title>General rules for technical summaries of surveying and mapping - CH/T 1001-2005 - Chinese standardNet - bzxz.net
Home > CH > General rules for technical summaries of surveying and mapping
General rules for technical summaries of surveying and mapping

Basic Information

Standard ID: CH/T 1001-2005

Standard Name:General rules for technical summaries of surveying and mapping

Chinese Name: 测绘技术总结编写规定

Standard category:Surveying and mapping industry standards (CH)

state:in force

Date of Release2005-12-07

Date of Implementation:2006-01-01

standard classification number

Standard ICS number:Mathematics, Natural Sciences >> 07.040 Astronomy, Geodesy, Geography

Standard Classification Number:Comprehensive>>Surveying and Mapping>>A75 Surveying and Mapping Comprehensive

associated standards

alternative situation:Replaces CH 1001-1991

Publication information

publishing house:China Standards Press

Publication date:2006-01-01

other information

drafter:Lü Yuxia, Guo Yufang, Pang Shangyi, Sang Dongwen

Drafting unit:National Bureau of Surveying, Mapping and Geoinformation Institute of Surveying and Mapping Standards

Focal point unit:National Bureau of Surveying and Mapping

Proposing unit:National Bureau of Surveying and Mapping

Publishing department:National Bureau of Surveying and Mapping

competent authority:National Bureau of Surveying and Mapping

Introduction to standards:

This standard specifies the main contents and requirements for the preparation of surveying and mapping project summaries and professional and technical summaries. This standard is mainly applicable to the preparation of project summaries and professional and technical summaries for surveying and mapping production projects, and can be used as a reference for the preparation of other surveying and mapping project summaries. CH/T 1001-2005 Provisions for the Preparation of Surveying and
Mapping Technical Summaries CH/T1001-2005 Standard download decompression password: www.bzxz.net This standard specifies the main contents and requirements for the preparation of surveying and mapping project summaries and professional and technical summaries. This standard is mainly applicable to the preparation of project summaries and professional and technical summaries for surveying and mapping production projects, and can be used as a reference for the preparation of other surveying and mapping project summaries.


Some standard content:

ICS 07O
Grid Diameter-: 1602—20
Standard of the Surveying and Mapping Industry of the People's Republic of China
CH/T 1001.-2005
Substitute Sample (H 1001-.91
General rules for technical summaries of surveying and mapping mapping
2005-12-07Released
National Bureau of Surveying and Mapping
2006-01-01Implemented
Periodic application document
3 Summary
System of surveying and mapping technology summary
1. Contents of project summary
Main contents of small 3 professional and technical summary
Tao Lu A (scientific appendix) cover, cover format, font, student number reference document
TYKAONYKAca
...........
C/T 1001--2005
This standard (Regulations on the preparation of surveying and mapping technical summaries) is different from the standard in the following aspects: The format of the standard is in accordance with Part G.20:20 Guidelines for standardization work, etc. Part 1: Rules for the preparation of standards: Chapter "Normative nature and use of documents" is added. The surveying and mapping technical summary is used as a normative reference document: "1 .1 General Rules, which stipulates the composition and content of each component of the surveying and mapping technical summary: The contents of the professional technical summary are summarized and no longer divided into professional descriptions. This standard is a reference appendix. This standard was proposed and planned by the National Bureau of Surveying and Mapping. The main authors of this standard are: Zheng Yuxia, Guo Zhufang, Pang Shangyi, Sang Dongwen. The previous version replaced by the standard is: 1991. Provisions for the preparation of surveying and mapping technical summaries. This standard stipulates the main contents and requirements for the preparation of professional technical summaries of surveying and mapping summaries. CH/T 1001—2005
In the preparation of the project summary and the technical summary of the production estimate, the system of the summary of other surveying and mapping items can be referred to
2 Normative Reference Documents
The clauses in the following documents become the clauses of this standard through the reference of the standard. For all the referenced documents with the annotation period II, all the subsequent amendments (excluding the internal wear of the error) or revisions are not applicable to this standard. However, the parties who reach an agreement based on this standard are encouraged to study whether it is a section that can be The latest version of these documents shall be used. For any referenced document without an indication of the date, the latest version of this standard shall be used. (HTt004--2:0 Standard Surveying and Mapping Technical Design Regulations 3 Summary
3.1 Surveying and Mapping Technical Summary In the process of surveying and mapping services, the implementation of surveying and mapping technical design documents and technical standards and specifications, the main technical problems and treatment methods encountered in the implementation of technical design solutions, the quality of results (or products), the application of new technologies, etc. shall be analyzed and studied, and an objective summary and evaluation shall be made. The surveying and mapping technical summary provides guidance for the reasonable use of results (or products) by the user (or the next step), and provides a basis for the continuous quality control of surveying and mapping units. At the same time, it also provides information for surveying and mapping technical design and the formulation of relevant technical standards and regulations. The surveying and mapping technical summary is a technical document that is closely related to surveying and mapping results (or products) and is an important technical file to be preserved for a long time. 3.2 Surveying and Mapping Technical Summary 4 Summary and Professional Technical Summary. The professional and technical summary is a technical document written by the surveying and mapping professional activities included in the surveying and mapping project after their results (products) have been checked and qualified. The scope of surveying and mapping professional activities included in the professional and technical summary and the work content of each surveying and mapping professional activity shall comply with the provisions of 5.3.3 of CH10042305. The monthly summary is a technical summary of the entire project made on the basis of various professional and technical summaries after the final results (or products) of a surveying and mapping project have been checked and qualified. For users with a smaller workload, the project summary and professional and technical summaries can be combined into the monthly summary as needed. 3.3 The professional and technical summary is written or compiled by the legal person who undertakes the project task of surveying and mapping. The specific editing work is usually undertaken by the technical personnel of the unit. After the technical summary is completed, the unit general manager or technical person in charge shall review the objectivity and completeness of the technical summary and be responsible for the quality of the technical summary. The technical summary shall be approved by the market, signed by the market, and submitted and archived along with the surveying and mapping results (or products), surveying and mapping technical design documents and results (or product) inspection reports.
3.4 ​​The main references for the preparation of the surveying and mapping technical summary include: the relevant requirements of the surveying and mapping task book or contract, the records of customer requirements or supplier requirements, the market's requirements or expectations. Surveying and mapping technical design documents, relevant laws, regulations, technical standards and specifications: C. Quality inspection reports of the results (or products). The previous surveying and mapping technical design, the information provided by the surveying and mapping technical summary, and the quality records and relevant data of the existing production process and products.
e Other relevant materials,
3.5 The compilation of the surveying and mapping technical summary should be:
The content should be substantial and comprehensive, with emphasis on key points. When explaining and evaluating the implementation of technical requirements, the relevant technical requirements of the design document should not be simply copied: the main technical problems and treatment methods encountered during the operation, the treatment of special situations and the effects achieved, experience, lessons and legacy should be explained in detail.
HTYKAONYKAca
CI1/T1001--2005
h. The document should be concise. The formulas, numbers and charts should be accurate. The names, terms, practices and measurement standards should all be consistent with the existing document specifications and standards.
Xie Luo Technical Summary is a concise summary of the form and content of the summary.
411 The composition of the surveying and mapping technical summary
Xie Yue Investment Technical Summary (summary of the project) usually consists of an overview of the implementation of the technical design, a description and evaluation of the results (or product quality), a list of the results or products and their materials submitted to the central file 4.1.2 The main content of "Overview" is to explain the general situation of surveying and mapping work. For example, the source of the task, the standard, the work, the arrangement and completion of the task, as well as the overview of the work area and the use of existing data, etc. 4.1.3 The main content of "Technical design implementation" is to explain and evaluate the implementation of the technical requirements, standards and specifications of the surveying and mapping technical design documents. The content mainly includes the technical standards and specifications of the surveying and mapping technical design documents based on production, the implementation of the design specifications and the technical changes during the implementation process, the main technical problems and treatment methods in the production process, the treatment of special situations and the effects achieved, etc., the new technologies, new methods, new materials, etc., experience, experience, legacy issues, improvement opinions and suggestions, etc. 4.1.4 The main content of "Quality description and evaluation of results (or products)" is to briefly explain and evaluate the quality of the surveying and mapping results (released products), including the necessary accuracy statistics, and explain the technical quality indicators achieved by the products. 4.1.5 The main contents of "List of results (or products) submitted and archived and their materials" respectively describe the form and quantity of the results (or products) submitted and archived in the period, as well as the list of materials and documents submitted and archived. 4.2 Contents of the project summary
4.2.1 Overview
Summary:
, project source, content, objectives, work volume, project organization and implementation, professional surveying and mapping task division, content and corresponding task units, product delivery and acceptance, etc.
1, Project execution status: explain the completion of production service arrangements, statistics on relevant work quota operation rates, fund heat records, etc. :Overview of the operation area and the use of existing data: 4.2.2 Implementation of technical design
The content includes:
a. Technical documents based on which the production is to be carried out, including: project design, all professional technical design documents included in the project, technical design change documents:, relevant technical standards and specifications,
The above describes the implementation of the relevant technical standards and specifications of the project design documents during the implementation of the project, and explains the technical changes of the design documents (including the content of the technical design changes, the explanation of the source, etc.) Focus on the main technical problems and treatment methods encountered during the implementation of the project, the treatment of special situations and the effects achieved, etc. e.Describe the implementation of quality assurance measures (including organizational management measures, resource assurance measures, quality control measures and data safety measures) during project implementation. When new technologies, new methods and new materials are used in the production process, their effectiveness should be described and summarized in detail. Summarize the experience, lessons learned (including major deficiencies and failures) and problems in project implementation, and put forward suggestions and constructive measures for future production. 423 Description and evaluation of the quality of surveying and mapping results (or products) CH/r1001—2005 Description and evaluation of the quality of the final surveying and mapping results (or products) (including necessary accuracy) and the technical indicators achieved by the product. Name and number of the quality inspection report of the final surveying and mapping results (or products) 12.4 Handover and archiving of surveying and mapping results [ or product|and its data list, including the form, quantity, etc. of the work and the documents of the work and the documents. Mainly include:
Surveying and mapping results or products: state their name, quantity, type, and when the quantity or scope of the results changes, the results sub-map should be attached
Documentary materials: including the design change documents of the project, the project summary, the quality inspection report, and when necessary, the professional and technical design books and related professional design change documents, professional and technical summary, document book (history book) and other important records formed during the work. Other materials that need to be submitted.
4.3 Main contents of the professional and technical summary
4.3.1 Overview
To summarize:
hole, surveying and mapping Item and name of the professional surveying and mapping task: the content, workload and standards of professional surveying and mapping services, product delivery and acceptance, etc.
h Statistics on the planned and actual completion status, and the accuracy rate. Overview of the work area and the use of existing data. 4.3.2 Implementation of technical design
The main contents include:
Technical documents on which professional activities are based, including: professional technical design and related technical design change documents, and when necessary, the project design book and design change documents of this surveying and mapping project:
Related technical standards and specifications,
1 Describe and evaluate the implementation of professional technical design documents during professional technical activities, and specifically explain the changes to professional technical design certificates during the professional surveying and mapping production process ( d. When new technologies, new methods and new materials are used in the production process, their application should be described and summarized in detail. Summarize the experience, lessons (including major defects and failures) and legacy issues in professional surveying and mapping production, and put forward improvement opinions and suggestions for current production.
4.3.3 Description and evaluation of the quality of surveying and mapping results (or products) The quality of surveying and mapping results (or products) (including necessary accuracy statistics), the technical indicators achieved by the products, and the name and number of the quality inspection report of surveying and mapping results (or products). 4.3.4 Description of the list of surveying and mapping results (or products) and materials submitted! The main content and form of the surveying and mapping results (or products) and materials submitted, mainly including: l. Test results (or products): indicate their name, quantity, type, etc. When the number or scope of the submitted results changes, a distribution map of the submitted results must be attached. Document materials: professional and technical design materials, professional and technical summaries, inspection reports, necessary document support (charts and calendars) and other important records formed during the operation.
, other materials that need to be submitted for new filing,
TYKAONYKAca
(11/T1001-2005
Format requirementswwW.bzxz.Net
Appendix A
【Informative Appendix】
Format, cover format and font. Font size
Projection is not always based on the A series of standard paper specified in Sichuan 613.7%8. A1 resolution (21mm293nm) is correct to facilitate reading and copying.
A.2 Cover format
A21 cover format
A. 2. 1. 1 Project summary
The contract format of the project summary is shown in Figure A212. Professional and technical summary
The main cover format of the professional and technical summary is shown in Figure A2.2.2. The secondary cover format
A. 2. 2. 1 Project summary
The sub-format of the project summary is shown in Figure A.3
A.2.2.2 Professional and technical summary
The sub-format of the professional and technical summary is shown in Figure A.1A.3 Font size and font of technical summary
A.3.1 Font size and font of the cover and title
The title of the technical summary should be in "#1", the title of the table of contents should be in "#2", and the content should be in "#4". A3.2 Font size and font of the main text
In the main text of the technical summary, the number and title of the chapter, article, and record should be in "#1". The title of the figure, table, and footnotes should be in "#5". Mathematical and textual materials in the figures, tables and graphs as well as the unit's presentation shall be in the designated font.
All other contents in the appendix shall be in Song font size 4. Confidentiality level
Project name
Project summary
Name of the writing unit
shall be "confidentiality level" in accordance with the confidentiality levels divided by relevant national regulations: "+abbreviation" for the design unit to number by itself, or the project number of the project may be used; line: "confidentiality level" and "editing card" on the cover of the technical summary of the project A.1 Project summary cover format
TYKAONYKAca
CH/T1001--2005
Number:
TH/T 1001-—2005
Project name
No.\:
(Name of surveying and mapping specialty) Name of the writing unit of professional and technical summary
Figure A.2 Format of the main cover of professional and technical summary
Project name
Project summary
Written by:
Review comments·
Reviewer:
Figure A.3 Format of the sub-cover of project summary
TKAONYKAca
CH/1001-2005
CH/T 1001-2005
Project name
(Name of surveying and mapping specialty) Professional and technical summary Compilation unit (seal):
Compiler:
Year/month/day
Review opinion:
Reviewer:
Year/month/day
Figure A.4 Format of sub-cover of professional and technical summary
References
12xs19919 Figure # Name of magazine and its format size (neu 150 67[6:983)TYKAONiYKAca
CH/1001—20052. Implementation of technical design
Main contents include:
Technical documents based on professional activities, including: professional technical design and related technical design change documents, and if necessary, the project design book and design change documents of this surveying and mapping project:
Related technical standards and specifications,
1. Explain and evaluate the implementation of professional technical design documents during professional technical activities, and explain the changes of professional technical design certificates in the process of professional surveying and mapping production (including the changes in professional technical design certificates, reasons, etc.). C. Describe the main technical problems and solutions in the process of professional surveying and mapping production, the handling of special situations and the effects achieved, etc. d. When new technologies, new methods and new materials are used in the process of professional surveying and mapping, their application should be described and summarized in detail. Summarize the experience, lessons (including major defects and failures) and legacy issues in professional surveying and mapping production, and put forward improvement opinions and suggestions for current production.
4.3.3 Explanation and evaluation of the quality of surveying and mapping results (or products) Explanation of the quality of surveying and mapping results (or products) (including necessary accuracy statistics), the technical indicators achieved by the products, and the name and number of the quality inspection report of the surveying and mapping results (or products) 4.3.4 Explanation of the list of surveying and mapping results (or products) and materials submitted! The main content and form of the surveying and mapping results (or products) and materials submitted, mainly including: 1. Surveying results (or products): explain their name, quantity, type, etc. When the number or scope of the submitted results changes, a distribution map of the submitted results must be attached.
h Documents: professional technical design documents, professional technical summary, inspection report, necessary document support (charts and calendars) and other important records formed during the operation.
, other materials that need to be submitted for new filing,
TYKAONYKAca
(11/T1001-2005
Format requirements
Appendix A
【Informative Appendix】
Format, cover format and font. Font size
Projection is not always based on the A series of standard paper specified in Sichuan 613.7%8. A1 resolution (21mm293nm) is correct to facilitate reading and copying.
A.2 Cover format
A21 cover format
A. 2. 1. 1 Project summary
The contract format of the project summary is shown in Figure A212. Professional and technical summary
The main cover format of the professional and technical summary is shown in Figure A2.2.2. The secondary cover format
A. 2. 2. 1 Project summary
The sub-format of the project summary is shown in Figure A.3
A.2.2.2 Professional and technical summary
The sub-format of the professional and technical summary is shown in Figure A.1A.3 Font size and font of technical summary
A.3.1 Font size and font of the cover and title
The title of the technical summary should be in "#1", the title of the table of contents should be in "#2", and the content should be in "#4". A3.2 Font size and font of the main text
In the main text of the technical summary, the number and title of the chapter, article, and record should be in "#1". The title of the figure, table, and footnotes should be in "#5". Mathematical and textual materials in the figures, tables and graphs as well as the unit's presentation shall be in the designated font.
All other contents in the appendix shall be in Song font size 4. Confidentiality level
Project name
Project summary
Name of the writing unit
shall be "confidentiality level" in accordance with the confidentiality levels divided by relevant national regulations: "+abbreviation" for the design unit to number by itself, or the project number of the project may be used; line: "confidentiality level" and "editing card" on the cover of the technical summary of the project A.1 Project summary cover format
TYKAONYKAca
CH/T1001--2005
Number:
TH/T 1001-—2005
Project name
No.\:
(Name of surveying and mapping specialty) Name of the writing unit of professional and technical summary
Figure A.2 Format of the main cover of professional and technical summary
Project name
Project summary
Written by:
Review comments·
Reviewer:
Figure A.3 Format of the sub-cover of project summary
TKAONYKAca
CH/1001-2005
CH/T 1001-2005
Project name
(Name of surveying and mapping specialty) Professional and technical summary Compilation unit (seal):
Compiler:
Year/month/day
Review opinion:
Reviewer:
Year/month/day
Figure A.4 Format of sub-cover of professional and technical summary
References
12xs19919 Figure # Name of magazine and its format size (neu 150 67[6:983)TYKAONiYKAca
CH/1001—20052. Implementation of technical design
Main contents include:
Technical documents based on professional activities, including: professional technical design and related technical design change documents, and if necessary, the project design book and design change documents of this surveying and mapping project:
Related technical standards and specifications,
1. Explain and evaluate the implementation of professional technical design documents during professional technical activities, and explain the changes of professional technical design certificates in the process of professional surveying and mapping production (including the changes in professional technical design certificates, reasons, etc.). C. Describe the main technical problems and solutions in the process of professional surveying and mapping production, the handling of special situations and the effects achieved, etc. d. When new technologies, new methods and new materials are used in the process of professional surveying and mapping, their application should be described and summarized in detail. Summarize the experience, lessons (including major defects and failures) and legacy issues in professional surveying and mapping production, and put forward improvement opinions and suggestions for current production.
4.3.3 Explanation and evaluation of the quality of surveying and mapping results (or products) Explanation of the quality of surveying and mapping results (or products) (including necessary accuracy statistics), the technical indicators achieved by the products, and the name and number of the quality inspection report of the surveying and mapping results (or products) 4.3.4 Explanation of the list of surveying and mapping results (or products) and materials submitted! The main content and form of the surveying and mapping results (or products) and materials submitted, mainly including: 1. Surveying results (or products): explain their name, quantity, type, etc. When the number or scope of the submitted results changes, a distribution map of the submitted results must be attached.
h Documents: professional technical design documents, professional technical summary, inspection report, necessary document support (charts and calendars) and other important records formed during the operation.
, other materials that need to be submitted for new filing,
TYKAONYKAca
(11/T1001-2005
Format requirements
Appendix A
【Informative Appendix】
Format, cover format and font. Font size
Projection is not always based on the A series of standard paper specified in Sichuan 613.7%8. A1 resolution (21mm293nm) is correct to facilitate reading and copying.
A.2 Cover format
A21 cover format
A. 2. 1. 1 Project summary
The contract format of the project summary is shown in Figure A212. Professional and technical summary
The main cover format of the professional and technical summary is shown in Figure A2.2.2. The secondary cover format
A. 2. 2. 1 Project summary
The sub-format of the project summary is shown in Figure A.3
A.2.2.2 Professional and technical summary
The sub-format of the professional and technical summary is shown in Figure A.1A.3 Font size and font of technical summary
A.3.1 Font size and font of the cover and title
The title of the technical summary should be in "#1", the title of the table of contents should be in "#2", and the content should be in "#4". A3.2 Font size and font of the main text
In the main text of the technical summary, the number and title of the chapter, article, and record should be in "#1". The title of the figure, table, and footnotes should be in "#5". Mathematical and textual materials in the figures, tables and graphs as well as the unit's presentation shall be in the designated font.
All other contents in the appendix shall be in Song font size 4. Confidentiality level
Project name
Project summary
Name of the writing unit
shall be "confidentiality level" in accordance with the confidentiality levels divided by relevant national regulations: "+abbreviation" for the design unit to number by itself, or the project number of the project may be used; line: "confidentiality level" and "editing card" on the cover of the technical summary of the project A.1 Project summary cover format
TYKAONYKAca
CH/T1001--2005
Number:
TH/T 1001-—2005
Project name
No.\:
(Name of surveying and mapping specialty) Name of the writing unit of professional and technical summary
Figure A.2 Format of the main cover of professional and technical summary
Project name
Project summary
Written by:
Review comments·
Reviewer:
Figure A.3 Format of the sub-cover of project summary
TKAONYKAca
CH/1001-2005
CH/T 1001-2005
Project name
(Name of surveying and mapping specialty) Professional and technical summary Compilation unit (seal):
Compiler:
Year/month/day
Review opinion:
Reviewer:
Year/month/day
Figure A.4 Format of sub-cover of professional and technical summary
References
12xs19919 Figure # Name of magazine and its format size (neu 150 67[6:983)TYKAONiYKAca
CH/1001—20051 Format of the main cover of the project summary
TYKAONYKAca
CH/T1001--2005
No.:
TH/T 1001-—2005
Project name
No.\:
(Name of surveying and mapping specialty) Name of the organization compiling the professional and technical summary
Figure A.2 Format of the main cover of the professional and technical summary
Project name
Project summary
Compiler’s position (stamp):
Compiler:
Review comments·
Reviewer:
Figure A.3 Format of the secondary cover of the project summary
TKAONYKAca
CH/1001-2005
CH/T 1001-2005
Project name
(Name of surveying and mapping specialty) Professional and technical summary Compilation unit (seal):
Compiler:
Year/month/day
Review opinion:
Reviewer:
Year/month/day
Figure A.4 Format of sub-cover of professional and technical summary
References
12xs19919 Figure # Name of magazine and its format size (neu 150 67[6:983)TYKAONiYKAca
CH/1001—20051 Format of the main cover of the project summary
TYKAONYKAca
CH/T1001--2005
No.:
TH/T 1001-—2005
Project name
No.\:
(Name of surveying and mapping specialty) Name of the organization compiling the professional and technical summary
Figure A.2 Format of the main cover of the professional and technical summary
Project name
Project summary
Compiler’s position (stamp):
Compiler:
Review comments·
Reviewer:
Figure A.3 Format of the secondary cover of the project summary
TKAONYKAca
CH/1001-2005
CH/T 1001-2005
Project name
(Name of surveying and mapping specialty) Professional and technical summary Compilation unit (seal):
Compiler:
Year/month/day
Review opinion:
Reviewer:
Year/month/day
Figure A.4 Format of sub-cover of professional and technical summary
References
12xs19919 Figure # Name of magazine and its format size (neu 150 67[6:983)TYKAONiYKAca
CH/1001—2005
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.