title>NY/T 648-2002 Technical specification for quality evaluation of potato harvesters - NY/T 648-2002 - Chinese standardNet - bzxz.net
Home > NY > NY/T 648-2002 Technical specification for quality evaluation of potato harvesters
NY/T 648-2002 Technical specification for quality evaluation of potato harvesters

Basic Information

Standard ID: NY/T 648-2002

Standard Name: Technical specification for quality evaluation of potato harvesters

Chinese Name: 马铃薯收获机质量评价技术规范

Standard category:Agricultural Industry Standards (NY)

state:in force

Date of Release2002-12-30

Date of Implementation:2003-03-01

standard classification number

Standard ICS number:Agriculture>>Agricultural machinery, tools and equipment>>65.060.50 Harvesting equipment

Standard Classification Number:Agriculture & Forestry>>Agricultural & Forestry Machinery & Equipment>>B91 Agricultural Machinery

associated standards

Publication information

publishing house:China Standards Press

ISBN:155066.2-15083

Publication date:2003-02-01

other information

drafter:Zhao Yongtao, Liu Guangming, Wang Xiheng, Chen Zhiwen, etc.

Drafting unit:Heilongjiang Agricultural Machinery Testing and Identification Station, Heilongjiang Bonong Machinery Co., Ltd., etc.

Focal point unit:National Agricultural Machinery Standardization Technical Committee Agricultural Mechanization Technical Committee

Proposing unit:Agricultural Mechanization Administration, Ministry of Agriculture

Publishing department:Ministry of Agriculture of the People's Republic of China

Introduction to standards:

This standard specifies the product quality evaluation indicators, test methods and evaluation rules for potato harvesters. This standard applies to the test and quality inspection of potato harvesters. NY/T 648-2002 Technical Specification for Quality Evaluation of Potato Harvesters NY/T648-2002 Standard download decompression password: www.bzxz.net

Some standard content:

ICS 65.060.50
Agricultural Industry Standard of the People's Republic of China
NY/T 648 2002
Technical specification of quality evaluation for potato harvesters barvesters2002-12-30 Issued
2003-03-01 Implementation
Ministry of Agriculture of the People's Republic of China
This standard was proposed by the Mechanization Management Department of the Ministry of Agriculture, and was managed by the Agricultural Chemicals Subcommittee of the National Agricultural Machinery Standardization Technical Committee: NY/T648
The drafting units of this standard are: Zhaolonghui Agricultural Machinery Type Verification Station, Heilongjiang Bonong Machinery City Co., Ltd., Heilongjiang Danghai Small Agricultural Machinery Factory.
The main drafting persons of this standard are Zhao Qiuyou, Liu Ming, Chen Jianwen, Qingjie, and Jinze Wencai. T
|1 Scope
Technical specification for quality evaluation of maize harvesters This standard specifies the product quality evaluation indicators, test methods and evaluation rules of maize harvesters. This standard is applicable to the test, adjustment and quality inspection of light harvesters. 2 Normative referenced documents
NY/T 6482002
The clauses in the following documents also become the clauses of this standard through reference in this standard. For any product that is produced and expired, all subsequent revisions (excluding internal revisions for correction) or chain versions are not applicable to this standard. However, the service provider who has agreed with this standard may study whether the latest version of the product can be used. For documents without a date, the latest version shall apply to this standard. GB1764-973 Determination of film thickness by cutting method GR195-30 Regulations for shape and position tolerance inspection GB/T2828-1987 Counting sampling order and group table for reverse batch inspection (applicable to continuous batch inspection before changing) GB/T5262-185 General regulations for the determination of test conditions for agricultural machinery GR/T 5667-1935 Agricultural production test method GB 9969.1 1993 GR 10305. 1—200]
GR1396-.1999
General rules for use of agricultural and forestry tractors and machinery
Technical requirements for safety of agricultural and forestry tractors and machinery Part 1: General rules General rules for safety signs and hazard signs for agricultural and forestry tractors and machinery G3/T13306—1991
HJ14248-—1993
JB/T 5243—1991
IE/T 5673—1991
Determination of braking performance of harvester
Method for determination of cleanliness of transmission box of harvesting machinery General technical conditions for operation of agricultural and forestry tractors and other machinery B62681S92 Method for determination of noise level of self-propelled harvesting machinery IB/T832.3—155
Method for determination of performance of tractors and implements of agricultural and forestry tractors Pressing and cutting method 3 Definitions
This standard adopts the following definitions,
Ma Mu harvester
Used for harvesting some machines, including traction diggers and traction machines, white walk-type combine harvesters, 3.2
After the machine end operation, the potato tubers are released and grown on the mountain. 3. 3
After the machine is operating, there is no leakage of the next piece. 3.4
NY/T6482002
After the machine digs out the bundle, the pieces are buried in the process of spreading. 3.5
The combined harvester is used to collect the collected pieces. 3.6
Loss
Excavator: The end of the excavator is used to collect the pieces.
Combine harvester: Collect the leakage of the general printing. 3.7
After the skin is broken, the meat is damaged.Www.bzxZ.net
Quality evaluation index
The harvester should be approved by the specified process and the technical documents should be followed, and meet the relevant standards. The performance index and reliability index of the harvester should meet the requirements of Table 1: Table 1 Performance index of the harvester
Economic efficiency
Working leaflet productivity/<hm/h)
Efficient!
43 The performance index and reliability index of the harvester should be included in the provisions of 2. Table 2 Performance index of the harvester
Missing rate
Contracting rate
Working hourly productivity
Environmental sound
Noise and noise at the location of the unique model
Control furnace settlement: wrinkle pressure system L
Handleability)
The above item is not suitable for the three-in-one horse-drawn horse landing test 4.4 Safety requirements
Not lower than the design value
The lower calculated road
Brake plate force 3 or reduction center 4.5m, and the adhesion cannot be excited to stop accurately 06 (1\14 ten hard groups high pass 90%
44.1*The product design should be reasonable to ensure that the operator is responsible for the use of the product and there is no danger when using the card for replacement and maintenance. 4.4.2, the external running parts must be close to the operator T open position medicine account driving wheel resistance belt should have protective devices: the protective device should be in accordance with the provisions of Glus
NY/T 648- -2002
The vehicle shall be equipped with ladders and handrails, and the size of the warehouse shall comply with the provisions of H103!51. The driving platform shall be equipped with protective coverings. The surface of the board shall be 4. 4. 3
The windshield of the driver's seat shall be made of safety glass. 44.5 Non-operating parts shall be able to minimize the movement. 44.6 Dangerous places shall have necessary safety signs, and the quality of the signs shall comply with the provisions of GR1133. 4.4.7 Self-propelled and bell-shaped combine harvesters shall be equipped with lighting and rearview mirrors. 4.5 The quality of the main parts, assembly and appearance shall comply with the specifications in Table 3. Table 3 Main parts, assembly and appearance quality evaluation standard No. 8
