title>Quality management specification of dry-mixed mortar - SB/T 10647-2011 - Chinese standardNet - bzxz.net
Home > SB > Quality management specification of dry-mixed mortar
Quality management specification of dry-mixed mortar

Basic Information

Standard ID: SB/T 10647-2011

Standard Name:Quality management specification of dry-mixed mortar

Chinese Name: 干混砂浆质量管理规程

Standard category:Business Industry Standard (SB)

state:in force

Date of Release2011-12-20

Date of Implementation:2012-01-01

standard classification number

Standard ICS number:Sociology, Services, Organization and management of companies (enterprises), Administration, Transport>>Quality>>03.120.10 Quality management and quality assurance

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

publishing house:China Standards Press

Publication date:2012-01-01

other information

drafter:Xiao Qunfang, Liu Hongbo, Wang Junqing, Cai Luhong, He Huiyong, Zhang Yinxiang, Mou Zongping, Dong Weiliang, Li Yongxin, Gou Hongshan, Li Jun

Drafting unit:Beijing Bulk Cement Office, Beijing General Research Institute of Building Materials Co., Ltd., etc.

Focal point unit:Department of Circulation Development, Ministry of Commerce of the People's Republic of China

Proposing unit:Department of Circulation Development, Ministry of Commerce of the People's Republic of China

Publishing department:Ministry of Commerce of the People's Republic of China

competent authority:Department of Circulation Development, Ministry of Commerce of the People's Republic of China

Introduction to standards:

SB/T 10647-2011 Quality Management Procedure for Dry-mixed Mortar SB/T10647-2011 |tt||Standard compression package decompression password: www.bzxz.net
This standard specifies the general principles, terms, classification and marking, production process quality management, finished product quality management, transportation and storage quality management, and construction process quality management. This standard applies to the quality control and management of dry-mixed mortar during production, inspection, logistics and construction. This standard is
proposed and managed by the Circulation Development Department of the Ministry of Commerce of the People's Republic of China.
The responsible drafting units of this standard: Beijing Bulk Cement Office, Beijing General Research Institute of Building Materials Science Co., Ltd.
Participating drafting units of this standard: Tianjin Yuchuan Dry Mortar Co., Ltd., Fujian Nanfang Pavement Machinery Co., Ltd., Wacker Polymer Materials (Shanghai) Co., Ltd., Beijing Ready-mixed Mortar Engineering Technology Center.
The main drafters of this standard are Xiao Qunfang, Liu Hongbo, Wang Junqing, Cai Luhong, He Huiyong, Zhang Yinxiang, Mou Zongping, Dong Weiliang, Li Yongxin, Gou Hongshan and Li Jun.
The following documents are indispensable for the application of this document. For all dated referenced documents, only the dated version applies to this document. For all undated referenced documents, the latest version (including all amendments) applies to this document.
GB1596 Fly ash used in cement and concrete
GB175 General purpose Portland cement|| tt||
GB7531 Determination of ignition residue of organic chemical products
GB8076 Concrete admixtures
GB9774 Cement packaging bags
GB9776 Building gypsum
GB23439 Concrete expansion agent
GB50203 Code for acceptance of construction quality of masonry engineering
GB50209 Code for acceptance of construction quality of building floor engineering
GB50210 Code for acceptance of construction quality of building decoration and renovation engineering
GB50325 Code for indoor environmental pollution control of civil construction engineering
GB/T625 Chemical reagent sulfuric acid
GB/T8077—2000 Test method for homogeneity of concrete admixtures
GB/T14684 Sand for construction
GB/T18046 Granulated blast furnace slag powder for cement and concrete
GB/T18736 Mineral admixture for high strength and high performance concrete
GB/T20473 Thermal insulation mortar for building
GB/T21120 Synthetic fiber for cement concrete and mortar
GB/T25181 Premixed mortar
GB/T50448 Technical specification for application of cement-based grouting materials
JC890 Masonry mortar and plastering mortar for autoclaved aerated concrete
JC/T1004 Ceramic wall and floor tile grout
JC/T1042 Expansion agent glass microspheres
JG158 Glue powder polystyrene granules External wall insulation system
JGJ63 Standard for water used in concrete
JGJ110 Standard for the test of bonding strength of facing bricks in building projects
Foreword III
1 Scope1
2 Normative references1
3 Terms and definitions2
4 Classification and marking2
4.1 Classification2
4.2 Marking3
5 Quality management of production process3
5.1 General requirements3
5.2 Quality management of raw materials4
5.3 Control of production process6
6 Quality management of finished products8
6.1 General provisions8
6.2 Inspection items8
6.3 Sampling and batching11
7
7.1 General requirements 12 7.2
Bulk dry-mixed mortar 12
7.3 Bag dry-mixed mortar 13
8 Quality management during construction 13
8.1 General provisions 13
8.2 Masonry mortar 13
8.3 Plastering mortar 14
8.4 Floor mortar 15
8.5 Ceramic tile grouting mortar 15
8.6 Glue powder polystyrene granule insulation mortar and building insulation mortar 16
8.7 Wall facing mortar 16
8.8 Masonry mortar and plastering mortar for aerated concrete 17
8.9 Other special mortars17
Appendix A (Normative Appendix) Basic conditions for dry-mixed mortar enterprise laboratories18
Appendix B (Normative Appendix) Test methods for conventional properties of cellulose ethers20
Appendix C (Normative Appendix) Test methods for conventional properties of redispersible rubber powder22
Appendix D (Normative Appendix) Test method for uniformity of bulk ordinary dry-mixed mortar23
__

