title>SY 4030.1-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Electrical Engineering (Overhead Power Line Engineering) - SY 4030.1-1993 - Chinese standardNet - bzxz.net
Home > SY > SY 4030.1-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Electrical Engineering (Overhead Power Line Engineering)
SY 4030.1-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Electrical Engineering (Overhead Power Line Engineering)
Basic Information
Standard ID:
SY 4030.1-1993
Standard Name: Petroleum Construction Engineering Quality Inspection and Assessment Standard Electrical Engineering (Overhead Power Line Engineering)
This standard applies to the quality inspection and assessment of new overhead power line projects of 220kV and below in the construction of oil, gas fields and long-distance pipeline projects. SY 4030.1-1993 Petroleum Construction Project Quality Inspection and Assessment Standard Electrical Engineering (Overhead Power Line Project) SY4030.1-1993 Standard Download Decompression Password: www.bzxz.net
Some standard content:
Standard for Petroleum Construction EngineeringElectrical Engineering (Overhead Power Lines Engineering)SY4030.1--93 Editor: China National Petroleum Corporation Infrastructure Engineering BureauApproving department: Ministry of Energy of the People's Republic of ChinaEffective date: March 1, 1984 Petroleum Industry Press 1993·Beijing Earthwork engineering Cast-in-place foundation engineering Assembled prefabricated foundation engineering Rock foundation engineering Tower support engineering Wire installation engineering Wire erection engineering| |tt||Accessory installation project 10Pole electrical equipment installation project 11Household line installation project 12Grounding project Appendix A Appendix B List of inspection instruments. Overhead power line project quality assurance data··Terms used in this standard Additional explanation 1 General 1.0.1This standard applies to the quality inspection and assessment of 220kV and below newly built overhead power line projects in the construction of oil, gas fields and long-distance pipeline projects. 1.02The division of overhead power line project unit (division) engineering and sub-projects shall comply with the provisions of SY4024-93 "Petroleum Construction Project Quality Inspection and Assessment Standards". The names of overhead power line unit (division) engineering and sub-projects shall comply with the provisions of Table 1.0,2. Names of unit (division) projects and sub-projects of overhead power lines Table 1,0,2 Name of unit (sub-project) project Guokong power line Earthwork engineering Sub-project name Cast-in-place foundation engineering Assembled foundation engineering Rock foundation engineering Pole and tower engineering Wire installation engineering Conductor installation engineering Attached installation engineering Pole electrical equipment installation engineering User line installation engineering Grounding engineering 1.0.3 While implementing this standard, the provisions of "SY4024-93 General Rules for Quality Inspection and Assessment of Petroleum Construction Projects" should also be observed. 1.0.4 The main indicators and requirements of this standard are proposed based on the following standards and specifications: GBJ233-90 "110~500kV overhead power line construction and acceptance specifications GB50173-9 "Electrical installation engineering 35KV and below overhead power line construction and acceptance specifications". 1.0.5 The inspection tools and instruments used in the project quality inspection and evaluation should be within the validity period of metrological verification, and the names and specifications of the main tools and instruments should comply with the provisions of Appendix A of this standard. 1.0.6 The names of the quality assurance materials for overhead power line projects should comply with the provisions of Appendix B of this standard. Earthwork engineering Guarantee items 2.1.1 Before the construction of earthwork engineering, the construction base must be measured according to the design disclosure. Inspection method Check the construction measurement records according to the design drawings. 2.2 Basic items 2.2.1 The quality requirements and specified scores of the tower foundation pit shall comply with the provisions of Table 2,21. The quality requirements and specified scores of the tower foundation pit The depth of the overhead power line tower foundation pit of 110k or more exceeds Quality requirements Specified scores The bottom of the pit should be leveled +100m, and should be treated according to the provisions of the specification The depth of the foundation pit of the same tower should bebZxz.net Inspection quantity Spot check 20%, but not less than 5 places, which should include the foundation pits of terminal, tension and corner towers. Inspection method Inspection record or observation inspection. 2.2.2 The quality requirements and specified scores of rock foundation pit excavation shall comply with the provisions of Table 2.2.2. Quality requirements Specified scores Quality requirements and specified scores for rock foundation pit excavation The pit depth should not be less than the design depth The hole drilled for lack of solid foundation The designed taper should be maintained The stone powder, floating soil and loose rocks on the pit wall should be removed The rock foundation pit excavation should not destroy the integrity of the structure Spot check 20%, but not more than 5 places, which should include the terminal, the main tension and the corner tower foundation pit. Inspection party Hao observation inspection or inspection of hidden engineering records. 2.2.3 The quality requirements and specified scores for foundation pit backfilling should comply with the provisions of Table 2.2.3. Quality requirements and specified scores for foundation pit backfilling. The quality requirements for each backfill of the soil pit are specified scores, and weeds and ice and snow must not fall into it. Inspection quantity. Inspection method. Stone pit backfilling is to mix stone and soil in a ratio of 3:1 and then backfill in layers. 20% of the pumping is required. The water pit should be drained first, backfilled to soil, and the hidden engineering records or observations should be checked in layers. 2.3 Allowable value difference items Measures should be taken to reinforce the foundation pit that is not suitable for compaction. 