Transmission clear active performance
Break performance
High distribution parts quantity
According to the protection ground /IIH
Orange ring list
1.Work seat
Sweep dead combustion/mm
Idle operation account internal parts inspection movement said the machine information use pressure photo mm
Read the tiger shop leather
Xu Kang incident degree/
Start the plan, increase the system, damage the movement section to wait for the oil, water and air separation parts when the movement must be changed, there must be no sticking phenomenon, please, no
burn through, East quality, gas and other sensitive traps, other bad welcome to work together with the company will tell you reliable, monthly energy mail two balance should be allowed to work safely surface: allowed below 0.5|| tt||Start and the right part, operation, no need to guide the production, some dynamic number 3 net 11300
color half sentence, flat light good life
2 more than
4.6 convenient month said: the instruction manual should contain safety regulations and customer full view, edit the creation of consultation according to the current provisions of B9359.1.
4.7 marking, packaging, transportation, purchase and storage
no damage.
the product mark should be clearly marked in the position of the harvester, the point specification, payment certificate should comply with the provisions of GB/1336, customer add: product name Modification and:
Main technical content of the product;
Product number:
Product production date
Manufacturer name and certificate:
Implementation standard.
Harvester parts, transmission system, and other parts must have obvious signs: These harvesters can be shipped in general assembly or in parts packaging. The packaging and parts packaging can be the same, and the production can ensure that all parts are complete. Technical documents should include:
Factory certificate:
Use environment,
Packing list:
! The machine should be packed in accordance with the relevant provisions of the transportation department to ensure that there is no damage to parts under normal operation. 3
NY/T 648—2002
4.7.6 The warehouse for storing harvesters should be clean and tidy. 5 Test method
51 General requirements
5.1. 1 Before measuring, the measuring instruments should be calibrated. The measuring instruments should be within the valid calibration period. 5.1.2 The sample machine should be selected according to the requirements of the instruction manual. The changes should be small and adjusted to the working state. The technical condition should be good. 5.1.3 The test site should also be chemically stable. The terrain should be flat and free of obstacles. The absolute soil water content should not be greater than %. The length of the test area should not be less than 5 meters, and the width should not be less than 2 times the width of the operating area. 51. If the following conditions occur during the test, the test shall be interrupted: During the test operation of the machine, all parts are not able to rotate quickly, and the machine is stuck, resulting in failure to operate normally. 6) During the test, the machine has a problem with the performance test and cannot work normally: 5.2 Technical characteristics measurement
Before the test, the technical characteristics of the prototype should be measured. The measurement should be carried out on a level and solid ground: 53 Test site survey
5.3.1 Determine the test area and terrain conditions. Take 5 points along the line in the test area. The moisture content, filling solidity and other parameters should be measured. The method of measurement should be in accordance with CBT52.
5.3.2 Determine the growth condition of crops, height, row spacing, standard, bedding and beauty, heat dissipation and density. The measurement method should be in accordance with CBT52.
53.3 Take 5 points diagonally in the test area to determine the width, depth and density of the plot. The width and depth should be measured at 5 rows (rows) at each point. On the same scale (line), the test blocks with a width of 2m are weighed and the length of the blocks is measured. At the same time, the length, size and weight of each block in the area are measured. 5.4 Performance test 54.1 Determination of performance indicators of the bell control machine 5.4.1.1 The test area consists of a stable area, a stable area and a test area. The length of the stable area is 10m1, and the length of the stable area is 2C. After the stable area is pulled, it should be connected with the body of the vehicle. The performance test is carried out in the test area. 5.4.1.2 The number of round trips in each test area should be no less than ~, and the machine should not change its working condition in the test area. 5.4. 1. 3 Determination of the productivity of each stroke in a year shall be calculated according to the formula: 11, and the average value shall be calculated after heating, = 0,0001-/
The productivity of one working hour, the unit is meter hour t); The time taken for the sample to be picked up through the measurement, the unit is hour (h): 5--
The length of the working area, the unit is meter (m);
The width of the working area, the unit is meter (m):
5.2.1.4 The principle of determination: After the machine has worked for a stroke, collect the measured pieces and weigh them. 5.4.1.5 Determination of loss quality: a) Determination of loss quantity: after the whole is collected, the damaged pieces which are controlled by the machine are found out and weighed. b) Determination of mixed excavation: after the collection and burial, the remaining pieces which can be dug out by the machine are found out manually (for the damaged pieces, they need to be separated), and weighed. The sum of the loss quantity and the damaged quantity is taken as the basis for loss. 5.4.1.7 Determination of loss of H: The loss of H shall be calculated according to formula (2) and formula (3): W = W × 1G3
