title>Detail specification for electronic components Gas discharge tube for overvoltage prolection,Type R-250TB (Applicable for certification) - SJ/T 10034-1991 - Chinese standardNet - bzxz.net
Home > SJ > Detail specification for electronic components Gas discharge tube for overvoltage prolection,Type R-250TB (Applicable for certification)
Detail specification for electronic components Gas discharge tube for overvoltage prolection,Type R-250TB (Applicable for certification)

Basic Information

Standard ID: SJ/T 10034-1991

Standard Name:Detail specification for electronic components Gas discharge tube for overvoltage prolection,Type R-250TB (Applicable for certification)

Chinese Name: 电子器件详细规范 R-250TB型过电压保护气体放电管(可供认证用)

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1991-04-08

Date of Implementation:1991-07-01

Date of Expiration:2010-01-20

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ/T 10034-1991 Detailed Specification for Electronic Devices R-250TB Overvoltage Protection Gas Discharge Tube (for certification) SJ/T10034-1991 Standard Download Decompression Password: www.bzxz.net



Some standard content:

Electronic Industry Standard of the People's Republic of China S1/T[0c54--91
Detailed Specification of Electronic Components
R-250TB Overvoltage Protection Gas Discharge Tube (Available for Certification)
1991-04-08 Issued
1991-57 C: Implementation
The Ministry of Machinery and Electronics Industry of the People's Republic of China Issued Electronic Industry Standard of the People's Republic of China Detailed Specification of Electronic Components
R-250TB Overvoltage Protection Gas Discharge Tube Dctall spcclticatlon tor electronic componentsGas discharge tube far nvervolluge This standard is applicable to R-250TF reverse voltage protection gas discharge tube, which is formulated in accordance with GE13065 overvoltage protection gas discharge tube detailed specification, and complies with the requirements of GB9433 overvoltage protection gas discharge tube general specification. It is implemented by China Electronics Components Quality Certification Committee and China Electronics Technology Standardization Institute. Ministry of Machinery and Electronics Industry of the People's Republic of China 199·34 Product Approval 1991-07-D1 Implementation
Ministry of Machinery and Electronics Industry of the People's Republic of China and Ministry of Quality Assessment of 9133-9
General Specification for Gas Discharge Tubes for Overvoltage Protection" S, T10064.-91
Detailed specification: Type 25 overvoltage protection gas discharge tube 1. Design and structure
Electrode quality, 2. External filling material diagram
Sit-end form, no leads: b. With leads. 2 External image
Element lead
b. Abandoned lead
3·Application
S10034-9
Mainly used for local telephone systems and
other electronic receivers
Quality assessment category
5 Characteristics
5.1.7 Safety device. Note
5.1.2 Measurement:! g
5.2 Usage
5.2.1 Length: -- 1i-R5T
5.2.2 Degree: 55 pieces
5.3 Limit
No limit value is required in Table 1.
5. 4 Electrical characteristics
Flow through the mountain
Strike the king
Electrical group
Self-sustaining properties See Table 2.
5, 4, 2
Network absolute interval
Fake interval intermediate
Benefits over-maintaining voltage K
5.5 Durability
Main property test wave
SJ/T 1003491
15Ene:.20mALle
IU:1CPI-,1JUA
6 signs
Test monitoring project
New city training electricity
New city release single middle flow ()
General type of effective electricity reading (long -)
SI/T10034-91
H/2M,1 time
1C/1003ug.300 times
Discharge tube has clear sound, durable following signs: manufacturer's mark or code:
Manufacture, month.
Ordering information
The ordering party should carefully write the following contents on the order form: required product model, specification and lead-out terminal form: b. Detailed specification of terminal number and release date:
Others.
Related documents
9 Structural similarity
19 Safety requirements
:1 Additional information
12 Test and inspection requirements
Setting approval test table 4.
Finalize the forced
Inspection or test
Direct double inspection
Direct bottle shock voltage
Visual question reverse current
Rated alternating current
Education current through the load level
Death room electric customer
