Basic Information

Standard ID: NY/T 510-2002

Standard Name: Sunflower seed shelling machine

Chinese Name: 葵花籽剥壳机

Standard category:Agricultural Industry Standards (NY)

state:in force

Date of Release2002-01-04

Date of Implementation:2002-02-01

standard classification number

Standard Classification Number:Agriculture & Forestry>>Agricultural & Forestry Machinery & Equipment>>B91 Agricultural Machinery

associated standards

Publication information

publishing house:China Standards Press

ISBN:155066.2-14472

Publication date:2002-02-01

other information

drafter:Wu Yilong, Zhang Gejin, Wu Guoxian, Sun Benzhu, Ziyang, Liu Zengqiang, Du Yehong, Liu Junming

Drafting unit:农业部农产品加工机械设备质量监督检验测试中心(沈阳)、锦州俏牌实业有限公司

Focal point unit:National Agricultural Machinery Standardization Technical Committee Agricultural Mechanization Technical Committee

Proposing unit:Agricultural Mechanization Administration, Ministry of Agriculture

Publishing department:Ministry of Agriculture of the People's Republic of China

Introduction to standards:

This standard specifies the technical requirements, definitions, test methods, inspection rules and marking, packaging and storage of sunflower seed shelling machines. This standard applies to sunflower seed shelling machines. NY/T 510-2002 Sunflower seed shelling machine NY/T510-2002 Standard download decompression password: www.bzxz.net

Some standard content:

Agricultural Industry Standards of the People's Republic of China
NY/T 510—2002
Sunflower seeds huller
Sunflower seeds huller
Released on 2002-01·04||tt| |Implemented on 2002-02-01
Published by the Ministry of Industry of the People's Republic of China
NY/T 5102002
Annex A of this standard does not mention minor requirements.
This standard was recorded by the Generalization and Generalization Department of the Industrial Machinery Industry Department. This standard is held by the Nongkai North Technical Committee of the Agricultural Machinery Standardization Technical Committee! mouth. This standard follows the quality supervision and control of the agricultural product processing machinery equipment manufacturer of the unit development department and the customer satisfaction (Shen Jinzhou Jianlu Industrial Co., Ltd.
Main scholars of the standard: Ling Wenlong, Zhang Ejin, Pin Guoxian, Bad Bao Bai Institute, Liu Diqiang, Duye Chong Liu Xiangming. Agricultural industry standard of the People's Republic of China
Sunflower seeds huller
NY/T 510 - 2002
This standard specifies the technical requirements, definitions, test force methods, construction inspection rules and marking, packaging and storage of shaving machines (hereinafter referred to as shaving machines). Exfoliation machine). 2 Referenced standards
The texts contained in the following standards are referenced in this standard at the time of publication. Valid: All standards will be revised so that all parties involved in this standard should explore the possibility of using the latest version of the standard G/T2823-19873
Medical inspection and counting program sampling table ( GB/T 3768 1996 Acoustic Sound Pressure Law for Determining the Sound Power Consumption of Noise Sources Above the Radiation Surface Using a Integrated Scale Gauge CB Gate 5971-1986 Test Point Method for Feed Powder Conveyors GB/T 3239-1088
Determination of the allowable small balance of flat quality rotors G 996.—1958
CB10395.11S89
CB 11764—1589
1 industry product use General Instructions
Safety Pulling Requirements for Agricultural and Forestry Excavators and Machinery Part 1: General Sunflower Seeds
R/T13306—1991
JB/T56731991
SB2221S85|| tt | tt||Technical requirements of Yanshu
Lin volume or half of the quality of dried whole kernels. 3.2 Separation rate
After the machine is finished, peel out the kernels (whole kernels and falling kernels). Kernels) The quality of the whole half kernel (different kernels and Shulichu kernels) has a proportion of 3.3 in the yellow quality
After the machine work is completed, put the flower shell ( Proportion of shells including unflowered seeds) 4 Technical Department Requirements
4.1 General Requirements
4.1.1 The shell carving machine should meet the requirements of car standards and be approved according to the drawings and technology of the prescribed procedures Documentation is appropriate, 4.1.2 When the certificate 1 does not meet the second-class melting standard specified in GB:1764, the performance of the shell measuring machine shall comply with the provisions of Table 1. Approved by the Ministry of Agriculture of the People's Republic of China on 2002.01-04 and 2002-02. -01 Buy gun
Hour production beam)
Moving net rate/certificate
Steel kernel rate/
Ren content rate/%
gram Xiaohanren
Power consumption per ton of seeds/kw·h/)
Talk about the film attached to Ruofang/level
Dork sound (A)
Powder degree/( mg/m) ||tt | drop. 4.1.4 When connecting the connecting parts to the stove, there shall be no signs of welding or burning. tt||4.1.5 After the rotor is transferred, a new static test should be carried out. The total F grid plate should not be less than 16 velvet specified in B/T92391985. 4.1.6 Rotor u: should be made of moon-resistant bottom material and its use should be consistent. It should not be lower than iturh.4.1.7
After the piece is assembled, the smaller one is the main one
4.1.8 All parts should be inspected and qualified, and the purchased parts should be delivered together when ordered. It can be assembled: After the whole machine is assembled, carry out the 201 empty certificate at the rated speed and meet the following requirements: 4- 1-9
) The quality of the firmware is reliable and not loose or loose; ) Each rotating piece should be operated smoothly, and there should be no abnormal phenomena such as F belts and turbulence. 4. 1. 13
The appearance of the machine shall not be lower than the general coating requirements specified in JBT53. When the Yuanji failed, the temperature range exceeded 22℃. The internal temperature format of the product manual has become the current setting of Leopard B.1, and the usability of the product should not exceed 95%, 4 . 2 Compliance and health requirements
The exposed rotary parts of the high-voltage charging machine shall be protected by a protective cover, in compliance with the requirements of the regulations of 1395.1 (: 1395.1). 4.2.2 Model casing machines shall have obvious rotor rotation on the front. Mark 4.2.3 The machined product parts shall comply with the provisions of Chapter 1 of the Food Law of the People's Republic of China: 4.2.4 Sichuan. Parts that come into contact with labor shall comply with the provisions of B222 4.2. .5 The broken plate of the machine should be leaked after the machine is introduced to avoid contamination of the material. 5 Test methods | 5.1.2 The test prototype should be adjusted and maintained in good technical condition according to the instructions in the manual.
5.1.3 The test driver is a companion and the driver is matched to ensure that the test results are real. 5.1.4 The test will produce an 8V false difference. is +2℃v.
Within the validity period, 5.1.6 seeds supplied for testing were averaged 3.1% of age and measured according to the requirements of 611764. 5.1. Before the test, the technical parameters of the prototype were measured. 5.2 Calories. Capability test
5.2. 1 Test requirements
Conduct two stop-type tests for each prototype. The number of readings in each test shall not be less than 11, and the arithmetic mean of the two readings shall be taken. The value is used as the measurement result. The average frequency increase of the motor during the test must not exceed 1% of the calibrated function. If the following conditions occur, the test will not be effective: a> The mass of the machine material is too large to affect the mass of the machine material. ;
5) Material research center 1 change;
r) Material research center to ensure that the test is interrupted
