Engineering Construction Standard Full-text Information System
Standard of the Ministry of Urban and Rural Construction and Environmental Protection of the People's Republic of China Technical Test Procedures for Construction Machinery
JGJ34-86
1986 Beijing
Engineering Construction Standard Full-text Information System
. Engineering Construction Standard Full-text Information System
Standard of the Ministry of Urban and Rural Construction and Environmental Protection of the People's Republic of China Technical Test Procedures for Construction Machinery
JGJ34—86
Editor: Beijing Construction Engineering Approved by the General Company: Ministry of Urban and Rural Construction and Environmental Protection Date of implementation: October 1, 1987
Engineering Construction Standards Full Text Information System
Engineering Construction Standards Full Text Information System
(87) Chengkezi No. 41
According to the arrangement of our Ministry's (83) Chengkeguizi No. 41, Beijing Construction Engineering General Company, together with relevant units, has revised the "Technical Test Regulations for Construction Machinery (Trial)" (BJG12-64) issued by the former Ministry of Construction in 1964. After review, it is now approved as a ministry standard, numbered JGJ34-86, and will be implemented from October 1, 1987. If any localities have any questions or opinions during implementation, please inform Beijing Construction Engineering General Company in writing.
Ministry of Urban and Rural Construction and Environmental Protection
January 26, 1987
Engineering Construction Standards Full Text Information System
bzsosO.com3
Engineering Construction Standards Full Text Information System
Chapter 1
Power Machinery
Chapter 2
Internal Combustion Engine
Section 2 Air Compressor
Section 3 Hydraulic System
Chapter 4
Generator
Motor
Electrical System||tt ||Lifting Machinery
Belt Crane
Section 3 Hydraulic Truck-type and Tire-type Cranes
Section 4 Tower Cranes
Section 4 Winch
Section 5
Construction Elevators
Chapter 5 Earth-moving Machinery
Section 1 Single-bucket Excavator
Section 2 Tractor and Bulldozer
Seven-wheel Roller
Section 4
Vibratory Roller
Section 5 Tire Roller
Section 6 Hydraulic Loader
Chapter 6
Transport Machinery
Section 1
Load Heavy and dump trucks
Section 2
Concrete pump trucks
Section 3
Motorized dump trucks
Chapter 7
Foundation construction machine
Section 1 Diesel pile driver
Engineering construction standard full text information system
5
Engineering construction standard full text information system
Section 2
Section 3
Section 4
Chapter 8
Vibration sinker?
Hydraulic static pressure pile puller
Auger drilling machine
Other machinery
Section 1||tt ||Section 2
Section 3
Section 4
Section 5
Section 6
Section 7
Rebar straightening, cutting and bending machines
Woodworking machinery
Electric welding machines
Butt welding and spot welding machines
Concrete mixers
Mortar delivery pumps
Engineering construction standard full text information system
.Engineering construction standard full text information system
Chapter 1 General
Article 1.0.1 This regulation is specially formulated to strengthen machinery management, ensure safe production, give full play to the effectiveness of machinery, and improve economic benefits. Article 1.0.2 This regulation applies to comprehensive technical tests of construction machinery before it is put into use to assess the basic performance and safety reliability of the whole machine. Article 1.0.3 All newly purchased, overhauled, reassembled or technically modified mechanical equipment shall be subject to technical tests in accordance with this regulation and may only be put into use after obtaining a qualified certificate.
Article 1.0.4 For lifting and pile-driving machinery that has been out of service for a long time, necessary tests shall also be carried out in accordance with this regulation to ensure safety when it is put into use. Article 1.0.5 If the electrical device attached to the main engine is not overhauled or disassembled and reassembled with the main engine, the necessary tests of the items may be carried out in accordance with this regulation as appropriate. Article 1.0.6 The technical tests of newly purchased mechanical equipment shall be organized by the mechanical equipment management department and jointly carried out by the safety department. The overhauled, newly assembled and technically modified mechanical equipment shall be organized by the unit responsible for the task and carried out with the participation of the entrusting unit.