Some standard content:

ICS 03. 120. 10
No.: 35404—2012
People's Republic of China Domestic Trade Industry Standard SB/T10647—2011
Quality nanagement specification of dry-mixed mortar
Quality nanagement specification of dry-mixed mortar2011-12-20 Issued by
Ministry of Commerce of the People's Republic of China
2012-01-01Implementation
2 Normative references
3 Terms and definitions
4 Classification and marking
1.1 Classification
4.2 Marking
5 Quality management of production process
5.1 General requirements
5.2 Quality management of raw materials
5.3 Control of production process
6 Quality management of finished products
6.1 General provisions
G.2 Inspection items
6.3 Sampling and batching
Quality management of transportation and storage
General requirements
7.2 Bulk dry-mixed mortar
7.3 Bag-mixed sand Mortar…
Construction process quality management
General provisions…
Borate masonry mortar
8.3 Plastering mortar…
Floor mortar
8.5 Ceramic tile grouting mortar·
8.6 Glue powder polystyrene granule insulation mortar and building insulation mortar…8.7 Wall facing mortar…
8.8 Aerated concrete special masonry mortar Plastering mortar 8.9 Other special mortars.
Appendix A (normative appendix) Basic conditions for dry-mixed mortar enterprise laboratory Appendix B (normative appendix) Test method for conventional properties of cellulose aldehyde
Appendix C (normative appendix) Test method for conventional properties of redispersible glue powder Appendix D (normative appendix)
Test method for uniformity of bulk ordinary mixed mortar SB/T 10647—2011
This comprehensive standard is proposed by the Department of Circulation Development of the Ministry of Commerce of the People's Republic of China and is under the jurisdiction of SB/T10647--2011
The responsible drafting units of this standard are: Beijing Bulk Cement Office, Beijing General Research Institute of Building Materials Science Co., Ltd., and the participating units of this standard are: Tianjin Yuchuan Qianfen Mortar Co., Ltd., Fujian Nanfang Pavement Machinery Co., Ltd., Wacker Polymer Materials (Shanghai) Co., Ltd., and Beijing Ready-mixed Mortar Engineering Technology Center. The main drafters of this standard are: Xiao Qunfang, Liu Hongbo, Zheng Junqing, Cai Luhong, He Huiyong, Zhang Yinxiang, Mou Zongping, Dong Weidu, Li Yongxin, Gou Hongshan, and Li Jun.
1 Scope
Quality management regulations for dry-mixed mortar
SB/T 106472011
This standard specifies general terms, classification and marking, production process quality management, finished product quality management, transportation and storage quality management, and construction process quality management.
This standard applies to the quality control and management of dry-mixed mortar during production inspection, logistics and construction. 2 Normative references
The following documents are indispensable for the application of this document. For all dated references, only the dated version applies to this document. For any undated ceremonial document, its latest version (including all amendments) shall apply to this document: GB1596 Fly ash for cement and concrete GB175 General purpose Portland cement GB7531 Determination of ignition residue of organic cement products GB8076 Concrete admixtures GB 9774 GB 9776 GB23439 GF 50203
Cement packaging bag
Building stone
Concrete expansion agent
Code for acceptance of construction quality of masonry engineering
GB50209
GB50210
GB50325
Code for acceptance of construction quality of building ground engineering Code for acceptance of quality of building decoration and renovation engineering Code for control of indoor environmental pollution of civil engineering Chemical reagents Sulfuric acid
GB/T 625
GB/T8077—2000 Test method for homogeneity of admixtures in concrete GB/T14684 Sand for construction
GB/T 18046
GB/T 18736
Granulated blast furnace slag powder for cement and concrete Mineral admixture for high strength and high performance concrete GB/T 20473
Building thermal insulation mortar
GB/T 21120
GB/T 25181
Synthetic fiber for cement concrete and mortar
Premixed mortar
GR/T 50448
Technical specification for application of cement-based grouting materials
JC890Autoclaved aerated concrete + masonry mortar and spicy mortarJC/T1004Ceramic wall and floor tile grouting agent
JC/T1042Expansion agent vitrified microspheres
JG158Glue powder benzene particleExternal wall insulation systemJGJ63Water standard for coagulationbZxz.net
JGJ110Test standard for bonding strength of facing bricks in building engineeringFiiKacaoaaikAca-
SB/T 10647—2011
JGJ126Exterior wall facing brick construction and acceptance projectJGJ114
Exterior wall insulation engineering technical code
Standard for test methods of basic properties of building mortarJGJ/T 70
Technical code for self-leveling floor engineering
JGJ/T 175
JCJ/T220Technical code for plastering mortar
JGJ/T223Technical code for application of premixed mortarYB/T1201Steel slag sand for ordinary premixed mortarSB/T10461Bulk mobile silo for dry-mixed mortarSB/T 10546
JJF 70
Bulk dry-mixed mortar transport vehicle
Metrological inspection rules for the net content of quantitatively packaged goods 3 Terms and definitions