5.2.2 Item and method of performance test measurement||tt ||5.2 2.1 The production load is 10, and the test is the main speed, range, and small variable load power. 5-2.2.2 Check the test pieces for testing, and the test time shall not exceed 15 minutes. 5.2.2.3 During the martial arts test, prove! Record the start time, end time, final meter reading and the new category 1 flower cup quality: 5.2.2.4 starting from the formal test 15ui. The book 1>1nin determines the main details, current, voltage, Load power, measured three times in total. 5.2.2.5 The actual momentum will be determined according to 1/78. The measured point is 1m away from the surface of the machine, 1g from the ground, and the parts, left, stone and upper force (upper and farther from the surface of the machine) are 1m each. The arithmetic mean value of each point is calculated, 5. 2. 2. 5 Concentration withdrawal shall be carried out according to the provisions of GB1 971, and the exit of the machine shall be determined. 5.2. 2.7 The power drop of the attached book 363 shall be carried out. 5.2.2.8 Use a point meter or test switch to check the energy and tiles. The final ratio is the multi-dimensional gain of each shaft source. The highest bearing wet rise is used as the test result. 5.2.3 Gram measurement | The main production port accepts a limited number of samples for each consecutive batch of products. One original sample of cattle is used as a parallel sample. The total mass of the three samplings is less than 1. If the three original samples are checked and checked, it will be The original product market test method teaches 10) 8. Measurement of thorn net pull, kernel yield rate, kernel content rate, and kernel content base by using coupons: 5.3 Calculation of rottenness index
5.3 .1 hour of production*Although
Xiaozhou orchid yield is calculated according to the formula:
In the formula: -
Processing status kg:
Li writer Calculation of formula 2),
Formula household: B-net rate,:
One whole benevolence amount:
The remaining air volume that can be reduced,||tt| |5. 3.3 The kernel content rate shall be calculated according to the formula; where: core fragmentation rate, % 5.3.41 The mass of kernel in shell shall be calculated according to: c The mass of kernel in shell shall be calculated according to: 5.3.5 The mass of kernel in shell shall be calculated according to: 1 g The mass of kernel in shell shall be calculated according to: 2 g The mass of kernel in shell shall be calculated according to: 3 The mass of kernel in shell shall be calculated according to: 5.3.5 The mass of kernel in shell shall be calculated according to: 2 g The mass of kernel in shell shall be calculated according to: 3 The mass of kernel in shell shall be calculated according to: 5.3.5 The mass of kernel in shell shall be calculated according to: 2 g The mass of kernel in shell shall be calculated according to: 3
5.3.6 Ton of lemongrass electric power consumption is calculated according to the formula (6:
In the formula: core ton seed power stop·h/
-processing quality,;
-power consumption, kw+h.
5.4 Production test
5.4-: cattle production test day
×1000
old press machine belt light dyeability, scalability, adaptability, performance secret world, adjustment Maintenance method, product performance, labor records and safety,
5.4.2 Requirements
5.4.2.1 Preparation of production test. Clarify the test requirements and methods, that is, arrange the test plan for the production test. 5.4.2.2 The production test shall be carried out in detail for at least 2 machines. The time for production inspection shall be no less than 6 times a month, and the cumulative time for each inspection shall be no less than 1 time.
5.4.3 The internal test time of local products
5.4.3.1 Production assessment
5.4.3.1.1 Fill in the production test record according to the inspection requirements, and summarize the measured data. 5.4.3.1.2 During the production test, the machine shall be started and terminated once and for all. The items and methods are the same as those in this standard.
5.4.3.1.3· Record the deformation and damage of the main parts of the prototype. The relevant data of the wear resistance should be measured before and after the test. For representative and severe wear pieces, the durability of the main parts and wearing parts shall be evaluated. 5.4.3.1.4 Inspect and determine the integrity and 5.4.3.1.5 Check and determine the convenience of work and the safety of working conditions. 5.4.3.2 5.4.3.2.1 The inspection should be carried out for at least one consecutive time. The net working hours in each shift should be accurately recorded during the inspection, and the net working hours should be calculated; NY/T510—2002 5.4.3.2.2 The working time of each shift should not be less than 61. 5.4.4 Calculation of technical chain indicators 5. 4. 4. 1 Usability
Usage reliability is calculated by the formula [! Calculate
Where: Usability, %
Production assessment interval working time h: ≥t
Production connection period is called package registration time, h5.4.4.2 Non-hourly productivity
Light hourly cattle production yield (8 door calculation:
Wuzhong, H autumn hourly production room.t/h
Production assessment period each batch of processing steamed flower seeds quality.-
Producer review interval light time mountain:
54.4.3 Pure T small sitting yield|| tt||The first working hour production process (\) calculation: E.7
Pure working efficiency t small
Production check shift processing fee amount, T; production check shift pure working hours.b
5.4.4.4Batch ton seed power consumption
Batch ton good quality formula (10) 1 calculation:
In the formula: Gh—shift ton seed+kwh
Electricity consumption per shift during production assessment, kw, 5.4.4.5Full maintenance convenience
Full maintenance convenience formula (11) calculation, %)
t: + ≥t,
Wherein:
Adjust the maintenance points to make the production
The production period is adjusted every shift. 6 Inspection rules
6-1 Inspection classification
The machine inspection is divided into delivery inspection and arrival inspection. 6.2H inspection
When the product is delivered, the delivery inspection should be carried out continuously. Inspection items are shown in Table 2: 6.3 Type inspection Inspection license item Assembly quality NY/T510-2002 Inspection items are shown in Table 2. When the following situations occur, a planned inspection shall be carried out: 1. The new product is converted into an old product and the trial production is carried out! The tax compliance of 1.2 is required. 1. 3 The regulations are as follows. 1. The regulations start from the planning, production, and management methods of the products. There are major changes that can affect the performance of the products. The normal production is recorded. The product quality inspection is carried out at least once every half an hour: d. The product is long-term after production. The quality inspection personnel supervise the purchase of the machine. 6.3.1 GB "2328 stipulates that the average production of the TF car in the past six months is based on the sampling. The sampling is prohibited for a few times ~ 1 set. Under this limit, the sampling can be selected 2 samples. 6.3.2 Unqualified import classification
