Basic Information

Standard ID: GB/T 19001-2016

Standard Name:Quality management systems—Requirements

Chinese Name: 质量管理体系 要求

Standard category:National Standard (GB)

state:in force

Date of Release2016-12-30

Date of Implementation:2017-07-01

standard classification number

Standard ICS number:Sociology, Services, Organization and management of companies (enterprises), Administration, Transport>>Quality>>03.120.10 Quality management and quality assurance

Standard Classification Number:General>>Standardization Management and General Regulations>>A00 Standardization, Quality Management

associated standards

alternative situation:Replace GB/T 19001-2008

Procurement status:ISO 9001:2015

Publication information

publishing house:China Standards Press

other information

Review date:2023-12-28

drafter:Tian Wu, Kang Jian, Zhang Huicai, Li Qiang, Ren Qingyue, Li Ming, Zheng Yuanhui, Huang Xueliang, Qu Xintian, Zheng Yan, Liang Ping, Wang Mei, Li Ping, Xia Fang, Wang Jinde, Cao Hua, Deng Xiangning, Pei Jie, Lin Chuang, Zhou Hongbo, Li Yeqiu, Li Chenxuan, Fan Yejuan, Jie Hui, Zhu Jiangtao, Wei Xiangyang, Liu Ye, Dong Xiaohong

Drafting unit:China National Institute of Standardization, Certification and Accreditation Administration of the People's Republic of China, China Certification and Accreditation Association, China National Accreditation Service for Conformity Assessment, China Qu

Focal point unit:National Technical Committee on Quality Management and Quality Assurance Standardization (SAC/TC 151)

Proposing unit:National Technical Committee on Quality Management and Quality Assurance Standardization (SAC/TC 151)

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Standardization Administration of China

Introduction to standards:

This standard is one of the core standards of the GB/T 19000 family of standards. This standard specifies the requirements for a quality management system for the following organizations: a) Need to demonstrate its ability to consistently provide products and services that meet customer requirements and applicable statutory and regulatory requirements; b) Aim to enhance customer satisfaction through the effective application of the system, including the process of system improvement, and to ensure compliance with customer requirements and applicable statutory and regulatory requirements. All requirements specified in this standard are generic and are intended to be applicable to organizations of all types and sizes that provide different products and services. This standard replaces GB/T 19001-2008 "Quality Management System Requirements". Compared with GB/T 19001-2008, the main technical changes, except for editorial changes, are as follows: ——Adopt the high-level structure given in Annex SL of ISO Supplement to Part 1 of ISO/IEC Directives; ——Adopt risk-based thinking; ——Fewer prescriptive requirements; ——More flexible requirements for documented information; ——Improved applicability to the service industry; ——More emphasis on organizational environment; ——Strengthen the requirements for leadership; ——More emphasis on achieving expected process results to enhance customer satisfaction.



This standard is one of the core standards of the GB/T 19000 family of standards. This standard specifies requirements for a quality management system for organizations that: a) need to demonstrate their ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements; b) aim to enhance customer satisfaction through the effective application of the system, including processes for system improvement, and to ensure compliance with customer and applicable statutory and regulatory requirements. All requirements specified in this standard are generic and are intended to be applicable to organizations of all types and sizes providing different products and services. This standard replaces GB/T 19001-2008 "Quality Management System Requirements". Compared with GB/T 19001-2008, in addition to editorial modifications, the main technical changes are as follows: —— Adopt the high-level structure given in Annex SL of ISO Supplement to Part 1 of ISO/IEC Directives; —— Adopt risk-based thinking; —— Fewer prescriptive requirements; —— More flexible requirements for documented information; —— Improved applicability to the service industry; —— Greater emphasis on organizational environment; —— Strengthened requirements for leadership; —— Greater focus on achieving expected process results to enhance customer satisfaction.


