than 2 hours.
5.6.3 The raw materials for the test machine can be replaced by granular materials similar to tablets, and the weight should be 1.5 times the maximum drug charge before coating. 5.6.4 Coating pot inclination angle: 30°.
5.6.5 Load detection items:
a) Use a wrong-shaped ammeter to measure the current of each phase separately, and take its arithmetic average; use a thermometer to measure the air temperature at a distance of 100mm from the air supply pipe mouth: b)
Use a tachometer to detect the rotation speed;
c
d) Power (P) is calculated according to formula (1):
P=/3Ulcosd||tt| |In the formula:
P—three-phase electric power, W;
U—line voltage, V;
(1)
43
JB20017 —2004
——line current, A
——-the phase difference between phase voltage and phase current. 6 Inspection Rules
6.1 Each coating machine must pass the inspection by the quality inspection department of the manufacturing unit and be accompanied by a product certificate before it can leave the factory. 6.2 The coating machine is divided into factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 Product factory inspection shall be carried out one by one according to Table 3. Table 3 Coating machine factory inspection items
Item category
Appearance
General performance
Main performance
Inspection items
4.3, 4.4 , 4.5, 4.6
4.7
4.8,4.9,4.10,4.11,4.12
6.2.1.2 If unqualified products are found during the acceptance process, they should be returned for repair and re-inspection. . If the re-inspection still fails, the product will be judged to be unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out in one of the following situations: a) When the product is trial-made or transferred to a factory for production; b) Product design, material or process When there are major changes: c) When the product is discontinued for 2 years, when production is resumed: d) When the factory inspection results are significantly different from the last type inspection results: when the national quality supervision agency makes a request for type inspection. e)
6.2.2.2 Type inspection items shall test all requirements of this standard. 6.2.2.3 Type inspection prototypes shall be selected from 10% of the products that have passed the factory inspection. The sampling method shall be carried out in accordance with GB/T10111, and one unit shall be tested.
6.2.2.4 During the inspection, if any of the electrical safety performance of protective grounding circuit continuity, insulation resistance, and withstand voltage fails, the product will be deemed to have failed the type inspection. If one of the main properties is unqualified, the test should be repeated twice. If it is still unqualified, the batch of products will be judged to be unqualified.
7 Logo, instructions for use, packaging, transportation and storage 7.1 Logo
7.1.1 Each coating machine has a product label fixed at the position specified on the drawing. The label should comply with the regulations of GB/T13306. The content is as follows: a) Product name and model:
b) Manufacturer’s name:
e) Factory serial number and date;
d) Main technical parameters;
44
e) This standard number.
7.1.2 The text and signs on the outer wall of the packaging box should be clear, comply with the regulations of CB/T191, and have the following content: a) Product name and model;
b) Delivery date: || tt||e) Shipping and receiving station names:
d) Shipping and receiving units and addresses:
e) Gross weight and overall dimensions;
f) Storage and transportation symbols should be Indicate "upward", "afraid of rain", "no rolling" and "suspended from here". 7.2 Instructions for use
The instructions for use should comply with the regulations of CB/T9969.1, and the content should include: a) product name, production unit, address, postal code and contact number; b) implemented product standards;
JB 200172004
e) The main structure, performance, specifications, product purpose, scope of use, precautions, warnings and reminder instructions, and safety measures of the product;
d) Graphics, symbols, and abbreviations of the logo Explanation of content such as: e) installation instructions and diagrams;
f) correct product lifting methods, product maintenance and care methods, and special storage methods. 7.3 Packaging
The packaging of domestic products should comply with the regulations of GB/T13384, and the following documents should be included in the packaging box: a) Product certificate;
b) Product instruction manual;
c) Packing List.
7.4 Transportation
Transportation According to the provisions of the order contract, the packaging equipment should be firmly fixed on the transportation vehicle during transportation, and rolling and silicon collision are strictly prohibited. 7.5 Storage
After packing the coating machine, it should be stored in a dry and well-ventilated room without corrosive gas or in a filtered place. 45
5 Load detection items:
a) Use a wrong-shaped ammeter to measure the current of each phase separately, and take its arithmetic average; use a thermometer to measure the air temperature at a distance of 100mm from the air supply pipe mouth: b)
Use a tachometer to detect the rotation speed;
c
d) Power (P) is calculated according to formula (1):
P=/3Ulcosd
where: ||tt ||P—three-phase electric power, W;
U—line voltage, V;
(1)
43
JB20017—2004
——Line current, A
——-The phase difference between phase voltage and phase current. 6 Inspection Rules
6.1 Each coating machine must pass the inspection by the quality inspection department of the manufacturing unit and be accompanied by a product certificate before it can leave the factory. 6.2 The coating machine is divided into factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 Product factory inspection shall be carried out one by one according to Table 3. Table 3 Factory inspection items of coating machine
Item category
Appearance
General performance
Main performance
Inspection items
4.3, 4.4 , 4.5, 4.6
4.7bZxz.net
4.8,4.9,4.10,4.11,4.12
6.2.1.2 If any unqualified product is found during the acceptance process, it should be returned for repair and re-inspection. . If the re-inspection still fails, the product will be deemed to be unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out in one of the following situations: a) When the product is trial-made or transferred to a factory for production; b) Product design, material or process When there are major changes: c) When the product resumes production after 2 years of discontinuation: d) When the factory inspection results are significantly different from the last type inspection results: when the national quality supervision agency proposes a requirement for type inspection. e)
6.2.2.2 Type inspection items shall test all requirements of this standard. 6.2.2.3 Type inspection prototypes shall be selected from 10% of the products that have passed the factory inspection. The sampling method shall be carried out in accordance with GB/T10111, and one unit shall be tested.