There are some changes in the current day. All those that are not related to the first quantity are not selected. The product point station can be divided into two groups: sub-qualified and slightly unqualified. The serious unqualified is divided into two groups A and B, and the minor unqualified is the core group. 6.3.3.1 According to the sampling column, the quality assessment is carried out according to Table 1. Table 4 Q1. is the qualified quality level, 1. is the number of qualified determination, and 1. is the number of unqualified determination. Table 3 Sampling Column Determination
Unqualified English
Selection Scheme
Qualified Products
Sample)
Inspection
Selection Code
6.3.3.2 If the translation item is not moved, the batch of products must be qualified if all the groups in Table 4 are qualified, and the report card is qualified. Table 1 Unqualified Top Import Classification Table
Qualification Inspection
Low productivity
Tun beat power consumption
Fast dust according to convenience
Ren Zhong contains first-class learning
Complete report Ren private
Detailed review of Sichuan.4
The cost of rising
Yuanzhou Sanding parts
Special for static balance
Optical code purchase
Xu Shen external performance available area
Dig cotyledons + Chong Liu wither
7Price, packaging and purchase
NY/T 510:2002
7.1 The label of the granulator should be made according to the provisions of GB/T13306 and fixed in a conspicuous position. The label should include the following contents: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
quality:
g) system! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)No:
Unique quality
Number of shell kernel
NY/T 51D-- 2002
Heart () =
G, (%) =mtm × 100
Fill small unjudged seed quality mother.
5.3.6Ton of lemon power
Tun pole power consumption according to the formula (6):
Where: center ton seed power consumption·h/
One processing pattern quality,;
-power consumption, kw+h.
5.4 Production test
5.4-: cattle production test day
×1000
Old press machine belt with the same light dyeability, scalability, adaptability, performance secret world, adjustment Maintenance method, product performance, labor records and safety,
5.4.2 Requirements
5.4.2.1 Preparation of production test. Clarify the test requirements and methods, that is, arrange the test plan for the production test. 5.4.2.2 The production test shall be carried out in detail for at least 2 machines. The time for production inspection shall be no less than 6 times a month, and the cumulative time for each inspection shall be no less than 1 time.
5.4.3 The internal test time of local products
5.4.3.1 Production assessment
5.4.3.1.1 Fill in the production test record according to the inspection requirements, and summarize the measured data. 5.4.3.1.2 During the production test, the machine shall be started and terminated once and for all. The items and methods are the same as those in this standard.
5.4.3.1.3· Record the deformation and damage of the main parts of the prototype. The relevant data of the wear resistance should be measured before and after the test. For representative and severe wear pieces, the durability of the main parts and wearing parts shall be evaluated. 5.4.3.1.4 Inspect and determine the integrity and 5.4.3.1.5 Check and determine the convenience of work and the safety of working conditions. 5.4.3.2 5.4.3.2.1 The inspection should be carried out for at least one consecutive time. The net working hours in each shift should be accurately recorded during the inspection, and the net working hours should be calculated; NY/T510—2002 5.4.3.2.2 The working time of each shift should not be less than 61. 5.4.4 Calculation of technical chain indicators 5. 4. 4. 1 Usability
Usage reliability is calculated by the formula [! Calculate
Where: Usability, %
Production assessment interval working time h: ≥t
Production connection period is called package registration time, h5.4.4.2 Non-hourly productivity
Light hourly cattle production yield (8 door calculation:
Wu Zhong, H autumn hourly production room.t/h
Production assessment period each batch of processing steamed flower seeds quality.-
Producer verification interval light time mountain:
54.4.3 Pure T small sitting yield|| tt||The first working hour production process (\) calculation: E.7
Pure working efficiency t small
Production check shift processing fee amount, T; production check shift pure working hours.b
5.4.4.4Batch ton seed power consumption
Batch ton good quality formula (10) 1 calculation:
In the formula: Gh—shift ton seed+kwh
Electricity consumption per shift during production assessment, kw, 5.4.4.5Full maintenance convenience
Full maintenance convenience formula (11) calculation, %)
t: + ≥t,
Wherein:
Adjust the maintenance points to make the production
The production period is adjusted every shift. 6 Inspection rules
6-1 Inspection classification
The machine inspection is divided into delivery inspection and arrival inspection. 6.2H inspection
When the product is delivered, the delivery inspection should be carried out continuously. Inspection items are shown in Table 2: 6.3 Type inspection Inspection license item Assembly quality NY/T510-2002 Inspection items are shown in Table 2. When the following situations occur, a planned inspection shall be carried out: 1. The new product is converted into an old product and the trial production is carried out! The tax compliance of 1.2 is required. 1. 3 The regulations are as follows. 1. The regulations start from the planning, production, and management methods of the products. There are major changes that can affect the performance of the products. The normal production is recorded. The product quality inspection is carried out at least once every half an hour: d. The product is long-term after production. The quality inspection personnel supervise the purchase of the machine. 6.3.1 GB "2328 stipulates that the average production of the TF car in the past six months is based on the sampling. The sampling is prohibited for a few times ~ 1 set. Under this limit, the sampling can be selected 2 samples. 6.3.2 Unqualified import classification
There are some changes in the current day. All those that are not related to the first quantity are not selected. The product point station can be divided into two groups: sub-qualified and slightly unqualified. The serious unqualified is divided into two groups A and B, and the minor unqualified is the core group. 6.3.3.1 According to the sampling column, the quality assessment is carried out according to Table 1. Table 4 Q1. is the qualified quality level, 1. is the number of qualified determination, and 1. is the number of unqualified determination. Table 3 Sampling Column Determination
Unqualified English
Selection Scheme
Qualified Products
Sample)
Inspection
Selection Code