The following terms and definitions apply to this document. 3.1
Dry-mixed mortar
A mixture of aggregates and cementitious materials that have been screened by dry coal and various components determined according to performance, mixed in a certain proportion in a professional production base, and mixed with water or matching components in a specified proportion at the place of use. The packaging form of the product can be divided into bags or bulk.
Ordinary dry-mixed mortarordinarytry-mixedmortarA dry-mixed mortar that meets certain requirements but does not have special properties. Including dry-mixed construction mortar, lower-mixed plastering mortar, and ten-mixed floor mortar.
Special dry-mixed mortarspecialdry-mixedmortarA dry-mixed mortar for construction and decoration that has special performance requirements. Including insulation board bonding mortar, insulation board plastering mortar, ceramic tile bonding mortar, dry-mixed self-leveling mortar, decorative mortar, etc. 3.4
Original sand
Sand that needs to be dried, screened and other pre-treatment processes after entering the factory before it can be used in the production of dry-mixed mortar. 3.5
Finished sand
Sand that can be directly used in the production of dry-mixed mortar without going through drying, screening and other pre-treatment processes after entering the factory. 4 Classification and marking
4.1 Classification
The classification, code and applicable standard of dry-mixed mortar shall comply with the provisions of Table 1. 2
Ordinary dry-mixed mortar
Special mortar for excavation
4.2 Marking
Example 1:
Table 1 Classification, code and technical performance of dry-mixed mortarApplicable standardsClassification of dry-mixed mortar
Iodine-built mortar
Plastering mortar
Floor mortar
Insulation board bonding mortar
Insulation board plastering mortar
Ceramic tile bonding silica mortar|| tt||Free-flowing mortar
Interface treatment mortar
Polymer cement waterproof silica mortar
Ceramic tile grouting mortar
Non-shrinkage mortar
Wall facing mortar
Glue powder benzene granular insulation mortar
Glassified micro-lightweight mortar
Special mortar for aerated concrete
Special bed mortar for aerated concrete
XX.XX XXXX
Product standard number
Special properties and classification
Dry mortar code
Plastering mortar, strength grade is M10,Its mark is DP-M10-GB/T25181. Example 2: Interface treatment mortar, base surface treatment 5 Production process quality management 5.1--General requirements--aerated concrete, its mark is IDIT-JQ-G1/T25181SB/T 10647-2011 Applicable standards GB/T 25181 JC/T1004 GB/T 50448 JC/T1024 GB/T 20473 5.1.1 The dry-mixed mortar production line shall meet the local land, planning and environmental protection, fire protection, industry qualification and other management requirements. 5.1.2 The dry-mixed mortar production line should have a certain scale. The single-shift (8-hour per shift) production capacity of ordinary lower-mixed mortar should be greater than 300 t, and the single-shift (8-hour per shift) production capacity of special-mixed mortar should be greater than 100 t. 5.1.3 The dry-mixed mortar production line should include storage, feeding, metering, mixing, packaging (ordinary mortar production lines should have the ability to load dry-mixed mortar dust production and logistics), and should be controlled by an automatic control system. The production process should be equipped with necessary dust collection and noise reduction facilities, and the dust emission indicators and noise should meet local environmental protection requirements. 5.1.4 The production of lower-mixed mortar should use solid wastes such as fly ash, slag, and tailings sand. The use of solid wastes in mortar should be verified by experiments.
iiKacaoiaikAca
SB/T10647—2011
5.1.5 The determination, adjustment and management of the mix ratio of dry-mixed mortar shall comply with the following provisions: a) The particle gradation of aggregates used in mixed mortar shall be determined through experiments; the mix ratio design of dry-mixed masonry mortar shall be carried out in accordance with JGJ98, and the mix ratio design of other dry-mixed mortars may refer to JGJ98: by
The production mix ratio shall be determined after laboratory trial mixing and pilot testing, and included in the laboratory mix ratio summary table; during the use of the dry-mixed aggregate mix ratio, the mix ratio shall be adjusted in time according to the feedback of product quality information and approved by the technical person in charge;