Some standard content:

Appendix F introduces the investigation, measurement methods and calculation formulas of water leakage in concrete pressureless pipes in detail. The main contents are from the practical experience of various projects, and refer to the provisions of Appendix C of "Code for Acceptance of Underground Waterproof Engineering Quality" GB50208-2002 and the engineering construction standards of Beijing, Shanghai and other regions. Appendix G Method for Assessment of Appearance Quality Defects of Reinforced Concrete Structures In the assessment of the appearance (visual) quality of cast-in-place concrete construction quality acceptance of water supply and drainage pipeline projects, it is necessary to scientifically assess the appearance quality defects of reinforced concrete structures. Table G.0.1 refers to the relevant provisions of Article 8.1.1 of "Code for Acceptance of Construction Quality of Concrete Structure Engineering" GB50204-2002.
Appendix H Polyurethane (PU) Coating
In view of the engineering examples of polyurethane (PU) coating used as the outer anti-corrosion layer of steel pipes in water supply pipeline projects, this part of the content is included in Appendix H of this specification for the convenience of application.
Full text reading has ended. Downloading this article requires 2700 credits
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
No. 132
Announcement on the release of the national standard "Specifications for Construction and Acceptance of Water Supply and Drainage Pipeline Projects"
The "Specifications for Construction and Acceptance of Water Supply and Drainage Pipeline Projects" is now approved as a national standard, numbered GB50268-2008, and will be implemented from May 1, 2009. Among them, Articles 1.0.3, 3.1.9, 3.1.15, 3.2.8, 9.1.10, and 9.1.11 are mandatory provisions and must be strictly enforced. The original "Specifications for Construction and Acceptance of Water Supply and Drainage Pipeline Projects" GB50268-97 and "Standards for Quality Inspection and Assessment of Municipal Drainage Pipeline Projects" CJJ3-90 are abolished at the same time.
This specification is published and distributed by China Building Industry Press organized by the Standard and Quota Research Institute of our Ministry.
Ministry of Housing and Urban-Rural Development of the People's Republic of China October 15, 2008
This specification is revised by Beijing Municipal Construction Group Co., Ltd. and relevant units in accordance with the requirements of the Ministry of Construction's "Notice on Issuing the 2004 National Standard Formulation and Revision Plan for Engineering Construction" (Jianbiao (2004) No. 67). During the revision process, the compilation team conducted in-depth investigations and research and special discussions, summarized the practical experience of water supply and drainage pipeline construction and quality acceptance in various parts of my country, adhered to the guiding principles of "separation of inspection and evaluation, strengthening acceptance, improving means, and process control", referred to relevant domestic and foreign specifications, and widely solicited opinions from relevant units in various forms. Finally, it was finalized after review. The main contents of this specification are: general principles, terminology, basic regulations, earthwork and foundation treatment, main structure of pipelines with fine construction, main structure of pipelines without groove construction, main structure of immersed pipes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendices.
The provisions marked in bold in this specification are mandatory and must be strictly enforced. The Ministry of Housing and Urban-Rural Development is responsible for the management and interpretation of the mandatory provisions of this specification, and Beijing Municipal Construction Group Co., Ltd. is responsible for the interpretation of the specific technical content. In order to improve the quality of the specification, each unit should pay attention to summarizing experience and accumulating data in the process of implementing this specification, and send any problems and opinions found to Beijing Municipal Construction Group Co., Ltd. (address: No. 6 Sanhuqiao Road, Haidian District, Beijing, zip code: 100044; E-mail: [email protected]) at any time for reference in future revisions. The editor, participating units and main drafters of this specification Editor: Beijing Municipal Construction Group Co., Ltd. Participating units: Public Utilities Branch of Shanghai Construction Engineering Quality Supervision Station Beijing Urban Drainage Group Co., Ltd. Tianjin Municipal Highway Administration
Beijing Water Supply Design Company
Tianjin Water Supply Group Co., Ltd.
Beijing Municipal Engineering Management Office
Beijing Municipal Fourth Construction Engineering Co., Ltd. Shanghai Municipal Second Municipal Engineering Co., Ltd. Beijing Institute of Architecture and Civil Engineering
