Some standard content:
JB | Tank
Concentrated Silk
Extraction Tank
Released on 2004-02-05
Implemented on 2004-06-01
Released by the National Development and Reform Commission|| tt | tt | Normative reference documents
3 Classification and marking·…
4 Requirements
5 Test methods
6 Inspection rules
, signs, labels, packaging, Transportation and Storage 7
Item
Times
JB20036—2004
JB20036—2004
Foreword
This standard is based on "Drug Production Quality Management Specifications" and GB/T1.1--2000 "Standardization Work Guide Part 1: Standard Structure and Writing Rules", GB/T1.2-2002 "Standardization Work Guide Part 2: Specifications in Standards" "Method for Determining the Content of Sexual Technical Elements" is a revision of YY0024-1990 "Extraction and Concentration Accuracy". This standard replaces YY0024-1990 from the date of implementation. Compared with YY0024-1990, the main changes in this standard are as follows: a) The scope has been expanded, that is, a dynamic extraction and concentration tank has been added. b) Some relevant standards cited in this standard have been canceled or added to the normative reference documents. c) Added manufacturing requirements and electrical system safety requirements for dynamic extraction and concentration, and clarified the corresponding test methods. d) Added calculation formulas for evaporation, steam consumption, and cooling water consumption. e) Requirements for outgoing test items and judgment rules have been added to the inspection rules. This standard is proposed by China Pharmaceutical Equipment Industry Association. This standard is under the jurisdiction of the Pharmaceutical Equipment Industry Standardization Technical Committee. This standard was drafted by: Changshu Pharmaceutical Machinery Factory Co., Ltd. The main drafter of this standard: Cha Liwen.
4
1 Scope
Extraction and concentration tanks
JB20036—2004
This standard specifies the classification and marking, requirements, and test methods of extraction and concentration tanks. , inspection rules and signs, labels, packaging, transportation and storage.
This standard applies to static and dynamic extraction and concentration tanks (hereinafter referred to as extraction tanks). 2 Normative reference documents
The provisions in the following documents become provisions of this standard through reference in this standard. For dated reference documents, all subsequent amendments (excluding corrigenda) or revisions do not apply to this standard. However, parties to an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. Version. For undated referenced documents, the latest edition applies to this standard. GB150-1998 Steel Pressure Vessels
GB/T191 Packaging, Storage and Transportation Pictorial Marks
GB3836.1 Electrical Equipment for Explosive Gas Environments Part 1: General Requirements GB/T4272-1992 Equipment and Pipeline Insulation Technical General Principles GB5226.1-2002 Mechanical Safety Mechanical and Electrical Equipment Part 1: General Technical Conditions GB/T6060.4 Surface Roughness Comparison Sample Polishing Surface GB/T9969.1 Industrial Product Instructions General GB/T10111||tt| |Method of random sampling using random numbers GB/T13306 Labeling
Measurement method of noise and sound pressure level of metal cutting machine tools GB/T16769
JB/T4711 Pressure vessel coating and transportation packaging JB4730 Pressure vessel Non-destructive testing
YY/T0216 Pharmaceutical Machinery Model Preparation Method State Food and Drug Administration
Good Manufacturing Practice for Pharmaceuticals (1998 Revised Edition) Pressure Vessel Safety Technical Supervision Regulations (1999 Edition) National Quality and Technical Supervision and Management Pharmacopoeia of the People's Republic of China (2000 Edition) National Pharmacopoeia Commission 3 Classification and Labeling
3.1 Type
There are two types of extraction carvings, static and dynamic, 3.2 Model
3.2. 1The extraction tank model should comply with the regulations of YYT0216. JB20036—2004
3.2.2 Model Marking
TN
Marking Example
Improved Design Gu Serial Number: (A, B, C\)
Main Parameters (equipment volume, L)
product type code, static type is not represented, dynamic type uses D to represent product function code, extraction and concentration equipment
TND300 type: indicates dynamic extraction with an equipment volume of 300L Concentrated end. 3.3 The basic parameters of the extraction end should comply with the provisions of Table 1. Table 1 Basic parameters
Product model
Equipment volume, L
Evaporation plate kg/h
Allowable vacuum degree in the equipment, MPa
In the jacket Working pressure, MPa
Heating area, m2
Steam consumption/evaporation, kg/h
Cooling water consumption/evaporation, t/h
TN300
300
65
1.00
Note 1: The evaporation amount in the table is measured with soft water as the medium. TN500 | ||4.1 Material requirements
TN700
700
115
0.08
0.15
1.50
1.15||tt ||12.5
TN1000
1000
145
2.00
4.1.1 Parts in contact with the material should be made of materials that will not chemically change with the material. Made of materials that do not adsorb materials, TN1S00
1500
175
2.50
4.1.2 The sealing material used should be non-toxic, corrosion-resistant, and comply with the "Drugs The provisions of Article 32 of the Production Quality Management Standards (1998 revised edition).