2.1 The quality indicators of the allowable deviation items of earthwork engineering, their inspection quantity, inspection methods and specified scores should comply with the provisions of Table 2.3.1. Pre- Quality indicators of earthwork engineering allowable deviation items and their inspection quantity inspection methods and specified scores Pole tower foundation pit depth Wire wire foundation pit depth Pole tower foundation pit root opening Pole tower and wire 35kV and below Anti-sinking platform height Allowable deviation (mm) +Uncontrolled 10k and above Anti-sinking trench anti-sinking combined height (m) Anti-sinking platform upper area Specified value Inspection quantity inspection method specified score Sweet inspection 10 feet measurement inspection [100~300 School pit 24 Earthwork sub-item engineering quality inspection and evaluation table 2.4.1 The quality inspection and evaluation table for earthwork sub-item engineering shall conform to the unified format of Table 2, 4, and 1. 5 Guarantee item Item actual situation Item uniform situation Sub-item location Foundation pit Stone foundation pit excavation Return period Foundation pit return area Accurate number Inspection result Approval grade Evaluation chain 3 Cast-in-place foundation engineering 31 Guarantee item 3, 11 The varieties and specifications of raw materials such as steel and cement used for cast-in-place foundation must meet the design requirements, and they should be accompanied by product factory quality certificates or test reports. Inspection method Check the factory quality certificate or test report of raw materials. 3.1.2 It is strictly forbidden to add chloride salts to foundation concrete. Inspection method Check the construction record of concrete foundation. 3.13 The strength of the foundation built on site must meet the design requirements. Inspection method Check the test record of concrete strength test blocks, and use rebound hammer to conduct random inspection at 30% when necessary. 32 Basic items 3.2.1 The quality requirements for the maintenance and surface of the foundation cast on site and the number of inspections, inspection methods, and specified scores shall comply with the provisions of Table 3, 2, 1. The quality requirements of the curing and surface of the cast-in-place foundation and its inspection quantity, inspection method, and specified score The quality requirements of the curing and test block preparation of the foundation Inspection quantity Inspection method Specified score The work should comply with the specifications The surface should be flat and without obvious Spot check 30% Inspection construction records Observation and inspection The foundation strength when removing the formwork should not be less than 2.5MP8, and should not damage foundation surface and edges Inspection of construction records and observation inspection 3,2.2 The quality requirements of anchor bolts and embedded parts, their inspection quantity, inspection methods and specified scores shall comply with the provisions of Table 3.2.2. The quality requirements of anchor bolts and embedded parts, their inspection quantity, inspection methods and specified scores Quality requirements The installation should be firm and correct, without any leakage. Inspection quantity Inspection method Check by hand Specified score The bolts should be perpendicular to the foundation surface Spot check 3 required On-site inspection 3,3 Allowed adjustment items The bolt thread should be intact The quality indicators of the allowable deviation of the cast-in-place foundation project, their inspection quantity, inspection methods and specified scores shall comply with the provisions of Table 3,3,1. Quality indicators of permissible deviation items of cast-in-place foundation engineering and their inspection quantity, inspection methods and regulations Tower foundation Leg size Protective layer thickness (m) Vertical and pedestal section size Displacement of center of high-mounted anchor bolt from center of vertical axis (mm) Sectional size Gusset foundation Displacement of center of guy ring from designed position Displacement of center of guy ring from designed position in front and back direction of guy ring (the distance between the agreed point of center of guy ring)| |tt||Allowable deviation inspection number plate inspection method specified score 15 一一8 Random inspection 3% [but not less than Measurement inspection Horizontal line direction Anchor bolt inspection type Main steel trace Along the cutting direction Foundation root opening and diagonal Line size Straight line (m blood) Corner (mm) Corner (Ⅱ blood) Anchor bolt type Main steel insertion type Relative height difference between foundation items or main steel flat marks (m)||t t||Torsion of foundation () Horizontal displacement between the center of foundation and the center pile (mm) Dimensions of foundation root opening and diagonal Elevation difference between the top surface of foundation or the main steel level (mm) Torsion of foundation () Continued Table 3.3.1 Allowable deviation Inspection quantity Inspection method Specified score 30 ±2 Full inspection Measurement inspection Note: (①Horizontal direction of corner tower foundation refers to the direction of the internal angle bisector: Along the line direction refers to the direction of the angle bisector: ② Foundation The foundation root opening and diagonal line refer to the horizontal distance between the centers of the same group of anchor bolts or the main steel lines of the tower legs: ③Relative height difference should not refer to the relative height difference after plastering. When the corner tower and terminal tower are pre-compiled, the relative height difference of the top surface of the foundation is not limited to 5mm, ①The elevation difference of the pre-compiled foundation surface refers to the ratio with the design elevation; ②Commercial towers refer to the large span design, and the tower height is more than 8 blood: ③L is the horizontal distance from the center of the guy ring to the center of the pole tower. 3.4 Quality inspection and evaluation table of cast-in-place foundation sub-project 3.4.1 The quality inspection and evaluation table of cast-in-place foundation sub-project should comply with the unified format of Table 3.41. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.