Guangdong University of Technology
Chongqing University
Xi'an Municipal Design and Research Institute
Wuhan Water Affairs Bureau
Wuhan Water Supply and Drainage Engineering Design Co., Ltd. Xinxing Casting Pipe Co., Ltd.
Main drafters: Jiao Yongda Su Yaojun Yang
Li Qiang Zheng Jinyu
Wang Hongchen
Wang Heping Cai
Yuan Guanjie| |tt||Wang Jinliang
Cao Honglin, Li Junqi, Yue Xiuping
Cheng Ge Jinke, Sun Lianyuan, Li Shaohai
Liu Yanlin
You Qingcheng
Basic regulations.
Basic regulations for construction,
Basic regulations for quality acceptance,
Earthwork and foundation treatment,
General regulations,
Construction drainage
Trench excavation and support..
Foundation treatment.
Trench backfilling
Quality acceptance standards
Construction of pipeline main structure by grooving.
5.1 General provisions.
Pipeline foundation
Steel pipe installation
Corrosion protection inside and outside the steel pipe.
Installation of ductile iron pipe
Installation of reinforced concrete pipe and prestressed (self-) concrete pipe Installation of prestressed steel cylinder concrete pipe
Fiberglass pipe installation
Installation of rigid polyvinyl chloride, polyethylene pipe and its composite pipe.Quality acceptance standards
Construction of pipeline main structure without grooving.
General provisions
Working well,
Shallow buried and dark excavation
6.6 Directional drilling and ramming pipe
Quality acceptance standards
Construction of main structure of immersed pipe and bridge pipe.
General provisions|| tt||7.3 Bridge pipe
7.4 Quality acceptance standard,
8 Pipeline auxiliary structures.
General provisions,
Rainwater inlet
Quality acceptance standard
Pipeline functional test,
General provisions
Water pressure test of pressure pipeline,
Water-tight test of non-pressure pipeline.
9.4 Air-tight test of non-pressure pipeline||t t||9.5 Flushing and disinfection of water supply pipes
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Division of sub-items, sections and unit projects of water supply and drainage pipeline projects, and quality acceptance records of sub-items, sections and unit projects. Water injection method test
Closed water method test. ·
Air-tight method test
Measurement and evaluation method of water seepage in non-pressure pipes of concrete structures Evaluation method of defects in the appearance quality of reinforced concrete structures Polyurethane (PU) coating
Terms used in this specification
Appendix: Explanation of clauses,
1 General
1.0.1 This specification is formulated to strengthen the construction management of water supply and drainage (hereinafter referred to as water supply and drainage) pipeline projects, standardize construction technology, unify construction quality inspection and acceptance standards, and ensure project quality. 1.0.2 This specification is applicable to the construction and acceptance of outdoor water supply and drainage pipeline projects for newly built, expanded and renovated urban public facilities and industrial enterprises; it is not applicable to the construction and acceptance of water supply and drainage pipelines with special requirements in industrial enterprises. 1.0.3 The varieties, specifications and performance of raw materials, semi-finished products, finished products and other products used in water supply and drainage pipeline projects must comply with the provisions and design requirements of relevant national standards; products that come into contact with drinking water must meet relevant hygiene requirements. It is strictly prohibited to use products that have been explicitly eliminated or banned by the state.
1.0.4 The construction and acceptance of water supply and drainage pipeline projects shall comply with the provisions of relevant national standards in addition to the provisions of this specification.
2.0.1 Pressure pipeline pressurepipeline 2 Terms
This specification refers to water supply and drainage pipelines with a working pressure of 0.1MPa or above. 2.0.2 Nonpressure pipeline nonpressure pipeline This specification refers to water supply and drainage pipelines with a working pressure of less than 0.1MPa. 2.0.3 Rigid pipeline rigidpipeline
Pipes that mainly rely on the strength of the pipe body material to support external forces have little deformation under external loads, and the failure of the pipeline is due to the control of the strength of the pipe wall. This specification refers to reinforced concrete, prestressed (self-)stressed concrete pipes and prestressed steel cylinder concrete pipes. 2.0.4 Flexible pipeline flexiblepipeline Pipes that deform significantly under external loads. Most of the vertical loads are balanced by the elastic resistance generated by the soil on both sides of the pipe. The failure of the pipeline is usually caused by deformation rather than damage to the pipe wall. This specification mainly refers to steel pipes, chemical building material pipes and ductile iron pipes with flexible joints.