4.1.3 The insulation layer material should comply with the provisions of 5.1~5.3 in CB/T4272--1992. 4.2 Manufacturing requirements
4.2.1 The Ra value of the surface in contact with the material shall not be greater than 0.8um. ??The surface shall be flat, smooth, without dead corners, easy to clean and disinfect, and comply with the "Good Manufacturing Practice for Pharmaceutical Products" (revised in 1998) version) does not allow cross-contamination between materials. 4.2.2 The axial gap between the mixer and the cylinder should not be greater than 15mm, and the radial gap should not be greater than 10mm: 4.2.3 Each connecting part should be firm and sealed, and there should be no leakage. 4.2.4 The manufacturing of main pressure components and components should comply with the relevant provisions of 10.1~10.5 in GB150-1998 and the Pressure Vessel Safety Technical Supervision Regulations (1999 Edition).
4.2.5 The non-destructive testing evaluation standards for extraction should comply with the provisions of JB4730. 4.2.6 The extraction tank should operate smoothly, the transmission system should have no abnormal noise, and the noise level during load operation should not exceed 75dB(A). 6
4.3 Electrical system safety requirements
4.3.1 Explosion-proof electrical safety requirements
JB20036—2004
Explosion-proof electrical devices should comply with the category and level of explosive hazardous locations According to the requirements of the corresponding explosion-proof level, the electrical performance should comply with the regulations of GB3836.1.
4.3.2 Non-explosion-proof electrical safety requirements
4.3:2.1 The continuity of the protective grounding of the electrical system shall comply with the provisions of 19.2 in GB5226.1-2002; 4.3.2.2 The insulation resistance of the electrical system shall Comply with the provisions of 19.3 in GB5226.1-2002; 4.3.2.3 The withstand voltage of the electrical system shall comply with the provisions of 19.4 of CB5226.1-2002; 4.3.2.4 The protective grounding circuit of the electrical system shall comply with 8.2 of GB5226.1-2002 Regulation. 4.3.2.5 The buttons of the electrical system should comply with the provisions of 10.2 in GB5226.1-2002; 4.3.2.6 The indicators and displays of the electrical system should comply with the provisions of 10.3 of GB5226.1-2002; 4.3.2.7 The wiring of the electrical system should Comply with the provisions of Chapter 14 of GB5226.1-2002; 4.3.2.8 The signs, warning signs and project codes of the electrical system shall comply with the provisions of Chapter 17 of CB5226.1-2002. 4.4 Safety accessories requirements
4.4.1 The pressure gauge shall comply with the provisions of Chapter 7 of the "Safety Technical Supervision Regulations for Pressure Vessels" (1999 Edition). 4.4.2 Safety valves should comply with the provisions of Chapter 7 of the "Pressure Vessel Safety Technical Supervision Regulations" (1999 Edition). 4.5 Appearance requirements
4.5.1 The surface of stainless steel should be flat and smooth, without obvious scratches or dents. 4.5.2 The coating on the outer surface of the paint should be even and firm, without obvious flow marks, and the surface should be free of defects such as cracks, wrinkles, and bubbles. 5 Test method
5.1 Performance test
After the extraction tank has been working normally for 15 minutes, use a standard measuring cylinder, rotor flowmeter, clock, etc. to measure the evaporation, steam consumption, and cooling water consumption simultaneously. Test, each measurement is 10 minutes, three measurements in total, calculated according to formula (1), and the arithmetic average is taken. 1Q(A,B)
W(A.BQ
where:
W is the arithmetic mean of the ratio of steam consumption to evaporation; W—cooling water consumption and Arithmetic mean of the ratio of evaporation; QA—steam consumption;
Q=cooling water consumption;
Q—evaporation
5.2 Material inspection
5.2.1 Raw materials should be inspected for quality and material certificates from the production unit. If there is no such certificate, the material should be inspected.