Article 1.0.7 The test procedures are divided into: pre-test inspection, no-load test, rated load test, and overload test. The tests must be carried out in sequence, and the next test shall not be carried out until the previous test is confirmed to be qualified.
Article 1.0.8 Before the test, the main assemblies, working devices and complete equipment should be checked, and the following materials must be available.
1. New machinery and equipment must have product certificates and operating instructions. 2. Mechanical equipment that has undergone technical transformation must have reports, plans, drawings and factory inspection certificates approved by the relevant superior authorities. Mechanical equipment that has been repaired or reassembled and technologically transformed must have overhaul or assembly records and quality inspection records.
Engineering Construction Standards Full Text Information System
bzSos.COm1
Engineering Construction Standards Full Text Information System
Article 1.0.9 Before conducting the test, attention should be paid to the following:wwW.bzxz.Net
1. You must be familiar with the technical documents, understand the technical performance of the machinery, formulate a plan, and make preparations. The test can only be carried out when conditions are met. 2. You must choose a road, ramp, site or a construction site with conditions that meets the test requirements.
3. Cleaning, inspection, adjustment, tightening and lubrication of machinery must be done well. Rust inhibitors and accumulated debris should be removed from all parts of new machinery. The machinery must be in normal technical condition to ensure the correctness of the test results.
Article 1.0.10 The relevant provisions of the "Technical Regulations for Safety in the Use of Construction Machinery" (JGJ33-86) and the relevant provisions in the machinery manual must be strictly followed during the test. Article 1.0.11 If any abnormal phenomenon is found during the test, the test should be stopped immediately and the test should be continued after the fault is eliminated. Article 1.0.12 After the test, the technical conditions or faults during the test should be carefully analyzed and handled. After confirming that they meet the requirements of this regulation, fill in the technical test report form, which shall be jointly signed by the participants in the test, and signed, filed and delivered for use by the company's chief mechanical engineer.
Article 1.0.13/All internal combustion engines, electrical systems and hydraulic systems installed on machinery shall be tested in accordance with the provisions of the relevant sections of Chapter 2 of this regulation. Article 1.0.14 For mechanical equipment not listed in this regulation and test requirements not mentioned, the mechanical equipment management department shall refer to relevant technical documents, formulate technical test plans, and conduct tests after approval by the company's chief mechanical engineer. Article 1.0.15 The test regulations for various types of machines in this regulation are general technical conditions and test methods, and the indicators set are basic requirements. Therefore, during the test, except for special regulations of the original factory, all should be carried out in accordance with this regulation. Article 1.0.16 If this regulation conflicts with national standards, regulations, regulations, etc., the relevant national documents and regulations shall prevail. Engineering Construction Standard Full Text Information System
bzSos, COm Engineering Construction Standard Full Text Information System
Chapter 2
Power Machinery
Section 1
Internal Combustion Engine
Article 2.1.1 Pre-test inspection
, all parts, assemblies, and instruments must be fully assembled. The machine body is firmly installed, and each transmission belt should be appropriately tight. 3. Fuel, lubricating oil and cooling water should comply with the original manufacturer's regulations. 4. All pipes and joints are correctly installed, and the electrical and gas lines are complete, wrapped and fastened well.
No-load test
Article 2.1.2 The no-load test should be carried out when the cooling water temperature reaches 75-85℃. Article 2.1.3 Test time, if there is no special provision by the original manufacturer, should be carried out according to the time specified in Table 2-1-1.
Speed of reassembled (including overhauled) internal combustion engine
Minimum speed limit
3/4 of the maximum speed limit
Maximum speed limit
Gasoline engine
New internal combustion engine (including reactivated)
Minimum speed limit
Engineering Construction Standard Full Text Information System
Gasoline engine
Table 2-1-1
Time unit: min
Diesel engine
Diesel engine
w3
Engineering Construction Standard Full Text Information System
Article 2.1.4 The following checks are required for the no-load test: 1. It should be able to start smoothly at the following ambient temperatures: 1.Diesel engine is not lower than 5℃.