2.0.5 Rigid joint of pipelines Pipeline joints that cannot withstand a certain amount of axial displacement and relative angular displacement, such as pipe joints sealed with cement materials or connected with flanges.
2.0.6 Flexible joint of pipelines Pipeline joints that can withstand a certain amount of axial displacement and relative angular displacement, such as pipe joints sealed with rubber rings and other materials. 2.0.7 Chemical material pipes Chemical material pipes This specification refers to the collective name of glass fiber pipes or glass fiber reinforced thermosetting plastic pipes (referred to as FRP pipes), rigid polyvinyl chloride pipes (UPVC), polyethylene pipes (PE), polypropylene pipes (PP) and their steel-plastic composite pipes 2.0.8 Canal, ditch, channel refers to water delivery channels with rectangular, arched or other special (non-circular) cross-sections built with bricks, stones, concrete blocks, cast in situ with reinforced concrete, or assembled with reinforced concrete prefabricated components. 2.0.9 Trench installation: A construction method in which a trench is excavated from the ground surface and a pipeline (channel) is laid in the trench. 2.0.10 Trenchless installation: A construction method in which a pipeline (channel) is laid or poured in a hole excavated under the ground along the pipeline. There are pipe jacking, shield tunneling, shallow buried excavation, directional drilling, and pipe ramming. 2.o.11 Pipeline cross processing: Pipeline cross processing refers to the necessary construction treatment to ensure construction safety and the safety of existing pipeline operation when the construction pipeline intersects or is close to the existing pipeline.
2.0.12 Pipe jacking method: A construction method in which a prefabricated pipe segment is pushed into the ground without trenching for underground pipelines with the help of a jacking device. 2.0.13 Shield method shield method
A non-grooving construction method that uses a shield machine to dig in the stratum and assemble prefabricated pipe segments or cast-in-place concrete to construct underground pipelines. 2.0.14 Shallow under cutting method shallow under cutting method A non-grooving construction method that uses the short-term self-stabilizing ability of the soil layer during the excavation process and takes appropriate support measures to form a close-fitting thin-walled support structure on the surface of the surrounding rock or soil layer. 2
5 Directional drilling method directional drilling method 2.0.15
A construction method that uses a horizontal drilling machine to drill a small-diameter guide hole, then uses a back-expanding drill bit to expand the borehole, and at the same time pulls the pipeline into the hole.
6 Pipe Ramming Method
Underground pipeline construction method without trenching, using pipe ramming hammer (pneumatic rammer) to ram steel pipe into the stratum 2.0.17 Sunken Pipeline Method; Immersed Pipeline Method Underwater pipeline laying method, which sinks the assembled pipe or reinforced concrete sealed pipe section of a certain length into the water bottom or the trench excavated under the water. Also known as the burial method and the prefabricated pipe section burial method. B Bridging Pipeline Method 2.0.18
A pipeline laying method dedicated to natural or artificial obstacles such as rivers, lakes, seas, railways, roads, valleys, etc. in the form of a bridge. 9 Working Shaft
When using non-trenching construction methods such as jacking pipe, shield, shallow buried dark excavation, etc., the auxiliary passage vertically excavated from the ground to the bottom of the pipeline is also called a working pit, shaft, etc.
leaktest
2.0.20 Pipeline tightness test
A general term for tests that use liquid or gas to check for leakage in laid pipelines. 2.0.21 Water pressure test for pipeline: A test that uses water as the medium and pressurizes the laid pressure pipeline after filling it with water to check whether the pipeline has structural damage at the specified pressure value and whether it meets the specified allowable water seepage (or allowable pressure drop) standards. 2.0.22 Non-pressure pipeline water obturation test
water obturation test for pipeline: A tightness test on laid gravity flow pipelines (channels) using water as the medium. 3 Non-pressure pipeline air obturation test for pipeline 2.0.23
A tightness test on laid pipelines using gas as the medium. 3
3 Basic Provisions
Basic Provisions for Construction
3.1.1 Construction units engaged in water supply and drainage pipeline projects should have corresponding construction qualifications, and construction personnel should have corresponding qualifications. The construction and quality management of water supply and drainage pipeline projects should have corresponding construction technical standards. 3.1.2 Construction units should establish and improve management systems for construction technology, quality, and safe production, formulate various construction management regulations, and implement them.