5.2.3 The insulation material should be accompanied by a certificate of conformity. With certificate.
5.3 Manufacturing inspection
(1)
7
JB20036—2004
5.3.1 Use CB/T6060.4 comparison sample First, check the roughness of the inner surface of the extraction tank. 5.3.2 The radial gaps between the agitator and the cylinder are measured at four equal parts in the axial direction. The axial gaps are measured at both ends with a ruler. The gaps between the four different radial parts of the cover. 5.3.3 The entire machine shall be tested for hydraulic pressure and visually inspected for leaks in accordance with CB150-1998. 5.3. 5 Non-destructive testing shall be carried out according to the requirements of 10.8 in GB150-1998. 5.3.6 Under load operation, the noise of the extraction tank shall be tested according to the method of CB/T16769.
5.4.1 Explosion-proof Type electrical safety shall be inspected in accordance with the relevant requirements of GB3836.1. 5.4.2 Non-explosion-proof electrical safety inspection
5.4.2.1 The continuity, insulation resistance and withstand voltage tests of the electrical system shall be in accordance with GB5226.1. 19.2, 19.3 and 19.4 of 2002 shall be inspected
5.4.2.2 The protective grounding circuit, buttons, indicators and displays, wiring, signs, warning signs and project codes of the electrical system shall be in accordance with GB5226.1. - Visual inspection according to the requirements of 8.2, 10.2, 10.3, Chapter 14 and Chapter 17 of 2002. 5.5 Safety accessories inspection
Safety valves and pressure gauges must be inspected by the national quality supervision and inspection department before they can be used. 5.6. Appearance inspection
Visual inspection of appearance quality
6 Inspection rules
6.1 After the extraction tank has passed the inspection by the quality inspection department of the manufacturing unit and the local boiler and pressure vessel supervision agency, it is attached. The quality certificate can be used before leaving the factory.
6.2 Inspection is factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 The factory inspection items of the extraction tank shall be inspected one by one according to Table 2. Factory inspection itemsbzxz.net
Item categories
Main performance
General performance
Inspection items
3.3,4.1.1,4.1.2, 4.2.3, 4.2.4, 4.2.5, 4.3, 4.44.1.3, 4.2.1, 4.2.2, 4.2.6, 4.56.2.1.2 If the extracted marrow is found to be unqualified during the inspection process, it is allowed to be returned for repair and reissue. If the product still fails to pass the inspection, the product will be judged as a non-conforming product.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out when one of the following situations occurs: a) trial production and identification of products after trial production or transfer to factory production; b) after normal production, If there are major changes in structure, materials, and processes that may affect product performance: c) When the product resumes production after 2 years of suspension: 8
d) When the national quality supervision agency or certification agency puts forward requirements for type inspection . 6.2.2.2 Judgment rules
JB20036—2004
Type inspection shall comply with all requirements of this standard. The prototype for type inspection shall be selected from the products that have passed the factory inspection according to the method specified in CB/T10111. During the inspection, if one of the electrical safety performance items 4.3.2.1~4.3.2.3 fails, it will be deemed as unqualified in the type inspection. If one of the other items is unqualified, the unqualified item will be re-inspected twice. If the re-inspection still fails, the product will be judged to have failed the type inspection.