6.2.2.4 During the inspection, if any of the electrical safety performance of protective grounding circuit continuity, insulation resistance, and withstand voltage fails, the product will be deemed to have failed the type inspection. If one of the main properties is unqualified, the retest should be doubled. If it is still unqualified, the batch of products will be judged to be unqualified.
7 Logo, instructions for use, packaging, transportation and storage 7.1 Logo
7.1.1 Each coating machine has a product label fixed at the position specified on the drawing. The label should comply with the regulations of GB/T13306. The content is as follows: a) Product name and model:
b) Manufacturer’s name:
e) Factory serial number and date;
d) Main technical parameters;
44
e) This standard number.
7.1.2 The text and signs on the outer wall of the packaging box should be clear, comply with the regulations of CB/T191, and have the following content: a) Product name and model;
b) Delivery date: || tt||e) Shipping and receiving station names:
d) Shipping and receiving units and addresses:
e) Gross weight and overall dimensions;
f) Storage and transportation symbols should be Indicate "upward", "afraid of rain", "no rolling" and "suspended from here". 7.2 Instructions for use
The instructions for use should comply with the regulations of CB/T9969.1, and the content should include: a) product name, production unit, address, postal code and contact number; b) implemented product standards;
JB 200172004
e) The main structure, performance, specifications, product purpose, scope of use, precautions, warnings and reminder instructions, and safety measures of the product;
d) Graphics, symbols, and abbreviations of the logo Explanation of content such as: e) installation instructions and illustrations;
f) correct product lifting methods, product maintenance and care methods, and special storage methods. 7.3 Packaging
The packaging of domestic products should comply with the regulations of GB/T13384, and the following documents should be included in the packaging box: a) Product certificate;
b) Product instruction manual;
c) Packing List.
7.4 Transportation
Transportation According to the provisions of the order contract, the packaging equipment should be firmly fixed on the transportation vehicle during transportation, and rolling and silicon collision are strictly prohibited. 7.5 Storage
After packing the coating machine, it should be stored in a dry and well-ventilated room without corrosive gas or in a filtered place. 45
5 Load detection items:
a) Use a wrong-shaped ammeter to measure the current of each phase separately, and take its arithmetic average; use a thermometer to measure the air temperature at a distance of 100mm from the air supply pipe mouth: b)
Use a tachometer to detect the rotation speed;
c
d) Power (P) is calculated according to formula (1):
P=/3Ulcosd
where: ||tt ||P—three-phase electric power, W;
U—line voltage, V;
(1)
43
JB20017—2004
——Line current, A
——-The phase difference between phase voltage and phase current. 6 Inspection Rules
6.1 Each coating machine must pass the inspection by the quality inspection department of the manufacturing unit and be accompanied by a product certificate before it can leave the factory. 6.2 The coating machine is divided into factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 Product factory inspection shall be carried out one by one according to Table 3. Table 3 Factory inspection items of coating machine
Item category
Appearance
General performance
Main performance
Inspection items
4.3, 4.4 , 4.5, 4.6
4.7
4.8,4.9,4.10,4.11,4.12
6.2.1.2 If any unqualified product is found during the acceptance process, it should be returned for repair and re-inspection. . If the re-inspection still fails, the product will be deemed to be unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out in one of the following situations: a) When the product is trial-made or transferred to a factory for production; b) Product design, material or process When there are major changes: c) When the product resumes production after 2 years of discontinuation: d) When the factory inspection results are significantly different from the last type inspection results: when the national quality supervision agency proposes a requirement for type inspection. e)
6.2.2.2 Type inspection items shall test all requirements of this standard. 6.2.2.3 Type inspection prototypes shall be selected from 10% of the products that have passed the factory inspection. The sampling method shall be carried out in accordance with GB/T10111, and one unit shall be tested.
6.2.2.4 During the inspection, if any of the electrical safety performance of protective grounding circuit continuity, insulation resistance, and withstand voltage fails, the product will be deemed to have failed the type inspection. If one of the main properties is unqualified, the retest should be doubled. If it is still unqualified, the batch of products will be judged to be unqualified.
7 Logo, instructions for use, packaging, transportation and storage 7.1 Logo
7.1.1 Each coating machine has a product label fixed at the position specified on the drawing. The label should comply with the regulations of GB/T13306. The content is as follows: a) Product name and model:
b) Manufacturer’s name:
e) Factory serial number and date;
d) Main technical parameters;
44
e) This standard number.
7.1.2 The text and signs on the outer wall of the packaging box should be clear, comply with the regulations of CB/T191, and have the following content: a) Product name and model;
b) Delivery date: || tt||e) Shipping and receiving station names:
d) Shipping and receiving units and addresses:
e) Gross weight and overall dimensions;
f) Storage and transportation symbols should be Indicate "upward", "afraid of rain", "no rolling" and "suspended from here". 7.2 Instructions for use
The instructions for use should comply with the regulations of CB/T9969.1, and the content should include: a) product name, production unit, address, postal code and contact number; b) implemented product standards;
JB 200172004
e) The main structure, performance, specifications, product purpose, scope of use, precautions, warnings and reminder instructions, and safety measures of the product;
d) Graphics, symbols, and abbreviations of the logo Explanation of content such as: e) installation instructions and illustrations;
f) correct product lifting methods, product maintenance and care methods, and special storage methods. 7.3 Packaging
The packaging of domestic products should comply with the regulations of GB/T13384, and the following documents should be included in the packaging box: a) Product certificate;
b) Product instruction manual;
c) Packing List.
7.4 Transportation
Transportation According to the provisions of the order contract, the packaging equipment should be firmly fixed on the transportation vehicle during transportation, and rolling and silicon collision are strictly prohibited. 7.5 Storage
After packing the coating machine, it should be stored in a dry and well-ventilated room without corrosive gas or in a filtered place. 45
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.