Some standard content:
AG1014—2006
Verification Kegulation ot
FlectronicParking Meters
JJG1010—20(6
This regulation is signed by the National Quality Supervision and Inspection Bureau on May 23, 2007 and will be implemented from August 23, 2008
Relevant unit: National Parking Meter Installation Committee Major drafting unit: Metropolitan Quality and Technical Supervision Inspection and Testing Center Wenzhou Nanqi Inspection Institute
Drafting unit: Nanning Provincial Planning and Health Research Institute Beijing AT Technology Co., Ltd.
This regulation is entrusted to the full-time Metrology Technical Committee to interpret the main drafters of this regulation:
Participating drafters:
Cui Guangxin
Chen Cifeng
JG61I0HU0
(Ministry of Industry and Information Technology Supervision and Inspection Center) (Wenzhou Quality Supervision and Inspection Institute)
(Henan Engineering Research Institute)
(Henan Provincial Institute of Computer Science and Technology) Research Institute)
(Zhengzhou Quality and Technical Supervision Inspection and Testing Center) (Beijing L)A丨Technology Co., Ltd.)
1 Specification
2 References
3 Technical Evaluation (117 CITIC
3.1 Time difference...
3.2 Unit collection time
3.4 Free parking time
Due to display of charges
5 Measurement requirements,
≤. 2+ hour day ticket
Stop rate timing error
Water and deduction of gas theft
. This is written properly
Tongzhen Technical Safety Requirements
6.2 Function ·
7 Metering device and its control
7.1. Delivery case
7.2 Inspection block item
7.3 Decision method
7.1 Processing of inspection results
7. Regularity
UG IU1U-20n6
Limited to record A self-provided car collection form (bed! Standard certificate change verification certificate holder uncertified year book (inside account) format (8) trap record 3 ten pieces of fee table (taste light) verification record country
JG1M-—200
Electronic parking meter verification procedures
Six Sichuan made in: change the card for the harmonious fee body of the other prison this capital table of the method of investment, after the determination and use of Sichuan ten according to the risk.
2 cited literature
This view program quotes the following to reduce
5]—[999: plan
P 1159—19% space measurement does not increase: 3
Make Sichuan body visual note forget to use
3 terms and measurement prohibitions
3.1 time external
electronic components interpreter table internal clock reading
and change the amount of hope difference. Single space is seconds,
quoted
effective cost
effective close called time Fang, time reason naturally run one day than through the set can be measured after the city is extracted
is it called stock time
3.2 unit price interval
by 2 storage cold start gate approved in parking
variable internal preset amount is small The charging time system can be selected, the charging time is the unit, the measurement unit is n or n
3.3 The total charging amount of the charging time system
1.4 The free net car inch
Zhao has the two intentions of the transportation department to ask the limit 3.5 The collection time is the same as the time limit of the parking lot. The charging time is different from the charging time of the city's parking lot (the charging time is the same as the charging time). Generally, the I card or lottery card is used as the body, and the information of the meter is displayed and stored. According to the request and compensation of the city, the actual charging management of the road or the amount of the car is realized. There are many types of card collection, such as contact type TCF meter, non-contact type [CF1
JJG: Jn10-20U6
branch, wire transmission type meter, etc. The same company can be divided into one punch and two punch cards. The "one card one second" parking fee is still popular. The parking fee needs to be sent to the parking door for an hour. The fee is charged according to the actual time: the card is used for multiple parking spaces per year. The parking time is set according to the parking space. At this time, the small meter is used: metering performance requirements
5.1 Difference: +
5.2 Time error: ±
5.3 Parking meter error: 1
5.4 Rate deduction code method
Collection and estimation of rates ""Sand related production door charging regulations complete enterprise one missing, accurate conversion: 5.5 reduction and sincerity
Inspection group: charging personnel reading and writing products high worry not at m: 6 general photography requirements
.1 external request
6.1.1 The charging clothes should have the number 4, factory number, production pool, name sequence. 6.1.2 The surface should have the whole piece of metal that affects the use and the gold, and all kinds of displays should be intact. 6.: .3 Each function test has a clear mark, according to the life, health and teaching mode. 6.! 4 The other product has a light energy or lighting signal, which will be sent after the connection. F.2 Point energy||tt| |6.2.1 One-time payment and digital currency
1) Year, month, 11, hour, minute,
2) Single collection service period
3: Fee prison:
4) - Time fee is generally charged at the time.
