Basic Information

Standard ID: GB 50268-2008

Standard Name:Code for construction and acceptance of water and sewerage pipeline works

Chinese Name: 给水排水管道工程施工及验收规范

Standard category:National Standard (GB)

state:in force

Date of Release2008-10-15

Date of Implementation:2009-05-01

standard classification number

Standard ICS number:Building materials and buildings>>Fixtures in buildings>>91.140.01Fixtures in buildings, general

Standard Classification Number:Engineering Construction>>Water Supply and Drainage Engineering>>P40 Water Supply and Drainage Engineering Comprehensive

associated standards

alternative situation:Replace GB 50268-97; CJJ 3-90; From the date of implementation of GB 55026-2022 "Urban Water Supply Project Specification", the relevant mandatory provisions of this standard, Articles 1.0.3, 3.1.9, 3.1.15, 3.2.8, 9.1.10, and 9.1.11 will be abolished at the same time.

Publication information

publishing house:China Architecture & Building Press

Publication date:2009-05-01

other information

Drafting unit:Beijing Municipal Construction Group Co., Ltd.

Focal point unit:Ministry of Housing and Urban-Rural Development of the People's Republic of China

Proposing unit:Ministry of Housing and Urban-Rural Development of the People's Republic of China

Publishing department:Ministry of Housing and Urban-Rural Development of the People's Republic of China

Introduction to standards:

The main contents of this specification are: general principles, terminology, basic regulations, earthwork and foundation treatment, main structure of pipelines in slot construction, main structure of pipelines in non-slot construction, main structure of immersed tubes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendices.
The main contents of this specification are: general principles, terminology, basic regulations, earthwork and foundation treatment, main structure of pipelines in slot construction, main structure of pipelines in non-slot construction, main structure of immersed tubes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendices.
This specification was approved and issued by the Ministry of Housing and Urban-Rural Development in Announcement No. 132 and will be implemented from May 1, 2009. "The original "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" GB 50268-97 and "Standard for Quality Inspection and Assessment of Municipal Drainage Pipeline Engineering" CJJ 3-90 are hereby repealed.

1 General Principles;
2 Terminology;
3 Basic Provisions;
4 Earthwork and Foundation Treatment;
5 Main Pipeline Structure by Grooving;
6 Main Pipeline Structure by Non-grooving;
7 Main Structure of Immersed Pipe and Bridge Pipe Construction;
8 Ancillary Pipeline Structures;
9 Pipeline Functional Test.
Appendix A Water Supply and Drainage Pipeline Engineering;
Appendix B Division of Items, Divisions and Unit Projects;
Appendix C Water Injection Test;
Appendix D Water Confinement Test;
Appendix E Air-tight method test;
Appendix F Measurement and evaluation method for water seepage in non-pressure pipes of concrete structures;
Appendix G Evaluation method for appearance quality defects of reinforced concrete structures;
Appendix H Polyurethane (PU) coating.
Explanation of terms used in this specification.
Appendix: Explanation of clauses.
The main contents specified in this specification include: general provisions, terminology, basic provisions, earthwork and foundation treatment, main structure of pipelines in slotted construction, main structure of pipelines in non-slotted construction, main structure of pipelines in immersed pipes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendixes.
The main contents specified in this specification include: general provisions, terminology, basic provisions, earthwork and foundation treatment, main structure of pipelines in slotted construction, main structure of pipelines in non-slotted construction, main structure of pipelines in immersed pipes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendixes.
This specification is approved and issued by the Ministry of Housing and Urban-Rural Development in Announcement No. 132 and will be implemented from May 1, 2009. "The original "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" GB 50268-97 and "Standard for Quality Inspection and Assessment of Municipal Drainage Pipeline Engineering" CJJ 3-90 are abolished at the same time.

1 General principles;
2 Terms;
3 Basic regulations;
4 Earthwork and foundation treatment;
5 Main structure of pipelines constructed by trenching;
6 Main structure of pipelines constructed without trenching;
7 Main structure of immersed pipes and bridge pipes;
8 Pipeline ancillary structures;
9 Pipeline functional test.
Appendix A Water supply and drainage pipeline engineering;
Appendix B Division of sub-items, sub-divisions and unit projects;
Appendix C Water injection test;
Appendix D Water-tightness test;
Appendix E Air-tightness test;
Appendix F Measurement and evaluation method of water seepage in non-pressure pipes of concrete structures;
Appendix G Evaluation method of appearance quality defects of reinforced concrete structures;
Appendix H Polyurethane (PU) coating.
Explanation of terms used in this specification.
Appendix: Explanation of clauses.