7 Logo, labeling, packaging, transportation and storage 7.1 The nameplate of each extraction tank should be fixed at the specified position. The size and technical requirements of the nameplate should comply with the regulations of GB/T13306, and should have the following marks: || tt||a) Product name and model;
b)
Main technical parameters:
c) Product number and manufacturing date:
d) Product weight;| |tt||e)
manufacturer name;
registered trademark;
f)
g) container category;
h) supervisory inspection mark ;
i) Pressure vessel manufacturing license number:
i) Product standard number.
7.2 The packaging and transportation of the extraction tank should comply with the regulations of JB/T4711. The parts in the tank that are prone to vibration problems should have reliable anti-shock and shock-absorbing measures, and the exposed nozzles, sight glasses and other parts should be sealed. Mixing components should be packaged separately. The text and signs on the outer wall of the packaging box should be clear and have the following content: 7.2.1
a) Product model and name;
b) Shipping unit and shipping station name: ||tt| |Receiving unit and receiving station name;
e)
d) Shipping date;
Product net weight, gross weight, volume;
e||tt| |f) Product number;
According to the regulations of CB/T191, print the words "upward", "center of gravity", "afraid of getting wet", "no rolling", "lifted here", etc. on the packaging box )
sample or logo.
7.2.23
The following documents should be attached to the packaging box of the extraction tank: Product certificate:
a
The instructions for use should be written in accordance with GB/T9969.1 stipulates that the content should include: 1. product name, manufacturer name, address, postal code and contact number: implemented product standards;
1. main structure, performance, specifications, product purpose, scope of use, precautions, Warnings and informative instructions, protection 9
1 Performance test
After the extraction tank has been working normally for 15 minutes, use a standard measuring cylinder, rotameter, clock, etc. to test the evaporation, steam consumption, and cooling water consumption at the same time. Each measurement is 10 minutes, for a total of Measure three times, calculate according to formula (1), and take the arithmetic average. 1Q(A,B)
W(A.BQ
where:
W is the arithmetic mean of the ratio of steam consumption to evaporation; W—cooling water consumption and Arithmetic mean of the ratio of evaporation; QA—steam consumption;
Q=cooling water consumption;
Q—evaporation
5.2 Material inspection
5.2.1 Raw materials should be inspected for quality and material certificates from the production unit. If there is no such certificate, the material should be inspected.
5.2.3 The insulation material should be accompanied by a certificate of conformity. With certificate.
5.3 Manufacturing inspection
(1)
7
JB20036—2004
5.3.1 Use CB/T6060.4 comparison sample First, check the roughness of the inner surface of the extraction tank. 5.3.2 The radial gaps between the agitator and the cylinder are measured at four equal parts in the axial direction. The axial gaps are measured at both ends with a ruler. The gaps between the four different radial parts of the cover. 5.3.3 The entire machine shall be tested for hydraulic pressure and visually inspected for leaks in accordance with CB150-1998. 5.3. 5 Non-destructive testing shall be carried out according to the requirements of 10.8 in GB150-1998. 5.3.6 Under load operation, the noise of the extraction tank shall be tested according to the method of CB/T16769.
5.4.1 Explosion-proof Type electrical safety shall be inspected in accordance with the relevant requirements of GB3836.1. 5.4.2 Non-explosion-proof electrical safety inspection
5.4.2.1 The continuity, insulation resistance and withstand voltage tests of the electrical system shall be in accordance with GB5226.1. 19.2, 19.3 and 19.4 of 2002 shall be inspected
5.4.2.2 The protective grounding circuit, buttons, indicators and displays, wiring, signs, warning signs and project codes of the electrical system shall be in accordance with GB5226.1. - Visual inspection according to the requirements of 8.2, 10.2, 10.3, Chapter 14 and Chapter 17 of 2002. 5.5 Safety accessories inspection
Safety valves and pressure gauges must be inspected by the national quality supervision and inspection department before they can be used. 5.6. Appearance inspection
Visual inspection of appearance quality
6 Inspection rules
6.1 After the extraction tank has passed the inspection by the quality inspection department of the manufacturing unit and the local boiler and pressure vessel supervision agency, it is attached. The quality certificate can be used before leaving the factory.