When the main raw materials and production processes change, the mix ratio should be redesigned and trial mixed; the review, issuance, recording and archiving of the mix ratio shall be strictly carried out in accordance with ISO9000 regulations. 5.1.6 Dry-mix mortar manufacturers should, based on actual conditions, prepare production process quality control charts and internal control indicators for raw materials, fuels, semi-finished products and finished products. 5.1.7 Dry-mix mortar manufacturers should set up special quality management organizations and comply with the following provisions: a) A special quality inspection room (laboratory) for dry-mix mortar should be set up and meet the requirements of Appendix A. b) Each unit and department should set up a corresponding quality management organization to be responsible for the quality management of the department. The quality inspection of raw materials and finished products should be carried out separately and respectively undertaken by special quality inspection teams. Quality inspectors should be professional and technical personnel with industry-recognized quality inspection qualification certificates and should undergo internal training and be familiar with production processes, relevant standards and quality regulations before they can take up their posts. The number of quality inspectors should be able to meet the needs of inspection work and should not be less than 4. 5.1.B The training and assessment of quality inspectors of dry-mixed mortar production enterprises shall comply with the following provisions: a) An annual training and assessment plan for dry-mixed mortar quality inspectors shall be formulated; b) Quality management education and technical training shall be strengthened for quality inspectors according to the plan every year, and assessment shall be carried out. Those who fail the assessment twice in a row shall be transferred from the quality inspection position.
5.2 Raw material quality management
5.2.1 General
The raw materials used for dry-mixed mortar shall not cause harmful effects on the environment, organisms, and human bodies, and shall comply with the relevant provisions of GB50325. 5.2.2 Cementitious materials
5.2.2.1 Cement:
Cement for ordinary mortar should be bulk cement; b) Cement should be silicate cement, ordinary silicate cement, slag silicate cement, and composite silicate cement, and its quality should comply with the relevant provisions of GB175. When other types of cement are used, their quality shall comply with the provisions of the relevant national standards in force; cement must have quality certification documents when entering the factory, and sampling and re-inspection shall comply with the provisions of Table 2; e
d) For cement of the same type and strength grade produced by the same cement plant, the same batch of cement entering the factory at a single time shall be regarded as one inspection batch, but the total amount of one inspection batch shall not exceed 500t; if the inventory cement that has not exceeded the storage period causes quality doubts due to improper storage, or the cement that has exceeded the storage period, it shall be re-sampled and re-inspected, and the re-inspection results shall prevail.
Table 2 Re-inspection items for raw materials entering the factory
Type of raw materials
Cementitious materials
Re-inspection items
Stability, setting time, 1d dryness", 3d flexural strength, 3d compressive strength, 28d demolition strength, 28d compressive strength
Fineness, setting time, 2 h compressive strength, 2 h Flexural strength implementation standard
GB9776
Admixture
Additive
Raw material types
Natural sand
Finished sand
Light aggregate
Pulverized coal
Slag powder
Artificial sand
Steel slag sand
Polystyrene particles
Glass microspheres
Fiber ether
Redispersible rubber powder
Water-retaining and thickening materials for ordinary mortar
Expansive agent
Superplasticizer
Polyolefin fiber
1When there is a requirement for cement 1d strength .
Table 2 (continued)
Re-test items
Mud/stone powder content, moisture content, mud block content, grading maximum particle size, grading", content, moisture content maximum particle size, grading\, stone powder content, moisture content maximum particle size, grading", bulk density, moisture content bulk density, particle size
Appearance, particle size, bulk density, volume water absorption, fineness, loss on ignition
Loss on ignition, mortar properties
Activity index, moisture content, loss on ignition
Appearance, fineness, viscosity, ash content4)
Appearance, ash content, solid content
Appearance, shrinkage time difference, compressive strength ratio, fineness, condensation time, water 7 Whether the limit expansion rate, strength
fineness, cement paste fluidity
appearance, size, elongation at break
" shall be used as the qualified evaluation index for entering the factory by the enterprise itself. "It shall be determined by the dry-mixed mortar manufacturer according to the product formula design or relevant standards. “)The dry-mix mortar manufacturer shall determine the indicators based on the actual situation. 5.2.2.2 Gypsum:
a) The quality of gypsum used in the production of dry-mix mortar shall comply with the relevant provisions of GB 9776;SB/T 106472011
Implementation standard
GB/T14684
YB/T 4201
JC/T1042
GB 1596 Class I standard
GB/T 18736
GB/T 18046
Appendix B
Appendix ℃
JG/T 164
GB23439
GB8076
GB/T 21120
b) Gypsum must have a quality certificate when entering the factory, and the sampling and re-inspection should comply with the provisions of Table 2. It can only be used after passing the re-inspection; c) For the same type of gypsum produced by the same enterprise, the gypsum entering the factory at a single time is regarded as an inspection batch, but the total amount of an inspection batch shall not exceed 100t:
d) When gypsum is stored improperly or for too long, it should be re-sampled and re-inspected, and the re-inspection results shall be used as the final result. 5.2. 3 Aggregates
5.2.3.1 Aggregates used in the production of dry-mixed mortar include raw sand, finished sand, lightweight aggregate, etc., among which sand can be divided into natural sand, artificial sand, steel slag sand, etc.
5.2.3.2 The quality of natural sand and machine-made sand used in the production of dry-mixed mortar shall comply with GB/T 14684, the stone powder content of the sand should not exceed 10% and remain stable, and the deviation of the test results of the two previous and subsequent test batches should not exceed 20%; the quality of steel slag sand should comply with the provisions of YB/T4201.
5.2.3.3 The sampling and re-inspection of aggregates after entering the factory should comply with the provisions of Table 2, and they can only be used after passing the re-inspection. Aggregates are inspected as a batch with a single purchase quantity, but the total amount of a single inspection batch of raw sand shall not exceed 1000 t, and the total amount of a single inspection batch of finished sand shall not exceed 100 t. 5.2.3.4 The moisture content of finished sand should not be greater than 0.5%. 5
rrKacaaaiKAca
SB/T 10647—2011
5.2.4 Mineral admixtures
5.2.4, 1 The quality of mineral admixtures used in dry-mixed mortar shall comply with the provisions of relevant product standards. 5.2.4.2 When mineral admixtures enter the factory, they must have a quality certificate and should be stored in warehouses according to different varieties and grades. 5.2.4.3 The sampling and re-inspection of mineral admixtures shall comply with the provisions of Table 2. The single purchase quantity of mineral admixtures is an inspection batch, but the total amount of an inspection batch shall not exceed the number of inspection batches specified in its product standards. 5.2.4.4 The moisture content of mineral admixtures shall not be greater than 1%. 5.2.5 Additives
5.2.5.1 Additives shall comply with the provisions of relevant product standards. 5.2, 5.2 Additives must have a quality certificate number when entering the factory. The sampling and re-inspection of redispersible rubber powder, cellulose, expanders, superplasticizers, and polypropylene fibers shall comply with the provisions of Table 2.
5.2.5.3 The quantity of additives purchased at a time is considered as one inspection batch, but the total quantity of one inspection batch shall not exceed the number of inspection batches specified in its product standard:
5.2.5,4 The use method and dosage of additives shall be determined through experiments. 5.2.5.5 The addition of additives shall not harm the durability of mortar. 5.2.6 Fillers
5.2.6.1 The quality of fillers used in the production of mixed mortar, including heavy calcium carbonate, quartz powder, talcum powder, etc., shall comply with the relevant standards. If there is no relevant standard, the enterprise shall verify it through experiments and determine it in combination with the characteristics of the product. 5.2.6,2 The quantity of fillers purchased at a time is considered as one inspection batch, and quality certificates must be provided when entering the factory. 5.2.7 Handling of unqualified raw materials
For raw materials that fail to meet the inspection requirements, the supplier shall be notified in a timely manner and the products shall be returned. When the two parties have a disagreement, they may entrust provincial or provincial quality inspection agencies to conduct type inspection or arbitration inspection. 5.2.8 Requirements for storage of qualified raw materials
5.2.8.1 Raw materials should be placed in fixed positions and the principle of first in, first out should be followed. 5.2.8.2 Raw materials should be stored in a rainproof and moisture-proof manner (except for raw sand). For flammable and explosive raw materials, explosion-proof treatment should be carried out during storage, and organic materials should be protected from direct sunlight.
5.2.8.3 A raw material storage account should be established to record the name, model, date of entry, quantity, origin of raw materials, basic information of suppliers and other information of raw materials.
5.2.8.4 For additives, re-inspection should be carried out every two months according to the raw material storage account. Re-inspection should be carried out once a month in the rainy season or the season with high humidity (≥80RH%). Among them, the maximum loss on ignition and fineness are not mandatory requirements during re-inspection. Raw materials that fail the re-inspection should be marked in time and handled accordingly.
5.3 Production process control
5.3.1 Aggregate pretreatment
5.3.1.1 Aggregates with a moisture content greater than 0.5% shall be pre-dried. Clean fuel should be used in the drying pretreatment process. 5.3.1.2 The temperature of the pre-treated aggregate shall not be higher than 65°C before entering the batching bin for storage. 5.3.2 Batching