Some standard content:

National Standard of the People's Republic of China
GB50268-2008
Code for construction and acceptance ofwater and sewerage pipeline worksPromulgated on October 15, 2008
Implementation on May 1, 2009
Jointly issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China and the State Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
No. 132
Announcement on the Issuance of the National Standard "Code for Construction and Acceptance of Water and Sewerage Pipeline Works"
The "Code for Construction and Acceptance of Water and Sewerage Pipeline Works" is now approved as a national standard, numbered GB50268-2008, and will be implemented on May 1, 2009. Among them, Articles 1.0.3, 3.1.9, 3.1.15, 3.2.8, 9.1.10 and 9.1.11 are mandatory provisions and must be strictly enforced. The original "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" GB50268-97 and "Standard for Quality Inspection and Assessment of Municipal Drainage Pipeline Engineering" CJJ3-90 are abolished at the same time.
This code is published and distributed by China Building Industry Press organized by the Standard and Quota Research Institute of our Ministry.
Ministry of Housing and Urban-Rural Development of the People's Republic of China October 15, 2008
This code is revised by Beijing Municipal Construction Group Co., Ltd. and relevant units in accordance with the requirements of the Ministry of Construction's "Notice on Issuing the "2004 National Standard Formulation and Revision Plan for Engineering Construction" (Jianbiao (2004) No. 67). During the revision process, the drafting team conducted in-depth investigations and research and special seminars, summarized the practical experience of water supply and drainage pipeline construction and quality acceptance in various parts of my country, adhered to the guiding principles of "separation of inspection and evaluation, strengthening acceptance, improving means, and process control", referred to relevant domestic and foreign specifications, and widely solicited opinions from relevant units in various forms, and finally finalized after review. The main contents of this specification are: general principles, terminology, basic regulations, earthwork and foundation treatment, main structure of pipelines with fine construction, main structure of pipelines without groove construction, main structure of immersed pipes and bridge pipes, pipeline ancillary structures, pipeline functional tests and appendices.
The provisions marked in bold in this specification are mandatory and must be strictly enforced. The Ministry of Housing and Urban-Rural Development is responsible for the management and interpretation of mandatory provisions of this specification, and Beijing Municipal Construction Group Co., Ltd. is responsible for the interpretation of specific technical contents. In order to improve the quality of the specification, each unit should pay attention to summarizing experience and accumulating data in the process of implementing this specification, and send any problems and opinions found to Beijing Municipal Construction Group Co., Ltd. (address: No. 6 Sanhuqiao Road, Haidian District, Beijing, zip code: 100044; E-mail: [email protected]) at any time for reference in future revisions. The editor, participating units and main drafters of this specification Editor: Beijing Municipal Construction Group Co., Ltd. Participating units: Public Utilities Branch of Shanghai Construction Engineering Quality Supervision Station Beijing Urban Drainage Group Co., Ltd. Tianjin Municipal Highway Administration
Beijing Water Supply Design Company
Tianjin Water Supply Group Co., Ltd.
Beijing Municipal Engineering Management Office
Beijing Municipal Fourth Construction Engineering Co., Ltd. Shanghai Municipal Second Municipal Engineering Co., Ltd. Beijing Institute of Architecture and Civil Engineering
Guangdong University of Technology
Chongqing University
Xi'an Municipal Design and Research Institute
Wuhan Water Affairs Bureau
Wuhan Water Supply and Drainage Engineering Design Co., Ltd. Xinxing Casting Pipe Co., Ltd.
Main drafters: Jiao Yongda Su Yaojun Yang
Li Qiang Zheng Jinyu
Wang Hongchen
Wang Heping Cai
Yuan Guanjie| |tt||Wang Jinliang
Cao Honglin, Li Junqi, Yue Xiuping
Cheng Ge Jinke, Sun Lianyuan, Li Shaohai
Liu Yanlin
You Qingcheng
Basic regulations.
Basic regulations for construction,
Basic regulations for quality acceptance,
Earthwork and foundation treatment,
General regulations,
Construction drainage
Trench excavation and support..
Foundation treatment.
Trench backfilling
Quality acceptance standards
Construction of pipeline main structure by grooving.
5.1 General provisions.
Pipeline foundation
Steel pipe installation
Corrosion protection inside and outside the steel pipe.
Installation of ductile iron pipe
Installation of reinforced concrete pipe and prestressed (self-) concrete pipe Installation of prestressed steel cylinder concrete pipe
Fiberglass pipe installation
Installation of rigid polyvinyl chloride, polyethylene pipe and its composite pipe.Quality acceptance standards
Construction of pipeline main structure without grooving.
General provisions
Working well,
Shallow buried and dark excavation
6.6 Directional drilling and ramming pipe
Quality acceptance standards
Construction of main structure of immersed pipe and bridge pipe.
General provisions|| tt||7.3 Bridge pipe
7.4 Quality acceptance standard,
8 Pipeline auxiliary structures.
General provisions,
Rainwater inlet
Quality acceptance standard
Pipeline functional test,
General provisions
Water pressure test of pressure pipeline,
Water-tight test of non-pressure pipeline.