6.2 Inspection is factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 The factory inspection items of the extraction tank shall be inspected one by one according to Table 2. Factory inspection items
Item categories
Main performance
General performance
Inspection items
3.3,4.1.1,4.1.2, 4.2.3, 4.2.4, 4.2.5, 4.3, 4.44.1.3, 4.2.1, 4.2.2, 4.2.6, 4.56.2.1.2 If the extracted marrow is found to be unqualified during the inspection process, it is allowed to be returned for repair and reissue. If the product still fails to pass the inspection, the product will be judged as a non-conforming product.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out when one of the following situations occurs: a) Trial production of the product is completed or trial production is carried out when the factory is transferred to production; b) After normal production, If there are major changes in structure, materials, and processes that may affect product performance: c) When the product resumes production after 2 years of suspension: 8
d) When the national quality supervision agency or certification agency puts forward requirements for type inspection . 6.2.2.2 Judgment rules
JB20036—2004
Type inspection shall comply with all requirements of this standard. The prototype for type inspection shall be selected from the products that have passed the factory inspection according to the method specified in CB/T10111. During the inspection, if one of the electrical safety performance items 4.3.2.1~4.3.2.3 fails, it will be deemed as unqualified in the type inspection. If one of the other items is unqualified, the unqualified item will be re-inspected twice. If the re-inspection still fails, the product will be judged to have failed the type inspection.
7 Logo, labeling, packaging, transportation and storage 7.1 The nameplate of each extraction tank should be fixed at the specified position. The size and technical requirements of the nameplate should comply with the regulations of GB/T13306, and should have the following marks: || tt||a) Product name and model;
b)
Main technical parameters:
c) Product number and manufacturing date:
d) Product weight;| |tt||e)
manufacturer name;
registered trademark;
f)
g) container category;
h) supervisory inspection mark ;
i) Pressure vessel manufacturing license number:
i) Product standard number.
7.2 The packaging and transportation of the extraction tank should comply with the regulations of JB/T4711. Components in the tank that are prone to vibration problems should have reliable anti-vibration and shock-absorbing measures. Barely installed nozzles, sight glasses and other components should be sealed. Mixing components should be packaged separately. The text and signs on the outer wall of the packaging box should be clear and have the following content: 7.2.1
a) Product model and name;
b) Shipping unit and shipping station name: ||tt| |Receiving unit and receiving station name;
e)
d) Shipping date;
Product net weight, gross weight, volume;
e||tt| |f) Product number;
According to the regulations of CB/T191, print the words "upward", "center of gravity", "afraid of getting wet", "no rolling", "lifted here", etc. on the packaging box )
sample or logo.
7.2.23
The following documents should be attached to the packaging box of the extraction tank: Product certificate:
a
The instructions for use should be written in accordance with GB/T9969.1 stipulates that the content should include: 1. product name, manufacturer name, address, postal code and contact number: implemented product standards;
1. main structure, performance, specifications, product purpose, scope of use, precautions, Warnings and informative instructions, protection 9
1 Performance test
After the extraction tank has been working normally for 15 minutes, use a standard measuring cylinder, rotameter, clock, etc. to test the evaporation, steam consumption, and cooling water consumption at the same time. Each measurement is 10 minutes, for a total of Measure three times, calculate according to formula (1), and take the arithmetic average. 1Q(A,B)
W(A.BQ
where:
W is the arithmetic mean of the ratio of steam consumption to evaporation; W—cooling water consumption and Arithmetic mean of the ratio of evaporation; QA—steam consumption;
Q=cooling water consumption;
Q—evaporation
5.2 Material inspection
5.2.1 Raw materials should be inspected for quality and material certificates from the production unit. If there is no such certificate, the material should be inspected.
