title>GB 19079.3-2005 Opening conditions and technical requirements for sports venues Part 3: Bungee jumping venues - GB 19079.3-2005 - Chinese standardNet - bzxz.net
Home > GB > GB 19079.3-2005 Opening conditions and technical requirements for sports venues Part 3: Bungee jumping venues
GB 19079.3-2005 Opening conditions and technical requirements for sports venues Part 3: Bungee jumping venues

Basic Information

Standard ID: GB 19079.3-2005

Standard Name: Opening conditions and technical requirements for sports venues Part 3: Bungee jumping venues

Chinese Name: 体育场所开放条件与技术要求 第3部分:蹦极场所

Standard category:National Standard (GB)

state:in force

Date of Release2005-01-24

Date of Implementation:2005-06-01

standard classification number

Standard ICS number:Household and commercial equipment, recreation, sports >> 97.220 Sports equipment and facilities

Standard Classification Number:Light Industry, Culture and Living Goods>>Culture, Education, Sports and Entertainment Goods>>Y55 Sports Facilities and Equipment

associated standards

Publication information

publishing house:China Standards Press

ISBN:155066.1-22401

Plan number:20032359-Q-451

Publication date:2005-02-17

other information

Release date:2005-01-24

drafter:Li Zhixin, Qin Kaifeng, Yan Jinan, Yang Shitao, Li Shi, Feng Yong, Chen Xueling, Li Zhi, Shi Chunjian

Drafting unit:China Mountaineering Association

Focal point unit:Sports Economics Department of the State Sports General Administration

Proposing unit:State Sports General Administration

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Standardization Administration of China

competent authority:State Sports General Administration

Introduction to standards:

This part of GB 19079 stipulates the basic conditions and basic technical requirements for the opening of bungee jumping venues. This part applies to all types of bungee jumping venues open to the public. GB 19079.3-2005 Opening conditions and technical requirements for sports venues Part 3: Bungee jumping venues GB19079.3-2005 Standard download decompression password: www.bzxz.net

Some standard content:

ICS 97.220
National Standard of the People's Republic of China
GB19079.3—2005
Operation eonditions and technical requirements for gymnasium and playgroundPart 3: Bungee jump place
2005-01-24 Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China and Standardization Administration of China
2005-06-01 Implementation
GB1079 Opening Conditions and Technical Requirements for Sports Venues" is divided into the following parts: Part 1: Swimming Venues;
Part 2: Karting Venues;
Part 3: Bungee Jumping Venues;
Part 4: Rock Climbing Venues;bzxz.net
. Part 5. Roller Skating Venues,
-Part 6 Part 1: Skiing places; Part 7: Ice places; Part 8: Shooting places; Part 9: Archery places; Part 10: Diving places; Part 11: Rafting places; Part 12: Paragliding places; Part 13: Hot air balloon places; Part 4: Powered paragliding places This part is Part 3 of GB19079, and all the contents of this part are mandatory. This part is proposed by the State Sports General Administration, and this part is drafted by the Sports Economics Department of the State Sports General Administration and is responsible for interpretation. The responsible drafting unit of this part: China Mountaineering Association. GB19079.3—2005
Drafters of this part: Li Zhixin, Luan Kaifeng, Yan Jinan, Yang Shitao, Li Shi, Feng Yong, Chen Xuling, Li Zhi, Shi Dengjian, 1 Scope
Opening conditions and technical requirements for sports venues
Part 3: Bungee jumping venues
GB 19079.3—2005
This part of GB19079 specifies the basic conditions and basic technical requirements for the opening of bungee jumping venues. This part applies to bungee venues open to the public. 2 Normative references
The clauses in the following documents become clauses of this standard through non-standard references. For dated references, all subsequent amendments (excluding erroneous content or sub-editions) are not applicable to this standard: However, all parties involved in the design of this standard are encouraged to study whether the latest versions of these documents can be used. For undated references, the latest versions are applicable to this standard. GB8408-2000 Safety of amusement machines and recreational facilities GB/T5144-1985 Safety regulations for heavy-duty machines GB/T17093 Hygienic standard for total number of bacteria in indoor air GB /T10001.1 Public information graphic symbols for signs Part 1: General symbols 3 Terms and definitions
The following terms and definitions apply to this part of (19079. 3.1
Bungee jump
refers to the activity of people jumping from a high place using a bungee rope. 3.2
Bungee jump place
A place that can meet the needs of people to carry out activities such as bungee jumping training, competition, fitness and leisure, which includes: artificial bungee jumping places and natural bungee jumping places.
Bungee jumping platform bungee Jump platform is a flat structure for jumpers to jump.
Safety auxiliary rope
assist1 the rope safety
Ropes other than the bungee rope used to protect the safety of bungee jumpers during bungee jumping activities. 3. 5
Bungee jumping technical instructor is a person who teaches bungee jumping theory and skills. 4 Qualification of practitioners
Bungee jumping technical instructors, security personnel, etc. must hold relevant national professional qualification certificates before they can go on the job. GB19079.3—2005
5 Site, facilities and equipment conditions
5.1 Bungee jumping tower
5.1.1 The natural height shall not exceed 80 t1, the length of the platform is not less than 3㎡, the width is not less than 2m, and the length of the platform arm is not less than 12m
5.1.2 The radius of the vertical projection point of the bungee rope is not less than 12m from the surrounding obstacles. 5.1.3 The bottom water depth of the vertical projection point of the bungee rope is not less than 4m. 5.1.4 There are clear and eye-catching water depth marks and isolation belts. 5.1.5 There are safety guardrails, anti-slip facilities, and protective nets. Blocking facilities are set at the exit of the bungee platform. 5.2 Bungee Platform
5. 2. 1. Set up an isolation area, and set up isolation facilities between bungee jumpers and non-jumping personnel. 5.2.2. Set up barriers around the bungee platform, and set up barriers that can be opened and closed inwards at all entrances. 5.2.3. The active load shall not be less than 300kg/m
5.2.4. The horizontal thrust of the safety guardrail shall comply with the requirements of GB8408-2000. 5.2.5. The static friction coefficient of the ground surface shall not be less than 0.5.5.2.6. Observation points shall be set up in the bungee jumping area, and video monitoring equipment shall be provided. 5.2.7. The horizontal distance between the recovery rope and the jump platform shall not be less than 0.4m. 5.3. The vertical distance between the rebound point and the lower edge of the platform shall not be less than 7% of the bungee jumping height. 5.3.2. When the jumping height is less than 40m, the vertical distance between the lowest point of the fall and the landing area shall not be less than 3m: when the jumping height is greater than 40mm, the vertical distance between the lowest point of the fall and the landing area shall not be less than 4m. 5.3.3 When the jumping height is less than 40m, the bungee rope shall be at least 16m away from the obstacle in the vertical state and 9.6m away from the side; when the jumping height is greater than 40m, the bungee rope shall be at least 25m away from the obstacle in the vertical state and 2m away from the side.
5.4 Lifting, lowering and transmission equipment
5.4.1 The safety coefficient of the safety auxiliary rope shall be greater than 10, and the diameter shall be not less than 8mm5.4.2 The safety auxiliary rope fixing device of the lifting equipment shall meet the requirements of GB8408:2000. 5.4.3 The diameter ratio of the pulley or drum to the safety auxiliary rope shall not be less than 40 times, and the diameter ratio of the guide wheel to the diameter of the safety auxiliary rope shall not be less than 20 times.
5.4.4 For bungee platforms below 20m, the diameter ratio of the pulley or drum to the safety auxiliary rope shall not be less than 20. 5.4.5 There shall be a device to prevent the safety auxiliary rope from falling off, over, loosening and folding. 546:
When the safety auxiliary rope is unloaded, the number of times it is wound around the drum shall not be less than 3 turns. 5. 4.7t
Make sure to install the pole three times and jump the bottom: the pole can be lifted and lowered by the winch. 5.4.8 The brake of the winch shall comply with the requirements of GB/T5144-1985. 5.5 Bungee rope
5.5.1 The pole rope shall be issued with a product inspection certificate issued by a professional and technical organization that meets the statutory conditions. 5.5.2 The number of times the lying pole rope is used shall not exceed the rated number of times of use of the manufacturer, and the broken wire shall not exceed 5%. 5.5.3 The buckle connecting the instantaneous pole rope to the person shall be at least 2, and the buckle shall be a locking structure. 5.6 Other requirements
5.6.1 Jumping equipment such as straps, fan straps, ankle straps, etc. shall be traceable to the product inspection certificate issued by the professional technical organization that meets the statutory conditions.
5.6.2 Bungee jumping platforms with a wind speed higher than 20 Ⅱ shall be equipped with a wind speed control system. 5.6.3 The staff of the platform, the reception area and the lounge shall keep in contact. 5.6.4 In the event that the lifting equipment cannot operate normally, there shall be emergency rescue facilities. 5.6.5 There shall be a life-saving observation platform, lifeboat, lifebuoy, lifeguard, etc. and rescue board. 5.6.6 The indoor air quality of the public lounge in the bungee jumping venue shall meet the requirements of GB/T17093. 5.6.7 Public signs should comply with the requirements of (GH/T10001.1. 6 Safety Assurance
6.1 There should be "Bungee Jumping Personnel Instructions" and safety warnings in a conspicuous position. 6.2 The bungee jumping equipment safety inspection pass mark should be fixed in a conspicuous position. GB19079.3---2005
6.3 There should be a special equipment registration form, factory documents for equipment and its components, annual maintenance plan and implementation, installation, repair records and acceptance materials. Equipment failure and handling records 6.4 First aid medicines and equipment should be written in a conspicuous position for easy access. 6.5 There should be on-duty personnel during non-opening hours.
6.6 There should be obvious training for all types of personnel.
6, 7 There should be a sound system for safety inspection, safe operation, accident handling, safety and security, and a personnel service post responsibility system.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.