Standard Classification Number:Electrical Engineering>>Power Transmission and Transformation Equipment>>K46 Power Semiconductor Devices and Components
associated standards
Publication information
publishing house:Mechanical Industry Press
Publication date:1992-09-01
other information
drafter:Du Jimei, Qin Xianman, Chen Zhenyun, Liu Wei, Qiu Minxian
Drafting unit:Xi'an Power Electronics Technology Research Institute of the Ministry of Machinery and Electronics Industry, Jiangyin Thyristor Accessories Factory and Shanghai Rectifier General Factory
Focal point unit:Xi'an Power Electronics Technology Research Institute of the Ministry of Machinery and Electronics Industry
Proposing unit:Xi'an Power Electronics Technology Research Institute of the Ministry of Machinery and Electronics Industry
Publishing department:Ministry of Machinery and Electronics Industry of the People's Republic of China
This standard specifies the technical parameters and inspection rules for profile heat sinks for power semiconductor devices. This standard applies to extruded profile heat sinks for power semiconductor devices. JB/T 5781-1991 Technical conditions for profile heat sinks for power semiconductor devices JB/T5781-1991 Standard download decompression password: www.bzxz.net
Some standard content:
Mechanical Industry Standard of the People's Republic of China Technical Conditions for Profile Heat Sinks for Power Semiconductor Devices 1 Subject Content and Scope of Application This standard specifies the technical parameters and inspection rules for profile heat sinks for power semiconductor devices. This standard applies to extruded profile heat sinks for power semiconductor devices. 2 Cited standards GB/T11456 GB6892 GB3190 GB3199 3Technical requirements Test methods for thermal resistance and flow resistance of heat sinks for power semiconductor devices Heat sinks for power semiconductor devices Insulation parts and fasteners for power semiconductor devices Profile heat sink dimensions for power semiconductor devices Industrial aluminum and aluminum alloy hot extrusion profiles Chemical composition of aluminum and aluminum alloy processed products Packaging, marking, transportation and storage of aluminum and aluminum alloy processed products 3.1 Dimensions and deviations JB5781—91 The cross-sectional view and dimensions of the heat sink of the profile heat sink shall comply with the provisions of GB/T11456. The deviation of the dimensions shall comply with the provisions of GB6892. 3.2 Appearance and surface quality 3.2.1 Appearance The surface of the profile heat sink is not allowed to have defects such as cracks and scratches. 3.2.2 Surface quality The surface roughness of the profile heat sink is Ral1.6μm. The surface roughness of the heat sink is Ra25μm. The surface of the profile heat sink should meet the tolerance grade 9 accuracy. The verticality of the axis to the table should meet the tolerance grade 11 accuracy. The screw hole depth and installation slot size meet the requirements of Table 1. Table Approved by the Ministry of Machinery and Electronics Industry in 1991—10—17 mm Numbers and indicators Installation dimensions Installation slot dimensions M5×12 M10×14 M12X16 M16X(1.5)×18 M20×(1.5)×18 Width×Height 10.0×4.0 Implementation in 1992—10—01 3.3 Insulation, fasteners and installation requirements JB5781—91 Continued Table 1 Installation dimensions||t t||M12X16 M16×(1.5)X18 M20×(1.5)X18 M16X(1.5)X18 M20×(1.5)X18 M24X(1.5)X22 M20×(1.5)X18 M24X(1.5)X22 M30×(2.0)X24 M24×(1.5)×22 M30X(2.0)X24 3.3.1 Insulating parts and peripheral parts dedicated to radiator shall comply with the relevant provisions of GB8446.3. mm Slot size Width×Height 14.2×6.5 15.0×4.0 3.3.2The firm torque or firm pressure when installing the heat sink and the power semiconductor device shall comply with the provisions of the relevant detailed specifications. 3.3.3The size of the installation center positioning hole of the XF series heat sink table is 3.5mm in diameter and not less than 1.5mm in depth. 3.4Main performance parameters 3.4.1After the XF series heat sink is assembled with the simulation device (insulated tube core), it is tested for 1min under the conditions of ambient temperature 25±10C and relative humidity 85%. The withstand voltage between the cathode and anode shall not be lower than the following provisions, and there shall be no flashover phenomenon. When the distance between the cathode and anode is less than 26mm, it is 5000V (effective value), and when the distance between the cathode and anode is greater than or equal to 26mm, it is 8000.V (effective value). : The main parameters of the radiator shall comply with the provisions of Table 2. 3. 4. 2 Parameters and indicators (L=30,M5) (L=60,M8) (L-80,M10)1.9 (L=100,M10) (L=70,M12) (Z=100.M20) (L=125,M20) (L=150,M30) JB5781—91 Continued Table · 2 (L=110) (L=140) (L=140) (Z=180) (L160) and indicators 3.4.3The radiator manufacturer shall provide the characteristic curves of radiator thermal resistance, flow resistance and wind speed, radiator temperature rise and dissipated power in the technical documents related to the radiator. 3.4.4Material of radiator It is recommended to use aluminum alloy with code LD31 or equivalent performance, and its chemical composition shall comply with the provisions of GB3190. Inspection rules Radiator inspection is divided into two categories: quality consistency inspection and identification inspection. 4.1 Quality consistency inspection 4.1.1 Group A inspection (avoid batches) Each batch of radiators must be inspected according to the items specified in Table 3 before leaving the factory. Table 3 Inspection items Dimensions Surface quality Inspection method Measure with a vernier caliper Flatness and verticality are carried out in accordance with GB1958, and surface consistency is in accordance with relevant standards Qualification criteria Conform to GB/T11456.1 Conform to Article 3.2.1 Conform to Article 3.2.2 Sampling plan Inspection level Note: The specific sampling number of AQL is shown in Appendix A. If the batch inspection fails the initial submission, it can be resubmitted for re-inspection according to the strict inspection method, but it can only be resubmitted once. 4.1.2 Group C inspection (cycle) The heat exchangers produced by finalization must be inspected at least every two years according to the items specified in Table 4. Table 4 Inspection items Thermal resistance and flow resistance Insulation test Inspection method According to GB8446.2 Add adjustable AC voltage to the specified value In the sampling plan, n and c are the number of samples and the number of qualified judgments respectively. Qualified judgment Conform to Article 3.4.2 Conform to Article 3.4.1 Identification inspection If the first sampling fails, it can be inspected again by adding samples according to Appendix B, but only once. ② Identification inspection Identification inspection is a series of complete inspections conducted on several samples of this series, and its purpose is to determine whether the manufacturer is capable of producing products that meet the requirements of the standard. JB5781—91 When the design, process, or material is changed or when the production is resumed after suspension, an identification test shall be conducted. The identification test items shall be carried out in accordance with the items specified in Article 4.1. 5 Packaging, transportation, storage, and marking 5.1 Packaging After the radiator has passed the inspection and obtained the certificate of conformity, it shall be properly packaged in accordance with the provisions of GB3199. This standard recommends the use of box packaging, 5.2 Transportation The radiator shall be strictly protected from severe vibration and magnetic field during transportation to avoid damage. 5.3 Storage The radiator should be stored in a dry and well-ventilated place. 5.4, Marking The following markings should be marked on the outside of the packaging box; a. Product model and specifications: Net weight; Should be marked with the word "moisture-proof" or logo; Address and name of the receiving unit; Name of the shipping unit; Date of shipment. Certificate of conformity The radiator must be accompanied by a certificate of conformity when it leaves the factory. Its contents include: a. Name of the manufacturer; Product model;Www.bzxZ.net Product batch number: Conclusions on the inspection of various indicators and the official seal of the inspection department; Standard number or contract number; Date of inspection. 5.6 Acceptance After receiving the radiator, the purchaser shall conduct an acceptance inspection in a timely manner. If any problems are found, they shall be raised to the supplier within three months and the supply and demand parties shall negotiate and deal with them. JB5781—91 Appendix·A AQL (acceptable quality level) sampling table (Supplement) AQL (acceptable quality level) sampling see Table A1 Number of samples $·10~25 .51~90 151~280 281~500 501~1200 12013200 3201~10000 See Table B1 for additional sampling. Initial sampling Additional sampling Additional number (ng-n) Appendix B Additional sampling table (supplement) Qualified number Self-cooling thermal resistance and heat sink weight of air-cooled radiator Additional instructions: JB5781—91 Appendix c Self-cooling thermal resistance and heat sink weight of air-cooled radiator (Xin test piece) This weight is shown in Table C1, Heat sink weight (single piece, after drilling)||t t||(L=30,M5) (L60,M8) (L=100,M10) (L=70,M12) (L100,M20) (L=125,M20) (L=150,M30) (L=110) (L=140) (L=140) (L=160) This standard is proposed and managed by the Xi'an Power Electronics Technology Research Institute of the Ministry of Machinery and Electronics Industry. This standard was drafted by the Xi'an Power Electronics Technology Research Institute of the Ministry of Machinery and Electronics Industry, Jiangyin Thyristor Accessories Factory and Shanghai Rectifier General Factory. The main drafters of this standard are Du Jimei, An Xianman, Chen Zhenyun, Liu Wei and Qiu Minxian. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.