Some standard content:
ICS 97.140.70
Classification number, Y71bzxz.net
Alternative number: 12499-2003
Light Industry Standard of the People's Republic of China
QB 2585-2003
Water jet massage bathtub
Hydromassage bathtmh
Published on September 13, 2003
National Development and Reform Commission of the People's Republic of China Implemented on October 1, 2003
iKAoNhiKAca
QB2585-2003
Section 4 of this standard. Articles 1.2, 4.4.3, 4.5 and 4.6 are mandatory, and the rest are recommended. The technical standards are based on the United States No. 1795 "Full Landing Department" standard, which is suitable for domestic and foreign market demand and local production status of the five major bathroom equipment industries in Japan and Japan. This standard was proposed by China Light Industry Reform Association. This standard was jointly drafted by the National Building Hardware Standardization Center. The drafting parties of this standard are: Guangdong Abo Building Materials Science and Technology Co., Ltd., Zhongshan Liansheng Bathroom Equipment Co., Ltd., Shanghai Chengjing Co., Ltd., Shanghai Weiqing Co., Ltd., Boguanghexiao Co., Ltd., Guangdong Jiale Leisure Equipment Co., Ltd., Shunde Duisha Sanitary Ware Co., Ltd., and Huijia Zhuansan Building Hardware Quality Inspection Center. The drafters of this standard: Xu Lv, Jing Jiale, Liu Yong, Chang Ninglong, Zhizhong, E Dehua, Zhi Wan, Su Sen, Xu Zhide, QB2585-2003
1 concentrated star
water jet massage bathtub
technical standard specifies the definition, requirements, test methods, inspection rules and instructions for use, packaging, transportation, business, and use of water jet massage bathtubs (hereinafter referred to as "massage bathtubs"). This standard is used for: rest, water, spray, discharge, etc. Accessories Red No more than one person uses the thick bath standard: 2 Normative reference documents || tt || The clauses in the following documents are cited in this standard and become the case of this standard. For any dated application document, its revision list (excluding error flashing and relaxing edition) is not applicable to this standard. However, it is recommended that the latest version of this document be used. For undated application documents, its latest version is applicable to the standard GB 1913000 Packaging, storage and transportation diagrams
GB4706.1-1998 Safety of household H and similar products in transit Part 1: Delivery requirements C/T761-1906 Technical conditions for sanitary F copper drainage pipes KC/T779-2000 Wave pass fiber energy-enhancing plastic bath QB/T1334-1998 Water end pass technical system
QB3564-1999 Dismantling bath section
8 Definition
The bath is a massage bath where the air and water flow are sprayed onto the human body to produce a massage effect. 4 Requirements
4.1 Appearance
4.1.1 The surface of the product must be flat, without scratches, cracks, deformation and other defects. 4.1.2 The surface can be easily touched by the human body and there should be no flash and burrs. 4.1.3 The surface of metal accessories should not have cracks, scratches, gas and other defects. Rust-prone parts should be treated with rust prevention. 4.2 Cylinder requirements
4.2.1 4.2.2 The glass fiber reinforced plastic plate body shall meet the requirements of JC/T779-2000. 4.2.3 Other surface materials shall meet the corresponding standards: if there is no standard, refer to the above two standards. 4.3 Surface treatment of metal accessories
The surface coating shall meet the requirements of 5.3 in 1334-1998. 4.4 Performance
4.4.1 Water flow ionization
After the test in 5.4.1, the horizontal distance of the aerated water jet is 150mm~60mm.4.4.2 Tightness
4.4.2.1 After the test in 5.4.2.1, the 1 ring is filled with a large amount of stagnation. 4.4.2.2 After the test in 5.4.2.2, the circulation system is leak-free. 4.4.2.3 After the test in 5.4.2.3, the storage The water system should not leak. 4.4.2.4 The drainage system should comply with the provisions of 3C/T761-1996 in February 2006. 4.4.2.5 Other materials and drainage accessories should comply with the corresponding structural standards of the enterprise. 4.4.3 Retained water After the test in 5.5, the total mass of retained water shall not exceed 500g. 4.5 Electrical safety This product belongs to Class 1 equipment. The electrical safety of the product shall comply with CB4706.1-19 99 regulations: 4.6 Noise
The product shall be tested according to 6.7, and the noise level shall not exceed 68dB: 5 Test method
-iKAoNiiKAca-
QB2585-2303
5.1 Appearance
The external pressure test method shall be carried out, and the test day shall be under the radiation line, and the light competition shall not be less than 300, and the distance from the measured object shall be 500mm. It shall comply with the provisions of 4.1.