9.4 Air-tight test of non-pressure pipeline||t t||9.5 Flushing and disinfection of water supply pipes
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Division of sub-items, sections and unit projects of water supply and drainage pipeline projects, and quality acceptance records of sub-items, sections and unit projects. Water injection method test
Closed water method test. ·
Air-tight method test
Measurement and evaluation method of water seepage in non-pressure pipes of concrete structures Evaluation method of defects in the appearance quality of reinforced concrete structures Polyurethane (PU) coating
Terms used in this specification
Appendix: Explanation of clauses,
1 General
1.0.1 This specification is formulated to strengthen the construction management of water supply and drainage (hereinafter referred to as water supply and drainage) pipeline projects, standardize construction technology, unify construction quality inspection and acceptance standards, and ensure project quality. 1.0.2 This specification is applicable to the construction and acceptance of outdoor water supply and drainage pipeline projects for newly built, expanded and renovated urban public facilities and industrial enterprises; it is not applicable to the construction and acceptance of water supply and drainage pipelines with special requirements in industrial enterprises. 1.0.3 The varieties, specifications and performance of raw materials, semi-finished products, finished products and other products used in water supply and drainage pipeline projects must comply with the provisions and design requirements of relevant national standards; products that come into contact with drinking water must meet relevant hygiene requirements. It is strictly prohibited to use products that have been explicitly eliminated or banned by the state.
1.0.4 The construction and acceptance of water supply and drainage pipeline projects shall comply with the provisions of relevant national standards in addition to the provisions of this specification.
2.0.1 Pressure pipeline pressurepipeline 2 Terms www.bzxz.net
This specification refers to water supply and drainage pipelines with a working pressure of 0.1MPa or above. 2.0.2 Nonpressure pipeline nonpressure pipeline This specification refers to water supply and drainage pipelines with a working pressure of less than 0.1MPa. 2.0.3 Rigid pipeline rigidpipeline
Pipes that mainly rely on the strength of the pipe body material to support external forces have little deformation under external loads, and the failure of the pipeline is due to the control of the strength of the pipe wall. This specification refers to reinforced concrete, prestressed (self-)stressed concrete pipes and prestressed steel cylinder concrete pipes. 2.0.4 Flexible pipeline flexiblepipeline Pipes that deform significantly under external loads. Most of the vertical loads are balanced by the elastic resistance generated by the soil on both sides of the pipe. The failure of the pipeline is usually caused by deformation rather than damage to the pipe wall. This specification mainly refers to steel pipes, chemical building material pipes and ductile iron pipes with flexible joints.
2.0.5 Rigid joints of pipelines Pipeline joints that cannot withstand a certain amount of axial displacement and relative angular displacement, such as pipe joints sealed with cement materials or connected with flanges.
2.0.6 Flexible joints of pipelines Pipeline joints that can withstand a certain amount of axial displacement and relative angular displacement, such as pipe joints sealed with rubber rings and other materials. 2.0.7 Chemical material pipes chemical material pipes This specification refers to the general term for glass fiber pipes or glass fiber reinforced thermosetting plastic pipes (referred to as FRP pipes), rigid polyvinyl chloride pipes (UPVC), polyethylene pipes (PE), polypropylene pipes (PP) and steel-plastic composite pipes. 2.0.8 Canal, ditch, channel refers to rectangular, arched and other special (non-circular) cross-section water delivery channels built with bricks, stones, concrete blocks, cast on-site with reinforced concrete or assembled with prefabricated reinforced concrete components. 2.0.9 Trench installation A construction method of excavating a trench from the surface and laying pipes (channels) in the trench. 2.0.10 Trenchless installation A construction method of laying or pouring pipes (channels) in a hole excavated under the ground along the pipeline, including jacking method, shield method, shallow buried dark excavation method, directional drilling method, ramming pipe method, etc. 2.o.11 Pipeline cross processing refers to the necessary construction treatment to ensure the safety of construction and the operation of existing pipelines when the construction pipeline intersects or is close to the existing pipeline.
2.0.12 Pipe jacking method Pipe jacking method A non-grooving construction method for underground pipelines that uses a jacking device to push prefabricated pipe sections into the soil. 2.0.13 Shield method Shield method
A non-grooving construction method that uses a shield machine to dig in the stratum while assembling prefabricated pipe segments or cast-in-place concrete to construct underground pipelines 2.0.14 Shallow under cutting method Shallow under cutting method A non-grooving construction method that uses the short-term self-stabilizing ability of the soil layer during the excavation process and takes appropriate support measures to form a close-fitting thin-walled support structure on the surface of the surrounding rock or soil layer. 2
5 Directional drilling method directional drilling method 2.0.15
