People's Republic of China Urban Construction Industry Standard CI/T205-2000
Crosslinked polyethylene (PE-X) pipes for water supply in buildings2000-12·Issued
Issued by the Ministry of Construction of the People's Republic of China
Implementation on June 1, 2001
CJ/T205-2000
This standard adopts the national standard 11N168921937 Quality requirements and test methods for cross-linked polyethylene (PF-X) pipes3 in terms of material technical requirements and test methods; and adopts the current provisions of the national standard IN16893, 1997 Cross-linked polyethylene (PE-X) pipe size standard in terms of size.
Appendix A of this standard is a reminder appendix,
This standard is newly proposed by the Ministry of Construction of China in the standard setting research. This standard is under the jurisdiction of the Ministry of Construction Product Standardization Technical Committee, and is drafted by the Hebei Provincial Department of Resources and Facilities. This standard is compiled by: Hebei Yeshan Zunbo Yuda Hardware Co., Ltd., Yada Plastic Sanitaryware Co., Ltd., Chahuangdao Sumitomo New Plastics Co., Ltd., Tuhai Dongli Technology Development Co., Ltd., Guangdong Wanjiatong Cross-linked Pipe Factory, Ningbo Jinfan Group, Hebei Yinglong Business Co., Ltd.:
Main contributors to this standard: Dang Xiaofeng, Li Tongze, Yue Zhanming, Shang Buhuo, this standard was first issued in 2000, 1 Scope
People's Republic of China Urban Construction Industry Standard Building Water Supply Cross-linked Polyethylene (PE-X) Pipes for Wnter Supply Lu Bauldings CJ/T 205-2000
This standard specifies the product categories, technical requirements, test methods, inspection specifications, marking, packaging, transportation and storage of PEX pipes (hereinafter referred to as pipes) with high-strength PEX as the main source, necessary agents, chemical cross-linking, and main building water supply cross-linking. This standard is applicable to building water supply materials with working temperatures not exceeding 9:1 (temperature range not exceeding 110). 2 Referenced standards
The following standards contain documents that have become part of this standard through reference. When this standard is issued, the version shown is valid and all standard parts will be revised. All parties to the international market should consider the possibility of using the latest version of the following standards. Remote batch inspection procedures and sample tables (applicable to continuous batch inspection) GB/T2828-1987
GB/T 2918-19U8
GB/I $111—1985
Plastic specimens and test standards: Determination of the resistance of plastic pipes to damage under long-term constant internal pressure GB/T6621.2-198%
Test method for tensile properties of thermoplastic light materials Polyethylene pipes GB/T8804.2-188
GB/T8805--1988 Rigid plastic materials Bend test method GR/T 880r—1988
GB/T172191598
3 Product classification
3.1 Pipe material specifications
Standard for the safety and performance of domestic natural water transmission and distribution equipment and protective materials Table 1 Material specifications
Standard SLR series
Nominal outer diameter
Theoretical quality
Ministry of Construction of the People's Republic of China 200-12-07 Approved for operation
Quality certification
Quality certificate
2001-(6-07 Implementation
Handled by the Ministry of Public Affairs
3.2 Labeling and Certification
Theoretical Quality
Material Marking Method
G/PE-X
3.2.2 Example
CJ/T 205—2000
Table 1 (End)
Micrometer Card Ratio SDR Series
Theoretical Quantity
Standard Number
Stop.
General material, mm1m
Nominal outer diameter of pipe, mm
Physical quality
Code for cross-linked polyethylene pipe for building water supply
Nominal outer diameter of 3 mm1m, wall thickness of 2.5 mm cross-linked polyethylene (PE.X> pipe G/PEX2X2.9CJ/r2052300
4 Requirements
4.1 The material composition shall comply with the provisions of this standard and shall be manufactured in accordance with the drawings and technical documents approved by the prescribed process. 4. Color
The stainless steel pipe is generally white, and other colors can be agreed upon by both parties according to the function: 7. 3
Additional quality
14-6i1
22-53
4.3 Appearance
CJ/T 205—2000
The inner and outer walls of the pipe should be smooth, without any air gap, bright and dark spots, concave and shading, or discoloration. 4.3.1
4.3-2 The two ends of the pipe should be cut flat and perpendicular to the axis of the pipe: 4.4 Dimensional deviation and geometric tolerance
The average outer diameter limit deviation of the pipe can be found in Table 3 of the tolerance series.