6.3.3.2 If the translation item is not moved, the batch of products must be qualified if all the groups in Table 4 are qualified, and the report card is qualified. Table 1 Unqualified Top Import Classification Table
Qualification Inspection
Low productivity
Tun beat power consumption
Fast dust according to convenience
Ren Zhong contains first-class learning
Complete report Ren private
Detailed review of Sichuan.4
The cost of rising
Yuanzhou Sanding parts
Special for static balance
Optical code purchase
Xu Shen external performance available area
Dig cotyledons + Chong Liu wither
7Price, packaging and purchase
NY/T 510:2002
7.1 The label of the granulator should be made according to the provisions of GB/T13306 and fixed in a conspicuous position. The label should include the following contents: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
quality:
g) system! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)No:
Unique quality
Number of shell kernel
NY/T 51D-- 2002
Heart () =
G, (%) =mtm × 100
Fill small unjudged seed quality mother.
5.3.6Ton of lemon power
Tun pole power consumption according to the formula (6):
Where: center ton seed power consumption·h/
One processing pattern quality,;
-power consumption, kw+h.
5.4 Production test
5.4-: cattle production test day
×1000
Old press machine belt with the same light dyeability, scalability, adaptability, performance secret world, adjustment Maintenance method, product performance, labor records and safety,
5.4.2 Requirements
5.4.2.1 Preparation of production test. Clarify the test requirements and methods, that is, arrange the test plan for the production test. 5.4.2.2 The production test shall be carried out in detail for at least 2 machines. The time for production inspection shall be no less than 6 times a month, and the cumulative time for each inspection shall be no less than 1 time.
5.4.3 The internal test time of local products
5.4.3.1 Production assessment
5.4.3.1.1 Fill in the production test record according to the inspection requirements, and summarize the measured data. 5.4.3.1.2 During the production test, the machine shall be started and terminated once and for all. The items and methods are the same as those in this standard.
5.4.3.1.3· Record the deformation and damage of the main parts of the prototype. The relevant data of the wear resistance should be measured before and after the test. For representative and severe wear pieces, the durability of the main parts and wearing parts shall be evaluated. 5.4.3.1.4 Inspect and determine the integrity and 5.4.3.1.5 Check and determine the convenience of work and the safety of working conditions. 5.4.3.2 5.4.3.2.1 The inspection should be carried out for at least one consecutive time. The net working hours in each shift should be accurately recorded during the inspection, and the net working hours should be calculated; NY/T510—2002 5.4.3.2.2 The working time of each shift should not be less than 61. 5.4.4 Calculation of technical chain indicators 5. 4. 4. 1 Usability
Usage reliability is calculated by the formula [! Calculate
Where: Usability, %
Production assessment interval working time h: ≥t
Production connection period is called package registration time, h5.4.4.2 Non-hourly productivity
Light hourly cattle production yield (8 door calculation:
Wuzhong, H autumn hourly production room.t/h
Production assessment period each batch of processing steamed flower seeds quality.-
Producer review interval light time mountain:
54.4.3 Pure T small sitting yield|| tt||The first working hour production process (\) calculation: E.7
Pure working efficiency t small
Production check shift processing fee amount, T; production check shift pure working hours.b
5.4.4.4Batch ton seed power consumption
Batch ton good quality formula (10) 1 calculation:
In the formula: Gh—shift ton seed+kwh
Electricity consumption per shift during production assessment, kw, 5.4.4.5Full maintenance convenience
Full maintenance convenience formula (11) calculation, %)
t: + ≥t,
Wherein:
Adjust the maintenance points to make the production
The production period is adjusted every shift. 6 Inspection rules
6-1 Inspection classification
The machine inspection is divided into delivery inspection and arrival inspection. 6.2H inspection
When the product is delivered, the delivery inspection should be carried out continuously. Inspection items are shown in Table 2: 6.3 Type inspection Inspection license item Assembly quality NY/T510-2002 Inspection items are shown in Table 2. When the following situations occur, a planned inspection shall be carried out: 1. The new product is converted into an old product and the trial production is carried out! The tax compliance of 1.2 is required. 1. 3 The regulations are as follows. 1. The regulations start from the planning, production, and management methods of the products. There are major changes that can affect the performance of the products. The normal production is recorded. The product quality inspection is carried out at least once every half an hour: d. The product is long-term after production. The quality inspection personnel supervise the purchase of the machine. 6.3.1 GB "2328 stipulates that the average production of the TF car in the past six months is based on the sampling. The sampling is prohibited for a few times ~ 1 set. Under this limit, the sampling can be selected 2 samples. 6.3.2 Unqualified import classification
There are some changes in the current day. All those that are not related to the first quantity are not selected. The product point station can be divided into two groups: sub-qualified and slightly unqualified. The serious unqualified is divided into two groups A and B, and the minor unqualified is the core group. 6.3.3.1 According to the sampling column, the quality assessment is carried out according to Table 1. Table 4 Q1. is the qualified quality level, 1. is the number of qualified determination, and 1. is the number of unqualified determination. Table 3 Sampling Column Determination
Unqualified English
Selection Scheme
Qualified Products
Sample)
Inspection
Selection Code
6.3.3.2 If the translation item is not moved, the batch of products must be qualified if all the groups in Table 4 are qualified, and the report card is qualified. Table 1 Unqualified Top Import Classification Table
Qualification Inspection
Low productivity
Tun beat power consumption
Fast dust according to convenience
Ren Zhong contains first-class learning
Complete report Ren private
Detailed review of Sichuan.4
The cost of rising
Yuanzhou Sanding parts
Special for static balance
Optical code purchase
Xu Shen external performance available area
Dig cotyledons + Chong Liu wither
7Price, packaging and purchase
NY/T 510:2002
7.1 The label of the granulator should be made according to the provisions of GB/T13306 and fixed in a conspicuous position. The label should include the following contents: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
quality:
g) system! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)5.4.2.2 The number of cattle production inspections shall be no less than 2 units. The cumulative inspection time shall be no less than 6 times per month and no less than 1 time per month. 5.4.3 The number of domestic product tests shall be no less than 5.4.3.1 Production assessment
5.4.3.1.1 Fill in the production test record according to the inspection requirements, and summarize the measured data. 5.4.3.1.2 During the production test, the machine shall be started and terminated once and for all. The items and methods are the same as those of this standard.
5.4.3.1.3· Check and record the deformation and damage of the main parts of the prototype. The relevant data of the wear resistance shall be measured before and after the test. For representative and severe wear pieces, the resistance of the main parts and wearing parts shall be evaluated. 5.4.3.1.4 Check and determine whether the installation, assembly and disassembly of each part of the prototype are convenient. 5.4.3.1.5 Check and determine the convenience of replacement and the safety of working conditions. 5.4.3.2 Next production assessment
5.4.3.2.1 The inspection shall be carried out for no less than one consecutive time. During the inspection, the net working hours of each shift shall be accurately recorded, and the net working hours shall be calculated; NY/T510—2002 54.3.2.2 The working time of each shift shall not be less than 61 hours. 5.4.4 Calculation of technical chain indicators 5.4.4. 1 Usability
Usage reliability is calculated by the formula [! Calculate
Where: Usability, %
Production assessment interval working time h: ≥t
Production connection period is called package registration time, h5.4.4.2 Non-hourly productivity
Light hourly cattle production yield (8 door calculation:
Wuzhong, H autumn hourly production room.t/h
Production assessment period each batch of processing steamed flower seeds quality.-
Producer review interval light time mountain:
54.4.3 Pure T small sitting yield|| tt||The first working hour production process (\) calculation: E.7
Pure working efficiency t small
Production check shift processing fee amount, T; production check shift pure working hours.b
5.4.4.4Batch ton seed power consumption
Batch ton good quality formula (10) 1 calculation:
In the formula: Gh—shift ton seed+kwh
Electricity consumption per shift during production assessment, kw, 5.4.4.5Full maintenance convenience
Full maintenance convenience formula (11) calculation, %)
t: + ≥t,
Wherein:
Adjust the maintenance points to make the production
The production period is adjusted every shift. 6 Inspection rules
6-1 Inspection classification
The machine inspection is divided into delivery inspection and arrival inspection. 6.2H inspection
When the product is delivered, the delivery inspection should be carried out continuously. Inspection items are shown in Table 2: 6.3 Type inspection Inspection license item Assembly quality NY/T510-2002 Inspection items are shown in Table 2. When the following situations occur, a planned inspection shall be carried out: 1. The new product is converted into an old product and the trial production is carried out! The tax compliance of 1.2 is required. 1. 3 The regulations are as follows. 1. The regulations start from the planning, production, and management methods of the products. There are major changes that can affect the performance of the products. The normal production is recorded. The product quality inspection is carried out at least once every half an hour: d. The product is long-term after production. The quality inspection personnel supervise the purchase of the machine. 6.3.1 GB "2328 stipulates that the average production of the TF car in the past six months is based on the sampling. The sampling is prohibited for a few times ~ 1 set. Under this limit, the sampling can be selected 2 samples. 6.3.2 Unqualified import classification
There are some changes in the current day. All those that are not related to the first quantity are not selected. The product point station can be divided into two groups: sub-qualified and slightly unqualified. The serious unqualified is divided into two groups A and B, and the minor unqualified is the core group. 6.3.3.1 According to the sampling column, the quality assessment is carried out according to Table 1. Table 4 Q1. is the qualified quality level, 1. is the number of qualified determination, and 1. is the number of unqualified determination. Table 3 Sampling Column Determination
Unqualified English
Selection Scheme
Qualified Products
Sample)
Inspection
Selection Code
6.3.3.2 If the translation item is not moved, the batch of products must be qualified if all the groups in Table 4 are qualified, and the report card is qualified. Table 1 Unqualified Top Import Classification Table
Qualification Inspection
Low productivity
Tun beat power consumption
Fast dust according to convenience
Ren Zhong contains first-class learning
Complete report Ren private
Detailed review of Sichuan.4
The cost of rising
Yuanzhou Sanding parts
Special for static balance
Optical code purchase
Xu Shen external performance available area
Dig cotyledons + Chong Liu wither
7Price, packaging and purchase
NY/T 510:2002
7.1 The label of the granulator should be made according to the provisions of GB/T13306 and fixed in a conspicuous position. The label should include the following contents: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
quality:
g) system! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)5.4.2.2 The number of cattle production inspections shall be no less than 2 units. The cumulative inspection time shall be no less than 6 times per month and no less than 1 time per month. 5.4.3 The number of domestic product tests shall be no less than 5.4.3.1 Production assessment
5.4.3.1.1 Fill in the production test record according to the inspection requirements, and summarize the measured data. 5.4.3.1.2 During the production test, the machine shall be started and terminated once and for all. The items and methods are the same as those of this standard.
5.4.3.1.3· Check and record the deformation and damage of the main parts of the prototype. The relevant data of the wear resistance shall be measured before and after the test. For representative and severe wear pieces, the resistance of the main parts and wearing parts shall be evaluated. 5.4.3.1.4 Check and determine whether the installation, assembly and disassembly of each part of the prototype are convenient. 5.4.3.1.5 Check and determine the convenience of replacement and the safety of working conditions. 5.4.3.2 Next production assessment
5.4.3.2.1 The inspection shall be carried out for no less than one consecutive time. During the inspection, the net working hours of each shift shall be accurately recorded, and the net working hours shall be calculated; NY/T510—2002 54.3.2.2 The working time of each shift shall not be less than 61 hours. 5.4.4 Calculation of technical chain indicators 5.4.4. 1 Usability