Use a horizontal drilling machine to drill a small-diameter guide hole, then use a back-expanding drill bit to expand the borehole, and at the same time pull the pipeline into the hole.
6 Pipe tamping method pipe tamping method
Use a pipe tamping hammer (pneumatic tamping hammer) to tamp the steel pipe into the stratum. The construction method of underground pipelines without grooving 2.0.17 Sunken pipeline method; immersed pipeline method The method of laying underwater pipelines by sinking the pipelines or reinforced concrete sealed pipe sections assembled into a certain length into the bottom of the water or in the trench excavated under the water. It is also called the burying method and the prefabricated pipe section burying method. B Bridging pipeline method bridging pipeline method 2.0.18
A pipeline laying method dedicated to crossing natural or artificial obstacles such as rivers, lakes, seas, railways, roads, valleys, etc. in the form of bridges. 9 Working shaft
When constructing with non-grooving construction methods such as jacking pipe, shield, shallow buried dark excavation, etc., the auxiliary passageway excavated vertically from the ground to the bottom of the pipeline is also called working pit, shaft, etc.
leaktest
2.0.20 Pipeline tightness test
A general term for tests that use liquid or gas to check the leakage of laid pipelines. 2.0.21 Water pressure test for pipeline: Using water as the medium, the laid pressure pipeline is pressurized after being filled with water to check whether the pipeline has structural damage at the specified pressure value and whether it meets the specified allowable water seepage (or allowable pressure drop) standards. 2.0.22 Non-pressure pipeline closed water test
water obturation test for pipeline: Using water as the medium, a tightness test is performed on the laid gravity flow pipeline (channel). 3Pneumatic pressure test for pipeline2.0.23
A tightness test of the laid pipeline using gas as the medium. 3
3Basic provisions
Basic construction provisions
3.1.1Construction units engaged in water supply and drainage pipeline projects should have corresponding construction qualifications, and construction personnel should have corresponding qualifications. The construction and quality management of water supply and drainage pipeline projects should have corresponding construction technical standards. 3.1.2Construction units should establish and improve construction technology, quality, production safety and other management systems, formulate various construction management regulations, and implement them.
3.1.3Construction units should organize relevant construction technical management personnel to conduct in-depth investigations along the line in accordance with the contract documents, design documents and relevant specifications and standards, and according to the construction unit's underground pipelines and other structural (construction) data and engineering hydrogeological data within the construction boundary, to understand and grasp the actual situation on site and make good preparations for construction. 3.1.4Construction units should be familiar with and review construction drawings, and grasp the design intent and requirements. Implement the self-examination, joint review (briefing) and visa system; when questions or errors are found in the construction drawings, opinions and suggestions should be put forward in a timely manner: if the design needs to be changed, it should be submitted for review in accordance with the corresponding procedures, and implemented after being approved by the relevant units. 3.1.5 The construction unit should prepare a construction organization design before starting construction, and prepare special construction plans for key sub-items and sub-projects. The construction organization design and special construction plan must be approved and implemented according to the prescribed procedures, and the change approval must be handled when there is a change. 3.1.6 Temporary construction facilities should be reasonably set up according to the characteristics of the project, and there should be an overall layout plan. For projects that should not be interrupted, there should be backup power and equipment.
3.1.7 Construction measurement should be carried out under the review system of the construction unit and the re-measurement system of the supervision unit, and relevant records should be filled in and comply with the following provisions: Before construction, the construction unit should organize relevant units to hand over piles on site, and the construction unit should re-check and measure the handed-over piles: When the original measurement piles are lost or displaced, they should be promptly supplemented with piles for correction, and should be identified by the corresponding technical quality management departments and personnel: 2 The setting of temporary leveling points and pipeline axis control piles should be easy to observe, not easily disturbed and must be firm, and protective measures should be taken; the number of temporary leveling points along the line for trenching and laying pipelines should not be less than 1 for every 200m; 3 Temporary Temporary leveling points, pipeline axis control piles and elevation piles must be reviewed before use, and should be checked frequently: 4 Temporary leveling points and pipeline axis control piles for pipelines, immersed pipes, bridge pipes and other projects without trenching should be set according to the construction plan and checked in time;