5.3.2.1 Dry-mixed mortar should be batched by mass method. Raw materials with a dosage of less than 0.01% should be pre-mixed and amplified: Raw materials with a dosage of less than 0.1% can be added by manual weighing, and raw materials with a dosage of not less than 0.1% should be automatically measured. The allowable error of automatic measurement should comply with the provisions of Table 3.
5.3.2.2 The production line operating procedures and computer control programs should pre-set the raw material measurement sequence for different products. 5.3.2.3 When manual measurement is used, the reliability of the measurement must be guaranteed, and one person should measure and one person should review. 5.3.2.4 All measuring equipment should have a verification report issued by the statutory measurement and verification department within the validity period, and should be re-inspected regularly. 5.3.2.5 When handing over a shift, a designated person should be designated to review the ingredient ledger. Table 3 Raw materials measurement allowable error
Raw materials
Measurement allowable
Cementitious materials
Ordinary mortar
Special mortar
±2kg±20kg
Additives
>30g
When>1%
Other materials\
1) Only applicable to other raw materials with addition amount ≥1%. When the addition amount is less than 1%, the additive measurement allowable error shall be implemented. 5.3.3 Mixing
5, 3. 3. 14
The production line operating procedures and computer control programs should pre-set the raw material feeding sequence of different products. 5.3.3.2 The mixing uniformity of the mixer shall not be less than 95%; the residual rate shall not be greater than 3%. 5. 3. 3. 3 Before production, the maximum mixing time shall be determined through process tests, and the product mixing time should not be more than 5 min. >10%
Mortar mixer's mixing uniformity and residual rate should be calibrated regularly during mixing, and relevant process parameters should be adjusted in time according to the calibration results.
5.3.3.5 When the product variety is changed, the mixing and conveying equipment must be cleaned to avoid cross contamination; all cleaning materials should be recycled. 5.3.4
Bulk and packaging of dry-mixed mortar
5.3.4.1 Bulk
a) Dry-mixed mortar should be transported in bulk; b) The finished product silo for dry-mixed mortar should be waterproof and moisture-proof: the height-to-diameter ratio of the finished product silo should be reasonably designed. When the silo height exceeds 4m, it should also have an anti-segregation device; c
d) When the finished product silo is changed to a different mortar variety, it should be emptied and cleaned. 5.3.4.2 Packed
The packaging and metering accuracy of dry-mixed mortar products should comply with the requirements of JJF70; a
b) The packaging should have a moisture-proof function, and its quality should comply with the relevant provisions of GB9774; the quality error of bagged products shall not exceed ±1% of the labeled quality. The total mass of 20 bags randomly selected shall not be less than the total mass of the labels;
d) The packaging bag should clearly indicate the product name, product model, product grade implementation standard, manufacturer name or logo, production period, production number, quality, and product storage period; e) The manufacturer may add the following labels to the packaging bag according to the product situation: product use, product application range for the base surface, product color, usage restrictions, safe use rules, etc. 7
-niKacaoiaiKAca
SB/T 10647--2011
5.3.5 Disposal of unqualified finished products
5.3.5.1 If unqualified products are found before the finished products leave the factory, a review meeting for unqualified products shall be held within 24 hours, and the leader of the review meeting shall give opinions on rework or scrapping.
5.3.5.2 If the subsequent performance of the finished products is found to be unqualified after they leave the factory, the entire batch of products shall be recalled. 5.3.5.3 After the unqualified products are reworked as required, they must be re-inspected for quality, and can only be put into storage after passing the inspection; unqualified products that are scrapped shall be stored in a designated scrap area and disposed of in a timely manner. 6 Finished product quality management
6.1 General provisions
6.1.1 The quality inspection of dry-mixed mortar is divided into type inspection, factory inspection, delivery inspection and on-site re-inspection. 6.1.2 Under normal production conditions, dry-mixed mortar manufacturers shall conduct at least type inspections on their products every year. ; Product type inspection should be carried out before new products are put into production, when raw materials undergo major changes, when production processes are adjusted, when production is resumed after continuous shutdown for more than six months, and when national quality supervision and inspection agencies make requirements. 6.1.3 Management of quality records, files, and information of mortar production enterprises. 6.1.3.1 There must be complete original records and classified ledgers for each inspection, and they shall be bound into books on a monthly basis, kept by a dedicated person, and stored in technical archives on schedule. The original record retention period is three years, and the ledgers shall be kept for a long time. 6.1.3.2 The filling of the original records and classified ledgers of each inspection must be clear and complete, and no arbitrary alterations shall be allowed. When a typo occurs, it shall be corrected, and the corrected data shall be written in its place and stamped with the seal of the person who modified it. 6.1.3.3 The quality inspection data shall be sorted and counted in a timely manner. There shall be monthly statistical reports and monthly statistical analysis summaries every month, and annual statistical reports and annual statistical quality summaries shall be available throughout the year.