The average outer diameter limit deviation of the pipe
10--32
10--32
10--40
|11--12
|12--5--6
3-r--8
|>9--10
|>11~12
|>12--1 --14
2~15~·16
>16--17
Average foreign teacher limit gain
Public ball industry
Material thickness batch limit deviation
Nominal birth order.
--x-- 1
>19~2n
>20~21
2h-~22
>23~·2x
>23- 24
>24-25
>25·27
>27--28
>28~23
129 ~- 30
>3(~ 8
>31~32
>32~33
233~34
>34 --35
Average outer diameter limit
CJ/T 205—2000
4.4.3 Fragrant material country - containing magic thick shrink pot a flower 14%4.4.4 Yingcun same number of surface outside network, direct small change 10.0244e (1 calculation see less than 1mm when take 1mm), coil wisdom not greater than 0.o de
Pipe length extreme end difference see 4.
Installation 4 temporary material length size limit difference
Material length
( 1 )
5: Including: 5: The following pipes are required to be used as pipes or require warning 3 grades 32) The above materials are all common materials for mutual pipes. Changan can also be increased according to user requirements
Physical properties
The physical properties of the pipes should comply with the requirements of Table 3
Table 5 Physical properties of materials
Number of directions to the same gift (12T)
Cross-linked products
Kitchenware under the busy belt
11 This item can be used for 165h joint test
4.6 Health instructions
The health indicators of the pipe generation should comply with the provisions of GBT17219 for the replacement of the allowable working bottom force,
Technical indicators
Mold network maintenance
Nominal length
: The ring pressure is 12 Pa, 1 h without cracking, no leakage, ring type force 4.1%, 1 h is not cracked, not leaking
damage stress 4.FM, 1, no cracking-no activity
stress 4.4MPa small rupture, no leakage\
pipe material safety series, different usage and allowable working pressure under different conditions refer to the effect A (in the appendix). 5 Test method
5.1 Test conditions and tests are carried out in the standard environment specified in GB/T291, the ambient temperature is 23Y:+2℃, the adjustment time is not less than 24h, and the test is carried out under these conditions.
5.2 Appearance and color
observe directly with the naked eye: the light source can be used for illumination, 5.3 Size inspection
5.3.1 The average outer diameter of the pipe is measured according to G3/T88. 5.3.2. Thickness of pipes shall be measured by the following formula: 5.3.3 The thickness error rate of the same section of the pipe shall be calculated by the formula (1): -X33%
Where: -
Thickness error rate
CJ/T 205-2000
e: the maximum thickness of the same section of the pipe, mr: the minimum wall thickness of the pipe, mm, 5.3.4 The outer diameter of the pipe can be calculated by the following formula: de' de..-de.
Where: de—maximum outer diameter of the pipe, nr
dtemr—maximum outer diameter of the same section of the pipe, muT.t·minimum outer diameter of the same section of the pipe n
5.3.5 Pipe length: Use a 10mm diameter tool to calculate the pipe length. 5.4 Physical energy test
5.4.1 Determination of pipe shrinkage
Cut three pieces of 2CCmm long from the test sample pipe and make a mark from them, with a distance of 1Umm and 2.25L5: Place the sample on a glass plate sprayed with talcum powder, and then place it in a constant temperature environment. See Table 6 for normal test conditions for pipe shrinkage
After the material reaches the test position, remove the sample together with the glass from the supply box and cool it to 32 in air. Measure the short distance H between the two marks. Then follow step (3) to confirm the material. It is expressed as white content, Le -Ieai
- Pipe shrinkage, %:
Medium:
- The distance between the two marks before the treatment, mm
- The shortest distance between the marks after treatment, mm, the average value of the three samples is taken. 5.4.2 Degree of crosslinking of pipes
5.4.2.1 Method of expressing crosslinking
The degree of crosslinking should be expressed in terms of the minimum percentage (%) of VTE in the molten metal 5.4.2.2 Trial preparation
Cut a piece of 0.2 mm thick film from the end of the pipe. 5.4.2.3 Test procedure
Weigh the sample piece m. Accurate to \. Put it into a small container made of gold mesh with a hole diameter of 0.125mm, put it into a natural bottle, add a car (pure) and 1% of the best or ratio (22-single double 4-6 reported) reflux = 5m, take out the sample, cool it to room temperature, put it in a 140-degree supply box, cool it to the original loss, and add some residual sample sheets n, and the exact amount is 1mg.
