title>GB/T 4018.1-1997 Test of accuracy of cylindrical vertical drilling machines Part 1: Test of geometric accuracy - GB/T 4018.1-1997 - Chinese standardNet - bzxz.net
Home > GB > GB/T 4018.1-1997 Test of accuracy of cylindrical vertical drilling machines Part 1: Test of geometric accuracy
GB/T 4018.1-1997 Test of accuracy of cylindrical vertical drilling machines Part 1: Test of geometric accuracy
Basic Information
Standard ID:
GB/T 4018.1-1997
Standard Name: Test of accuracy of cylindrical vertical drilling machines Part 1: Test of geometric accuracy
This standard specifies the requirements and methods for the geometric accuracy inspection of cylindrical vertical drilling machines. This standard applies to general-purpose cylindrical vertical drilling machines. GB/T 4018.1-1997 Cylindrical vertical drilling machine accuracy inspection Part 1: Geometric accuracy inspection GB/T4018.1-1997 Standard download decompression password: www.bzxz.net
Some standard content:
1CS.25.100.20 National Standard of the People's Republic of China GI/T 4018. 1-~4018. 21997 eqISo 2773-1--2773-2:1973 Pillar type vertical drilling machinesTesting of the accuracy 1997- 11 - 13 Issued by State Administration of Technical Supervision 1998-07-01 Implementation GB/T4018.1—1997 This standard is based on [902773-11973 (confirmed in 1990) - Vertical Drilling Machine - Accuracy Inspection - Part 1, Geometric Determination of Degree of Correction. This standard has made minor technical changes to IS277-11973 (confirmed in 1990). [502773-11973 confirmed in 1995) mentioned in G4 that "the straightness of the guide rail should be inspected". Taking into account the structural characteristics of my country's vertical drilling machine, the word "straightness of the guide rail" is used in this standard. The method of checking the verticality of the spindle shaft and the verticality of the guide rail at the upper and lower positions of its travel is used to check the verticality of the spindle shaft and the verticality of the guide rail. G/T4018 is divided into two parts under the general title of precision inspection of measuring column filling stations. Part 1 G/T4918.1 Geometric precision inspection Part 2 GB/T4018.24 Working precision inspection>, which will take effect from the date of entry into force and replace the geometric inspection part of G/T4018-83. This standard was proposed by the Ministry of Machinery Industry of the People's Republic of China and was approved by the Beijing Institute of Analysis of the Ministry of Machinery Industry. The drafting place of this standard: Beijing San Machine Tool Factory This standard was first issued on March 19, 2003, GB/T4018.1:1997 ISO Foreword ISO (International Organization for Standardization) is a federation of national standardization bodies (150 member bodies) within the world scope. The formulation of international standards is completed through ISO technical committees. Each member who is interested in the topic of the established technical committee has the right to express his opinion at the meeting. Related international organizations, official and non-official organizations also participate in the formulation work. The draft international standard accepted by the technical committee must be voted on by each member before being determined as an international standard by the ISO Council International Standard 1502773- 1 Drafted by 150 C39 Machine Tool Technical Committee and submitted to the member countries in June 1972, this standard has received the following approvals: Belgium, Austria, Ireland, Italy, New Zealand, Romania, Japan, Spain ... 1 Specification This standard specifies the requirements and methods for the accuracy test of vertical drilling machines. This standard is applicable to general vertical drilling machines. 2 Referenced standards GB/T4018.1—1997 eQ*IS02773-1:1973 All references are GB401883 The texts contained in the following standards are cited in this standard and are considered to be the main texts of this standard. The versions cited at the time of publication of this standard are all valid. All standards are subject to revision, so the latest version of the following standards should be considered when applying this standard. JB267-82 Precision Inspection and Testing of Machine Tools 3 General Requirements 3.1 When using this standard, reference should be made to JB2670, especially the installation, idle operation, warm-up, inspection of the shaft and other parts before the precision inspection! The recommended inspection and testing tools are given in accordance with the recommended inspection and testing methods. 3.2 The geometric accuracy inspection is arranged in order according to the machine and tool parts, so it does not represent the actual inspection order. In order to make the installation and disassembly of the tools and the inspection methods more convenient, the inspection can be carried out in any order. 3.3 When the actual measured length is different from the length specified in this standard, the tolerance should be reported in accordance with the provisions of 2.3.1.1 of JB2670-82, and the length that can be measured should be converted. When the conversion result is less than 0.07mm, it is still calculated as 0.mm. 3.4 According to the structural characteristics or the agreement between the user and the manufacturer, the inspection items can be increased. 3.5 The working precision inspection of this machine tool will be specified in Part 2 of this standard. Approved by the State Administration of Technology Supervision on 1997-71-13 and implemented on 1998-07-01 4 Geometric Precision Inspection CB/T 401B.1 According to the function of the machine: a) in the flat meat b> in the long plane mountain (through the seven thick lines) A--. The work will be on the work surface and the work seat work surface (the instrument is fast and the tool is flat. The indicator is 3 meters long and the test question is 0.3 safety) in the straight line over 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.050 large quantity applicable to flat work 0.0 Back to the bottom) Indicate the transfer See the network JB2670-88 standard test guide Place the work in the right position after the stroke Time is subject to E. As a surface work Attached, when the work is adjusted Thank you, the workman will ask the manager the right position, Yes, the platform is slowly raised. 5. 3. 8. 8 5. 6. 3, 2 5. 5. 3. 3. The following steps must be completed in sequence. The workbench is in the front position of the stroke. The workbench is raised and lowered. Place the ruler on the workbench according to the correct position. Fix the indicator so that the measuring head is stable and level. Check the ruler at point A. Note the point F. Turn the workbench back 180 degrees and tighten it. Note the point F. Turn the ruler back 5 degrees and check the same way again. Before measuring, the workbench must be tested. Make sure the measuring head is at the same position as the measuring head. GB/T 4018. 1 - 1997 Wheat (identification) Inspection and sight H. The slight lateral movement of the main axis: a) close to the main axis plane, b) on the vertical main axis potential surface, on the working surface and the working surface (such as through the working surface in the same plane: b) in the longitudinal plane (main and auxiliary system) = 0.025 ac.06/3c31 arssor) b) .06/300 fagnc\) vertical modification, b"1c/3u three work surfaces vertical residence a) in the company plane: h) to acid control after push indicator Hao Jingya indicator service according to 826752 inspection and inspection 0 5.6.1.2.3 rise precision back to the position of its expansion. about the inspection and inspection and the provisions of the above, the corresponding A3 A4 5.5.1.2.1 and 5. 5. 1. 2. 4.2 The upper workpiece and the lifting platform lead release, For the machine tool with two main precision boxes and vertical point strict lowering function, + axis protection designed for the same amount of virtual disease in the middle of the stroke, For the workpiece: the sub-plane, the brush workpiece is located in the upper, middle and lower three small positions of the food stroke , and the outer press 5. 5. 2.2. 2 Workers' platform, thick platform position, the front long position in the middle of the boundary, lift For the machine tool with main vertical lifting function, the axle box in the middle position, GB/T4018.1—1997 Table complete) Inspection items Main special medicine vertical and then move up 610.10/30 0 (ag9en the viewing square of the workbench surface (only applicable to the main axis with directional ascending grid guide machinebZxz.net rule bed>: plane: 5) in the fixed plane grid gathering engineer indicating energy set sleeping day 2670-this test .5.2. 2. 2 the working table and the opening and lowering are in the front position of the middle, and fast data, the main pumping poor first when measuring Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.