Some standard content:
JCS97.200
Classification: Y55
Registration No.: 11405-2003
Light Industry Standard of the People's Republic of China
QB/T25752002
Bowling equipment
Bowling equipmtnt
Published on 2002-12-27
Implementation on 2003-04-01 by the State Economic and Trade Commission of the People's Republic of China
QB/T2575—2002
This standard is formulated in combination with the actual production situation of my country's bowling equipment industry and relevant international bowling sports principles and regulations. This standard includes two parts: bowling lanes, including the placement of pins, scoring system, ball return equipment and its control system and scoring system: Part 3 includes: bowling lanes, which are equivalent to the ABC/WIBC specifications, including the table, lanes, inlays, grooves, control boards, etc. This standard does not include bowling balls, bowling alleys and other age products. This standard is the standard for the National Light Industry Federation and the National Sports Products Standardization Center! This standard is under the responsibility of Shanghai Yulu Industrial Co., Ltd.: Chengdu Zhangli Bowling Equipment Factory, Beijing Xidao Bowling Equipment Co., Ltd., Beijing Human Body Self-Health Products ... 2. 3
The process of sending the bowling pins to the designated position according to certain conditions. 2.4
Pin time
The first ball cycle time
Refers to the time required for the first ball to pass the hill, be lowered by the ball baffle, and then rise up (allowing the second ball to be thrown). The second ball cycle time
Refers to the time required for the first ball to pass the hill, from the time the ball baffle is lowered to the main opening (allowing the first ball of the next round) 2.5
Ball return time
The time required for the bowling ball to enter the tunnel and reach the exit of the rise and fall 3 Basic components, size specifications
3.1 Pin placement and ball return system
It consists of pins, pin delivery, pin lifting, pin distribution, pin pregnancy, control, ball return and other parts. 3.2 Scoring system
The main parts are scoring, display, operation and computer control. 33 bowling lanes
The bowling lanes include runway, lane markings, lanes, pins, ball guards, lanes, etc. (see Figures 1 and 2). 1
Report on the score
4 Requirements
Wine mark
Round East Oil
For the ball lake
Dream performance (this ball)
Make up into the ball)
Figure 1 Fairway
235=0119
10511 12.7 411/21/2*
1527±3 2 (65 173°±./8*)
Figure 2 Reverse cross section of the ball
4.1 Re-pin, ball return and scoring system
4.1.1 The exposed surface of the cylinder should be close to the effective auxiliary government treatment extension: installment board
4.1.2 Box placement time: the first appropriate time is ten days 155: the second time is not to the individual at 1t. 4.1.3 Stability: The rate of error is not more than one thousandth. QB/T 2575 - 2002
犯洗港
229--27C
4.1.4 Position error (i.e. the exact displacement from the center of the plate to the "punctuation" of the pin table): not more than BaIfKAoNYKAa=
QB/T2575-2002
4.1.5 When using the ball: +15..
4,1.6 The action of sweeping the pins is correct and effective.
4.1. The action of sending the pins is stopped, audible and in place. 4.1.9 The computer control program is correct and its program should comply with the requirements of Appendix A. 4.1.9 The scoring, display method and product display symbols comply with the provisions of Appendix B. 4.2 Bowling lanes (see Figure 3)