2. Gasoline engine is not lower than -5℃.
3. Gasoline start or diesel engine started by gasoline engine is not lower than 0℃. 4. Start with electric motor, no more than three times, each continuous time shall not exceed 10s
2. Rapid operation after starting is stable, and it should run at low speed, medium speed and high speed. When it suddenly accelerates or decelerates, it will not turn off or stop. The carburetor and muffler should not have backfire or sudden explosion. The exhaust smoke color is normal and there is no overheating. 3. When running at normal temperature, there should be no abnormal noises as follows: 1. Knocking sound of main bearing and connecting rod bearing. 2. Knocking sound of piston and cylinder body.
3. Knocking sound of piston pin.
4. Violent noise and uneven hook knocking sound of gears and rolling bearings. Knocking sound of water pump impeller and pump casing.
Knocking sound of abnormal combustion and air leakage. 61
HP, the maximum cooling water temperature should not exceed 90C. 5. The oil pressure must comply with the original factory regulations. 6. The joints of each pipeline and each sealing surface should not have defects such as water leakage, oil leakage, and air leakage, and the electrical circuit must ensure good insulation. 7. During acceleration, there should be no abnormal jet and oil injection at the oil filling pipe and vent pipe. For internal combustion engines in areas where environmental protection control has been implemented, the noise and emission standards must meet the requirements of national regulations.
The maximum and minimum speeds of the engine should comply with the original regulations. The maximum speed should not exceed 5% of the rated speed, and the minimum speed should not exceed 5% of the rated idle speed. 9. The cylinder pressure should comply with the original factory regulations. At the normal speed of the starter (when the internal combustion engine is 100-150r/min), the difference in pressure between each cylinder of the gasoline engine should not exceed 5%, and the difference in pressure between each cylinder of the diesel engine should not exceed 8%. Article 2.1.5 Any problems found in the no-load test must be eliminated or necessary disassembly and inspection must be carried out.
Rated load test
Article 2.1.6 The rated load test shall generally be carried out on a dynamometer according to the requirements of Table 2-1-2:
Table 2-1-2
20% of rated load
40% of rated load
60% of rated load
80% of rated load
Full load
Total test time
Operation time (min)
Gasoline engine
Diesel engine
Article 2.1.7 For new and reassembled internal combustion engines, if they have a factory inspection certificate, the rated load test may not be carried out. Article 2.1.8 Internal combustion engines installed on machinery shall be tested for rated loads in combination with the machinery and the fuel consumption shall be measured. Article 2.1.9 The rated load test shall meet the requirements of item 1 to 8 in Article 2.1.4 above.
Article 2110 After the rated load test, check and verify the valve clearance and cylinder head bolt torque when the engine is hot. If metal shavings or leaking cooling water are found in the crankcase oil, they shall be disassembled for inspection and replaced.
(Technical test report form is shown in Appendix 1)
Section 2
Air compressor
Article 2.2.1 Pre-test inspection:
1. Check all welds, transition areas of the head and pressure-bearing components of the gas storage tank. There shall be no defects such as cracks, deformation, rust, leakage, etc., and there shall be a certificate of qualified pressure test. 2. Safety valves, control valves, operating devices, protective covers, couplings, etc. must be complete.
3. There shall be no water leakage, oil leakage, air leakage, or electric leakage at the joints of all pipelines and all sealing surfaces.
No-load test
Article 2.2.2 Open the inlet and exhaust valves at all levels, start the compressor and then stop the operation to check all parts. After no abnormal phenomenon, carry out idling operation from low speed to rated speed for 30 minutes.
Article 2.2.3 Requirements for no-load test.
1. There is no abnormal knocking sound during operation, and all fastening parts are not loose. 2. The clutch works sensitively and reliably, without slipping or heating. 3. When the diesel engine is running rapidly, the centrifugal clutch should be able to separate automatically and not drive the air compressor to operate.