3.1.3 Construction units should organize relevant construction technical management personnel to conduct in-depth investigations along the line in accordance with the contract documents, design documents, and relevant specifications and standards, and based on the underground pipelines and other structural (construction) data and engineering hydrogeological data within the construction boundary provided by the construction unit, to understand and grasp the actual situation on site and make good preparations for construction. 3.1.4 Construction units should be familiar with and review construction drawings, and grasp the design intent and requirements. Implement the self-examination, joint review (briefing) and visa system; when questions or errors are found in the construction drawings, opinions and suggestions should be put forward in a timely manner: if the design needs to be changed, it should be submitted for review in accordance with the corresponding procedures, and implemented after being approved by the relevant units. 3.1.5 The construction unit should prepare a construction organization design before starting construction, and prepare special construction plans for key sub-items and sub-projects. The construction organization design and special construction plan must be approved and implemented according to the prescribed procedures, and the change approval must be handled when there is a change. 3.1.6 Temporary construction facilities should be reasonably set up according to the characteristics of the project, and there should be an overall layout plan. For projects that should not be interrupted, there should be backup power and equipment.
3.1.7 Construction measurement should be carried out under the review system of the construction unit and the re-measurement system of the supervision unit, and relevant records should be filled in and comply with the following provisions: Before construction, the construction unit should organize relevant units to hand over piles on site, and the construction unit should re-check and measure the handed-over piles: When the original measurement piles are lost or displaced, they should be promptly supplemented with piles for correction, and should be identified by the corresponding technical quality management departments and personnel: 2 The setting of temporary leveling points and pipeline axis control piles should be easy to observe, not easily disturbed and must be firm, and protective measures should be taken; the number of temporary leveling points along the line for trenching and laying pipelines should not be less than 1 for every 200m; 3 Temporary Temporary leveling points, pipeline axis control piles and elevation piles must be reviewed before use, and should be checked frequently: 4 Temporary leveling points and pipeline axis control piles for pipelines, immersed pipes, bridge pipes and other projects without trenching should be set according to the construction plan and checked in time;
5 The plane position and elevation of the connection between existing pipelines, structures (buildings) and the proposed project must be calibrated before construction begins. 3.1.8 The allowable deviation of construction measurement shall comply with the provisions of Table 3.1.8 and shall meet the relevant provisions of the current national standards "Engineering Survey Code" GB50026 and "Urban Survey Code" CJJ8: Special provisions shall also be observed for pipelines with specific requirements. Table 3.1.8
Leveling elevation closure error
Traverse measurement azimuth closure error
Traverse measurement relative closure error
Construction measurement allowable deviation
Allowable deviation
±20V (mm)
±6n (mm)
40 ()
Troughing pipeline construction
Other methods of pipeline construction
Difference between two direct distance measurements
Note: 1L is the length of the leveling closed line (km); 2n is the number of measuring stations for leveling or traverse measurement, 4
1/1000bzxz.net
1/3000
1/5000
3.1.9 The pipes, pipeline accessories, components (accessories) and main raw materials used in the project must be inspected upon entry into the construction site and must be well kept. During the on-site acceptance, the ordering contract, quality certificate, performance test report, instruction manual, commodity inspection report and certificates of imported products of each batch of products shall be checked, and re-inspected according to relevant national standards. They can only be used after passing the acceptance. 3.1.10 Engineering materials such as concrete, mortar, anti-corrosion and waterproof coatings prepared on site shall be used after passing the inspection. 3.1.11 Effective measures must be taken to prevent damage, rust or deterioration of pipe joints, semi-finished products, components (accessories) used during transportation, storage and construction.