5 The plane position and elevation of the connection between existing pipelines, structures (buildings) and the proposed project must be calibrated before construction begins. 3.1.8 The allowable deviation of construction measurement shall comply with the provisions of Table 3.1.8 and shall meet the relevant provisions of the current national standards "Engineering Survey Code" GB50026 and "Urban Survey Code" CJJ8: Special provisions shall also be observed for pipelines with specific requirements. Table 3.1.8
Leveling elevation closure error
Traverse measurement azimuth closure error
Traverse measurement relative closure error
Construction measurement allowable deviation
Allowable deviation
±20V (mm)
±6n (mm)
40 ()
Troughing pipeline construction
Other methods of pipeline construction
Difference between two direct distance measurements
Note: 1L is the length of the leveling closed line (km); 2n is the number of measuring stations for leveling or traverse measurement, 4
1/1000
1/3000
1/5000
3.1.9 The pipes, pipeline accessories, components (accessories) and main raw materials used in the project must be inspected upon entry into the construction site and must be well kept. During the on-site acceptance, the ordering contract, quality certificate, performance test report, instruction manual, commodity inspection report and certificates of imported products of each batch of products shall be checked, and re-inspected according to relevant national standards. They can only be used after passing the acceptance. 3.1.10 The engineering materials such as concrete, mortar, anti-corrosion and waterproof coatings prepared on site shall be used after passing the inspection. 3.1.11 During the transportation, storage and construction process of the pipe joints, semi-finished products, components (accessories), etc., effective measures must be taken to prevent them from being damaged, rusted or deteriorated.
3.1.12 The construction unit must abide by the laws and regulations of the state and local governments on environmental protection, and take effective measures to control the pollution and harm to the environment caused by various dust, exhaust gas, waste, noise, vibration, etc. on the construction site. 3.1.13 The construction unit must obtain a safety production license, and shall abide by the laws and regulations on construction safety, labor protection, fire prevention, and poison prevention, establish a safety management system and a safety production responsibility system to ensure safe construction. For special operations such as construction without trenching, pipelines crossing rivers or deep foundation trenches, special construction plans should be formulated. 3.1.14 The measuring instruments and testing equipment used in quality inspection and acceptance must be qualified after metrological verification and calibration before use. The unit responsible for material and equipment testing should have the corresponding qualifications. 3.1.15 The following provisions shall be met in the quality control of water supply and drainage pipeline construction 1 Each sub-project shall be subject to quality control in accordance with the construction technical standards, and each sub-project must be inspected after completion; 2 Handover inspection must be carried out between related sub-projects, and all concealed sub-projects must be subject to concealed acceptance. The next sub-project shall not be carried out without inspection or acceptance failure 3.1.16 Before installing pipeline ancillary equipment, the location, elevation, and size of the relevant equipment foundation, pre-processed parts, and reserved holes shall be reviewed. 3.1.17 The construction unit shall control the quality of the project construction throughout the entire process in accordance with the corresponding construction technical standards, and the construction unit, survey unit, design unit, supervision unit and other parties shall manage the quality of the project in accordance with relevant regulations. 8 The project shall be put into use only after passing the final acceptance. 3.1.18
3.2 Basic provisions for quality acceptance
3.2.1 The quality acceptance of water supply and drainage pipeline construction shall be carried out on the basis of the self-inspection of the construction unit, in the order of acceptance batch, sub-project, section (sub-section) project, unit (sub-unit) project, and shall comply with the following provisions: 1 The quality of project construction shall comply with the provisions of this specification and relevant professional acceptance specifications; 2 The quality of project construction shall comply with the requirements of engineering survey and design documents; 3 All parties involved in the quality acceptance of project construction shall have corresponding qualifications; 4 The quality acceptance of project construction shall be based on the self-inspection and qualified evaluation of the construction unit. The construction unit shall notify the supervision unit and other units to conduct acceptance before concealment of concealed works, and form acceptance documents: 5
6 Test blocks, test pieces and on-site inspection items involving structural safety and use functions shall be subject to parallel inspection or witness sampling inspection as required;
The quality of the acceptance batch shall be inspected according to the main control items and general items; The number of inspections for each inspection item shall be fully inspected unless otherwise specified in the relevant 7
