SY 5624-1993 Magnetic single and multi-point photographic inclinometer measurement procedures

Basic Information

Standard ID: SY 5624-1993

Standard Name: Magnetic single and multi-point photographic inclinometer measurement procedures

Chinese Name: 磁性单、多点照相测斜仪测量规程

Standard category:Oil and gas industry standards (SY)

state:Abolished

Date of Release1993-03-01

Date of Implementation:1993-09-01

Date of Expiration:2004-08-01

standard classification number

Standard Classification Number:>>>>Drilling Engineering

associated standards

Publication information

other information

Introduction to standards:

SY 5624-1993 Magnetic Single-point and Multi-point Photographic Inclinometer Measurement ProcedureSY5624-1993 Standard download decompression password: www.bzxz.net

Some standard content:

Industry Standard of the People's Republic of China
This standard has been transformed into the oil and gas industry standard after rectification. The standard number is: SY5624-93. It is a recommended standard and was confirmed in 1998. This is hereby stated. ZB E13 007-90
Measurement specification for magnetic single-point and multi-point photographic inclinometers Issued on 1990-02-27
Ministry of Energy of the People's Republic of China
1990-07-0 [Implementation
1 Topic Content and Scope of Application
ZBE13007-90
Part I Measurement specification for magnetic single-point photographic inclinometers Scope of application
Structure and working principle
Technical indicators
Operation method
Maintenance and calibration
Part II Measurement specification for magnetic multi-point photographic inclinometers
Application specification
Technical specifications
Operation method
Subject content and scope of application
Industry standards of the People's Republic of China
Measurement specification for magnetic single-point and multi-point photographic inclinometers ZBE13 007-90
This standard specifies the scope of use, structure, technical indicators and operation methods of conventional and high-temperature magnetic single-point photographic inclinometers and conventional multi-point photographic inclinometers.
This standard is applicable to the measurement of the inclination and azimuth of a certain depth in the direction and in the direction of the tool surface using a magnetic single-point photographic inclinometer. The measurement of high-temperature magnetic single-point and multi-point photographic inclinometers can also be used as a reference. The first article is the measurement procedure of the magnetic single-point photographic inclinometer. 2
Scope of use
In the pipe, the inclination angle of the depth can be measured: 2.2 When used with a non-magnetic drill, the inclination angle and azimuth of a certain depth can be measured. 2.3 When used with a fixed-angle drill, the inclination angle of a certain depth can be measured. Well inclination, azimuth and normal surface. 2.4 When there is no magnetic disturbance, the north inclination and azimuth at a certain depth can be measured in the open hole: 3 Structure and working principle
3.1 Structure
3.1.1 Main unit (see Figure 1)
Figure Main unit
1—End connector: 2—0~~10° angle unit; 3—0°~20° angle unit; 4—15°~90° angle unit; 5—15°~120° angle unit: 6—Instrument body assembly: 7—33-minute mechanical timer; 8—99-minute electronic timer; 9—Motion sensor; 10—Battery tube
Ministry of Energy of the People's Republic of China Approved on February 27, 1990, implemented on July 1, 1990
3.1.2 Maintenance and expansion assembly
ZB F13 007-90
The protective tube of the single-point photographic inclinometer is composed of two types: inclinometer and orientation: a.
The protective tube assembly of the inclinometer is shown in Figure 2:
Figure 2 Inclinometer protective tube assembly
1 Extension rod: 2-rotating joint: 3-support rod; 4-centering body; 5 rope cap: 6-fishing head; 7-floor cap; 12
8-sealing head: 90-type sealing ring; 10-spring: 11-housing: 12-0-type sealing ring: 13-rate sealing joint; 14-bottom carbon protection Components: 15—Extension rod b: Orientation instrument protection tube assembly as shown in Figure 3 Figure 3 Orientation instrument protection tube assembly
1—Coiling pin; 2—Energy pin: 3-way shoe: 4-Orientation component: 5—O-type sealing ring: 6—Shell; 7—Sealing joint: 8—Extension rod: 9-Anti-rotation joint; 10—Rightening joint; 11—Rightening rod; 12—Quick stop body; 13—Rope cap; 14—Salvage head; 15—Salvage width
3.1.3 Accessories
Includes developing tank, photosensitive adhesive, film loader, film reader, etc. 3.2 Principle
Use the photographic principle to expose the north inclination angle, azimuth angle and other directions at a certain depth in the well to the inclinometer film through the angle measuring device. The light time can be controlled by a timer or various sensors. Take out the inclinometer film from the out-of-well instrument and wash it, which is called reading the north inclination angle, azimuth angle and other directions. The inclinometer film is shown in Figure 4. X
15 ° ~ 91
Figure 4 Inclinometer film
0~20
1—azimuth angle: 2--inclination angle; 3--inclination angle; 4 Technical indicators
4.1 Measurement range and accuracy
4.1.1 Measuring film range
Inclination angle: 0°~120?
Azimuth: 0°~360°
4.1.2 Repeatability of measurement accuracy (see Table 1)
Angle measuring device
0°10°
0~20°
0 90°
0°~120°
4.2 Other technical indicators
4.2.1 Maximum operating temperature: 04°C,
4.2.2 Maximum pressure (protection tube): 117.68MPa.4.2.3 Instrument outer diameter: 44.45mm.
4.2.4 Total instrument weight: 50kg
4.2.5 Rated: 3~4.5V (3-cell No. 2 battery). Azimuth accuracy
Well inclination accuracy
4:2.6 Photographic exposure time: 7.5s
4.2.7 Rated time of timer
4.2.7.1 Mechanical timer: 33min and 66min4.2.7.2 Electric device: 1→99min,5 Operation method
5.1 Preparation before measurement
ZB E13 007-90
5.1.1 Selection of non-magnetic drill chain length and angle measuring device position The length of the non-magnetic drill chain is selected according to the magnetic field strength in each region and the expected maximum well inclination and azimuth. According to the horizontal strength of the geomagnetic field, the earth is divided into regions. my country selects according to the magnetic regions. The selection of non-magnetic drill chain length is shown in Figure 5: a: Below the outlet, the length of the non-magnetic drill bit should be no less than 9.14m, and the position of the angle measuring device should be 0.91~1.22m below the center of the non-magnetic chain
10203140506070B090
Azimuth, (')
Selection of magnetic drill length in magnetic zone
b. Above the curve, the length of the non-magnetic drill bit should be no less than 18.28m, and the position of the angle measuring device should be 2.44~3.50m below the center of the non-magnetic drill chain.
5.1.2 The expansion tube and extension rod of the instrument shall not be bent. 5.1.3 The butterfly patterns of each part shall be connected and the sealing rings shall be intact. 5.14 The lead pin in the keyway of the shoe must be firmly installed without any marks. 5.2 Mainframe inspection
5.2.1 The double disks in the angle measuring device rotate flexibly, the transparent liquid has no bubbles, and the measuring range is consistent with the expected well inclination angle of the non-bottom. The measuring device can only be put down after it is put on the shelf and calibrated. bzxz.net
5.2.2 The camera bulb is in good condition, and the film is flexible. 5.2.3 The battery performance must be good.
5.2.4 Inspection of accessories
5.2.4.1 Camera timer: Put 3 No. 2 batteries in the battery tube, and connect the timer as shown in Figure 6 (without anti-expansion belt). Put the camera into the battery tube, adjust the timer to "0", and the bulb will light up. 5.2.4.2 Electronic timer: Put 3 No. 2 batteries in the battery tube, and adjust the timer to "0". 5.2.4.2 Electronic timer: Put the camera and the timer tightly, and adjust the timer to "0". 5.2.3 The battery performance must be good.
5.2.4.1 Camera timer: Put 3 No. 2 batteries in the battery tube, and connect the timer as shown in Figure 6 (without anti-expansion belt). Put the camera into the battery tube, and adjust the timer to "0". 5.2.4.2 Electronic timer: Put the camera and the timer tightly, and adjust the timer to "0". 5.2.3 The battery performance must be good. 5.2.4.3 Electronic timer: Put 3 No. 2 batteries in the battery tube, and connect the battery and the timer as shown in Figure 6. 6. If not, replace with a new battery. 4
ZB E13 00790
Figure 6 Operation and inspection of various timers 1-Testing device: 2-Camera; 3-Battery energy; 4-Discharge; 5-Mechanical timer; 6-Clock; 7-Accessory; 8-Motion sensor; 9-Electronic timer 5.2.4.3 Motion sensor: The motion sensor has a switch on the outside, with two positions engraved with "on", "off", and "test" (see Figure 7). Install 3 No. 2 batteries in the battery cartridge: the positive poles face the motion sensor. Connect the battery cartridge to the motion sensor as shown in Figure 6, put the camera in contact with the motion sensor, and turn the switch of the motion sensor to the test position. The camera will flash for 5s and stay still for 45s. The camera light bulb will flash for 1-2 seconds, indicating that the motion sensor is working properly. If the light bulb continues to light up, it means that the battery is installed incorrectly and the battery should be installed vertically. If the light bulb does not light up or continues to light up without flashing, it means that the battery power is insufficient and a new battery should be replaced. Figure 7 Motion sensor
5.2.4.4 Non-magnetic sensor: Put 4 No. 2 batteries in the battery cartridge, with the positive pole facing the sensor direction, and use a multimeter to check that the battery circuit current is above 5A. Connect the battery cartridge, non-magnetic sensor and camera according to Figure 6, and the indicator light should flash. Use a non-magnetic test block to test the red and green areas of the sensor, the instrument should be silent for 2 minutes, and the camera bulb should be on for 7 seconds. Indicator light Figure 8 Film loading diagram
Xie Camera: 2- Film loader: Load the film according to A5.3 (see Figure 8)
ZB F13 007-90
5.3.1 Connect the angle measuring device and the camera
5.3.2 Hold the angle measuring device and the camera installed together horizontally with your left hand, and insert the outlet of the film loader into the inlet of the camera to make a good fit.
5.3.3 Press button A with your left index finger, and pull out the film loader plug with your right hand, then press it back to its original position, release button A with your left index finger, and remove the film loader.
5.3.4 Pull out the film loader plug. If it cannot be pressed back, it means there is no film in the film loader. 5.3.5 Check the bottom of button A. If you see a red ring or red dot, it means there is no film. You should reload the film according to the previous steps. 5.4 Timing, starting and downhole measurement
5.4.1 Connect the various components of the card machine in the order of Figure 6. 5.4.2 When completed, the start time should be selected according to the regional correction speed and well depth. 5.4.2.1 Timing and starting of mechanical timer: Press down the lever and rotate it in the direction of the arrow. You can observe the set time and the movement of the clothes from the observation window 11, and record the time at the same time. 5.4.2.2 Timing and starting of electric timer: There are two time buttons on the surface of the electric timer, one of which is marked with 1, 2, 9 numbers and the other is marked with 10, 20, ..., 90 numbers, which represent minutes. Select the time and press the start button: the LED starts to flash, the timer starts to work, and starts to record the time. 5.4.2.3 Start the motion sensor: After connecting the instrument, turn the knob switch from "off" to "on" and start recording the time. 5.4.2.4 Start the non-magnetic sensor: Connect the instrument according to the sequence in Figure 6, the indicator light flashes, and the time starts to be recorded. 5.4.3 Install the instrument into the protection tube, connect the protection tube and the extension rod or directional rod. 5.4.4 Use a steel wire to send the instrument from the pipe string to the predetermined measurement position or drop it from the pipe to the predetermined measurement position. The drill can be moved for 1 minute before the scheduled time. When using a mechanical timer or an electric timer, the drill tool should be stopped 1 minute before the scheduled time arrives, and photos should be taken after the time is reached: when using a motion sensor, it should be stopped for 1 minute or 2.5 minutes and then photos should be taken; when using a non-magnetic sensor, it should be stopped for 1 minute or 2 minutes and then photos should be taken.
5.4.5 After the instrument takes photos, the drill tool can be moved. Pull out the instrument. 5.5 Film development
5.5.1 Film development For example, add 12 to 1/3 of the developer tank and cover it. 5.5.2 The notch of the camera should match the top of the photo developing tank (see Figure 9). Figure 9 Unloading film
1—Angle measuring device and camera: 2-Close: 3—Photo developing tank 5.5.3 Put the handle of the photo developing tank in the "open" position, press the camera button A with your index finger, and release the camera button A when you feel the film falling into the photo developing tank. Check the camera button A. There should be a red ring or red dot indicating that the film has entered. If the film is put into the developing tank, filled with red rings or red dots, it should be unloaded.
5.5.4 Gently wash the film, temperature 20-27℃: develop for 4 minutes; when the temperature increases by 3℃, the developing time is shortened by 30s accordingly: when the temperature decreases by 3℃, the developing time is extended by 30s accordingly.5.5.5 Open the developing tank. Take out the film, rinse with water for 30s, and let it dry for 1.5.5.6 Use the two angle measuring devices in the measuring unit alternately. 5.6 Reading the film
ZB E13 007-90
5.6.1 Reading 0°~10 and 0°~20 films can be done with the help of a film reader (see Figure 10). Put the film reader on the film, the center point of the film reader is aligned with the film, the normal line on the film reader passes through the center of "+", at this time the normal line refers to the compass scale as the position angle, the center circle where the center of "+\" is located represents the well inclination angle, and the thick line on the film represents the surface. Figure 10 Film reader
5.6.2 Reading 0~90 film, the inclination angle is read from the intersection of the horizontal line and the scale. The angle of force is determined by the intersection of the vertical line and the compass scale. A short thick line on the film indicates a surface. The scale of the film reader is used to read the film. 5.6.3 When reading the film, the inclination angle is accurate to 0.25°, and the azimuth angle is accurate to 16°. Maintenance and calibration
6.1 Protective tube: After the instrument is taken out of the mountain, it must be rinsed with clean water and wiped clean with cotton yarn. If the instrument is not used for more than half a year, all threads must be brushed clean, grease must be applied, and a protective cap must be put on. It should be placed in a ventilated place indoors. 6.2 The timer should be maintained and calibrated once a year. 6.3 The battery must be removed after the instrument is used up.
6.4 Angle measuring device: It is strictly forbidden to touch the lens with hands or coarse cloth. The lens should be gently wiped clean with lens paper: Put on the protective cap, 6.5 Camera: The contact plate between the camera and the battery must be kept clean. The bulb must be replaced when it is exposed for more than 100 times. The lamp bowl should be gently wiped clean with lens paper or absorbent cotton, and the protective cap should be put on. 6.6 The protective tube O-ring and quick-correction rod should be inspected and replaced. 6.7 After the instrument is used up, each part should be disassembled, covered with a protective cap, and placed in the instrument box. 6.8 The measuring film and the most photographic solution should be stored at low temperature and away from light. Part II Magnetic Multi-point Photographic Inclinometer Measurement Procedure 7
Scope of use
Used in conjunction with a non-magnetic drill in a parallel eye without magnetic interference to measure the support bevel angle and azimuth angle. 7.2
Directional coring
Can continuously measure multiple positive bevel angles of different parallel depths in the column. 8 Structure
Machine: including power supply (battery tube), timer, motor, camera and angle measuring device (see Figure 11). 8.2
Protective tube assembly: see Figure 12.
Accessories: including developing tube, developing solution, film, dark bag, O-ring, voltage-stabilizing source, reader, etc. 9 Technical Specifications
ZB E13 007 --90
Instrument outer diameter 32mm, protection tube outer diameter 44.45mm, film width 10mm, film side band hole.
Magnetic multi-point inclinometer
1—Battery: 2—Timer: 3—Electric motor; 4—Camera: 5—Lens; 6—Light: 7—Transparent glass: 8—Knock liquid: 9—Single hammer: [0—Glass centripetal bad, 11—Double knock scale point; 12—Angle measuring device 1011
Figure 12 Protection expansion tube assembly
1—Salvage head: 2—Turtle cap: 3—Cable connector: 4—Swivel joint assembly: 5 Stopper: 6 Stopper body assembly 7-extension rod; 8-plug; 9-instrument breaker; 10-pressure cylinder [external millimeter): 1] battery cylinder: 2-instrument body assembly 13-measurement traction device: 14-spring: 15-plug; 16-extension cylinder: 17-bottom guide assembly 9.3 Film capacity: can hold 2.44m film at a time, image diameter is 6mm.9.4, shooting interval time: the program design has six gears (see Table 2) 9.5 Battery: 10 No. 5 alkaline batteries in 1 connection, total voltage 15V. - can take up to 360 pictures at a time:
9.6 Angle measurement specification: 0°~[0, 0°~17°, 0°~90°, 0°5° 15°120°9.7
Bulb: 3-bay special bulb
Operation method
Preparation before measurement
10.1.1 Selection of non-magnetic drill length
Infiltration 5.1.1.
ZB E13 007--90
10.1.2 The connecting threads of each part of the outer shell assembly of the instrument. The O-ring and the cover device should be intact. The outer shell shall not be bent, 10,1.3
The negative stopper of the battery shall not be installed in reverse, and the battery shall be measured one by one, the voltage is 1.5V, and the current is 5A. 10.1.4
The bulb of the camera is intact, without blackening, and the lens is clean. 10.1.5
The range of the angle measuring device is consistent with the maximum well inclination of the measured well, the inside and outside of the angle measuring device are clean, and the compass and pendulum float freely. Table 2
D-1/2
Image interval time
After 30min, match once every 30s
After delay (min, match once every 1min
10.1.6 The electrical circuit must not have cracked contacts, looseness or other obvious faults. 10.1.7
Must be calibrated and qualified before delivery to the site.
10.2 Assembly
10.2.1. Test of glue and developer: Open the film box in a dark case or a dark bag, cut two pieces of film, and develop the film after exposure.
Load the film (see Figure 13): Follow the following procedure in a dark case or dark bag: Figure 13 Typical mechanism and
1 - camera plate; 2 - glue stop sprocket wheel; 3 - recovery wheel; 4 - film tensioning wheel; 5 - film supply wheel; 6 - light block; 7 - film guard wheel; lens () a, dust cover screw;
Working time
The piece is developed before exposure:
ZBE1300790
b. Loosen the bolts of the hole cover plate and remove the camera cover plate: Take out the film cartridge: ℃ Place the film on the side with the small hole facing "d Put the film box on the right side, pull out a film from the box, use your hand to determine the photosensitive direction, and ensure that the photosensitive side is facing outward to the film supply wheel. Do not touch the film with wet fingers during the loading process; e. Install the film supply wheel into the camera and start threading the film. The route is to go around the two film wheels clockwise, along the inner wall of the camera, around the film sprocket and hang on the recovery wheel 1, and then recheck:, cover the cover, install the outer cylinder and dustproof period. 10.2.3 Instrument assembly
a Connect the battery cartridge to the top of the motor and the camera cartridge, and then install 10 No. 5 alkaline batteries in two rows according to the negative pole mark, "Fix the battery cartridge cover. At this time, the circuit is connected, and the sound of the motor turning should be heard. If it is comfortable, the battery and circuit should be checked. b. Install the corresponding angle measuring device.
Select the image interval according to Table 2 and press the start button to start the instrument. C
d Start the ground stopwatch while pressing the start button and start recording: fill in the data in Table 3c. Connect the instrument assembly with the instrument shock absorber and put it into the instrument protection tube to prepare for landing. 10.3 Measurement
Put the instrument into the lead rod: Baishan falls, and the drill needs to be moved up and down to prevent the drill from getting stuck. 10,3.1
The distance between the measuring blocks is the length of the column, and the corresponding measuring depth is calculated. Table 3 Field record table of magnetic multi-point photographic inclinometer (format) Measuring time
Column number
Vertical push length
Measuring point number
Incline angle
Reading angle
1033 After the instrument reaches the bottom, it stops and takes pictures twice, then the drill is pulled out, and the ground time of the re-measured point is recorded. Every time 10 columns are pulled out, 2 to 3 photos are taken again at a non-deep depth as a time verification point. 10.3.4 During the pulling process, a rotary buckle or a rotating rope mouth can be used. 1 gear low speed drilling. 10.3.5 After the measurement is completed, the instrument can be fished out with a salvage spear or the instrument assembly can be removed from the drill after the drilling is completed. 10.4 Film washing
10.4.1 Drill the expansion cartridge and take out the instrument. Wait for the instrument to take another photo: and record the time and serial number of the last clear film. 10.4.2 Remove the battery box, place the instrument in a dark room or dark bag next to the developing tank, remove the camera cover and cover, twist the recovery wheel to let the unused film pass through the lens, take out the film recovery wheel, wind the film in the recovery wheel onto the developing cylinder, put it into the developing chain, cover it, and fill the dark bag with developer. 10