5) Attach a parking space.
6.2.2, the most recent amount of book collection WeChat query: Chuanhu card information verification 6.2.3 Copy and collect car transaction flow record and 6.2.4 Power failure protection: When the meter is powered off, the data of the transaction and other conditions cannot be pushed. 6.2.3 The high value of the wave is removed or the metal part is cleared.
6.2.6 The meter can identify the legal card and stop the use of the card: the illegal card should be allowed to run; the number of the card recorded and the number of the actual busy card should be consistent,
The meter is directly controlled by the equipment
JJG 1U1U—U6
Includes: fire control, continuous risk control, continuous use of inspection type: 7.1 Cold setting conditions
7.1.1 Inspection light ring competition conditions
(0-35): for%
7.1.2 Inspection Sichuan device
7.1.2.1 Standard number
Current error: 11
5.1.2.1 Electric seconds
Day: 0-52 Mountain; division: 0.012.
7.1.2.3, 1 difference instrument
quantity: -n.1sd, division: (.Jsd
7.1.3.2 Theory of belt teaching device
reading rate (or week) temperature flow difference: =1×10\, 7..2. Steel self-ruler
rent: 150: error: -1
7.1.2.6 and the equipment rush to collect the change to go with the change, household card, draw test card , high card, etc., 7.1.2.7 The inspection and collection of the collection form set is not too much 1: one level parking lot and multiple parking spaces can be allocated for all items in the parking lot for investment, and the remaining parking spaces can only be inspected for the common funds and the correct transferability of the fee collection form 1. The inspection items of the collection form can be easily determined and the purpose is to remember the two benefits of the land and the resources. t||at that time
when the chicken
stop eating promise product
safety car expensive correct clear seven determination
see the actual parking prevention inspection
ancient second determination
after inspection
: "+" is also a test determination, one" for human inspection, to prove that the product is suitable for the position Ning Dan
7., construction method
7.3.1 external certificate use two for normal grab valley
JJG J010—2006
performance identification, marking and burning test light expansion this period of 6 requirements; after the electric quantity shows clear electric particle determination: no cumulative phenomenon outside the unqualified, the sound format recovery and then adjustment. 7.3.2 Energy test before time control
7.3.2.1 Use the charging table before the card or operation and the actual horse to check or adjust the frequency block energy setting in the charging table, about the loss of retrograde will be more in 2 bitter demands.
1) The charging state + question should be consistent with the core
2) The rate, the early effect of charging time
excessive good setting should be combined with the secondary flag energy department
3) The back of the quality, information difference to the quality guarantee 7.3.2.2 Current time agent gold enjoy
Sichuan standard time learning! Charging time rush to the inch middle product art::
Wu Zhong: A.-
Change the clock reading, mrin
..—standard reduction of external effectiveness. m:
Previous leaf time course base station product standard
7.3.3 Read when the table micro
difference installed
most monthly card or difference. For
charge loss
connected card school fee connected card
give the effect and actual maintenance effect of the skin one can
special non-connected six TC old in to the no
response device table, the next month or this period relatively Ding with the virtual state effective dynamic reverse effect and actual effect
sound 3cw place delivery
a "position and rate of the whole charging table for the name of the parking space to test, and the actual price of the car, the number of disk
7.3.4 piece needle daily inspection
7.3.1.1 pass count Liu product
three children vertical suffering
the first household effect original place, charging|| tt||The net load is the most created by the car, the number of times
The internal ratio of the clock is published, the oil counter measures the standard rate, the M of the meter is 1, the variable rate is: the formula (2) calculates the mountain descent time difference, the main, 86400%
In practice:
3 times the average can be within the three
clock standard ring or rate value Hz
JJG10L0—2006
In—the measured rate, H&: -1
7.3.4,! Use the daily test to measure only the difference between
and the original sensor 7. Set the steam exhaust time to make the daily readings constant, and measure 3 times in a row, and average the old readings. 7.3.2.3 Use the standard time
to measure the reading of the meter at a certain moment and the standard time, (), and record the difference between the two readings in the same month, [), and use the difference M
as the statistical value Its,
7.3.5 stop the rich calculation difference to the user
7.1.5.1 change the end of the fine
space fixed point of the economy car lead time,
terms, and install the style (! Calculate its average: :3
to compete for the world's dense time T. And the unit price of some leaves in the time, as the basis to select the original fixed point: a punch card installed a test fixed point from
a punch and the end of the drop a light fixed point, product, product card table of the standard
LuLal IImir
Take a user weak test card, the first exposed card, the bias of this fee meter into the family urgent Ye Qin cup accurate to the creation.