5.2.3 The insulation material should be accompanied by a certificate of conformity. With certificate.
5.3 Manufacturing inspection
(1)
7
JB20036—2004
5.3.1 Use CB/T6060.4 comparison sample First, check the roughness of the inner surface of the extraction tank. 5.3.2 The radial gaps between the agitator and the cylinder are measured at four equal parts in the axial direction. The axial gaps are measured at both ends with a ruler. The gaps between the four different radial parts of the cover. 5.3.3 The entire machine shall be tested for hydraulic pressure and visually inspected for leaks in accordance with CB150-1998. 5.3. 5 Non-destructive testing shall be carried out according to the requirements of 10.8 in GB150-1998. 5.3.6 Under load operation, the noise of the extraction tank shall be tested according to the method of CB/T16769.
5.4.1 Explosion-proof Type electrical safety shall be inspected in accordance with the relevant requirements of GB3836.1. 5.4.2 Non-explosion-proof electrical safety inspection
5.4.2.1 The continuity, insulation resistance and withstand voltage tests of the electrical system shall be in accordance with GB5226.1. 19.2, 19.3 and 19.4 of 2002 shall be inspected
5.4.2.2 The protective grounding circuit, buttons, indicators and displays, wiring, signs, warning signs and project codes of the electrical system shall be in accordance with GB5226.1. - Visual inspection according to the requirements of 8.2, 10.2, 10.3, Chapter 14 and Chapter 17 of 2002. 5.5 Safety accessories inspection
Safety valves and pressure gauges must be inspected by the national quality supervision and inspection department before they can be used. 5.6. Appearance inspection
Visual inspection of appearance quality
6 Inspection rules
6.1 After the extraction tank has passed the inspection by the quality inspection department of the manufacturing unit and the local boiler and pressure vessel supervision agency, it is attached. The quality certificate can be used before leaving the factory.
6.2 Inspection is factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 The factory inspection items of the extraction tank shall be inspected one by one according to Table 2. Factory inspection items
Item categories
Main performance
General performance
Inspection items
3.3,4.1.1,4.1.2, 4.2.3, 4.2.4, 4.2.5, 4.3, 4.44.1.3, 4.2.1, 4.2.2, 4.2.6, 4.56.2.1.2 If the extracted marrow is found to be unqualified during the inspection process, it is allowed to be returned for repair and reissue. If the product still fails to pass the inspection, the product will be judged as a non-conforming product.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out when one of the following situations occurs: a) trial production and identification of products after trial production or transfer to factory production; b) after normal production, If there are major changes in structure, materials, and processes that may affect product performance: c) When the product resumes production after 2 years of suspension: 8
d) When the national quality supervision agency or certification agency puts forward requirements for type inspection . 6.2.2.2 Judgment rules
JB20036—2004
Type inspection shall comply with all requirements of this standard. The prototype for type inspection shall be selected from the products that have passed the factory inspection according to the method specified in CB/T10111. If one of the electrical safety performance items in 4.3.2.1~4.3.2.3 fails during the inspection, it will be deemed as unqualified in the type inspection. If one of the other items is unqualified, the unqualified item will be re-inspected twice. If the re-inspection still fails, the product will be judged to have failed the type inspection.
7 Logo, labeling, packaging, transportation and storage 7.1 The nameplate of each extraction tank should be fixed at the specified position. The size and technical requirements of the nameplate should comply with the regulations of GB/T13306, and should have the following marks: || tt||a) Product name and model;
b)
Main technical parameters:
c) Product number and manufacturing date:
d) Product weight;| |tt||e)
manufacturer name;
registered trademark;
f)
g) container category;
h) supervisory inspection mark ;
i) Pressure vessel manufacturing license number:
i) Product standard number.