, The oil pressure should meet the original factory regulations. For lubrication with a dripping device, it should generally be 25 to 30 drops per minute at normal speed.
During operation,
Rated load test
Article 2.2.4 Close the inlet and exhaust valves at all levels and run idling for 30 minutes. Article 2.2.5 When operating at rated load, the compressor shall gradually reach the rated pressure and operate at the rated pressure for no less than 30 minutes. Article 2.2.6 Requirements for rated load test: 1. All instruments shall work normally and indicate accurately. 2. All parts shall not be loose, overheated, stuck, leaking, leaking, leaking, leaking, leaking, oil and other defects.
3. The safety valve shall be sensitive and reliable, and the pressure shall comply with the original factory regulations. 4. The pressure regulator, unloading valve of the electric air compressor and the rated load regulator of the motor air compressor shall work normally and reliably. Article 2.2.7 The technical test of the micro air compressor may refer to the provisions of this section for the engineering construction standard full text information system
bzSos, COm engineering construction standard full text information system
Article 2.2.8 The power part of the air compressor shall refer to the test provisions of the relevant chapters of this regulation.
(See Appendix 2 for the technical test report)
Section 3 Hydraulic System
Article 2.3.1 Pre-test inspection,
, all parts, assemblies, accessories, should be complete and complete, and the main hydraulic components in the system should have the manufacturer's certificate or test report. 2. The installation of hydraulic components and pipelines should comply with the original factory design. 3. The connections of all parts of the hydraulic system should be reliable and leak-free, and the pipelines of all parts should not be rusted, dented, folded, pressed, cracked, twisted, etc. 4. The hydraulic oil should comply with the regulations.
5. All hydraulic control parts should be flexible and connected reliably. They should stop at the zero position or unloading position before starting, and there should be safety devices to prevent overload and hydraulic shock. The adjustment pressure of the safety relief valve shall not be greater than 110% of the rated working pressure of the system, and the system working pressure shall not exceed the rated pressure of the oil pump. 6. All welding parts of the actuator should not have open welding. 7. The surface of the hydraulic cylinder and piston rod is smooth and undamaged. The dust ring and dust cover should be well sealed and not damaged.
8. The joint at the end of the hydraulic cylinder piston rod should be reliably connected. No-load test
Article 2.3.2 The no-load test should be carried out after the prime mover has been idling for 10 minutes:
1. Hydraulic travel mechanism: forward, backward, turn left, turn right. 2. Hydraulic working mechanism: various actions of the working cycle. Article 2.3.3 Requirements for the no-load test:
The hydraulic control system is flexible and reliable in operation, all instruments are working normally, and there must be no leakage in the pipeline.
Engineering Construction Standard Full-text Information System
bzSosO,co玛Article 5 For any problems found in the no-load test, it is necessary to eliminate them or conduct necessary disassembly and inspection.
Rated load test
Article 2.1.6 The rated load test shall generally be conducted on a dynamometer according to the requirements of Table 2-1-2:
Table 2-1-2
20% of rated load
40% of rated load
60% of rated load
80% of rated load
Full load
Total test time
Operation time (min)
Gasoline engine
Diesel engine
Article 2.1.7 For new or reassembled internal combustion engines, if they have a factory inspection certificate, the rated load test may not be conducted. Article 2.1.8 Internal combustion engines installed on machinery shall be tested for rated loads in combination with the machinery and the fuel consumption shall be measured. Article 2.1.9 The rated load test shall meet the requirements of item 1 to 8 in Article 2.1.4 above.
Article 2110 After the rated load test, check and verify the valve clearance and cylinder head bolt torque when the engine is hot. If metal shavings or leaking cooling water are found in the crankcase oil, they shall be disassembled for inspection and replaced.