Collect quick report stop correct
Promote steaming-
Shallow:
State record standard oil
Parking record
After the same time as the second Ting card, the effective) calculates the parking timing
Second,
A collection high variable Xie holds the linkage question: rnir;
Accuracy is to change the static deviation, that is, to use the degree, rmin from the bad time rebound or and the child autumn request according to 7.5.5.1 to take the standard high, respectively grab the collection meter's stop timing error, 1.3.2-3 A meter is verified by taking out an old user card or debugging a door card, and the meter is cancelled. The user stops at the station with 3 remaining parking spaces, which makes the meter enter the planned state and records the effective time at the same time, or starts the meter. After the charging rate is set, the meter sends a timeout signal from the parking point to the time point, and records the micro-clock reading, or stops in seconds with an electronic friend. According to the formula 6, the user's expected parking time is recorded in the meter outside the parking space: T, T:
Public: 1:--The person's estimated parking time, the meter records the actual parking time: T, T collection time, and the meter is reviewed by the staff. According to 7.3.5.1, check the inspection points of the light items: check the production of each product separately, 7.3. The parking room is checked according to the fixed
second punch card table: the card room belongs to T according to the charging table format, take T-T1min; change the punch card table: input the time, take a
female fee table as the internal call rate F, compare with the current fixed rate, judge whether it is regular:
1.3.3 Product qualification and labor age inspection
7.2,7-1, when
second punch card table: punch the same figure according to the charging table clock, take, =2,-1mm know: =3, lrir:
first punch card table: input the parking room price, or, =2, and Ding, =3T collection should be full and, step 7.3. measured * gold. A whole large time, get the mountain fee table minus the money, should be consistent with (7) results.
7.3.7.2 Fixed fee
k-(time summary: 11×F
Will call the long fee and read the number to the fixed fee period also start time. Note the period (large free parking for the next question.
Second hit a meter and a card meter to connect this time period fixed parking, the fee table minus the money for the other department to decide and has measured the amount of the fee table, the fee table time visit this number to the estimated fee period year request set H time greater than the loss of parking time). Repeat the above recording. 7.1.7.1 Time-reduced share fee| |tt||The time interval should be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time should be equal to the time of the vehicle before the vehicle is charged! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of loss. 7.3.8 Negative parking time, verification
Second scan Card table: scan and use 1 to confirm the clock of receiving clothes, change 1! % 1mim: heart
JG101I-HK
times can be table: accounted for the parking time calculated by the person who received the inspection, double =. Then the balance of the collection table 1 should be divided by the military, otherwise the built-in free parking time is wrong 7.1 Processing of verification results
7.4.1 Collection and stop visiting or reverse training and reading horse equipment for structure determination according to the test or judgment, according to the fee table record standard The results of the operation such as the deduction of fees during the verification process are completely consistent. 7.4. The verification certificate of the qualified fee table is issued by the heart: only the qualified ones are issued by the first bottle, and the card page of the card is not in the middle. 7.5 The verification period is
The fee table is inspected by the court for weeks! Years, the business is subject to the department's service or the middle of the effective quantity. You should choose the new one.