7.2 The packaging and transportation of the extraction tank should comply with the regulations of JB/T4711. The parts in the tank that are prone to vibration problems should have reliable anti-shock and shock-absorbing measures, and the exposed nozzles, sight glasses and other parts should be sealed. Mixing components should be packaged separately. The text and signs on the outer wall of the packaging box should be clear and have the following content: 7.2.1
a) Product model and name;
b) Shipping unit and shipping station name: ||tt| |Receiving unit and receiving station name;
e)
d) Shipping date;
Product net weight, gross weight, volume;
e||tt| |f) Product number;
According to the regulations of CB/T191, print the words "upward", "center of gravity", "afraid of getting wet", "no rolling", "lifted here", etc. on the packaging box )
sample or logo.
7.2.23
The following documents should be attached to the packaging box of the extraction tank: Product certificate:
a
The instructions for use should be written in accordance with GB/T9969.1 stipulates that the content should include: 1. product name, manufacturer name, address, postal code and contact number: implemented product standards;
1. main structure, performance, specifications, product purpose, scope of use, precautions, Warnings and informative instructions, protection 9
The requirements of 8.2, 10.2, 10.3, Chapter 14 and Chapter 17 of 1-2002 shall be visually inspected. 5.5 Inspection of safety accessories
Safety valves and pressure gauges must be inspected and passed by the national quality supervision and inspection department before they can be used. 5.6 Appearance inspection
Visually inspect the appearance quality.
6 Inspection Rules
6.1 After the extraction tank has passed the inspection by the quality inspection department of the manufacturing unit and the local boiler and pressure vessel supervision agency, it can only leave the factory with a quality certificate attached.
6.2 Inspection is factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 The factory inspection items of extraction tanks shall be inspected one by one according to the provisions in Table 2. Table 2 Factory inspection items
Item category
Main performance
General performance
Inspection items
3.3, 4.1.1, 4.1.2, 4.2. 3, 4.2.4, 4.2.5, 4.3, 4.44.1.3, 4.2.1, 4.2.2, 4.2.6, 4.56.2.1.2 If the extracted marrow is found to be unqualified during the inspection process, it is allowed to be returned for repair and repair. If the product still fails to pass the re-inspection, the product will be judged as unqualified.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be carried out when one of the following situations occurs: a) trial production and identification of products after trial production or transfer to factory production; b) after normal production, If there are major changes in structure, materials, and processes that may affect product performance: c) When the product resumes production after 2 years of suspension: 8
d) When the national quality supervision agency or certification agency puts forward requirements for type inspection . 6.2.2.2 Judgment rules
JB20036—2004
Type inspection shall comply with all requirements of this standard. The prototype for type inspection shall be selected from the products that have passed the factory inspection according to the method specified in CB/T10111. If one of the electrical safety performance items in 4.3.2.1~4.3.2.3 fails during the inspection, it will be deemed as unqualified in the type inspection. If one of the other items is unqualified, the unqualified item will be re-inspected twice. If the re-inspection still fails, the product will be judged to have failed the type inspection.
7 Logo, labeling, packaging, transportation and storage 7.1 The nameplate of each extraction tank should be fixed at the specified position. The size and technical requirements of the nameplate should comply with the regulations of GB/T13306, and should have the following marks: || tt||a) Product name and model;
b)
Main technical parameters:
c) Product number and manufacturing date:
d) Product weight;| |tt||e)
manufacturer name;
registered trademark;
f)
g) container category;
h) supervisory inspection mark ;
i) Pressure vessel manufacturing license number:
i) Product standard number.
7.2 The packaging and transportation of the extraction tank should comply with the regulations of JB/T4711. Components in the tank that are prone to vibration problems should have reliable anti-vibration and shock-absorbing measures. Barely installed nozzles, sight glasses and other components should be sealed. Mixing components should be packaged separately. The text and signs on the outer wall of the packaging box should be clear and have the following content: 7.2.1
a) Product model and name;
b) Shipping unit and shipping station name: ||tt| |Receiving unit and receiving station name;
e)
d) Shipping date;
Product net weight, gross weight, volume;
e||tt| |f) Product number;
According to the regulations of CB/T191, print the words "upward", "center of gravity", "afraid of getting wet", "no rolling", "lifted here", etc. on the packaging box )
sample or logo.