Usage reliability is calculated by the formula [! Calculate
Where: Usability, %
Production assessment interval working time h: ≥t
Production connection period is called package registration time, h5.4.4.2 Non-hourly productivity
Light hourly cattle production yield (8 door calculation:
Wuzhong, H autumn hourly production room.t/h
Production assessment period each batch of processing steamed flower seeds quality.-
Producer review interval light time mountain:
54.4.3 Pure T small sitting yield|| tt||The first working hour production process (\) calculation: E.7
Pure working efficiency t small
Production check shift processing fee amount, T; production check shift pure working hours.b
5.4.4.4Batch ton seed power consumption
Batch ton good quality formula (10) 1 calculation:
In the formula: Gh—shift ton seed+kwh
Electricity consumption per shift during production assessment, kw, 5.4.4.5Full maintenance convenience
Full maintenance convenience formula (11) calculation, %)
t: + ≥t,
Wherein:
Adjust the maintenance points to make the production
The production period is adjusted every shift. 6 Inspection rules
6-1 Inspection classification
The machine inspection is divided into delivery inspection and arrival inspection. 6.2H inspection
When the product is delivered, the delivery inspection should be carried out continuously. Inspection items are shown in Table 2: 6.3 Type inspection Inspection license item Assembly quality NY/T510-2002 Inspection items are shown in Table 2. When the following situations occur, a planned inspection shall be carried out: 1. The new product is converted into an old product and the trial production is carried out! The tax compliance of 1.2 is required. 1. 3 The regulations are as follows. 1. The regulations start from the planning, production, and management methods of the products. There are major changes that can affect the performance of the products. The normal production is recorded. The product quality inspection is carried out at least once every half an hour: d. The product is long-term after production. The quality inspection personnel supervise the purchase of the machine. 6.3.1 GB "2328 stipulates that the average production of the TF car in the past six months is based on the sampling. The sampling is prohibited for a few times ~ 1 set. Under this limit, the sampling can be selected 2 samples. 6.3.2 Unqualified import classification
There are some changes in the current day. All those that are not related to the first quantity are not selected. The product point station can be divided into two groups: sub-qualified and slightly unqualified. The serious unqualified is divided into two groups A and B, and the minor unqualified is the core group. 6.3.3.1 According to the sampling column, the quality assessment is carried out according to Table 1. Table 4 Q1. is the qualified quality level, 1. is the number of qualified determination, and 1. is the number of unqualified determination. Table 3 Sampling Column Determination
Unqualified English
Selection Scheme
Qualified Products
Sample)
Inspection
Selection Code
6.3.3.2 If the translation item is not moved, the batch of products must be qualified if all the groups in Table 4 are qualified, and the report card is qualified. Table 1 Unqualified Top Import Classification Table
Qualification Inspection
Low productivity
Tun beat power consumption
Fast dust according to convenience
Ren Zhong contains first-class learning
Complete report Ren private
Detailed review of Sichuan.4
The cost of rising
Yuanzhou Sanding parts
Special for static balance
Optical code purchase
Xu Shen external performance available area
Dig cotyledons + Chong Liu wither
7Price, packaging and purchase
NY/T 510:2002
7.1 The label of the granulator should be made according to the provisions of GB/T13306 and fixed in a conspicuous position. The label should include the following contents: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
quality:
g) system! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)t/h
The quality of each batch of steamed flower seeds processed during the production assessment period.-
Producer verification time:
54.4.3 Pure T for small counter-sit Productivity
The number of cows produced in the Lth working hour is calculated as follows: E.7
The productivity of the pure operation is t small
Production check shift processing fee Hua Shushi Quantity, T; the pure working hours of the production ban class.b
5.4.4.4 batches of tons of seeds power consumption
tons of power consumption (10) 1 calculation: || tt||In the formula: Gh—shift tons of seeds+kwh
During the production assessment period, each shift will drink electricity, kw, 5.4.4.5 full maintenance convenience
Xie Ran Maintenance convenience Formula (11) bullet calculation, %)
t: + ≥t,
In the formula:
Adjust the maintenance point to make the performance more
Production test every time during this period When the shift is adjusted to Shenzhen Philippines, 6 Inspection Rules
6-1 Inspection Classification
Finished embroidery machine inspection is divided into outgoing inspection and arrival inspection, 6.2H! Inspection
Product is out! "The time should be continued in succession" for inspection. Inspection items are shown in Table 2: ?
6.3 Type inspection
Inspection items
Jiaoquanheng
Assembly quality
Yiyu Xu Yingle tile || tt | Make sure the type is verified! The rule of
is equal to 1.2
and the rule of right [. 1. 3 is
and so on. |1) Product planning, annual production modification, and management methods have undergone major changes, which can affect the performance of the product. Keep in mind that it is a normal thing to do, and conduct an age inspection every noon: d product Long-term postpartum products:
Heart) Home quality inspectors supervise the purchase of traceability type inspection requirements. Dependent sampling, the number of times of sampling is limited to 1 unit. This limit is allowed under pin and convex sampling. Samples need to be picked 2
6.3.2 Classification of unqualified items
On a day-to-day basis, any product that does not meet the original and non-quantity-related requirements is considered undesirable. The promotion points that have an impact on the product site are divided into two types: one is small and one is small. Serious discrepancies are divided into A and two. Group, light ten qualified as the heart group. The classification of human parts is shown in Table 6.3.3. Quality assessment. Original purchase | The number is the number of non-crowding judgments.
Table 3 Draw column to judge all clothes
Unqualified
Drawing plan
Quality
Like a child)||tt| |Check and seek
Select the technical code
6.3.3.2 If there is no translation item, the batch of products must be qualified if each group in Table 4 is late and qualified, and the report will be issued. Qualified, Table 1 does not have a grid top classification table
