JB 8432.1-1996 On-site mixing and loading of heavy ammonium oil explosives truck
Some standard content:
Machinery Industry Standard of the People's Republic of China
JB 8432.1-96
On-site mixed heavy ammonium oil explosive car
1996-09-03 Issued
Ministry of Machinery Industry of the People's Republic of China
1997-07-01 Implementation
Machinery Industry Standard of the People's Republic of China
On-site mixed heavy ammonium oil explosive car
Subject content and scope of application
[B 8432. 1-96
This standard specifies the type and basic vehicle parameters, technical requirements, production conditions, marking, packaging, storage and manufacturing assurance requirements of existing loading and unloading explosive cars. This standard is applicable to standard on-site heavy-duty oil explosive cars (hereinafter referred to as loading cars). The equipment mainly refers to three types: wire, chemical, hydraulic, etc. It is suitable for on-site destructive mining industries such as wire, chemical, and hydraulic. The equipment is installed on the chassis of a car and uses a special flow pressure type and a gas-fired system. The model representation method should be in accordance with the provisions of JB1604. T
Product improvement code AB....
Loading base, t
Mixed loading (mixed)bZxz.net
Heavy oil and heavy oil)
Loading back car (car)
Charge equipment case
3. 3 Basic parameters should be able to meet the following requirements, ICZH-1Y BC2H-15 BC2H-20 BCZH-25 Machinery Industry Ministry 1996-09-03 approval, installation rate hgir.in hole: 450, water hole: 205, film volume three 5: 1991-07-01 implementation 4 Technical requirements J8432.1-96 4.1 The drug car should meet the requirements of this standard. Strictly follow the prescribed procedures for the approval of the technical plan. 4.2 Environmental recording
Chargers must ensure that the car works properly under the following three conditions
43.1 Applicable gun holes for charge cars:
: Water holes with a diameter of more than 100mm and a depth of less than 25m: a hole with a diameter of more than 1camm. The depth of the hole is unlimited
43.2 The requirements for the gun holder should be suitable for the maximum working pressure of 1.2M: 43.3 The standard pressure system has a normal working pressure of 3-4.4 The technical requirements of the main parts
4.1 The main performance indicators of the car must be manufactured according to the user's requirements. 3.4.2 The water, gas, and oil leakage of charge cars should not be prevented. Before assembly, each part should be inspected separately.
4.3 The gas lifting equipment of the drug loading vehicle is reliable, 44.+100 pieces of rotary benefits can be used, etc., and the grass-fed store can be flexible and can be connected. 4.5 The water-filled hose is made of red plastic with a backing of silk cotton:
b. The material of the box and the sugar material part is selected from the international two-core 4.6 Complete, sanitary and environmental protection
.1 The drug loading vehicle must be equipped with a fire extinguishing device and an effective anti-static connection cover. 1.6.2 When the drug loading vehicle is working, open flames are strictly prohibited in the operation area. 4.6.3 The exhaust pipe must be equipped with a silencer and a fire extinguishing capacity, and it is strictly prohibited to produce excessive media and increase the degree. 4.6.4 The water-gas washing system must ensure that the materials and accumulated dirt in the road can be cleaned up or cleaned up. 4.6. The loading car should be equipped with a standard 4.7 External requirements
+. The surface of the drawing should be beautiful, solid, beautiful, smooth and flat, without any sensitive, irregular, or obvious flow scars, etc.
4.2 The marking should be beautiful, clear, and well-defined. Different colors of paint should be clear. 4.8 Complete machine:
Random spare parts, workmanship,
Random with technical documents ||t t||Product instruction manual, production safety regulations and operating procedures of the charging furnace Product certificate:
Random spare parts and accessories list:
Packing electricity,
≤Test method
Preparation before the test
Each working handle, the open button is in the closed position: b.
Discard foreign matter from the material frost
Add hydraulic oil to the specified amount:
Check the chassis of the vehicle,
5.2 No-load test
JB 8432. 1- 96
After the assembly of each charging vehicle, the driver should do a no-load test: Start the engine, the movement is required to be flexible and there is only a throat sound, and the speed is 1350~.16C0:/mi. Automatic power take-off device. It is required to be flexible and can adjust the hydraulic system to specify the pressure. The well chain pressure oil is pre-set to the working push group. There are only two switch dials on the account. They drive the following systems and reach respectively. The rotation is required to be flexible and correct. The light and sound are different. Fuel consumption system motor:
2 screws and
emulsion:
screw open pump and reach the micro-point position:
dye pipe volume 7 transportation:
micro-heat room horse,
take-off test
no-load test, the new system includes the following: emulsification filter system;
dry and system:
fuel system:
micro-wall element system.
Use the new material to make the new product, the performance index of the whole machine shall meet the requirements of Article 3.3 of this standard, the mixed explosive test shall be carried out in the mine or in use, the performance index of the whole machine shall meet the requirements of Article 5.3 of this standard, 6 inspection rules
Each product shall be inspected before delivery. The inspection items of the factory include: W.
Correctness and completeness of assembly
Assembly pressure and product quality:
Efficiency and system tightness:
d. All items specified in 5.1--3 and 3.2 of this standard shall be met. 6.2 Type test
The detailed machine or product that has been approved before installation shall be tested as much as possible, and the type test shall be extended to include control! "Tire and process accessibility, 7. Marking, packaging, transportation, storage
7.1.1 Each product should have a product label in a conspicuous position. The type of label should comply with the provisions of GH/T13306. Label content
Product name, model:
Installation quantity:
Manufacturer name
Other packaging, storage and transportation diagrams should comply with the formulation of GB15S1 JB B432.1-96
7. 2. The technical documents of the random products shall be packed in a special plastic bag and placed in a different box with the vehicle. 3. The loading vehicle must meet the requirements of land and water transportation. 7.4 When storing the loading vehicle, it should be well ventilated and dry. Effective anti-rust and anti-freeze measures should be taken to ensure the safety of the vehicle. The user shall comply with the warranty, transportation, installation and use rules of the product. Within the last year from the date of the manufacturer's delivery, due to manufacturing quality: although six When the machine is damaged and cannot work properly, the manufacturer shall repair or replace it without any loss of service. 8.2 The service life of the charging vehicle is 3 years, 5 years, and the service life of the whole machine is 1 year. Additional remarks: This standard is proposed by the National Committee for Standardization of Mining Machinery. After the use of this standard, the drafter of the standard is Zhang Dongji. The standard is revised and the implementation date is January 2018. B/2Q1-5 charging interaction degree, 4
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.