Instant Record A
JJG: 1M0—2006
Electronic parking meter (account meter) verification certificate and verification error notice (see inside) format A. Your certificate currency! Format
A.1.] Format according to: J[G10I—2006 Electronic parking meter 4.1.2 Verification, the meter used is the most standard
degree or degree
.1.3 Functional system
A.1.4.1 External or external management of single production A.1.4.2 Energy inspection 1.1.4.3 Net number of price inspection A.1.4.5 At that time A.1.4.7 At that time ||Say #(eim
2.1.2.6 Tax payment voucher:
1..! Next effect inspection:
Miscellaneous juice:
Control result judgment (internal selection form
Internal consultation, after approval, if it does not meet the requirements, Appendix B
Exemption from inspection:
Receiver number:
DG1010—2006||tt ||Electronic parking meter (parking meter) calibration record compilation;
1. External and internal defects inspection:
7. Functional specifications: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)1 pass counting Liu product
three children vertical suffering
the first household effect original place, charging
net received the most load creation clinical car life, number of
wide collection published internal ratio of the clock China News rush out, oil counter measured the standard rate time, the efficiency meter M is 1, variable amount of profit times: the main formula (2) calculates the mountain descent time difference, the main, 86400%
actual:
3 times the average can be within three
clock standard ring or rate value Hz
JJG10L0—2006
on - measured rate, H&:-1
7.3.4,! Use daily test to only measure the difference between
and the original sensor 7 is used to measure the receiving volume. Set the steam extraction time to make the daily receiving readings stable. After 3 consecutive measurements, the average is calculated. 7.3.2.3 Use the standard time quantity
to compare the reading effect of a certain moment in the charging table with the standard time, (), record the difference between the two readings in the same month, [), the difference M
as the identification quantity,
7.3.5 Calculate the difference and give it to the user
7.1.5.1 Modify the end and take the
empty fixed point of the economic vehicle,
payment, and install the formula (! Calculate the average: 3
based on the time T of the competitive world. And the unit price of some leaves, as the basis point to select the original fixed point: a punch card installed a calibration fixed point self
a punch and the end of the reduction of a light fixed point, product, product card table specification
LuLal IImir
Take a user weak test card, the first exposed card, the bias of this fee meter into the family urgent Ye Qin cup accurate to the creation.
Collect quick report stop correct
Promote steaming-
Shallow:
State record standard oil
Parking record
After the same time as the second Ting card, the effective) calculates the parking timing
Second,
A collection high variable Xie holds the linkage question: rnir;
Accuracy is to change the static deviation, that is, to use the degree, rmin from the bad time rebound or and the child autumn request according to 7.5.5.1 to take the standard high, respectively grab the collection meter's stop timing error, 1.3.2-3 A meter is verified by taking out an old user card or debugging a door card, and the meter is cancelled. The user stops at the station with 3 remaining parking spaces, which makes the meter enter the planned state and records the effective time at the same time, or starts the meter. After the charging rate is set, the meter sends a timeout signal from the parking point to the time point, and records the micro-clock reading, or stops in seconds with an electronic friend. According to the formula 6, the user's expected parking time is recorded in the meter outside the parking space: T, T:
Public: 1:--The person's estimated parking time, the meter records the actual parking time: T, T collection time, and the meter is reviewed by the staff. According to 7.3.5.1, check the inspection points of the light items: check the production of each product separately, 7.3. The parking room is checked according to the fixed
second punch card table: the card room belongs to T according to the charging table format, take T-T1min; change the punch card table: input the time, take a
female fee table as the internal call rate F, compare with the current fixed rate, judge whether it is regular:
1.3.3 Product qualification and labor age inspection
7.2,7-1, when
second punch card table: punch the same figure according to the charging table clock, take, =2,-1mm know: =3, lrir:
first punch card table: input the parking room price, or, =2, and Ding, =3T collection should be full and, step 7.3. measured * gold. A whole large time, get the mountain fee table minus the money, should be consistent with (7) results.
7.3.7.2 Fixed fee
k-(time summary: 11×F
Will call the long fee and read the number to the fixed fee period also start time. Note the period (large free parking for the next question.
Second hit a meter and a card meter to connect this time period fixed parking, the fee table minus the money for the other department to decide and has measured the amount of the fee table, the fee table time visit this number to the estimated fee period year request set H time greater than the loss of parking time). Repeat the above recording. 7.1.7.1 Time-reduced share fee| |tt||The time interval should be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time should be equal to the time of the vehicle before the vehicle is charged! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of loss. 7.3.8 Negative parking time, verification
Second scan Card table: scan and use 1 to confirm the clock of receiving clothes, change 1! % 1mim: heart
JG101I-HK
times can be table: accounted for the parking time calculated by the person who received the inspection, double =. Then the balance of the collection table 1 should be divided by the military, otherwise the built-in free parking time is wrong 7.1 Processing of verification results
7.4.1 Collection and stop visiting or reverse training and reading horse equipment for structure determination according to the test or judgment, according to the fee table record standard The results of the operation such as the deduction of fees during the verification process are completely consistent. 7.4. The verification certificate of the qualified fee table is issued by the heart: only the qualified ones are issued by the first bottle, and the card page or the unqualified ones must be issued by the company. 7.5 Verification period
fee table inspection court week for! Year, the business is subject to the department's servants or the middle of the effective quantity to be re-set. Should be the main choice of the hundred times of qualification.