(Technical test report form is shown in Appendix 1)
Section 2
Air compressor
Article 2.2.1 Pre-test inspection:
1. Check all welds, transition areas of the head and pressure-bearing components of the gas storage tank. There shall be no defects such as cracks, deformation, rust, leakage, etc., and there shall be a certificate of qualified pressure test. 2. Safety valves, control valves, operating devices, protective covers, couplings, etc. must be complete.
3. There shall be no water leakage, oil leakage, air leakage, or electric leakage at the joints of all pipelines and all sealing surfaces.
No-load test
Article 2.2.2 Open the inlet and exhaust valves at all levels, start the compressor and then stop the operation to check all parts. After no abnormal phenomenon, carry out idling operation from low speed to rated speed for 30 minutes.
Article 2.2.3 Requirements for no-load test.
1. There is no abnormal knocking sound during operation, and all fastening parts are not loose. 2. The clutch works sensitively and reliably, without slipping or heating. 3. When the diesel engine is running rapidly, the centrifugal clutch should be able to separate automatically and not drive the air compressor to operate.
, The oil pressure should meet the original factory regulations. For lubrication with a dripping device, it should generally be 25 to 30 drops per minute at normal speed.
During operation,
Rated load test
Article 2.2.4 Close the inlet and exhaust valves at all levels and run idling for 30 minutes. Article 2.2.5 When operating at rated load, the compressor shall gradually reach the rated pressure and operate at the rated pressure for no less than 30 minutes. Article 2.2.6 Requirements for rated load test: 1. All instruments shall work normally and indicate accurately. 2. All parts shall not be loose, overheated, stuck, leaking, leaking, leaking, leaking, leaking, oil and other defects.
3. The safety valve shall be sensitive and reliable, and the pressure shall comply with the original factory regulations. 4. The pressure regulator, unloading valve of the electric air compressor and the rated load regulator of the motor air compressor shall work normally and reliably. Article 2.2.7 The technical test of the micro air compressor may refer to the provisions of this section for the engineering construction standard full text information system
bzSos, COm engineering construction standard full text information system
Article 2.2.8 The power part of the air compressor shall refer to the test provisions of the relevant chapters of this regulation.
(See Appendix 2 for the technical test report)
Section 3 Hydraulic System
Article 2.3.1 Pre-test inspection,
, all parts, assemblies, accessories, should be complete and complete, and the main hydraulic components in the system should have the manufacturer's certificate or test report. 2. The installation of hydraulic components and pipelines should comply with the original factory design. 3. The connections of all parts of the hydraulic system should be reliable and leak-free, and the pipelines of all parts should not be rusted, dented, folded, pressed, cracked, twisted, etc. 4. The hydraulic oil should comply with the regulations.
5. All hydraulic control parts should be flexible and connected reliably. They should stop at the zero position or unloading position before starting, and there should be safety devices to prevent overload and hydraulic shock. The adjustment pressure of the safety relief valve shall not be greater than 110% of the rated working pressure of the system, and the system working pressure shall not exceed the rated pressure of the oil pump. 6. All welding parts of the actuator should not have open welding. 7. The surface of the hydraulic cylinder and piston rod is smooth and undamaged. The dust ring and dust cover should be well sealed and not damaged.
8. The joint at the end of the hydraulic cylinder piston rod should be reliably connected. No-load test
Article 2.3.2 The no-load test should be carried out after the prime mover has been idling for 10 minutes:
1. Hydraulic travel mechanism: forward, backward, turn left, turn right. 2. Hydraulic working mechanism: various actions of the working cycle. Article 2.3.3 Requirements for the no-load test:
The hydraulic control system is flexible and reliable in operation, all instruments are working normally, and there must be no leakage in the pipeline.
Engineering Construction Standard Full-text Information System
bzSosO,co玛Article 5 For any problems found in the no-load test, it is necessary to eliminate them or conduct necessary disassembly and inspection.
