JB/T 9165.4-1998 JB/T 9165.4-1998 Special process equipment design drawings and design file formats JB/T9165.4-1998 Standard download decompression password: www.bzxz.net
Some standard content:
ICS25.010 Machinery Industry Standard of the People's Republic of China JB/T9165.4 Design drawing and documentation formfor special tooling Published on 1998-11-16 National Bureau of Machinery Industry Implemented on 1998-12-01 JB/T9165.41998 This standard is an editorial revision of JB/Z187.2~187.5—88, and the main technical content has not changed. Foreword This is a revision of "Process Document Integrity and Process Document Format". During the revision, only the compilation of this standard replaced JB/Z187.2~187.5—88 from the date of implementation. In this standard, Appendix A of JB/T9165.1 is a prompt appendix; Appendix A and Appendix B of JB/T9165.3 are standard appendices. This standard is proposed and managed by the Mechanical Science Research Institute. The responsible drafting unit of this standard is the Mechanical Science Research Institute, and the main drafters of this standard are Ma Xianzhi, Li Qin, Hu Huiqing, and Shi Junwei. I 1 Scope Mechanical Industry Standard of the People's Republic of China Design drawing and documentation form for special tooling Design drawing and documentation form for special tooling This standard specifies the design document format for special tooling and its filling rules. This standard is applicable to all machinery manufacturing enterprises. 2 Referenced standards JB/T9165.41998 Replaces JB/Z187.5-88 The provisions contained in the following standards constitute the provisions of this standard through reference in this standard. At the time of publication of this standard, the versions shown are valid. All standards are subject to revision, and parties using this standard should explore the possibility of using the latest versions of the following standards. GB/T14689—1993 Technical drawing format and format Process document integrity JB/T9165.1—1998 JB/T9165.3—1998 3Format Management process document format This standard specifies the following special tooling design file formats in accordance with the requirements of JB/T9165.1: Special process equipment design task book Special process equipment assembly drawing title bar, additional bar and code bar Special process equipment parts details bar||t t||Title bar of special process equipment parts drawing Special process equipment parts list Instruction manual of special process equipment Process equipment verification book 4 Filling rules Format 1 Format 2 Format 3 Format 4www.bzxz.net Format 5 (The format is the same as Format B3 in Appendix B of JB/T9165.3) Format 6 4.1 Special process equipment design task book (Format 1) should be copied into soft or hard multi-page carbon copy form as needed, and the filling rules are as shown in Table 1. Approved by the State Bureau of Machinery Industry on November 16, 1998 and implemented on December 1, 1998 Space (1)~(4) (5)~(6) (18) (20) (21)~(24) (25)、(26) JB/T9165.4 Content Fill in the product model and name of the tooling used according to the design documents and the drawing number and name of the fogging parts respectively. The number of parts using this tool in each product and the production batch Tool number Tool name Propose the first manufacturing quantity Tool complexity level (fill in according to enterprise standards) In which workshop is this tool used On which equipment is this tool used , generally only fill in the name of the equipment model. If there are special requirements for the process, fill in the equipment model and the factory equipment number Which product is this tool also suitable for? Only write the product model and part number process number to indicate that this tool is used in this process Use process content, indicating the content to be processed in this process using the tool. Old tool number Old tool inventory quantity Design reason of tool Process personnel put forward suggestions for the treatment of old tool. Draw a simple process diagram, indicating the positioning reference and clamping method. The person in charge signs and indicates the date Customize as needed Fill in the title column, additional column and code column (format 2) of the special process equipment assembly drawing (see Table 2) 4.2 Space number Tool name||tt ||Fill in content In fractional form: the numerator is the tooling number, the denominator is the user object. Fill in the material brand (when the tooling has only one fog piece) weight (when the tooling has only one fog piece) Fill in the proportion of the drawing Fill in numbers in order Fill in numbers for the number of drawings of the same tooling number. The name of the workshop using the tooling Equipment using the tooling Fill in the company name Space (16)~(23) (24 )~(26) (28) (30)~(33) JB/T9165.4 Change the symbol of the mark Table 2 (End) Fill in the content Fill in the number of the same mark symbol in Arabic numerals. Process document change notice number Signature of the person who changed Signature date of the person who changed Signature and date of each functional person It is a spare column, which is determined by each enterprise Description Signature of draftsman Signature of proofreader Base drawing number Define as needed Fill in the code of special tooling assembly drawing Fill in the details column of special process equipment fog parts drawing (format 3) (see Table 3) 4.3 Space number Parts sequence Tooling fog parts code Fog parts name Parts quantity Material brand Fill in content Special process equipment parts drawing title column (format 4) Fill in (see Table 4) 4.4 Space Tool part name Tool number Part code Material brand of fogging part Part weight Number of parts with the same code Drawing scale Change marking symbol Fill in content Fill in the number of the same marking symbol with Arabic numerals 3 Space (13)~(16) (17)~( 20) (21), (22) JB/T9165.4 Table 4 (end) Content Process document change notification number Signature of the person making the change Signature of the person making the change Date Signatures of each functional person Reserve column, to be determined by each enterprise Use Arabic numerals to fill in the total number and sequence number of each part drawing 5 Fill in the special process equipment parts list (format 5) (see Table 5) 4.5 Space (4), (5) (7)~(22) (23) (24) Special tool name Content to be filled in Fill in as a fraction: the numerator is the tool number, and the denominator is the object of use. Fill in the company name The total number of pages and sequence numbers of the parts list of the same set of special process equipment. Fill in the "Special process equipment parts list" according to the instructions of (11)~(26) in format 2. Fill in the part sequence number Tool part code Part name Number of parts with the same code Material brand Process equipment verification certificate (format Fill in formula 6) (see Table 6) Table 6 Space number (1)~(4) (5)~(10) (14)~(19) Fill in according to the provisions of the product drawings Consistent with the contents of the tooling design task book Fill in content Fill in the actual accuracy after verification item by item according to the specified verification items or the verification diagram Fill in the repair content and opinions after verification Fill in the verification conclusion of qualified, basically qualified, unqualified, and scrapped after verification The units and signatures of the verification organizers and participants, and indicate the date 4.7 The format of the design drawings of special process equipment shall be in accordance with the provisions of GB/T14689. 4 JB/T9165.4 QE(OT) Sea installation worker Each auxiliary static (joint project) (number) Base map application (11)(122 Marking place number change file number (field sample code) JB/T9165.4 1998 (Special process equipment drawing title bar, additional column and code) 75 Standardization Use workshop Use equipment Format 2 Base drawing number Binding number 【Continue format 2]】 JB/T9165.41998 (Special process equipment parts drawing Sample details column) 50 [According to the format Format 3 JB/T9165.4 Base drawing number Binding number 【According to formula 2】 Number of places Change document number (14) Standardization JB/T9165.41998 (Special process binding Spare parts drawing title bar) (1) Format 4 Bottom country number Binding number (Serial number! Number of markings Change file number Standardization! 《21) JB/T9165.41998 Special process equipment parts list Format 5 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.