instant recording A
JJG: 1M0—2006
Electronic parking meter (account meter) verification certificate and verification error notice (see inside) format A. Your certificate currency! Format
A.1.] Format according to: J[G10I—2006 Electronic parking meter 4.1.2 Verification, the meter used is the most standard
degree or degree
.1.3 Functional system
A.1.4.1 External or external management of single production A.1.4.2 Energy inspection 1.1.4.3 Net number of price inspection A.1.4.5 At that time A.1.4.7 At that time ||Say #(eimbzxz.net
2.1.2.6 Tax payment voucher:
1..! Next effect inspection:
Miscellaneous juice:
Control result judgment (internal selection form
Internal consultation, after approval, if it does not meet the requirements, Appendix B
Exemption from inspection:
Receiver number:
DG1010—2006||tt ||Electronic parking meter (parking meter) calibration record compilation;
1. External and internal defects inspection:
7. Functional specifications: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)1 pass counting Liu product
three children vertical suffering
the first household effect original place, charging
net received the most load creation clinical car life, number of
wide collection published internal ratio of the clock China News rush out, oil counter measured the standard rate time, the efficiency meter M is 1, variable amount of profit times: the main formula (2) calculates the mountain descent time difference, the main, 86400%
actual:
3 times the average can be within three
clock standard ring or rate value Hz
JJG10L0—2006
on - measured rate, H&:-1
7.3.4,! Use daily test to only measure the difference between
and the original sensor 7 is used to measure the receiving volume. Set the steam extraction time to make the daily receiving readings stable. After 3 consecutive measurements, the average is calculated. 7.3.2.3 Use the standard time quantity
to compare the reading effect of a certain moment in the charging table with the standard time, (), record the difference between the two readings in the same month, [), the difference M
as the identification quantity,
7.3.5 Calculate the difference and give it to the user
7.1.5.1 Modify the end and take the
empty fixed point of the economic vehicle,
payment, and install the formula (! Calculate the average: 3
based on the time T of the competitive world. And the unit price of some leaves, as the basis point to select the original fixed point: a punch card installed a calibration fixed point self
a punch and the end of the reduction of a light fixed point, product, product card table specification
LuLal IImir
Take a user weak test card, the first exposed card, the bias of this fee meter into the family urgent Ye Qin cup accurate to the creation.
Collect quick report stop correct
Promote steaming-
Shallow:
State record standard oil
Parking record
After the same time as the second Ting card, the effective) calculates the parking timing
Second,
A collection high variable Xie holds the linkage question: rnir;
Accuracy is to change the static deviation, that is, to use the degree, rmin from the bad time rebound or and the child autumn request according to 7.5.5.1 to take the standard high, respectively grab the collection meter's stop timing error, 1.3.2-3 A meter is verified by taking out an old user card or debugging a door card, and the meter is cancelled. The user stops at the station with 3 remaining parking spaces, which makes the meter enter the planned state and records the effective time at the same time, or starts the meter. After the charging rate is set, the meter sends a timeout signal from the parking point to the time point, and records the micro-clock reading, or stops in seconds with an electronic friend. According to the formula 6, the user's expected parking time is recorded in the meter outside the parking space: T, T:
Public: 1:--The person's estimated parking time, the meter records the actual parking time: T, T collection time, and the meter is reviewed by the staff. According to 7.3.5.1, check the inspection points of the light items: check the production of each product separately, 7.3. The parking room is checked according to the fixed
second punch card table: the card room belongs to T according to the charging table format, take T-T1min; change the punch card table: input the time, take a
female fee table as the internal call rate F, compare with the current fixed rate, judge whether it is regular:
1.3.3 Product qualification and labor age inspection
7.2,7-1, when
second punch card table: punch the same figure according to the charging table clock, take, =2,-1mm know: =3, lrir:
first punch card table: input the parking room price, or, =2, and Ding, =3T collection should be full and, step 7.3. measured * gold. A whole large time, get the mountain fee table minus the money, should be consistent with (7) results.
7.3.7.2 Fixed fee
k-(time summary: 11×F
Will call the long fee and read the number to the fixed fee period also start time. Note the period (large free parking for the next question.
Second hit a meter and a card meter to connect this time period fixed parking, the fee table minus the money for the other department to decide and has measured the amount of the fee table, the fee table time visit this number to the estimated fee period year request set H time greater than the loss of parking time). Repeat the above recording. 7.1.7.1 Time-reduced share fee| |tt||The time interval should be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time should be equal to the time of the vehicle before the vehicle is charged! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of loss. 7.3.8 Negative parking time, verification
Second scan Card table: scan and use 1 to confirm the clock of receiving clothes, change 1! % 1mim: heart
JG101I-HK
times can be table: accounted for the parking time calculated by the person who received the inspection, double =. Then the balance of the collection table 1 should be divided by the military, otherwise the built-in free parking time is wrong 7.1 Processing of verification results
7.4.1 Collection and stop visiting or reverse training and reading horse equipment for structure determination according to the test or judgment, according to the fee table record standard The results of the operation such as the deduction of fees during the verification process are completely consistent. 7.4. The verification certificate of the qualified fee table is issued by the heart: only the qualified ones are issued by the first bottle, and the card page or the unqualified ones must be issued by the company. 7.5 Verification period
fee table inspection court week for! Year, the business is subject to the department's servants or the middle of the effective quantity to be re-set. Should be the main choice of the hundred times of qualification.
instant recording A
JJG: 1M0—2006
Electronic parking meter (account meter) verification certificate and verification error notice (see inside) format A. Your certificate currency! Format
A.1.] Format according to: J[G10I—2006 Electronic parking meter 4.1.2 Verification, the meter used is the most standard
degree or degree
.1.3 Functional system
A.1.4.1 External or external management of single production A.1.4.2 Energy inspection 1.1.4.3 Net number of price inspection A.1.4.5 At that time A.1.4.7 At that time ||Say #(eim
2.1.2.6 Tax payment voucher:
1..! Next effect inspection:
Miscellaneous juice:
Control result judgment (internal selection form
Internal consultation, after approval, if it does not meet the requirements, Appendix B
Exemption from inspection:
Receiver number:
DG1010—2006||tt ||Electronic parking meter (parking meter) calibration record compilation;
1. External and internal defects inspection:
7. Functional specifications: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)A punch card is installed with a calibration point.
A punch and a final drop of a light fixed point, product, product card table specification
LuLal IImir
Take a user weak test card, the first exposed card, the bias of this fee table into the family urgent Ye Qin cup standard.
Collection fast report stop correct
Promote steaming-
Shallow:
State record standard oil
Parking record
After the same standard time, look for the second Ding card, effective) calculate the parking timing
Second,
A collection high variable Xie holds the linkage question: rnir;
Standard is to change the static deviation, that is, with the degree, rmin from the bad time spring or and the child autumn request according to 7.5.5.1 to take the specification high, respectively grab the collection table of the stop timing error, 1.3.2-3 A meter is verified by taking out an old user card or debugging a door card, and the meter is cancelled. The user stops at the station with 3 remaining parking spaces, which makes the meter enter the planned state and records the effective time at the same time, or starts the meter. After the charging rate is set, the meter sends a timeout signal from the parking point to the time point, and records the micro-clock reading, or stops in seconds with an electronic friend. According to the formula 6, the user's expected parking time is recorded in the meter outside the parking space: T, T:
Public: 1:--The person's estimated parking time, the meter records the actual parking time: T, T collection time, and the meter is reviewed by the staff. According to 7.3.5.1, check the inspection points of the light items: check the production of each product separately, 7.3. The parking room is checked according to the fixed
second punch card table: the card room belongs to T according to the charging table format, take T-T1min; change the punch card table: input the time, take a
female fee table as the internal call rate F, compare with the current fixed rate, judge whether it is regular:
1.3.3 Product qualification and labor age inspection
7.2,7-1, when
second punch card table: punch the same figure according to the charging table clock, take, =2,-1mm know: =3, lrir:
first punch card table: input the parking room price, or, =2, and Ding, =3T collection should be full and, step 7.3. measured * gold. A whole large time, get the mountain fee table minus the money, should be consistent with (7) results.
7.3.7.2 Fixed fee
k-(time summary: 11×F
Will call the long fee and read the number to the fixed fee period also start time. Note the period (large free parking for the next question.