5,2 Body
4.2.1, 4.2.2, 4.2.3 shall be tested according to QB/T3564-1999 and JC/T779-20U. 5.3 Determination of surface treatment of metal accessories
5.3.1 The surface of convex plating and spraying grid shall be determined according to 6.4 of QB/T1334-1998 and shall comply with the provisions of 4.3. 5.3.2 The abrasion refining performance before electroplating and spraying shall be in accordance with 6.7 of QB/1334-1998 and shall comply with the provisions of 4.3. 5.4 Performance in use
5.4.1 Determination of long-flow spraying distance: Place the bathtub on platform 1, level the body, inject water to 20mm above the level, start, and use a ruler to measure the water jet half-time distance: it shall comply with the provisions of 4.4.1. 5.4.2 Determination of sealing performance
5.4.2.1 Inject room temperature water into the water inlet of the bathtub, start the pump, and circulate the system for at least 10 minutes. Test the sealing parts of the bathtub and the sealing parts shall comply with the provisions of 4.4.2.1. 5.4.2.2 Inject 60% water into the bathtub until the water level reaches L1, start the pump, and circulate the system for at least 10 minutes. Test the sealing parts of the bathtub and the sealing parts shall comply with the provisions of 4.4.2.2. 5.4.2.3 Inject room temperature sterile water from the water inlet, remove the air in the pipe, and then open the valve of the water supply pipe. Use the pressure test system to increase the pressure to 1.6MPa, and ensure! , 2min, daily test of the massage bath and the pipe structure, according to the provisions of 4.4.2.3
5.4.2.4 The determination of drainage parts shall be carried out according to JC/761-19963.6, and the degree shall comply with the provisions of 4.4.2.4. 5.4.2.5 Test the determination of other materials and the corresponding standard methods of the starting parts: the degree shall comply with the provisions of 4.4.2.5. 5.5 Determination of retained water
After the half-dissolved water is released, the water in the compartment is injected into the bath through the overflow requirement, the system is started, and the circulation system reaches the running time. After the new water stops, the water is naturally discharged from the external water outlet of the massage bathtub, and the drainage is closed. No water can be replaced by swimming. Quickly judge the four points of the bathtub according to the rate, and then massage the four stages of the uphill stage, front, back, and confluence, and each of them should be inclined at least 30" to the south to leave water to flow out, and absorb it with absorbent materials. Use the cumulative method to calculate the quality of the accumulated water. The result should comply with the provisions of 4.4.3.
5.6 Test method for electrical performance
The test of gas safety performance shall be carried out according to the requirements of 0B4706.1-1998, and shall comply with the provisions of 4.5.5.7 Testing method
Test case: The ring block should not make noise, h should be less than 45dR or 10B lower than the actual massage cold red operation. . Place the product on the whole floor, install it according to the correct installation method, inject warm water into the bathtub with water inlet, start the pump, open the nozzle, and place the bath towel 1 meter above the ground. Collect the four test points before, after, and after the bath. Use a sound level meter and A-weighted sound level meter to measure the sound level. The average sound level of the product shall comply with the provisions of 4.6 of QB2585-2003. The inspection regulations are as follows: The production inspection is divided into factory inspection and type inspection. 6.1 Factory inspection 1.1 All products shall undergo factory inspection and can only be shipped after passing the inspection: 6. 1. 2 Test items for ageing Table 1.
Circulating system
Water injection system
Effective current
Input power
Electrical strength
6.2 Type test
8.2.1 Type test shall be carried out for the following conditions.
1. 4. 2. 1
4. 4. 2. 5
Trial type approval for new production or transfer of products to factory: b)
Testing
5.-1.2.3
When the product is in design, process, production equipment, management and other aspects that may affect the product performance: during normal production, after a certain amount of accumulation or accumulation, this property should be considered for re-inspection; when the product is resumed after production, when the inspection result is too different from the previous inspection result; when the supervisory inspection agency proposes the requirement for type inspection. Type inspection shall be carried out in accordance with all items of this standard: 6.2.2
6.2.3 Type format The qualified products of the factory inspection shall be sampled, and one batch shall be sampled for inspection. If the products do not meet the requirements of this standard, the batch shall be sampled twice. If they still do not meet the requirements of this standard, the batch shall be judged as unqualified. 7.1 Marking
| 1.1 The product shall have a clear, non-obstructive and visible mark. The marking content is as follows: product name, code, specification, color pressure standard number: a)
Manufacturer name:
Rated voltage, frequency, rated power rate,
manufacturing date:
packaging standard pot agent capacity
product name, model, specification, using standard number manufacturing name and address:
rated voltage, emergency rate, rated power:
lake orchid period:
trademark:
overall dimensions (length × width)
) to quantity (, net);
h) packaging transport icon mark, according to G19120, 7.2 instruction manual | |tt||iKAoNhiKAca
QB2586—2003
The product should be provided with clear installation, maintenance and use instructions as well as instructions on fire prevention, electrical safety and prevention of personal injury (independent and distinguishable from the common parts of the instruction manual) 7.3 Packaging
7.3.1 Each product has a certificate of conformity and safety instructions. The certificate of conformity should have the standard number, inspection code and inspection date. There should be a product inspection form. 7.3.2 The product packaging should not be damaged and its packaging should comply with relevant transportation regulations. 7.4 Transportation
The product should be protected from sunlight during transportation, loaded and unloaded with care, prevent dust and dirt, avoid contact with chemicals, and should not be in contact with chemicals that can corrode it. 7.5 Storage
The product should be stored in a well-ventilated work area and should not be in contact with chemicals that can corrode it.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.