6.1.4. Delivery inspection is the quality inspection at the time of delivery. Physical samples can be taken and their inspection results can be used as the basis, or the factory inspection report of the dry-mixed mortar of the same production shift can be used as the basis. The acceptance method adopted shall be agreed upon by the supply and demand parties and specified in the contract: a) When the delivery inspection is based on the factory inspection report of the production shift between dry-mixed mortar production enterprises, the inspection report shall be provided to the demander at the time of delivery. At the same time, the demander shall take a sample from the annual mixed mortar with the same number when receiving the goods. The sample shall not be less than 4 times the maximum amount used for the experiment. After the two parties jointly seal it, the demander shall keep it for 3 months; 6) When the demander has doubts about the quality of the dry-mixed mortar, the sealed sample should be sent to the provincial or nationally recognized quality supervision and inspection agency for arbitration inspection within 3 months; c) The inspection items in the inspection report provided by the supplier for bagged dry-mixed mortar with an age of more than 3d or bulk dry-mixed mortar with an age of more than 1d shall be reported to the demander within 32d from the date of issuance of the mortar:! d) When the delivery inspection is based on the inspection results of physical samples, the supplier and the buyer shall jointly take samples and seal them at the delivery site. Each numbered sample shall be taken randomly, and the total amount of samples shall not be less than 8 times the amount required for inspection; the sample shall be divided into two equal parts, one of which shall be sealed by the supplier for 40 days, and the other shall be inspected by the buyer in accordance with the provisions of this regulation; e) Within 40 days, if the buyer finds that the product quality has problems after inspection and the supplier has objections, the two parties shall send the sample kept by the supplier to a quality supervision and inspection agency recognized by the provincial or provincial level or above for arbitration inspection. 6.1.5 The on-site re-inspection of the powdered mortar shall be witnessed sampling and inspection. The construction unit shall randomly take samples from the construction site in accordance with the provisions of this regulation under the witness of the supervision engineer or the representative of the construction unit, and send them to the inspection agency with witness inspection qualification for inspection. 6.2 Inspection items
6.2.1 Type inspection of dry-mixed mortar products
The type inspection items of dry-mixed mortar products are all items included in the product standards. 6.2.2 Factory inspection of dry-mixed mortar products
6.2.2.1 The factory inspection items and batches of bulk ordinary dry-mixed mortar shall comply with the requirements of Table 4. Table 4 Inspection items and batches of bulk ordinary dry-mixed mortar Material name
Pujin building mortar
Ordinary plaster mortar
Ordinary floor mortar
Inspection items
Appearance, water consumption, water retention rate, compressive strength, 2 h consistency loss rate, screening uniformity
Appearance, water consumption, water retention rate, compressive strength, 2 h consistency loss rate, screening uniformity
SB/T 10647—2011
800 1 as one inspection batch
800 t as one inspection batch
800 t is an inspection batch
11 The manufacturer determines the index by itself according to the product characteristics, which is only used as an internal quality control index and may not be reflected in the factory inspection report. 2 The uniformity test method is shown in Appendix D. The screening uniformity result should be delivered at the same time as the transport vehicle; the screening uniformity inspection batch is once a month or when the type of transport vehicle is changed,
6.2.2.2 The factory inspection items and batches of bagged lower mixed mortar should comply with the specifications in Table 5. Table 5 Factory inspection items and batch numbers of bagged dry-mixed mortar
Material name
Ordinary construction mortar
Ordinary pearl lime mortar
Ordinary floor mortar
Insulation board bonding mortar
Insulation board plastering mortar
Building insulation mortar
Interface mortar
Wall finishing mortar
Ceramic tile bonding mortar
Ceramic tile joint mortar
Building inspection items
Appearance, water consumption\, 75μm pass rate, 2h consistency loss rate\, water retention rate, compressive strength, setting timeAppearance, water consumption\, 75 μm pass rate1,2 li consistency gauge tip rate\ water retention rate, compressive strength, setting time, tensile bond strengthAppearance, water consumption11, 75 μm pass rate, 2 h degree loss rate\, compressive strength, setting time
appearance, water consumption", setting bulk density 1, normal temperature tensile bond strength, operable time
appearance, water consumption\, bulk density\, normal temperature tensile bond strength, operable time
appearance, water consumption", bulk density, dry apparent density, compressive strength
appearance, water tray 1\, wet bulk density\,? d tensile bond original strength appearance, water consumption\) color after hydration and drying, operable time, tensile bond original strength, anti-pan-alkali
appearance, water consumption\》, wet content\》, tensile bond original strength, drying time
appearance, water consumption, screening”, color after hydration and drying, flexural strength, shrinkage value
-KicaaikAca
Each production shift is an inspection batch, the first
batch must be inspected"
Each production shift is an inspection batch, the first
batch must be inspected3
Each dust production shift is an inspection batch, the first
batch must be inspected "
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is... inspection batches, the first group must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the convex disk must be inspected", of which the appearance and color after hydration and drying must be inspected for each disk
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is an inspection batch, the first
disk must be inspected\Water consumption\, 75 μm pass rate 1,2 li consistency gauge tip rate\water retention rate, compressive strength, setting time, tensile bond strength appearance, water consumption 11, 75 μm pass rate, 2 h degree loss rate\, compressive strength, setting time
appearance, water consumption", solidification bulk density 1, normal temperature tensile bond strength, operable time
appearance, water consumption\, bulk density\, normal temperature tensile bond strength, operable time
appearance, water consumption", bulk density, dry apparent density, compressive strength
appearance, water tray 1\, wet bulk density\,? d tensile bond original strength appearance, water consumption\) color after hydration and drying, operable time, tensile bond original strength, anti-pan-alkali
appearance, water consumption\》, wet content\》, tensile bond original strength, drying time
appearance, water consumption, screening”, color after hydration and drying, flexural strength, shrinkage value
-KicaaikAca
Each production shift is an inspection batch, the first
batch must be inspected"
Each production shift is an inspection batch, the first
batch must be inspected3
Each dust production shift is an inspection batch, the first
batch must be inspected "
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is... inspection batches, the first group must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the convex disk must be inspected", of which the appearance and color after hydration and drying must be inspected for each disk
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is an inspection batch, the first
disk must be inspected\Water consumption\, 75 μm pass rate1,2 li consistency gauge tip rate\water retention rate, compressive strength, setting time, tensile bond strength appearance, water consumption11, 75 μm pass rate, 2 h degree loss rate\, compressive strength, setting time
appearance, water consumption", solidification bulk density1, normal temperature tensile bond strength, operable time
appearance, water consumption\, bulk density\, normal temperature tensile bond strength, operable time
appearance, water consumption", bulk density, dry apparent density, compressive strength
appearance, water tray1\, wet bulk density\,? d tensile bond original strength appearance, water consumption\) color after hydration and drying, operable time, tensile bond original strength, anti-pan-alkali
appearance, water consumption\》, wet content\》, tensile bond original strength, drying time
appearance, water consumption, screening”, color after hydration and drying, flexural strength, shrinkage value
-KicaaikAca
Each production shift is an inspection batch, the first
batch must be inspected"
Each production shift is an inspection batch, the first
batch must be inspected3
Each dust production shift is an inspection batch, the first
batch must be inspected "
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is... inspection batches, the first group must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the first
disk must be inspected"
Each production shift is an inspection batch, the convex disk must be inspected", of which the appearance and color after hydration and drying must be inspected for each disk
Each production shift is an inspection batch, the first
disk must be inspected
Each production shift is an inspection batch, the first
disk must be inspected\