7.2.23
The following documents should be attached to the packaging box of the extraction tank: Product certificate:
a
The instructions for use should be written in accordance with GB/T9969.1 stipulates that the content should include: 1. product name, manufacturer name, address, postal code and contact number: implemented product standards;
1. main structure, performance, specifications, product purpose, scope of use, precautions, Warnings and informative instructions, protection 9
1-2002, 8.2, 10.2, 10.3, Chapter 14 and Chapter 17. 5.5 Inspection of safety accessories
Safety valves and pressure gauges must be inspected and qualified by the national quality inspection department before they can be used. 5.6 Appearance inspection
Visually inspect the appearance quality.
6 Inspection rules
6.1 Extraction tanks must be inspected and qualified by the quality inspection department of the manufacturing unit and the local boiler and pressure vessel supervision agency, and they can only be shipped with a quality certificate.
6.2 Inspection includes factory inspection and type inspection. 6.2.1 Factory inspection
6.2.1.1 The factory inspection items of extraction tanks shall be inspected one by one according to the provisions of Table 2. Table 2 Factory inspection items
Item category
Main performance
General performance
Inspection items
3.3,4.1.1,4.1.2, 4.2.3, 4.2.4, 4.2.5, 4.3, 4.44.1.3, 4.2.1, 4.2.2, 4.2.6, 4.56.2.1.2 Extraction If unqualified products are found during the inspection process, they are allowed to be returned for repair and re-inspection. If they still fail to meet the requirements, they will be judged as unqualified products.
6.2.2 Type inspection
6.2.2.1 Type inspection shall be conducted in any of the following cases: a) After trial production or trial production of the product is completed or the product is transferred to another factory for production; b) After normal production, if there are major changes in structure, materials, and processes that may affect product performance; c) When the product is resumed after being discontinued for 2 years; 8
d) When the national quality supervision agency or certification agency proposes a request for type inspection. 6.2.2.2 Judgment rules
JB20036—2004
Type inspection shall comply with all requirements of this standard. The prototype for type inspection shall be selected from the qualified products of the factory inspection according to the method specified in CB/T10111. If one of 4.3.2.1~4.3.2.3 of the electrical safety performance fails during the inspection, it shall be judged as unqualified for type inspection. If one of the other items is unqualified, the unqualified item shall be re-inspected twice. If the re-inspection is still unqualified, the product type inspection shall be deemed unqualified.
7 Marking, labeling, packaging, transportation and storage 7.1 The nameplate of each extraction tank shall be fixed at the specified position. The size and technical requirements of the nameplate shall comply with the provisions of GB/T13306 and shall have the following marks:
a) Product name and model;
b)
Main technical parameters:
c) Product number and manufacturing date:
d) Product weight;
e)
Manufacturer name;
Registered trademark;
f)
g) Container category;
h) Supervisory inspection mark;
i) Pressure vessel manufacturing license abbreviation:
i) Product standard number.
7.2 The packaging and transportation of the extraction tank shall comply with the provisions of JB/T4711. The parts in the tank that are prone to vibration should have reliable anti-vibration and shock-absorbing measures, and the exposed parts such as the pipe mouth and sight glass should be sealed. The stirring parts should be packed separately. The words and signs on the outer wall of the packaging box should be clear and have the following contents: 7.2.1
a) Product model and name;
b) Shipping unit and shipping station name:
Receiving unit and receiving station name;
e)
d) Shipping date;
Net weight, gross weight and volume of the product;
e
f) Product number;
Print words or signs such as "upward", "center of gravity", "afraid of moisture", "no rolling", "lift from here" on the packaging box according to the provisions of CB/T191.
7.2.23
The following documents shall be attached to the packaging box of the extraction tank: Product certificate:
a
The preparation of the instruction manual shall comply with the provisions of GB/T9969.1 and shall include: 一Product name, manufacturer name, address, zip code and contact number: 一The product standard to be implemented;
一The main structure, performance, specifications, product use, scope of use, precautions, warnings and reminders, protection 9
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.