3.1.12 Construction units must comply with the laws and regulations of the state and local governments on environmental protection, and take effective measures to control the pollution and harm to the environment caused by various dust, exhaust gas, waste, noise, vibration, etc. at the construction site. 3.1.13 Construction units must obtain a safety production license, and should comply with the laws and regulations on construction safety, labor protection, fire prevention, and poison prevention, establish a safety management system and a safety production responsibility system, and ensure safe construction. Special construction plans should be formulated for special operations such as non-grooving construction, cross-river pipelines, or deep foundation trenches. 3.1.14 Measuring instruments and testing equipment used in quality inspection and acceptance must be qualified after metrological verification and calibration before use. Units responsible for material and equipment testing should have corresponding qualifications. 3.1.15 The following provisions shall be met in the quality control of water supply and drainage pipeline construction: 1. Each sub-project shall be subject to quality control in accordance with the construction technical standards, and each sub-project must be inspected after completion; 2. Handover inspection must be carried out between related sub-projects, and all concealed sub-projects must be subject to concealed acceptance. The next sub-project shall not be carried out without inspection or unqualified acceptance. 3.1.16 Before installing the pipeline ancillary equipment, the location, elevation, and size of the relevant equipment foundation, pre-processed parts, and reserved holes shall be reviewed. 3.1.17 The construction unit shall control the quality of the construction project throughout the entire process in accordance with the corresponding construction technical standards, and the construction unit, survey unit, design unit, supervision unit and other parties shall manage the quality of the project in accordance with relevant regulations. 8 The project shall be put into use only after passing the final acceptance. 3.1.18
3.2 Basic provisions for quality acceptance
3.2.1 The quality acceptance of water supply and drainage pipeline construction shall be carried out on the basis of the self-inspection of the construction unit, in the order of acceptance batch, sub-project, section (sub-section) project, unit (sub-unit) project, and shall comply with the following provisions: 1 The quality of project construction shall comply with the provisions of this specification and relevant professional acceptance specifications; 2 The quality of project construction shall comply with the requirements of engineering survey and design documents; 3 All parties involved in the quality acceptance of project construction shall have corresponding qualifications; 4 The quality acceptance of project construction shall be based on the self-inspection and qualified evaluation of the construction unit. The construction unit shall notify the supervision unit and other units to conduct acceptance before concealment of concealed works, and form acceptance documents: 5
6 Test blocks, test pieces and on-site inspection items involving structural safety and use functions shall be subject to parallel inspection or witness sampling inspection as required;
The quality of the acceptance batch shall be inspected according to the main control items and general items; The number of inspections for each inspection item shall be fully inspected unless otherwise specified in the relevant 7
clauses of this specification; 8 Tests or inspections shall be conducted on sub-projects involving structural safety and use functions; 9 The unit responsible for the inspection shall have the corresponding qualifications; 10 The appearance quality shall be jointly confirmed by the quality acceptance personnel through on-site inspection. 3.2.2 The division of unit (sub-unit) engineering, sub-section (sub-sub-section) engineering, sub-project and acceptance batch can be determined before the construction of the project according to Appendix A of this specification, and the filling of quality acceptance records shall be filled in according to Appendix B of this specification. 3.2.3 The quality acceptance of the acceptance batch shall meet the following requirements: 1 The quality of the main control project shall be qualified after sampling inspection: 2 The qualified rate of sampling inspection of the measured (allowable deviation) items in general projects shall reach 80%, and the maximum deviation value of the over-difference point shall be within 1.5 times the allowable deviation value: 3 The on-site acceptance and re-inspection of the main engineering materials shall be qualified, and the test blocks and test pieces shall be qualified: 4 The quality assurance data of the main engineering materials and the relevant test and inspection data are complete and correct: There are complete construction operation basis and quality inspection records.
