title>GB/T 14649-1993 Specification for performance test of marine auxiliary boiler units - GB/T 14649-1993 - Chinese standardNet - bzxz.net
Home > GB > GB/T 14649-1993 Specification for performance test of marine auxiliary boiler units
GB/T 14649-1993 Specification for performance test of marine auxiliary boiler units

Basic Information

Standard ID: GB/T 14649-1993

Standard Name: Specification for performance test of marine auxiliary boiler units

Chinese Name: 船用辅锅炉机组性能试验规范

Standard category:National Standard (GB)

state:Abolished

Date of Release1993-10-16

Date of Implementation:1994-07-01

Date of Expiration:2005-08-01

standard classification number

Standard ICS number:Shipbuilding and offshore structures>>Shipbuilding and offshore structures generally>>47.020.20 Marine engines and propulsion systems

Standard Classification Number:Ships>>Marine Main and Auxiliary Engines>>U41 Marine Boiler and Steam Engine

associated standards

alternative situation:Replaced by GB/T 14649-2005

Publication information

other information

Review date:2004-10-14

Drafting unit:Office

Focal point unit:China Shipbuilding Industry Corporation

Publishing department:State Bureau of Technical Supervision

Introduction to standards:

This standard specifies the classification, requirements, methods and test result evaluation of the performance test of marine auxiliary boiler units. This standard is applicable to marine fuel steam auxiliary boilers, fuel exhaust gas combined boilers, exhaust gas boilers and fuel hot water boilers with a medium outlet temperature not exceeding 120°C and a design pressure not exceeding 2.5MPa. GB/T 14649-1993 Performance test specification for marine auxiliary boiler units GB/T14649-1993 Standard download decompression password: www.bzxz.net

Some standard content:

UDC 621. 18
National Standard of the People's Republic of China
GB/T 14649—93
The properey test rule for marine auxiliary boiler unit
Issued on October 16, 1993
Implemented on July 1, 1994
State Administration of Technical Supervision: Issued
W.National Standard of the People's Republic of China
The properey test rule for marine auxiliary boiler unit
1 Subject content and applicable scope
GB/T 14649—93
This standard specifies the classification, requirements, methods and evaluation of test results of performance test for marine auxiliary boiler units. This standard is applicable to auxiliary oil-fired steam boilers with a design pressure of no more than 2.5 MPa and a medium temperature of saturated steam temperature, oil-fired exhaust gas combined boilers, high-pressure boilers and oil-fired hot water boilers with a medium outlet temperature of no more than 120°C. 2 Reference standards GB-10180 Thermal Engineering of Industrial Boilers. Test Specification GB1083 Performance Test Methods for Burners of Marine Auxiliary Boilers GB/T14650 General Technical Conditions for Marine Auxiliary Boilers CH'3161 Technical Conditions for Control Boxes of Marine Auxiliary Boilers 3 Test Classification 3.1 Type Test 3.1.1 Type tests should be conducted in the following cases: a. New products designed and manufactured for the first time, products with major changes in design structure that may affect performance; b. First products of old products converted into production, products that require type tests by the ship inspection department or other technical supervision departments. d.
3.1.2 The type test contents of the first-made products of the same series and other specifications that have passed the type test can be appropriately reduced. 3.2 Factory test
The boiler units shall be subjected to factory test one by one. 3.3 System (navigation) test
3.3.1 System test shall be carried out after the boiler units are assembled on board. 3.3.2 The exhaust gas boiler and the exhaust gas part of the oil-fired and exhaust gas combination boiler shall be tested when the ship is sailing. 3.4 Test items and numbers
Type test and exit test of boiler units! Test type: Mooring (navigation) test items and numbers are shown in Table 1. Approved by the State Technical Supervision Bureau on October 16, 1993 and implemented on July 1, 1994. W. Safety test and test questions. Automatic control. Manual control. Steam humidity. Thermal test. Combustion procedure. Medical prescription (for steam boilers). Flow rate (for heat boilers only). Safety protection
Smoke exhaust panel compliance
Fuel component effectiveness test
Furnace inspection
Test requirements
4.1 The following information should be submitted before the test:
Test outline:
General diagram and system diagram of the unit;
Machine manual,
Related information of main accessories;
General diagram or installation manual of burner:
GR/T 14649—93
Type test
Whole process
Control system instructions and electrical schematic diagram; Measuring point distribution diagram (position requirements for type test) Test results
Out! Test age
System training (inspection test
The boiler has passed the technical inspection, and the auxiliary machines and accessories of the unit must be used by the unit, and must pass the test after installation. 4.2
4.3 The test instruments and meters used should be within the validity period of the design environment. The test fuel should meet the design requirements.
Test method
5:1 Thermal test
, 5.1.1 The thermal test of marine auxiliary calciners should be carried out in accordance with GI310180. The test time under various loads is 2.e
W. Steam E-force control drama
Double-pull type
Continuous type
CB/T 14649--93
Low load
50% load
75% load
100% load
ln% load
5.1.2 For small auxiliary steel furnaces with design pressure less than 0.78MPa and steam output not more than 1t/h, only positive balance heat test can be carried out. 5.1.3 The thermal test items of exhaust gas weak furnace and exhaust gas combined boiler can be carried out according to the content agreed upon in the order negotiation between the two parties.
5.2 Safety test
5.2.1 The steam safety test should be conducted by raising the steam pressure in the steel furnace to the designed start-up value, and the start-up value of the safety valve should be observed and recorded.
5.2.2 The steam safety valve test should be conducted with the steam valve closed, 100% of the negative pressure in the furnace fully burned, and the water level kept within the safety water level range, and the start-up value should be observed and recorded. For combined boilers that can use both oil and gas, the steam test should be conducted during navigation.
5.2. 3. Manual opening test of steam safety valve, the opening handle of steam safety valve should be pulled quickly to conduct the test. 5.3. Oil injection test
The oil injection test of silver furnace combustion solution should be conducted in accordance with the relevant provisions of GB1C837. 5.4. Cold furnace heating test
The cold furnace heating test of boiler should record the time from cold furnace ignition to steam pressure reaching the working pressure. During the test, the steam valve and sewage valve must be closed, and the fire must not be stopped. 5.5. Automatic and manual control test
The boiler Automatic and manual control tests shall be conducted in accordance with the relevant provisions of CB, 3161. 5.6 Determination of steam humidity and exhaust temperature
The determination of steam humidity and exhaust temperature shall be conducted in accordance with the provisions of GB10180. 5.7 Determination of exhaust smoke Ringelmann blackness
Under normal combustion flow, the exhaust smoke blackness of the boiler shall be measured according to the Ringelmann flue gas concentration diagram. 5.8 Whole temperature determination
The boiler wall temperature shall be measured with a point thermometer. When measuring, local positions such as manholes, hand holes, and combustion port pipes shall be avoided. 5.9 Intermediate parts effectiveness test
During the test, the blowdown valve, steam valve, soot blower and other accessories shall be tested for manual operation effectiveness, and the water level gauge blow-off effectiveness test shall be conducted
5.10 Furnace wall inspection
The boiler furnace cavity inspection shall be conducted after the test is completed, and the furnace membrane inspection hole shall be opened, or the burner shall be tested. 5.1 Test record management
Fill in all test results in Table 3, Table 4, Table 5 and other tables. Table 3 Summary of thermal test results
Boiler output
t/L or M
Positive balance efficiency
Reverse balance efficiency
Bundle plate degree
Base air coefficient at exhaust
W. Test
Snail force
/h or Mw
Average boiler output
t/minus MW
Bubble and drug production humidity
(--) Fuel characteristics:
Oil temperature
Fuel temperature
Natural gas temperature
Fuel vortex point
Fuel water content
Fuel density
Fuel application base low heat
(II) Boiler protection level efficiency
8 Water flow
9 Self-use steam maximum
10 Steam pressure
1 Steam baking
Steam boiler temperature
13 Vaporization temperature
14 Water supply temperature
15 Water supply energy
16 Water supply
Level policy effect
GB/T 14649-93bZxz.net
Continued Table 3
Counter-balance efficiency
Table 4 Thermal test data summary table
kogitt
Calculation formula or data source
Test data
Comparison test data
Comparison test data
Test data
Test data
Test data
Test data
Test data
Test data
100100%
Air coefficient at the tree
Good efficiency.%
W.Seat number
17 Steam boiler water volume
Hot water forging sugar ring water embedding
Hot water boiler inlet overflow
Water boiler outlet condensation
, hot water boiler water pressure
Hot water boiler outlet jump
Hot water copper furnace water
Boiling furnace outlet
Hot water boiler guard output
Material physical nature
Additional fuel glass air external
Self-generated steam brought into the heat pad
Input heat
Positive balance rate
(III) Boiler reverse effect:
Non-tension RO:
331 Discharge 0
34 Discharge C0
GB/T 14649--93
Suspended 4
Calculation formula War number Saw intimate data
-or test data
Test data
Test data
Test data
Test data
k]J/kg 1
(m'/h)
(kJin')
(kJ/mc)
G
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.