Rated load test
Article 2.1.6 The rated load test shall generally be conducted on a dynamometer according to the requirements of Table 2-1-2:
Table 2-1-2
20% of rated load
40% of rated load
60% of rated load
80% of rated load
Full load
Total test time
Operation time (min)
Gasoline engine
Diesel engine
Article 2.1.7 For new or reassembled internal combustion engines, if they have a factory inspection certificate, the rated load test may not be conducted. Article 2.1.8 Internal combustion engines installed on machinery shall be tested for rated loads in combination with the machinery and the fuel consumption shall be measured. Article 2.1.9 The rated load test shall meet the requirements of item 1 to 8 in Article 2.1.4 above.
Article 2110 After the rated load test, check and verify the valve clearance and cylinder head bolt torque when the engine is hot. If metal shavings or leaking cooling water are found in the crankcase oil, they shall be disassembled for inspection and replaced.
(Technical test report form is shown in Appendix 1)
Section 2
Air compressor
Article 2.2.1 Pre-test inspection:
1. Check all welds, transition areas of the head and pressure-bearing components of the gas storage tank. There shall be no defects such as cracks, deformation, rust, leakage, etc., and there shall be a certificate of qualified pressure test. 2. Safety valves, control valves, operating devices, protective covers, couplings, etc. must be complete.
3. There shall be no water leakage, oil leakage, air leakage, or electric leakage at the joints of all pipelines and all sealing surfaces.
No-load test
Article 2.2.2 Open the inlet and exhaust valves at all levels, start the compressor and then stop the operation to check all parts. After no abnormal phenomenon, carry out idling operation from low speed to rated speed for 30 minutes.
Article 2.2.3 Requirements for no-load test.
1. There is no abnormal knocking sound during operation, and all fastening parts are not loose. 2. The clutch works sensitively and reliably, without slipping or heating. 3. When the diesel engine is running rapidly, the centrifugal clutch should be able to separate automatically and not drive the air compressor to operate.
, The oil pressure should meet the original factory regulations. For lubrication with a dripping device, it should generally be 25 to 30 drops per minute at normal speed.
During operation,
Rated load test
Article 2.2.4 Close the inlet and exhaust valves at all levels and run idling for 30 minutes. Article 2.2.5 When operating at rated load, the compressor shall gradually reach the rated pressure and operate at the rated pressure for no less than 30 minutes. Article 2.2.6 Requirements for rated load test: 1. All instruments shall work normally and indicate accurately. 2. All parts shall not be loose, overheated, stuck, leaking, leaking, leaking, leaking, leaking, oil and other defects.
3. The safety valve shall be sensitive and reliable, and the pressure shall comply with the original factory regulations. 4. The pressure regulator, unloading valve of the electric air compressor and the rated load regulator of the motor air compressor shall work normally and reliably. Article 2.2.7 The technical test of the micro air compressor may refer to the provisions of this section for the engineering construction standard full text information system
bzSos, COm engineering construction standard full text information system
Article 2.2.8 The power part of the air compressor shall refer to the test provisions of the relevant chapters of this regulation.
(See Appendix 2 for the technical test report)
Section 3 Hydraulic System
Article 2.3.1 Pre-test inspection,
, all parts, assemblies, accessories, should be complete and complete, and the main hydraulic components in the system should have the manufacturer's certificate or test report. 2. The installation of hydraulic components and pipelines should comply with the original factory design. 3. The connections of all parts of the hydraulic system should be reliable and leak-free, and the pipelines of all parts should not be rusted, dented, folded, pressed, cracked, twisted, etc. 4. The hydraulic oil should comply with the regulations.
5. All hydraulic control parts should be flexible and connected reliably. They should stop at the zero position or unloading position before starting, and there should be safety devices to prevent overload and hydraulic shock. The adjustment pressure of the safety relief valve shall not be greater than 110% of the rated working pressure of the system, and the system working pressure shall not exceed the rated pressure of the oil pump. 6. All welding parts of the actuator should not have open welding. 7. The surface of the hydraulic cylinder and piston rod is smooth and undamaged. The dust ring and dust cover should be well sealed and not damaged.