clauses of this specification; 8 Tests or inspections shall be conducted on sub-projects involving structural safety and use functions; 9 The unit responsible for the inspection shall have the corresponding qualifications; 10 The appearance quality shall be jointly confirmed by the quality acceptance personnel through on-site inspection. 3.2.2 The division of unit (sub-unit) engineering, sub-section (sub-sub-section) engineering, sub-project and acceptance batch can be determined before the construction of the project according to Appendix A of this specification, and the filling of quality acceptance records shall be filled in according to Appendix B of this specification. 3.2.3 The quality acceptance of the acceptance batch shall meet the following requirements: 1 The quality of the main control project shall be qualified after sampling inspection: 2 The qualified rate of sampling inspection of the measured (allowable deviation) items in general projects shall reach 80%, and the maximum deviation value of the over-difference point shall be within 1.5 times the allowable deviation value: 3 The on-site acceptance and re-inspection of the main engineering materials shall be qualified, and the test blocks and test pieces shall be qualified: 4 The quality assurance data of the main engineering materials and the relevant test and inspection data are complete and correct: There are complete construction operation basis and quality inspection records.
3.2.4 The quality acceptance of the sub-project shall meet the following requirements: 1 The quality acceptance of the acceptance batch contained in the sub-project is all qualified: 2 The quality acceptance records of the acceptance batch contained in the sub-project should be complete and correct: The relevant quality assurance data and test and inspection data should be complete and correct.
3.2.5 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects included in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete;
In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspections and spot checks on the external anti-corrosion layer of metal pipes, steel pipe cathodic protection system, pipeline equipment operation, pipeline location and elevation, as well as pipeline use function tests shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer65 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects contained in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete; In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspections and spot checks on the external anti-corrosion layer of metal pipes, steel pipe cathodic protection system, pipeline equipment operation, pipeline location and elevation, as well as pipeline use function tests shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer65 The quality acceptance of the section (sub-section) project shall comply with the following provisions: 1 The quality acceptance of all sub-projects contained in the section (sub-section) project shall be qualified; 2 The quality control data shall be complete; In the section (sub-section) project, the inspection and sampling test results of foundation treatment, pile foundation testing, concrete strength, concrete impermeability, pipeline interface 3
connection, pipeline location and elevation, metal pipeline anti-corrosion layer, water pressure test, pipeline equipment installation and commissioning, cathodic protection installation test, backfill compaction, etc. shall comply with the relevant provisions of this specification; 4 The appearance quality acceptance shall meet the requirements.
3.2.6 The quality acceptance of unit (sub-unit) projects shall comply with the following provisions: 1
The quality acceptance of all qualified quality control documents of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete;
The inspection data related to the safety and use function of the divisions (sub-divisions) included in the unit (sub-unit) project shall be complete: the test inspection and random inspection results of the external anti-corrosion layer of the metal pipeline, the steel pipe cathodic protection system, the operation of pipeline equipment, the pipeline position and elevation, and the pipeline use function test shall comply with the provisions of this specification; 5 The appearance quality acceptance shall meet the requirements.
When the quality acceptance of water supply and drainage pipeline projects fails: it should be handled in accordance with the following provisions: 3.2.7
The acceptance batches that have been reworked or replaced with pipe joints, pipe fittings, pipeline equipment, etc. should be re-accepted: 1
2 The acceptance batches that can meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications should be accepted; 3 The acceptance batches that cannot meet the design requirements after inspection and appraisal by a testing unit with corresponding qualifications, but can meet the structural safety and functional requirements after verification and approval by the original design unit, can be accepted: 4 The sub-projects, divisions (sub-divisions) of the projects that have been repaired or reinforced, but the external dimensions have been changed but can still meet the structural safety and functional requirements, can be accepted according to the technical processing plan documents and negotiation documents, 3.2.8 The division (sub-division) projects and unit (sub-unit) projects that still cannot meet the structural safety or functional requirements after repair or reinforcement are strictly prohibited from acceptance.
3.2.9 The acceptance batch and sub-projects shall be inspected and accepted by the technical person in charge of the construction project (professional quality inspector) organized by the professional supervision engineer.
The section (sub-section) project shall be inspected and accepted by the person in charge of the construction project quality, etc. organized by the professional supervision engineer6