5. 4.2.4 Calculation method
Calculation method of crosslinking degree of pipe material: (+ × 100%
Where; G
8 xylene before extraction 181
m- xylene after extraction.
5.4.3 Filtration test
CJ/T205-2000
Test temperature, hoop stress and test interval Table 6. Test method shall be in accordance with GR/6111. 5.5 Health index test
Test of hygienic index of pipe material shall be carried out in accordance with GB/T17219: 6 Inspection rules
6.1 The pipe material shall be qualified by the quality inspection department of the production plant and attached with the product certificate. 6.2 A batch
The pipe material produced by the company under the same raw materials, formula and process conditions is a batch. The quantity of each batch is not more than 10t: the initial production quantity is less, and the production period is less than 11 days, then the 6-day production is taken as one. 6.3 Factory inspection
6.3.1 The return inspection shall be valid only after the type inspection is completed. 6.3.2 Factory inspection items
The longitudinal shrinkage rate, cross-linking degree, and hydraulic short-term test in the inspection items 4.2~4.4 and 4.5. 6.3.3 Sampling strategy and judgment rules
For the inspection of 4.2~.4.4, the normal inspection shall be carried out according to GB/T2828. The general inspection water content quality level is 6.5, and the pressure table is 7.
Table 7 Sampling plan
BK1--:00
50:~1 20D
1 20. -~3 z00
3 2GJ~10 GiK:
Sample size
Combined judgment number A
6 Inclusive judgment number R
6.3.4 Randomly select no less than three grids from the qualified samples of the counting sample to carry out the longitudinal shrinkage rate and cross-sectional test in 1.5. The test results must all be qualified.
6.4 Type inspection
6.4.1 Type inspection should be carried out in any of the following circumstances: a) Trial design of new products or old products transferred to other factories; b) During normal production, annual inspection shall be carried out; after suspension of production, if major changes are made to the structure, materials, or workmanship, which may affect the product performance; d) When production is suspended for more than three months and when production is resumed; when the inspection results are significantly different from those of the last type inspection; when the national quality supervision agency proposes a requirement for type inspection. 6.4.2. Type inspection: Type inspection is for all items in the model requirements of this standard. 6.4.3 Oil sampling plan and judgment rules 6.4.3.1 Sampling plan CJ/T 205-2000 Randomly select no less than three samples from the samples that meet the factory inspection and conduct type inspection in parallel. 6-4.3.2 Judgment rules Quality 4.2~4.4 According to Table 7, if one of the mechanical properties does not meet the specified index, you can randomly select two samples for re-inspection. If it does not meet the requirements, the type or test will be unqualified. If one of the hygiene indicators does not meet the requirements, the type will be unqualified.
Marking, packaging, transportation, storage
7.1 Marking
Each pipe should have clear markings, and the markings should at least include the following: 1) Manufacturer name or trademark:
15) Product name,
2) Specifications and dimensions: nominal diameter, nominal outer diameter and wall thickness; 3) Standard end number
Date of production.
7.2 Packaging
Materials should be packed in cartons or light-shielding plastic boxes. The packaging boxes should indicate the product name or trademark, specification size, product number, implementation standard number, manufacturer name, telephone number, and all production quality certificates. 7.3 Transportation
Materials should not be exposed to the sun, stained, or damaged during transportation: they should not be combined with toxic and harmful substances. 4 Storage
Materials should be stored in a clean, dry, ventilated place, away from heat sources, and avoid explosion. 8
C1/T 205—2000
Appendix A
(Damage display record)
Tube village according to different series of use of temperature and life allowable working force reference attenuation allowable working force
Standard size ratio SDR
Service life
General material series
Allowable working pressure, MP
Service life
C/T 205 - 2000
Table A1 (filled)
Standard size ratio SDR
Along the system group
Allowable working force M1. Cross-linking degree shall be expressed in terms of the proportion (%) of VTE in the melt. 5.4.2.2. Test preparation
Cut a piece of 0.2 mm thick piece from the end of the pipe as a test piece. The piece width is equal to the entire thickness of the pipe and equal to the length of the pipe.
5.4.2.3. Test procedure
Weigh the sample piece to the nearest millimeter. Place it in a small container made of a gold mesh with a hole diameter of 0.125 mm, and then put it into a bottle. Add 100% pure water and 1% argon (22-single-double-4-6-report) to reflux for 5 minutes. Take out the sample. Let it cool to room temperature, put it in a 140° supply box, cool it to the original loss, and pay the residual sample sheet n. If it is accurate, add 1mg.
5.4.2.4 Calculation method
Calculation method of crosslinking degree of pipe material: (+ × 100%
Wherein; G
8The amount before xylene extraction 181
m-…The amount after xylene extraction.
5.4.3 Filtration test
CJ/T205—2000
Test temperature, hoop stress and test interval Table 6. Test method shall be in accordance with GR/6111. 5.5 Health index test
The test of health index of pipe material shall be carried out in accordance with GB/T17219: 6 Inspection rules
6.1 The pipe material shall be qualified by the quality inspection department of the production plant and attached with the product certificate. 6.2 The raw materials, formula and process of the batch shall be the same. Under these circumstances, the pipes produced by the company are divided into batches. The quantity of each batch is less than 10t: the initial production quantity is less, and the production period is less than 11 days, then the 6-day production is taken as one batch. 6.3 Factory inspection
6.3.1 The return inspection shall be carried out within the validity period of the type inspection meeting to be effective. 6.3.2 Factory inspection items
The longitudinal shrinkage rate, cross-linking degree, and hydraulic short-term test in the inspection items 4.2~4.4 and 4.5 are as follows. 6.3.3 Sampling strategy and judgment rules
For the inspection of 4.2~.4.4, the normal inspection shall be carried out according to the GB/T2828 sampling plan, and the water content quality level shall be 6.5, and the pressure table 7 shall be checked.
Table 7 Sampling plan
BK1--:00
50:~1 20D
1 20. -~3 z00
3 2GJ~10 GiK:
Sample size
Combined station judgment number A
6Inclusive grid judgment number R
6.3.4 Randomly select no less than three spring grids from the qualified samples of the counting sample for the longitudinal shrinkage rate and cross-sectional test in 1.5, and all test results must be qualified.
6.4 Type inspection
6.4.1 Type inspection should be carried out in any of the following situations: a) Trial type inspection of new products or old products transferred to the factory: b) During normal production, annual inspection is carried out. After the suspension of production, if the structure, material, and workmanship are greatly changed, it may affect the product performance; d) When the production is stopped for more than three months and when the production is resumed: ) When the inspection results are significantly different from the last type inspection; when the national quality supervision agency proposes a requirement for type inspection. 6.4.2. Type inspection: Type inspection is for all items in the model requirements of this standard. 6.4.3 Oil sampling plan and judgment rules 6.4.3.1 Sampling plan CJ/T 205-2000 Randomly select no less than three samples from the samples that meet the factory inspection and conduct type inspection in parallel. 6-4.3.2 Judgment rules Quality 4.2~4.4 According to Table 7, if one of the mechanical properties does not meet the specified index, you can randomly select two samples for re-inspection. If it does not meet the requirements, the type or test will be unqualified. If one of the hygiene indicators does not meet the requirements, the type will be unqualified.
Marking, packaging, transportation, storage
7.1 Marking
Each pipe should have clear markings, and the markings should at least include the following: 1) Manufacturer name or trademark:
15) Product name,
2) Specifications and dimensions: nominal diameter, nominal outer diameter and wall thickness; 3) Standard end number
Date of production.
7.2 Packaging
Materials should be packed in cartons or light-shielding plastic boxes. The packaging boxes should indicate the product name or trademark, specification size, product number, implementation standard number, manufacturer name, telephone number, and all production quality certificates. 7.3 Transportation
Materials should not be exposed to the sun, stained, or damaged during transportation: they should not be combined with toxic and harmful substances. 4 Storage
Materials should be stored in a clean, dry, ventilated place, away from heat sources, and avoid explosion. 8
C1/T 205—2000
Appendix A
(Damage display record)
Tube village according to different series of use of temperature and life allowable working force reference attenuation allowable working force
Standard size ratio SDR
Service life
General material series
Allowable working pressure, MP
Service life
C/T 205 - 2000
Table A1 (filled)
Standard size ratio SDR
Along the system group
Allowable working force M1. Cross-linking degree shall be expressed in terms of the proportion (%) of VTE in the melt. 5.4.2.2. Test preparation
Cut a piece of 0.2 mm thick piece from the end of the pipe as a test piece. The piece width is equal to the entire thickness of the pipe and equal to the length of the pipe.
5.4.2.3. Test procedure
Weigh the sample piece to the nearest millimeter. Place it in a small container made of a gold mesh with a hole diameter of 0.125 mm, and then put it into a bottle. Add 100% pure water and 1% argon (22-single-double-4-6-report) to reflux for 5 minutes. Take out the sample. Let it cool to room temperature, put it in a 140° supply box, cool it to the original loss, and pay the residual sample sheet n. If it is accurate, add 1mg.
5.4.2.4 Calculation method
Calculation method of crosslinking degree of pipe material: (+ × 100%
Wherein; G
8The amount before xylene extraction 181
m-…The amount after xylene extraction.
5.4.3 Filtration test
CJ/T205—2000
Test temperature, hoop stress and test interval Table 6. Test method shall be in accordance with GR/6111. 5.5 Health index test
The test of health index of pipe material shall be carried out in accordance with GB/T17219: 6 Inspection rules
6.1 The pipe material shall be qualified by the quality inspection department of the production plant and attached with the product certificate. 6.2 The raw materials, formula and process of the batch shall be the same. Under these circumstances, the pipes produced by the company are divided into batches. The quantity of each batch is less than 10t: the initial production quantity is less, and the production period is less than 11 days, then the 6-day production is taken as one batch. 6.3 Factory inspection
6.3.1 The return inspection shall be carried out within the validity period of the type inspection meeting to be effective. 6.3.2 Factory inspection items
The longitudinal shrinkage rate, cross-linking degree, and hydraulic short-term test in the inspection items 4.2~4.4 and 4.5 are as follows. 6.3.3 Sampling strategy and judgment rules
For the inspection of 4.2~.4.4, the normal inspection shall be carried out according to the GB/T2828 sampling plan, and the water content quality level shall be 6.5, and the pressure table 7 shall be checked.
Table 7 Sampling plan
BK1--:00
50:~1 20D
1 20. -~3 z00
3 2GJ~10 GiK:
Sample size
Combined station judgment number A
6Inclusive grid judgment number R
6.3.4 Randomly select no less than three spring grids from the qualified samples of the counting sample for the longitudinal shrinkage rate and cross-sectional test in 1.5, and all test results must be qualified.
6.4 Type inspection
6.4.1 Type inspection should be carried out in any of the following situations: a) Trial type inspection of new products or old products transferred to the factory: b) During normal production, annual inspection is carried out. After the suspension of production, if the structure, material, and workmanship are greatly changed, it may affect the product performance; d) When the production is stopped for more than three months and when the production is resumed: ) When the inspection results are significantly different from the last type inspection; when the national quality supervision agency proposes a requirement for type inspection. 6.4.2. Type inspection: Type inspection is for all items in the model requirements of this standard. 6.4.3 Oil sampling plan and judgment rules 6.4.3.1 Sampling plan CJ/T 205-2000 Randomly select no less than three samples from the samples that meet the factory inspection and conduct type inspection in parallel. 6-4.3.2 Judgment rules Quality 4.2~4.4 According to Table 7, if one of the mechanical properties does not meet the specified index, you can randomly select two samples for re-inspection. If it does not meet the requirements, the type or test will be unqualified. If one of the hygiene indicators does not meet the requirements, the type will be unqualified.