8. The joint at the end of the hydraulic cylinder piston rod should be reliably connected. No-load test
Article 2.3.2 The no-load test should be carried out after the prime mover has been idling for 10 minutes:
1. Hydraulic travel mechanism: forward, backward, turn left, turn right. 2. Hydraulic working mechanism: various actions of the working cycle. Article 2.3.3 Requirements for the no-load test:
The hydraulic control system is flexible and reliable in operation, all instruments are working normally, and there must be no leakage in the pipeline.
Engineering Construction Standard Full-text Information System
bzSosO,co玛Article 8 The power part of the air compressor shall be tested in accordance with the test provisions of the relevant chapters of this regulation.
(See Appendix 2 for the technical test report)
Section 3 Hydraulic System
Article 2.3.1 Pre-test inspection,
, all parts, assemblies, accessories, should be complete and complete, and the main hydraulic components in the system should have the manufacturer's certificate or test report. 2. The installation of hydraulic components and pipelines shall comply with the original factory design. 3. The connections of all parts of the hydraulic system shall be reliable and leak-free, and the pipelines of all parts shall not be rusted, dented, folded, pressed, cracked, twisted, etc. 4. The hydraulic oil shall comply with the regulations.
5. All hydraulic control parts shall be flexible and reliably connected. They shall stop at zero position or unloading position before starting, and there shall be safety devices to prevent overload and hydraulic shock. The adjustment pressure of the safety relief valve shall not be greater than 110% of the rated working pressure of the system, and the system working pressure shall not exceed the rated pressure of the oil pump. 6. There should be no open welding in all welding parts of the actuator. 7. The surface of the hydraulic cylinder and piston rod should be smooth and undamaged. The dust ring and dust cover should be well sealed and not damaged.
8. The joint at the end of the hydraulic cylinder piston rod should be reliably connected. No-load test
Article 2.3.2 The no-load test should be carried out after the prime mover has been idling for 10 minutes:
1. Hydraulic walking mechanism: forward, backward, left turn, right turn. 2. Hydraulic working mechanism: various actions of the working cycle. Article 2.3.3 Requirements for the no-load test:
The hydraulic control system is flexible and reliable in operation, all instruments work normally, and there should be no leakage in the pipeline.
Engineering Construction Standard Full-text Information System
bzSosO,co玛Article 8 The power part of the air compressor shall be tested in accordance with the test provisions of the relevant chapters of this regulation.
(See Appendix 2 for the technical test report)
Section 3 Hydraulic System
Article 2.3.1 Pre-test inspection,
, all parts, assemblies, accessories, should be complete and complete, and the main hydraulic components in the system should have the manufacturer's certificate or test report. 2. The installation of hydraulic components and pipelines shall comply with the original factory design. 3. The connections of all parts of the hydraulic system shall be reliable and leak-free, and the pipelines of all parts shall not be rusted, dented, folded, pressed, cracked, twisted, etc. 4. The hydraulic oil shall comply with the regulations.
5. All hydraulic control parts shall be flexible and reliably connected. They shall stop at zero position or unloading position before starting, and there shall be safety devices to prevent overload and hydraulic shock. The adjustment pressure of the safety relief valve shall not be greater than 110% of the rated working pressure of the system, and the system working pressure shall not exceed the rated pressure of the oil pump. 6. There should be no open welding in all welding parts of the actuator. 7. The surface of the hydraulic cylinder and piston rod should be smooth and undamaged. The dust ring and dust cover should be well sealed and not damaged.
8. The joint at the end of the hydraulic cylinder piston rod should be reliably connected. No-load test
Article 2.3.2 The no-load test should be carried out after the prime mover has been idling for 10 minutes:
1. Hydraulic walking mechanism: forward, backward, left turn, right turn. 2. Hydraulic working mechanism: various actions of the working cycle. Article 2.3.3 Requirements for the no-load test:
The hydraulic control system is flexible and reliable in operation, all instruments work normally, and there should be no leakage in the pipeline.
Engineering Construction Standard Full-text Information System
bzSosO,co玛
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.