Second hit a meter and a card meter to connect this time period fixed parking, the fee table minus the money for the other department to decide and has measured the amount of the fee table, the fee table time visit this number to the estimated fee period year request set H time greater than the loss of parking time). Repeat the above recording. 7.1.7.1 Time-reduced share fee| |tt||The time interval should be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time should be equal to the time of the vehicle before the vehicle is charged! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of loss. 7.3.8 Negative parking time, verification
Second scan Card table: scan and use 1 to confirm the clock of receiving clothes, change 1! % 1mim: heart
JG101I-HK
times can be table: accounted for the parking time calculated by the person who received the inspection, double =. Then the balance of the collection table 1 should be divided by the military, otherwise the built-in free parking time is wrong 7.1 Processing of verification results
7.4.1 Collection and stop visiting or reverse training and reading horse equipment for structure determination according to the test or judgment, according to the fee table record standard The results of the operation such as the deduction of fees during the verification process are completely consistent. 7.4. The verification certificate of the qualified fee table is issued by the heart: only the qualified ones are issued by the first bottle, and the card page or the unqualified ones must be issued by the company. 7.5 Verification period
fee table inspection court week for! Year, the business is subject to the department's servants or the middle of the effective quantity to be re-set. Should be the main choice of the hundred times of qualification.
instant recording A
JJG: 1M0—2006
Electronic parking meter (account meter) verification certificate and verification error notice (see inside) format A. Your certificate currency! Format
A.1.] Format according to: J[G10I—2006 Electronic parking meter 4.1.2 Verification, the meter used is the most standard
degree or degree
.1.3 Functional system
A.1.4.1 External or external management of single production A.1.4.2 Energy inspection 1.1.4.3 Net number of price inspection A.1.4.5 At that time A.1.4.7 At that time ||Say #(eim
2.1.2.6 Tax payment voucher:
1..! Next effect inspection:
Miscellaneous juice:
Control result judgment (internal selection form
Internal consultation, after approval, if it does not meet the requirements, Appendix B
Exemption from inspection:
Receiver number:
DG1010—2006||tt ||Electronic parking meter (parking meter) calibration record compilation;
1. External and internal defects inspection:
7. Functional specifications: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)A punch card is installed with a calibration point.
A punch and a final drop of a light fixed point, product, product card table specification
LuLal IImir
Take a user weak test card, the first exposed card, the bias of this fee table into the family urgent Ye Qin cup standard.
Collection fast report stop correct
Promote steaming-
Shallow:
State record standard oil
Parking record
After the same standard time, look for the second Ding card, effective) calculate the parking timing
Second,
A collection high variable Xie holds the linkage question: rnir;
Standard is to change the static deviation, that is, with the degree, rmin from the bad time spring or and the child autumn request according to 7.5.5.1 to take the specification high, respectively grab the collection table of the stop timing error, 1.3.2-3 A meter is verified by taking out an old user card or debugging a door card, and the meter is cancelled. The user stops at the station with 3 remaining parking spaces, which makes the meter enter the planned state and records the effective time at the same time, or starts the meter. After the charging rate is set, the meter sends a timeout signal from the parking point to the time point, and records the micro-clock reading, or stops in seconds with an electronic friend. According to the formula 6, the user's expected parking time is recorded in the meter outside the parking space: T, T:
Public: 1:--The person's estimated parking time, the meter records the actual parking time: T, T collection time, and the meter is reviewed by the staff. According to 7.3.5.1, check the inspection points of the light items: check the production of each product separately, 7.3. The parking room is checked according to the fixed
second punch card table: the card room belongs to T according to the charging table format, take T-T1min; change the punch card table: input the time, take a
female fee table as the internal call rate F, compare with the current fixed rate, judge whether it is regular:
1.3.3 Product qualification and labor age inspection
7.2,7-1, when
second punch card table: punch the same figure according to the charging table clock, take, =2,-1mm know: =3, lrir:
first punch card table: input the parking room price, or, =2, and Ding, =3T collection should be full and, step 7.3. measured * gold. A whole large time, get the mountain fee table minus the money, should be consistent with (7) results.
7.3.7.2 Fixed fee
k-(time summary: 11×F
Will call the long fee and read the number to the fixed fee period also start time. Note the period (large free parking for the next question.
Second hit a meter and a card meter to connect this time period fixed parking, the fee table minus the money for the other department to decide and has measured the amount of the fee table, the fee table time visit this number to the estimated fee period year request set H time greater than the loss of parking time). Repeat the above recording. 7.1.7.1 Time-reduced share fee| |tt||The time interval should be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time should be equal to the time of the vehicle before the vehicle is charged! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of loss. 7.3.8 Negative parking time, verification
Second scan Card table: scan and use 1 to confirm the clock of receiving clothes, change 1! % 1mim: heart
JG101I-HK
times can be table: accounted for the parking time calculated by the person who received the inspection, double =. Then the balance of the collection table 1 should be divided by the military, otherwise the built-in free parking time is wrong 7.1 Processing of verification results
7.4.1 Collection and stop visiting or reverse training and reading horse equipment for structure determination according to the test or judgment, according to the fee table record standard The results of the operation such as the deduction of fees during the verification process are completely consistent. 7.4. The verification certificate of the qualified fee table is issued by the heart: only the qualified ones are issued by the first bottle, and the card page or the unqualified ones must be issued by the company. 7.5 Verification period
fee table inspection court week for! Year, the business is subject to the department's servants or the middle of the effective quantity to be re-set. Should be the main choice of the hundred times of qualification.