W,
Total, unit: kilogram (kg): and W = W + W - total, unit: kilogram (kg): W, - unit: grams (ks): -: And the unit price is grams (kg) W,:. One-time loss, unit: grams (kg): I. - Loss rate, % ;
T,—Restore the sample,%,
5.4.2 Determination of performance indicators of combine harvester NY/T648—2002
5.4.2.1 The division of test area, the number of determinations and the determination of the yield rate during working hours shall be carried out in accordance with the provisions of 5.4.\.1.5.4.1.2.5.4..3 respectively:
5. 4. 2. 2
Determination of the weight of damaged parts:
Determination of the quality of the plate: After the prototype is processed in a process, the pieces that have not been dug out but not yet made shall be taken out and weighed. Determination of the quality of the dug products: Use .1 to find out the pieces that have not been damaged (the damaged pieces shall be separated) and weigh them. 5
The sum of the leakage amount is the alarm: 5.4.2.3 The measurement of harvested potatoes is: the prototype machine makes a trip: the method is to weigh the scale, 5. 4. 2. 4
The measurement of impurity amount: after the prototype machine works for one trip, collect the impurities in the box and weigh them. The measurement of general defects: from the picker, collect all the damaged ones and weigh them. 5. 4.2. 5
The loss rate and injury rate, including the impurity rate, are calculated by the formula (4) and formula (3), 5 4.2.63
Q1Q×100
where:
5. 4. 2. 7
The total amount is kilograms (kg) and the total amount is grams (k);
The total amount is grams (kg ...%:
Equal impurity rate,
User measurement: Follow the measurement method specified in [B6268. Dynamic performance measurement, according to the measurement method specified in [5:114243 +
wave pressure system control excavation static settlement measurement, before the test: the pressure system is running for 151. Then, the longitudinal control hydraulic system is adjusted to make the excavation and plug open to the layer height position to measure the height above the ground: after 3m\, the ground clearance is measured again, and the difference before and after is calculated, E
NY/T 648-2CD2
55 Inspection of assembly quality and appearance of main seasonal components 5.51 Inspection of transmission box cleanliness and sealing performance The machine is exposed to the rated speed. Run it idle for 1 hour and then stop it for training. Check whether there is any pain or oil leakage on the joint surface between the drive and the guard. Clean and eliminate waste connections using the method specified in J/T243. 5.5.2 Inspection of assembly quality of circular components and reliability of clutch For standard operation: Check whether the separation parts are stuck, and then check whether the clutch works smoothly. 5.5.3 Inspection of all parts at three points in the fire zone, two points outside the fire zone, one of which is not required to be in compliance with the requirements is a signal. 5. 5. 4 Welding quality
Deep welding
5.5.5 Countersunk head of the excavator
Check with a depth gauge.
5.5.6 Machine status
At rated speed, run the machine idle for 3 minutes and then check. 5.5.7 Transport space
On the ground, turn the machine to the correct transport state and measure the height from the lowest point to the ground with a ruler. 5.5.8 Appearance, thickness and adhesion of paint
Conform to the provisions of GB1734J/T5673J5/TU93.2.56 Safety
Conform to the provisions of 4.2. 5.7 Instruction manual
Conform to the provisions of 4.5. 5. Joint signs
Connection 1. 4.
5.9 Production test
5.9.1 Test purpose
To check the economy, reliability, performance stability, adaptability, maintenance convenience, durability of components and easy-to-pull parts, and safety of the machine:
5.9.2 Test requirements
5.9.2.1 The production test time shall not be less than 3 hours, and the matching power shall be selected according to the requirements of the production manual, and necessary accessories and work points shall be available.
5.9.2.2 The production test operation is 15hm per shift. During the test, the working hours, work volume and fuel consumption of each shift shall be measured,
5.9.2.3 The test conditions shall be in accordance with 3.1.1 ~ 5.1.5 Items shall be determined and suitable for the applicable range of the machine. 5.9.2.1 Before and after the test, measure the relevant parts of the product, the price of the main parts and the compatibility of the product parts. 5.9.2.5 Observe the operability of the prototype or make adjustments to ensure the safety of the installed equipment. 5.9.2.6 During the production assessment period, the country shall conduct no less than three consecutive shifts of inspections. The working time of each shift shall not be less than 3 hours, accurate to seconds. The classification of production time shall be carried out in accordance with the regulations of the G/T product market: 5.9.2.7 During the production inspection, the consumption of each selected item, disk and fuel consumption shall be measured: 5.9.3 Calculation of technical and economic indicators
pure work hour productivity, operating hour productivity, shift hour productivity Yield, unit fuel consumption, and reliability (effectiveness) are calculated according to H/T566, NY/T648-2D02,
Throwing plan
End judgment
Sampling method
Table judgment
Sampling method
Table 5 Inspection and judgment table of sampling inspection plan for potato diggers Item classification
Sample number
Self-propelled potato combine harvester Sampling inspection plan inspection and judgment table Power classification
Sample number
7 Inspection and judgment table of sampling inspection plan for towed potato combine harvesters Item classification
Vehicle efficiency
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.