1064-12.7
hair.8
d frlax
Figure 3 Fairway and runway markings
()8\05
4.2.1 Runway
4.2.1.1 Must be not less than 4572m ([5°)4.2.1.2 Width less than ten fairway widths.
4.2.2 Foul line
4.2.2.1 Degree: 9.5mn-25.4mm「3/8\.~\].4.2.2.2 Degree: flush with ball rot and runway damage.4.2.3: Ball shape
4.2. 3.1 The fairway can be divided into the intrinsic fairway and the formed fairway, and its size should meet the following requirements. Q#/25752002
4.2.3.2 Standard length: (18288 on 12. mm (60 on 1/2") (the distance from the foul line to the No. 4 position) The length of the No. 1 pin point center position after the low point reaches the edge (not including the board) is 1R68.4+1.6)mm (341/16*+1/16\>.4.2.8.3 Degree: (1054=12.7)mm (411/2±[/2\ )4.2.4 Ball groove
The two sides of the ball groove are mainly composed of the same ball. The size should meet the requirements of the table. 4.2.4.1 Circular ball groove
Length: The width of the ball groove should be 1527 (3.2) mm (60 [/s\11/8\) Length: After installation or after the film, the thickness from the surface of the ball groove to the lowest point should be at least 17.6 mm 17\ 4.2.4.2 Square groove
Length: (235±6.4) m (91/4*1/4\): Length: From the rear edge of the bottle table to the No. 1 bottle point, within 381mm (15): Depth: After installation, the connection with the ball groove should not be higher than the lowest point of the defect, and the position of the center of the last bracket point should be (88.9±3.21mut131/2\1/8\>4.2.5 Bottle table
4.2.5.1 The table and the fairway: The table can be of the same type and the plate table must be the same as the fairway. The table size must meet the requirements of the table (see Figure 4)
12.5.2 The height of the bottle table is also the same as the width of the fairway. 4.2.5.3 Report the table standard, Chengsheng
4.2. 5. 4 The bottle position is recorded as 157.2±[.6]mm (2 1/4\±[/16\]4.2.5.5 The length of each adjacent three-point structure is (304.8+1.6)mm (12_1/16\). The distance from the center of the 7th, 8th, 9th and 10th points (excluding the board!) is (76.2+1.6)mm3\+1/16\).4.2.5.6
4.2.5.7 The distance from the center of the 7th and 10th bottle points to the nearest bottle platform edge is (69.9±6.4mm (23/4\±1 /4\). 4.2.5.8 The distance between the center of the No. 7 pin and the guard plate near the center of the No. 0 pin is (306.4 ± 1.6) mm: 121/[6\±1/16\>. 4.2.5.9 The dimensions of the No. 1 pin and the two guard plates should be the same, with an allowable error of 7.2 mm to 1/8\). 4.2.5.10 The required distance between the center of the No. 1 pin and the last row of pins should be (79.2 ± 1.6) mm (31 3/16\±116\
4.2.5.1 From the No. 1 bottle point to the center of the tunnel point distance (excluding the live tail plate! is (968.4 soil 1.6) mm1313/16\±1/16*) 4.2.8 Guard plate. Figure 5
4.2.6.1 Long flow: from the rear edge of the plate to the No. 38lmm (15\) standard book. 4.2.6.2 Distance between the two reports: (152 7±3.2)mm (601/9\±1/8).4.2. The pit structure can be set according to the function of the device, and it must have the function of preventing bowling balls and pins from bouncing off the ball. 4.2. The markings or patterns on the lanes and runways (see Figure 3) 4.2.8.1 The position of the two or four red markings on the lanes reported or printed shall be from 50.8mm to 152.4mm (2″~6\) 4
HKANY KA=
QB/T2575-2002
Second group: 2743mm--3[4Rmm(9-~10*) First group: 3353mm~3658mm (11~·12) Fourth group: 4267mm~4572mm (14~15) The markings of each group are parallel to the lines, and each mark must be a graphic, with a true diameter of 19mm (3/4\); The second and third marks can be omitted:
4.2.8.2 The ball should be placed on the foul line 829mm-2438mm (6~8\) in front of the foul line. There should be 10 marks embedded or pasted on the ground parallel to the foul line. Each mark should have the same surface shape and the diameter should not exceed 19m (3/4\). 4.2.8.3 1. Seven arrows should be embedded or pasted 365%mm~4377mm (12~16\) in front of the foul line. The shape of each arrow should be the same, which can be a square, a diamond, a triangle, a rectangle, etc. The width of each marked mark on the surface should not exceed 31.8mm (11/4\), and the width should not exceed 152.4mm (6\). The adjacent two grid marks must also be equal. 4.2.8.4 The material composition of the embedded marking pattern is hexagon, red PVC board, plastic, and the composition of the fairway or runway. The surface of the synthetic fairway can be printed on the surface of the synthetic fairway. 42.8.5 When marking the fairway, the surface should be consistent with the material, and then the paint or liquid should be removed. 4.2.8.6 In all stadiums, at least 1 meter of the ball should be uniform, and the pattern, number and layout should be the same. Unit: mm
fairway half
914.4±3.2
+ 5i. ± t.6
Figure 4 Bottle position mark
+1=:*s4K
Protective cover
152?±3.2
Figure 5 Protective plate area section
4.2.9 Ball speed, run-up and installation requirements
4.2.9.1 The error of any position of the ball surface shall not exceed 1.8mm.4.2.9.2 The horizontal difference of the ball surface shall not exceed 1.5mm. QB/T25752002
Total position: mml
4.2.9.3 The horizontal error of the ball surface shall not exceed 1.5mm at any position within the same distance, and the forward drop shall not exceed 1.5mm in the total length of 19156mm. 12.7mm
4.2.9.4 The surface of the fairway is not allowed to have continuous marks or protrusions. The flatness error of the surface of the runway and the fairway within the same width shall not exceed 1.5m. 4.2.86 For the pin table of the synthetic fairway, the joints of the two boards (strips) of the fairway, foul velvet, and the selection channel shall be kept even or allowed to have an error of not less than 0.64mm (see Figure 6)wwW.bzxz.Net
Figure 6 Screening of synthetic fairway installation
HKAONYKAa
Generation: ma
QB/T2575—2002
4.2.9. For the pin table of the synthetic fairway, the surface of the adjacent board (strip) of the channel shall be -127m. 4.2.9.8 The surface of the fairway is divided into two lines and swept at the center of each board. This item is misaligned. 5 Test method
The test method is as shown in Table 1.
Test rules
4.2. t.1, 4.2.1.2
4, 2, 4.2, 4.2. 4. 3
4.2, 5. 1, 4.2.3.15
4.2.8 1-.4.2.8.3
4.2. 4, 4.2.9.8, 4.2. 5.3, 4.2. 74.2.8.4, 4.2.8.5. 4.2.R.6
6. "Full test is carried out after the output is installed and adjusted on site. 6.2 When testing 4.1.5, if 4 of the 5 tests meet the requirements of 6.3, all the test items must meet the requirements of grade H. Test method: 100 times of continuous testing, measure the resistance of the test bottle with a sand meter for 10 times, and observe the cumulative action. Whether the running status is displayed or not, record the flow of the test with a 30m ruler, measure the test results with a white scale, and also measure the test results with a level gauge. ||Use machine to measure the leather accurately
Use three rulers, Hong ruler measuring seat
Marking, packaging, transportation, purchase and storage
Product or type of packaging) should have the following markings a) Product name:
Model (specification)
Factory date:
Product inspection and certification:
Product name:
Address:
Execution standard.
7.2 Packaging
QB/T2575·2002
.2.1 The synthetic fairway (with curved track title) should have a surface that is as close to the material as possible, and the fourth step should be to ensure the expansion of the implementation. 7.2.2 The new packaging of the boards and runway materials should be neat and tidy to prevent deformation and facilitate unloading and transportation. 7.2.3 According to the different properties of the product components, the packaging should be moisture-proof and have obvious labels. 7.2.4 The outer packaging should indicate the weight, volume, quantity and other contents. 7.3 Transportation
7.31 The transportation process should be prevented from scratches and collisions. Collision and sun exposure can not be drenched. 7.3.2 The surface of the synthetic fairway board and runway board should not be scratched or hit during transportation. The surroundings should not be damaged. 1.3.3 During transportation, the fairway materials should be placed flat to prevent deformation due to improper placement. 7.34 The equipment should not be rolled during transportation. The main equipment should be placed carefully and gently. 7.4 Purchase and storage
74.1 The ball chasing materials should be placed in a ventilated, dry and warm place. 7.4.2 The synthetic ball board and the quality ball lane should be placed flat to prevent deformation. Appendix A (Normative Appendix) A.1 International Age-Restricted Bowling Federation6 The parallelism of the surface of the runway and the fairway within the same width shall not exceed 1.5m. 4.2.86 For the ballway, the joints of the two boards (strips) of the fairway, foul velvet, and runway surface shall be kept even or allow a misalignment of not less than 0.64mm (see Figure 6)
Figure 6 Installation screen of synthetic fairway
HKAONYKAa
Generation: ma
QB/T2575—2002
4.2.9. For the ballway, the parallelism of the adjacent board (strip) of the runway surface shall be -127m. 4.2.9.8 The surface of the fairway shall be divided into two lines, and the joints of each board shall be scanned at the center of the joint. This item is misaligned. 5 Test method
The test method shall be as shown in Table 1.
Test rules
4.2. t.1、 4.2.1.2
4.2, 4.2, 4.2. 4. 3
4.2,5. 1、4.2.3.15
4.2.8 1-.4.2.8.3
4.2.4、4.2.9.8、4.2. 5.3、4.2. 74.2.8.4,4.2.8.5. 4.2.R.6
6.」All inspection items must meet the requirements after the on-site installation and adjustment of the output. 6.2 When inspecting 4.1.5, if 4 of the 5 tests meet the requirements, 6.3 and all other inspection items must meet the requirements. Test method: 100 seconds continuous test, measure the resistance of the test sample with a sand meter, measure the actual operation, display the running status, record the flow, use a 30m ruler, measure the effect, and use a flat ruler to measure the plate. ||Use machine to measure the leather accurately
Use three rulers, Hong ruler measuring seat
Marking, packaging, transportation, purchase and storage
Product or type of packaging) should have the following markings a) Product name:
Model (specification)
Factory date:
Product inspection and certification:
Product name:
Address:
Execution standard.
7.2 Packaging
QB/T2575·2002
.2.1 The synthetic fairway (with curved track title) should have a surface that is as close to the material as possible, and the fourth step should be to ensure the expansion of the implementation. 7.2.2 The new packaging of the boards and runway materials should be neat and tidy to prevent deformation and facilitate unloading and transportation. 7.2.3 According to the different properties of the product components, the packaging should be moisture-proof and have obvious labels. 7.2.4 The outer packaging should indicate the weight, volume, quantity and other contents. 7.3 Transportation
7.31 The transportation process should be prevented from scratches and collisions. Collision and sun exposure can not be drenched. 7.3.2 The surface of the synthetic fairway board and runway board should not be scratched or hit during transportation. The surroundings should not be damaged. 1.3.3 During transportation, the fairway materials should be placed flat to prevent deformation due to improper placement. 7.34 The equipment should not be rolled during transportation. The main equipment should be placed carefully and gently. 7.4 Purchase and storage
74.1 The ball chasing materials should be placed in a ventilated, dry and warm place. 7.4.2 The synthetic ball board and the quality ball lane should be placed flat to prevent deformation. Appendix A (Normative Appendix) A.1 International Age-Restricted Bowling Federation6 The parallelism of the surface of the runway and the fairway within the same width shall not exceed 1.5m. 4.2.86 For the ballway, the joints of the two boards (strips) of the fairway, foul velvet, and runway surface shall be kept even or allow a misalignment of not less than 0.64mm (see Figure 6)
Figure 6 Installation screen of synthetic fairway
HKAONYKAa
Generation: ma
QB/T2575—2002
4.2.9. For the ballway, the parallelism of the adjacent board (strip) of the runway surface shall be -127m. 4.2.9.8 The surface of the fairway shall be divided into two lines, and the joints of each board shall be scanned at the center of the joint. This item is misaligned. 5 Test method
The test method shall be as shown in Table 1.
Test rules
4.2. t.1、 4.2.1.2
4.2, 4.2, 4.2. 4. 3
4.2,5. 1、4.2.3.15
4.2.8 1-.4.2.8.3
4.2.4、4.2.9.8、4.2. 5.3、4.2. 74.2.8.4,4.2.8.5. 4.2.R.6
6.」All inspection items must meet the requirements after the on-site installation and adjustment of the output. 6.2 When inspecting 4.1.5, if 4 of the 5 tests meet the requirements, 6.3 and all other inspection items must meet the requirements. Test method: 100 seconds continuous test, measure the resistance of the test sample with a sand meter, measure the actual operation, display the running status, record the flow, use a 30m ruler, measure the effect, and use a flat ruler to measure the plate. ||Use machine to measure the leather accurately
Use three rulers, Hong ruler measuring seat
Marking, packaging, transportation, purchase and storage
Product or type of packaging) should have the following markings a) Product name:
Model (specification)
Factory date:
Product inspection and certification:
Product name:
Address:
Execution standard.
7.2 Packaging
QB/T2575·2002
.2.1 The synthetic fairway (with curved track title) should have a surface that is as close to the material as possible, and the fourth step should be to ensure the expansion of the implementation. 7.2.2 The new packaging of the boards and runway materials should be neat and tidy to prevent deformation and facilitate unloading and transportation. 7.2.3 According to the different properties of the product components, the packaging should be moisture-proof and have obvious labels. 7.2.4 The outer packaging should indicate the weight, volume, quantity and other contents. 7.3 Transportation
7.31 The transportation process should be prevented from scratches and collisions. Collision and sun exposure can not be drenched. 7.3.2 The surface of the synthetic fairway board and runway board should not be scratched or hit during transportation. The surroundings should not be damaged. 1.3.3 During transportation, the fairway materials should be placed flat to prevent deformation due to improper placement. 7.34 The equipment should not be rolled during transportation. The main equipment should be placed carefully and gently. 7.4 Purchase and storage
74.1 The ball chasing materials should be placed in a ventilated, dry and warm place. 7.4.2 The synthetic ball board and the quality ball lane should be placed flat to prevent deformation. Appendix A (Normative Appendix) A.1 International Age-Restricted Bowling Federation
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.