Marking, packaging, transportation, storage
7.1 Marking
Each pipe should have clear markings, and the markings should at least include the following: 1) Manufacturer name or trademark:
15) Product name,
2) Specifications and dimensions: nominal diameter, nominal outer diameter and wall thickness; 3) Standard end number
Date of production.
7.2 Packaging
Materials should be packed in cartons or light-shielding plastic boxes. The packaging boxes should indicate the product name or trademark, specification size, product number, implementation standard number, manufacturer name, telephone number, and all production quality certificates. 7.3 Transportation
Materials should not be exposed to the sun, stained, or damaged during transportation: they should not be combined with toxic and harmful substances. 4 Storage
Materials should be stored in a clean, dry, ventilated place, away from heat sources, and avoid explosion. 8
C1/T 205—2000
Appendix A
(Damage display record)bzxz.net
Tube village according to different series of use of temperature and life allowable working force reference attenuation allowable working force
Standard size ratio SDR
Service life
General material series
Allowable working pressure, MP
Service life
C/T 205 - 2000
Table A1 (filled)
Standard size ratio SDR
Along the system group
Allowable working force M1. Sample sampling method
CJ/T 205—2000
Randomly select no less than three samples from the samples that meet the factory inspection and conduct type inspection in parallel.6-4.3.2 Judgment criteria
Quality is judged according to 4.2~4.4 in Table 7. If one of the physical and mechanical properties does not meet the specified index, the sample that does not meet the standard can be randomly sampled for re-inspection. If it does not meet the standard, the type or pull test will be unqualified. If one of the hygiene indicators does not meet the standard, the type will be unqualified.
Marking, packaging, transportation, storage
7.1 Marking
Each pipe should have clear markings, and the markings should at least include the following: 1) Manufacturer name or trademark:
15) Product name,
2) Specifications and dimensions: nominal diameter, nominal outer diameter and wall thickness; 3) Standard end number
Date of production.
7.2 Packaging
Materials should be packed in cartons or light-shielding plastic boxes. The packaging boxes should indicate the product name or trademark, specification size, product number, implementation standard number, manufacturer name, telephone number, and all production quality certificates. 7.3 Transportation
Materials should not be exposed to the sun, stained, or damaged during transportation: they should not be combined with toxic and harmful substances. 4 Storage
Materials should be stored in a clean, dry, ventilated place, away from heat sources, and avoid explosion. 8
C1/T 205—2000
Appendix A
(Damage display record)
Tube village according to different series of use of temperature and life allowable working force reference attenuation allowable working force
Standard size ratio SDR
Service life
General material series
Allowable working pressure, MP
Service life
C/T 205 - 2000
Table A1 (filled)
Standard size ratio SDR
Along the system group
Allowable working force M1. Sample sampling method
CJ/T 205—2000
Randomly select no less than three samples from the samples that meet the factory inspection and conduct type inspection in parallel.6-4.3.2 Judgment criteria
Quality is judged according to 4.2~4.4 in Table 7. If one of the physical and mechanical properties does not meet the specified index, the sample that does not meet the standard can be randomly sampled for re-inspection. If it does not meet the standard, the type or pull test will be unqualified. If one of the hygiene indicators does not meet the standard, the type will be unqualified.
Marking, packaging, transportation, storage
7.1 Marking
Each pipe should have clear markings, and the markings should at least include the following: 1) Manufacturer name or trademark:
15) Product name,
2) Specifications and dimensions: nominal diameter, nominal outer diameter and wall thickness; 3) Standard end number
Date of production.
7.2 Packaging
Materials should be packed in cartons or light-shielding plastic boxes. The packaging boxes should indicate the product name or trademark, specification size, product number, implementation standard number, manufacturer name, telephone number, and all production quality certificates. 7.3 Transportation
Materials should not be exposed to the sun, stained, or damaged during transportation: they should not be combined with toxic and harmful substances. 4 Storage
Materials should be stored in a clean, dry, ventilated place, away from heat sources, and avoid explosion. 8
C1/T 205—2000
Appendix A
(Damage display record)
Tube village according to different series of use of temperature and life allowable working force reference attenuation allowable working force
Standard size ratio SDR
Service life
General material series
Allowable working pressure, MP
Service life
C/T 205 - 2000
Table A1 (filled)
Standard size ratio SDR