3.2.4 The quality acceptance of the sub-project shall meet the following requirements: 1 The quality acceptance of the acceptance batch contained in the sub-project is all qualified: 2 The quality acceptance records of the acceptance batch contained in the sub-project should be complete and correct: The relevant quality assurance data and test and inspection data should be complete and correct.
3.2.5 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects included in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete;
In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspections and spot checks on the external anti-corrosion layer of metal pipes, steel pipe cathodic protection system, pipeline equipment operation, pipeline location and elevation, as well as pipeline use function tests shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer62 The division of unit (sub-unit) engineering, division (sub-division) engineering, sub-project and acceptance batch can be determined before the construction of the project according to Appendix A of this specification, and the filling of quality acceptance records shall be filled in according to Appendix B of this specification. 3.2.3 The acceptance of the quality of the acceptance batch shall meet the following requirements: 1 The quality of the main control project shall be qualified after sampling inspection: 2 The qualified rate of sampling inspection of the measured (allowable deviation) items in general projects shall reach 80%, and the maximum deviation value of the over-difference point shall be within 1.5 times the allowable deviation value: 3 The on-site acceptance and re-inspection of the main engineering materials shall be qualified, and the test blocks and test pieces shall be qualified: 4 The quality assurance materials of the main engineering materials and the relevant test and inspection materials are complete and correct: There are complete construction operation basis and quality inspection records.
3.2.4 The acceptance of the quality of the sub-project shall meet the following requirements: 1 The quality acceptance of the acceptance batch contained in the sub-project is all qualified: 2 The quality acceptance records of the acceptance batch contained in the sub-project should be complete and correct: The relevant quality assurance materials and test and inspection materials should be complete and correct.
3.2.5 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects included in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete;
In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspections and spot checks on the external anti-corrosion layer of metal pipes, steel pipe cathodic protection system, pipeline equipment operation, pipeline location and elevation, as well as pipeline use function tests shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer62 The division of unit (sub-unit) engineering, division (sub-division) engineering, sub-project and acceptance batch can be determined before the construction of the project according to Appendix A of this specification, and the filling of quality acceptance records shall be filled in according to Appendix B of this specification. 3.2.3 The acceptance of the quality of the acceptance batch shall meet the following requirements: 1 The quality of the main control project shall be qualified after sampling inspection: 2 The qualified rate of sampling inspection of the measured (allowable deviation) items in general projects shall reach 80%, and the maximum deviation value of the over-difference point shall be within 1.5 times the allowable deviation value: 3 The on-site acceptance and re-inspection of the main engineering materials shall be qualified, and the test blocks and test pieces shall be qualified: 4 The quality assurance materials of the main engineering materials and the relevant test and inspection materials are complete and correct: There are complete construction operation basis and quality inspection records.
3.2.4 The acceptance of the quality of the sub-project shall meet the following requirements: 1 The quality acceptance of the acceptance batch contained in the sub-project is all qualified: 2 The quality acceptance records of the acceptance batch contained in the sub-project should be complete and correct: The relevant quality assurance materials and test and inspection materials should be complete and correct.
3.2.5 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects included in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete;
In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspections and spot checks on the external anti-corrosion layer of metal pipes, steel pipe cathodic protection system, pipeline equipment operation, pipeline location and elevation, as well as pipeline use function tests shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer6