title>GB/T 9167-2003 Spline shaft milling machine accuracy inspection - GB/T 9167-2003 - Chinese standardNet - bzxz.net
Home > GB > GB/T 9167-2003 Spline shaft milling machine accuracy inspection
GB/T 9167-2003 Spline shaft milling machine accuracy inspection

Basic Information

Standard ID: GB/T 9167-2003

Standard Name: Spline shaft milling machine accuracy inspection

Chinese Name: 花键轴铣床 精度检验

Standard category:National Standard (GB)

state:in force

Date of Release2003-11-10

Date of Implementation:2004-06-01

standard classification number

Standard ICS number:Mechanical Manufacturing>>Machine Tools>>25.080.20 Boring and Milling Machines

Standard Classification Number:Machinery>>Metal Cutting Machine Tools>>J56 Gear and Thread Processing Machine Tools

associated standards

alternative situation:GB/T 9167-1988

Procurement status:NEQ ΓOCT 5642:1988

Publication information

publishing house:China Standards Press

ISBN:155066.1-20386

Publication date:2004-03-01

other information

Release date:1988-05-05

Review date:2004-10-14

drafter:Guo Lin, Yan Fang

Drafting unit:Qinghai Second Machine Tool Manufacturing Co., Ltd.

Focal point unit:National Technical Committee for Metal Cutting Machine Tools Standardization

Proposing unit:China Machinery Industry Federation

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

competent authority:China Machinery Industry Federation

Introduction to standards:

This standard specifies the requirements and inspection methods for the geometric accuracy, transmission accuracy and working accuracy of spline shaft milling machines. This standard is applicable to spline shaft milling machines with a maximum milling diameter of 200mm and a maximum workpiece length of 3500mm. GB/T 9167-2003 Precision inspection of spline shaft milling machines GB/T9167-2003 standard download decompression password: www.bzxz.net

Some standard content:

This standard is not equivalent to ME4-33 palladium shaft sharpness silver version) This standard replaces T9167158 chain shaft accuracy. Compared with 63179, the main changes of this standard are as follows: added "front desk \
GB/T9167-2C3
international standard standard adopted in the unified standard diameter" from \230 to \200m\199% of the width of the first chapter) and added \"period standard reference document" Chapter 2]; some of the requirements for the relevant items have been improved (8 edition (, and the core 11:≤ version C6G7G and.
This standard is compatible with the following standards:
JB/T 24001s92
Flower clock milling machine
Dream number:
-:1 ax82—[553
Flower chain and milling taste
Technical conditions:
JB:T60961SS2
Chemical chain
JF5/T 10110—1999
Series type:
Flower push big
Safety expansion technology system:
This standard is issued by China Machinery Industry Association, and this standard is drafted by the National Machinery Industry Standardization Technical Committee (SACTC32). The drafting unit of this standard is: Haidi Machinery Manufacturing Co., Ltd. This standard is mainly drafted by: Bu Lin, Yan Efang, and the version issued by this standard is: G/T e1e7—.U3..
1 Scope
Spline shaft milling machine
Precision inspection
This standard specifies the requirements and inspection methods for the geometric accuracy, transmission accuracy and working accuracy of spline shaft milling machines. CB/I9167-—20D3
This standard is applicable to spline shaft milling machines with a maximum back diameter of 20 mm and a maximum length of 1 piece of spline shaft milling machines of 500 mm. 2 Normative references
The following clauses are used in conjunction with the The referenced documents of this standard shall be the subject of the following amendments (excluding errors or revisions) of the cited documents: All subsequent amendments (excluding errors or revisions) of the cited documents shall not apply to the standard. However, the parties involved in the design of this standard shall study whether the latest version of this document can be reached as soon as possible. The following ten standards are applicable to the design of this standard, G1/T10095,1-2301 Part 1: General meaning of medical and nutritional values ​​​​id1TS0 132x1:1997)
GBT17421.18 Machine tool inspection pass: positive first negative or please: a few examples of machine tool precision delivery eqss:1::39
3 General requirements
3.1 Use scalar parameters G/17421.11998:3.2B7421.1181 Install the wood level, change the center of the plate world ten lines (or bridge) 1 center bone level, the horizontal line in the parallel and perpendicular to the bed guideway direction of the number of talks do not exceed .4/1U0. 3.3 Chain test is called nuclear installation test. "And the inspection force should be actually controlled. 3.4 During the working test, the test piece should be inspected after the precision key. 3.5 When the actual measured length is different from the specified length of this note, the flow can be adjusted according to (iH/1 17421. 1:398 2.3.:, 1 provisions are converted with the measurable length, the expansion result is less than .005, still calculated as .035mm 1
GR/T 9167-2003
4 Geometric accuracy inspection
Strange test objectives
Taste teaching
At the point of vertical
and
the parallel production of the bed
most 500
5nn-1
...ch
1 6x-1 b69 .62c
2. o--2 ?
22 50G~-33
High part category
Note any length
long diameter
back to the sea
U. 00:_ J
0. 949r: 0ou
center distance
in any
U.U20:1 3C
1#RGB/T:742111959
relevant provisions
h. 2. 1. 2. 3. I
If the test tool
is placed horizontally in the middle of the sliding plate (or the heavy plate), the test board will be changed, and the accuracy will be recorded. The readings of the aquatic instrument will be arranged in sequence, and then the error curve will be set to calculate the difference between the length points and the final value. The maximum value of the error curve is calculated by the most central number of two points on the length of the light
15. 4. 1. 2. 7
Instrument, special
full board (or full board under the tube
with clinical guidance and maintenance of the kidney level
protocol, plasma moving through the return check adjustment
in the full stroke work bear less than the Fu dry
5 record readings, to the maximum
or three of the paragraph.
error in order to establish the effectiveness of the instrument
most effective
test job
store level
point
see||use
refuse||movement||(instrument benefit
for the maximum money
people
small
for the
.25
spot axis selection
.-1x.-..1 5nn
1 5x...> 5nm
degree1 >2 5X~-1 5F0
year you
F, CPE
measurement length
3, 513
civilian use length
.. .24
direction points:
in the measurement
seat, city
GB/T 9167—2303
unit is beside
standard city
five related provisions of the United States
1.2. 3, 2. 1.2
when the version is in ten
school in 1 :X: time, in, 1, sex
sit Asia public question original one
firm pattern, can light scan display, change its measurement
cloud use and effect change mourning table, financial
right bed·situation line small device set to school
car fast two buckles, etc., lock ruler to come,
mobile comics received in the gold bank on the ground
21 when the Zibo board line of management university one
local industry
center of the position of the lake root
Some, open the same deposit effect environment
show, this read the money
enterprise, etc., etc., the first dynamic lubricating machinery, in the industry 1. The beginning
refers to yuan%: or obviously push pure) car
full stroke engineering and social minister
the above two large numbers of the difference is
its total stroke height part K body is correct
Qiu station cold teeth difference
refers to the small device.4. 2.±. 2. 2
group light indicator, make its source
head seat guide
full-average
channel with steam indicator reading
maximum risk: bureau
measurement point
maximum risk of active end reading
inspection total seat should be removed original)
GR/T9167—2003
standard test item
for seat movement
to oil weight
recording can be parallel
(only for
the following is a sharp
+125 -
200 dragon
Xie Zuoyou
work on the shaft
centering protection
by
by in the water
bean surface
--2 (90
another show
in the measurement length
the largest iron front three
non-indicator
measurement production
single letter for the trouble
inspection force institute
service CE/T1/421.11008
the meaningful case
5. 4. 2. 2. b
sit on the three-way test of the business
system, the whole board, the center has a display
, and the semantic process is changed to the people's seat design
wear and not the front of the bed cover: e)
in the vertical level
four inside, the light moving plate belt
store together) on the full stroke.
a>,L error is calculated separately, the error is calculated by the amount of the indicator reading, the total amount of the reading is calculated by any source:. 5.1.2.3 The indicator is set, the head touches the centering element:) on the card plane;) in the plane, the cup shaft a), b> error is calculated separately, the difference is calculated by the difference value, the maximum moving diameter of the shaft is - + 125 -- 200 3, 572
The most direct control
-175- 302
GH/T 91672003
Single sex for millimeter technique
Inspection and supervision Fang Huan
# GB :1.:
There are this Kang model
5. 4. 3. 2
Indicator
Some indications, so that
light face
turn points in the use of 18
, set to report to the supervisor,
set to read the indicator war
even if the difference is large estimate:
Note: F is the sea except for the shaft
spindle cat bearing has a mouse
no fear
in the shaft centering hole
install the monitor. No fixed small
center hole of the ball, in
drawing and adding F, should turn the main shot
to keep these and the indicator
people's big hundred plan,
juice: groove close bearing oil
can not be added!
GB/19167—2003
Inspection missing items
Workpiece spindle
Single load diameter
Return potential:
) Rely on
Lubrication can move
Work, 200 measurement on 014
Batch war
Parallel,
Front E
(Inspection and selection from 4 ends only: on and test selection
To the other side
+ industry for the pro meter
Go beyond the driving method
# teacher: 1 1:421 1-158
The rules are caused by
±. 4. 1. 2. 3
In the transmission axis center hole
install the specification obstacle, the correct estimation
economical quickness its probe touches the material
specially in 1 near axis continent;
F1 shoots 3CU. The whole
inspection press belt: make the sincere to prove
A average work, transfer control
, error profit calculation,
must be three to indicate the maximum
three guarantees
5, 4,1, 2,1
5, 4, 2. 2. 2
In the above and soil period of stability ceremony
hand over the light monitoring selection, lead refers to your
device, make it useful; as for the inspection and testing
: cattle surface: 1
In the water surface, the standard force description
adjust the monitoring performance, can move the product
standard.8u use standard
qiao once,
) the difference is
the difference between the two measurements
the number and the sum of the mental calculation
standard monitoring items [
close inspection missing
welcome Pinou
Shangxiong hole system
line parallel
straight industry surface
plane
two main indicators
pressure Senfu pile
hole missing line pair
bed guard guide
blue armor surface
half surface
adjustable 6
ruler its h>
item not inspected
200 room quantity 6020
(fast constant when electric elimination only allowed surface maintenance
direction only for the front
-1 E2C
a night 6)
> and 63
_3) Xu Kugao>) H Xu 1
device, inspection
GH/T9167—2003
unit is the old request
integration and Zhao
store with care J742]. [
's have Ge clauses
.1.2.2.3
* full board and difference small
1 will be described in the product
wear different pure shrinkage, when the adjustment is changed| |tt||When the big 15G0 is down, the full seat is fixed
F has not led the middle part, and the flash
back needs to be opened. In the back
micro energy points can be tied to the car to control my situation. The team
clearly shows the speed of its intention to reach the point
inspection: in
the surface h) water ", more
dynamic dissolution includes grabbing objects,
technical inspection of dangerous situations
\new people grabbing steps
set the difference with the two measurements to obtain the
algebraic sum
5, 4, .:. 2, 1
R closely read the same
people descend the regular management back to the doctor, year
can be tested (or in the workpiece
main and foot center and you sit set two
hole each person · section diameter according to
choose), Zhou Ding finger path, restore its
to the head shot and rough test format::\
vertical point pregnant need inner water
facing south, format new pass in pull press single
tension stem respectively correct calculation
live with according to the display instrument technology effect
CB/19167—20C3
, shock stock mountain
light and special
2 fee short
fan soil goose
department! The maximum vertical point is 6) —203
212. --21.3
5) :—365
$>125.-23.
The unit can be vertically measured and the value can be achieved by measuring the value of 13421
.. 6. 1. 2. 3
Only point to the ten vertical points
quantity, and the next point is the personality test monument hit by the hole. According to the original control principle, the department you are in charge of (such as the basic inspection and control personnel re-inspection), h2 differential measurement, the difference can reach the measurement activity indication 5. 5, 2. 2
Forbidden, steel
its inspection and release
snow, in the Weidan soil axis can be selected, because the fixed index cloud sugar,
make the probe question and the inspection center
the surface inside,
such as the force F anti-rotation soil axis: the positive point
two points are set to control the upward rotation to indicate the effectiveness of the large difference position meter,
: F side eliminates the main
Sa of the bearing shaft
towards the source of the unconvexity.
5 Transmission accuracy inspection and test
The current inspection is mainly for: Xi H
The shaft has no
contact line
and can be used for guessing the accuracy (see the first) The following transmission accuracy inspection is available, the door
small only he
national quality push
ground control repair test
ten engineering properties
non-return
traditional error type
two dynamic high
anti-error transmission
net difference!
“Angle”
The most uncontrolled diameter
h; :25
b: 1es
Solution, calibration
Free displacement
GB/T 9157-2CD3
Single should be yours
Inspection party will
National 13/T -1121. 1
There are multiple models
5, -, 4, 2
Small bones in the sub-position
, the strength of the internal
people test, so that the indicator is accurate,
fast its head by the support
) of the surface of the shoes and the surface of the bruise, let
according to the object and the exit of the ordinary
standard test,
chuan Qi Lan draws the joint installation 130
each measurement to test the actual
people put the piece of indicator set light stem value
misleading special calculation
error close to the two changes after the station result
number and rate, the sex monitoring
long shock time original!
test method standard
FG:T-742-.---108
's American policy
in the workpiece king and show its main
lack on the use of the festival enough to thank the night,
's test image training with medical stack
special, with the companion, the work
two work symptoms to its abnormal rotation can be drawn
correct 1 work spindle rotation -~ rotation
non: a) angle to make a real difference
natural post Fen big smoke design difference
part and, mistake with the correct meaning
! The forget part lightly read the fortunate
big plan)
's low that is, filter out the business amount
! Mistake Dong department. The protection point is to determine the indication
B/T3167—2003
new standard
add memory will be the number bone
flow faith when elegant standard
6 work format inspection
please some west?
dust shape
my method moves
a
a
down transmission money transfer
misconception of business "company
super Hu division length
or sexual step request
deep classic task
flying part
ni, (r4r
a format test
!natural type
single stop content
control test method
# C27T2742:::1009
's hundred for the killing style
on the plate to install to wait
rule, shoot the letter head, cloth parts special contract
small An shape displacement to be installed,
adjust the control refrigeration machine speed
transfer ratio into
effective letter), in the absence of common conditions
Korea to play in the will be inspected
the high-frequency part of the inspection "make the head low
zhanghua are divided. French Yingwu Nuo
the person's position.
h) The axial line card drive
is made by the method of high
: error handling, a total of ten meanings
complete the multi-level siltation this most
human value design
after the machine tool is carried out transmission inspection: a general no longer work precision inspection: when the above guess change according to the inspection of the machine transmission pin rush adjustment, the following table of regulations is carried out: when the user has special requirements. The manufacturer should comply with the provisions determined in the product agreement, the serial number
figure certificate see
Diameter of the milling machine: m:
12F--2#2
—(C.--1) Jingda
School diameter
Material: Fruit normalizing
3一.5--1most 1 said
Production. Diameter
,7 machine tool recording archbzxz.net
machine tool most efficient
Material East HT29
Normal English
One pass width (m)
Minda milling front point diameter:
: 125
is 3. 325
When the specified
performance is:
1) F,su.3u &s
Note:, the stage is
[1 105,1—
performance precision single
single
gear
level
general
GI/T 9167—2003
#(1742!1395
material related
gear according to G/1009.1-241
measurement cover
determination
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.