Full qualifications and inspections
Small productivity
Power consumption
Quick dust and convenience
Ren Zhongxianxue
Completely sue Rensi
Detailed comments on Zhuchuan.4
's promotion
Yuanzhou Sanding Piece
Special Yu Jingheng
Light code purchase
Xu Shenxian Keyu
Digging cotyledons + flushing six withers
7 discounts, packaging and purchasing||tt| |NY/T 510:2002 |
h) Supporting power:
c) Spindle speed:
Hour cattle yield:
Quality:
g) Made! Name:
h) Manufacturing factory address.
7.2 Product packaging must have precautionary measures, comply with transportation requirements and relevant regulations, and ensure that the accompanying documents, spare parts, accessories, etc. are complete 7.3 Random delivery Parts, spare parts and accessories,
2 Product supply instructions;
b) Product inspection certificate:
Fei packing list
d) Three-pack annual certificate,
e) Spare parts and accessories (provided in accordance with the instructions for use) 7.4 The product should be stored in a well-ventilated room with a flat floor, and attention should be paid to traceability and corrosion protection /
Light speed r/: u)
Purine by h(A)
Viscoelectric/:l:w·h)
Call bucket name
NY/T 510—2002||tt ||Appendix A
(Attachment ball shown)
Instruments, receipt and inspection items
Research degree
Operating support
Accuracy
Yawuyuan
Sharing power
Performance assurance
Requirements for accuracy and sharing power
rharuin
± 1. 5*/day difference
0.5 dH(A)t/h
The quality of each batch of steamed flower seeds processed during the production assessment period.-
Producer verification time:
54.4.3 Pure T for small counter-sit Productivity
The number of cows produced in the Lth working hour is calculated as follows: E.7
The productivity of the pure operation is t small
Production check shift processing fee Hua Shushi Quantity, T; the pure working hours of the production ban class.b
5.4.4.4 batches of tons of seeds power consumption
tons of power consumption (10) 1 calculation: || tt||In the formula: Gh—shift tons of seeds+kwh
During the production assessment period, each shift will drink electricity, kw, 5.4.4.5 full maintenance convenience
Xie Ran Maintenance convenience Formula (11) bullet calculation, %)
t: + ≥t,
In the formula:
Adjust the maintenance point to make the performance more
Production test every time during this period When the shift is adjusted to Shenzhen Philippines, 6 Inspection Rules
6-1 Inspection Classification
Finished embroidery machine inspection is divided into outgoing inspection and arrival inspection, 6.2H! Inspection
Product is out! "The time should be continued in succession" for inspection. Inspection items are shown in Table 2: ?
6.3 Type inspection
Inspection items
Jiaoquanheng
Assembly quality
Yiyu Xu Yingle tile || tt | Make sure the type is verified! The rule of
is equal to 1.2
and the rule of right [. 1.3 is
and the rule of 1.||tt| |1) Product planning, annual production modification, and management methods have undergone major changes, which can affect the performance of the product. Keep in mind that it is a normal thing to do, and conduct an age inspection every noon: d product Long-term postpartum products:
Heart) Home quality inspectors supervise the purchase of traceability type inspection requirements. Dependent sampling, the number of times of sampling is limited to 1 unit. This limit is allowed under pin and convex sampling. Samples need to be picked 2
6.3.2 Classification of unqualified items
On a day-to-day basis, any product that does not meet the original and non-quantity-related requirements is considered undesirable. The promotion points that have an impact on the product site are divided into two types: one is small and one is small. Serious discrepancies are divided into A and two. Group, light ten qualified as the heart group. The classification of human parts is shown in Table 6.3.3. Quality assessment. Original purchase | The number is the number of non-crowding judgments. | |tt | |Check the request
Select the technical code
If the translation of 6.3.3.2 is not found, the batch of products must be qualified if each group in Table 4 is late and qualified, and the report will be issued. Qualified, Table 1 Unqualified Top Classification Table
Full Qualifications and Inspections
Small Productivity
Power Consumption
Quick Dust
Ren Zhongxianxue
Completely sue Rensi
Detailed comments on Zhuchuan.4
's promotion
Yuanzhou Sanding Piece
Special Yu Jingheng
Light code purchase
Xu Shenxian Keyu
Digging cotyledons + flushing six withers
7 discounts, packaging and purchasing||tt| |NY/T 510:2002 |
h) Supporting power:
c) Spindle speed:
Hour cattle yield:
Quality:
g) Made! Name:
h) Manufacturing factory address.
7.2 Product packaging must have precautionary measures, comply with transportation requirements and relevant regulations, and ensure that the accompanying documents, spare parts, accessories, etc. are complete. 7.3 Random delivery Parts, spare parts and accessories,
2 Product supply instructions;
b) Product inspection certificate:
Fei packing list
d) Three-pack annual certificate,
e) Spare parts and accessories (provided in accordance with the instructions for use) 7.4 The product should be stored in a well-ventilated room with a flat floor, and attention should be paid to traceability and corrosion protection /
Light speed r/: u)
purine by h(A)
viscoelectricity/:l:w·h)
call bucket name
NY/T 510—2002||tt ||Appendix A
(Attachment ball shown)
Instruments, receipt and inspection items
Research degree
Operating support
Accuracy
Yawuyuan
Sharing power
Performance assurance
Requirements for accuracy and sharing power
rharuin
± 1. 5*/day difference
0.5 dH(A)The label should include the following: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
Quality:
g) System! Name: www.bzxz.net
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)The label should include the following: 1) Product name and model:
h) Matching power:
c) Spindle speed:
hour productivity:
Quality:
g) System! Name:
h) Address of the manufacturer.
7.2 The product packaging should have preventive measures, comply with the transportation requirements and relevant regulations, and ensure that the random documents, spare parts, accessories, etc. are complete. 7.3 Random accessories, spare parts and accessories,
2 Product instruction manual;
b) Product inspection certificate:
Packing list
d) Three-guarantee certificate,
e) Spare parts and accessories (provided according to the provisions of the instruction manual)7.4 The product should be stored in a well-ventilated and flat room, and pay attention to the anti-corrosion effect of the foot.
Light speed r/:u)
Purpose by h(A)
Adhesive/:l:w·h)
Name of the bucket
NY/T 510—2002
Appendix A
(Appendix A)
Instrument, test items, test conditions, accuracy, accuracy, accuracy, ±1. 5*/day difference, 0.5 dH(A)