Can be sampled
(In recent months, there has been a war)
Out of the state strong
Road to wire)
Determine the heat
Group degree change
Two safe shock city soft electricity
Element (short gland oil)
Formulate the shock core electricity
Two (long)
CEH43
3 in 2-1
9131 in 2,1 music
G0 9434 3.9
00 9493 ±1 3. 6. 9 4
O8913# 56.2 years
G9+33 3. 6-1
9438 8.6.3www.bzxz.net
G 9133 3. C- 11
9133 36.year
Gn 9434 2. 10
SI/T 10034—91
Trial year
0433 3.3
CB 9453 3. 4
1(/a,w-51)
2. SAnc, Ia, compared with 4, times, 5
times each time limit Hamir
153msR=2632R half
slightly, heart compensation
core selection: 13/1000%, electrical peak
micro::OA
235 +5:,,2 10. 5s
pull 0N, 1±19
when 5N, 2 times
40±3 and time temperature female
53%±%.48m
-45,857,30m, words
environmental improvement effect 5 times
10 ~ 5DUH2. 0. 15ul Horizontal and vertical 45m:1, 3/20j1s, peak position of electric shock: 2, bA, electric adjustment: 10, return to the wet state of each drinking time: 16/1000g, peak energy of CB9434 3.1 series electric effect: times, sinking time of each group: iarin maximum unit, gold bullet parts are not attracted to the ground in the appearance of the company. The same as 5.4.1 and 5.4.2 of the company are the same as 3. t.3. 1,5, 3. 2, 5. 3. 3
5.5 record
company + record
magnify 10 squeeze double decay light diffusion
sub-battle no this number
same 4. 1.5.4. 2
same 5,,1,5.1.2 years
time 5.4.3 bearing
rate 0. 0ct/s
same 5, 1. 1,5, 1. 3
5. 3. 1.5. 3. 2. 5, 3. 3
Same as 5.3.1, 5.3.2, 5.33
Quality inspection (mandatory approval) must be in Table 5
DC breakdown voltage
DC breakdown voltage is also shown in the breakdown voltage
Network speed power grid
Mineral potassium
(also used for lead
Parts: L: Check this level,
SI/T 10034—91
Test parts
GB9433 3.3
GB 9433 3.1 GB 5433 3.4 Table 100V/s, 0=51h
GF9434 2.1
039434 2.5
9 9134 3. 1 year
GD 9433 3. 6. 9
AOL qualified bone level,
1000V/
100vde
235±5℃.Soldering, 2±
sex output
minimum maximum unit
marking core is correct and clear metal
parts are not vigilant
within the outline drawing specification
old
same as 5. 4. 1
same as 5.4,2 recording
same as 5. 4. 3 plan
abandoned by the general public,
The kidney area is not large
The consistency test of the quality record (through period) is shown in Table 6
Ao Fen unloading
Test efficiency test
But the symptoms are still
extremely asked
G9433 application
G month 9453
G89433
G9434
Straight through maintenance: 9434 Towel
Partially determined effect:
Telephone
Outlet end strong library
(Applicable to lead
With worry
Temporary impact
(Short ball
Predetermined impact
Battery
GB9433
3.6.13
CB8433 Application
3.6.8
GR9433
3.6.5 Record
B94334
3.6. 11 items
SJ104—91
Test performance
—45±.2F
412℃.Relative temperature
3*+-46
≤150nw.H.260g
R: omitted
Waveform: 10/1
Flow position·FOA
2.5A, 14: Micro Electrical effect: times, time for each light drop 3aia, pulling force: 10N, 10±1s, bending force: 5N8, 30ain, required number of teeth: 1-500H2, 0.15m:* horizontal, each min, micrometer: 8/20k field, GB 9434! Low: 2.ExA,
on434
the law civil has the mark (D) to let the teaching be drum ring test registration, the test county seeks
the minimum and maximum position
same R.4. 1.3. 4. 2 years
same 5. 4. 1,5. 4. 2 records
time 5. 4. 3 items
same 5.4.5 records
same 5. 5. 1. 5. x. , 5. 3. 3
lead to continuous tolerance
same 541 items
thank you D/P
same 5 3.,5. 3. 2. 5. 3. 3
Electrical stimulation times: 16 times, each
defect time, 3l
other shape: 11030, electrical
certification engineer minimum: EDA
300
time required: 3n
2P, test period (F); n: sample size; \: qualified judgment network 5. H. 1, 5. 3. 2. 5. 5. 3 If cumulative need or when the material, design or manufacturing year are changed, the group test should be carried out, 1 12 : 5 1
5 Delayed change of goods
S1/1100349
For discharges that must pass the quality inspection, the warehouse has a value of more than 12 months. Before delivery, the following items must be re-inspected. The requirements are the same as those in Table 5.
Lu Guan inspection:
Direct breakdown voltage
Moving insulation resistance,
Additional instructions:
This standard was drafted by Hangzhou Electronic Fragrance Factory. The main drafters of this standard are: Zhou Cizuo, Hua Liying, 8
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.