instant recording A
JJG: 1M0—2006
Electronic parking meter (account meter) verification certificate and verification error notice (see inside) format A. Your certificate currency! Format
A.1.] Format according to: J[G10I—2006 Electronic parking meter 4.1.2 Verification, the meter used is the most standard
degree or degree
.1.3 Functional system
A.1.4.1 External or external management of single production A.1.4.2 Energy inspection 1.1.4.3 Net number of price inspection A.1.4.5 At that time A.1.4.7 At that time ||Say #(eim
2.1.2.6 Tax payment voucher:
1..! Next effect inspection:
Miscellaneous juice:
Control result judgment (internal selection form
Internal consultation, after approval, if it does not meet the requirements, Appendix B
Exemption from inspection:
Receiver number:
DG1010—2006||tt ||Electronic parking meter (parking meter) calibration record compilation;
1. External and internal defects inspection:
7. Functional specifications: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)1. Time-limited charging
The time-limited parking time can be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time will be charged to the time of the teacher before the teacher, and the time of the teacher! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of decision. 7.3.8 Negative parking time, verification
Secondary card scanning: Scan the card to determine the time of charging according to the clock, and change it to 1! %一1mim:心
JG101I-HK
times can be expressed: accounted for the parking time of the person who received the inspection, double =. Then the balance of the collection table 1 should be the army, otherwise the built-in free parking time, incorrect 7.1 Processing of verification results
7.4.1 The collection and reading equipment shall be used for the effective measurement or judgment of the structure, and the effective verification process shall be recorded according to the valid verification results of the fee table. 7.4. The verification certificate of the qualified fee table shall be issued: only the qualified one shall be issued, and the unqualified one shall be issued by the card page or the unqualified one. 7.5 Verification period
The fee table shall be inspected by the court for weeks! Years, the business shall be adjusted or the effective quantity shall be set after the new one. The new one should be selected.
Instant Recording A
JJG: 1M0—2006
Electronic Parking Meter (Account Meter) Verification Certificate and Verification Result Notice (see inside) Format A. Your certificate currency! Format
A.1.] Format: J[G10I—2006 Electronic Parking Meter 4.1.2 Verification, the most standard meter used
Degree or degree
.1.3 Functional Symptoms and Environmental Initial System
A.1.4 Verification 1.4.1 External or external
Management Single Output
A.1.4.2 Kinetic Energy Inspection
1.1.4.3 Net Number Price Preliminary Inspection
Inch Epidemic Prevention Equipment|| tt||Wash writing spirit
A.1.4.5At that time
4.1.4.G inches: Old
A.1.4.7When
Said#(eim
2.1.2.6Tax set coupons:
1..! Next effect dirt inspection:
Miscellaneous juice:
Control result judgment (internal true selection form
Internal consultation, after the comparison does not meet the items, Appendix B
Exemption section:||tt ||Receiver number:
DG1010—2006
Electronic parking meter (parking meter) calibration record number;
1. External and internal defects inspection:
7. Function specification: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)1. Time-limited charging
The time-limited parking time can be divided into two parts: part in the fixed charging period and part in the metered period.
The charging time will be charged to the time of the teacher before the teacher, and the time of the teacher! Fixed parking time: T=TT, T, -T, -1MT. The amount of this fee should be the sum of the fixed charging amount and the rate of decision. 7.3.8 Negative parking time, verification
Secondary card scanning: Scan the card to determine the time of charging according to the clock, and change it to 1! %一1mim:心
JG101I-HK
times can be expressed: accounted for the parking time of the person who received the inspection, double =. Then the balance of the collection table 1 should be the army, otherwise the built-in free parking time, incorrect 7.1 Processing of verification results
7.4.1 The collection and reading equipment shall be used for the effective measurement or judgment of the structure, and the effective verification process shall be recorded according to the valid verification results of the fee table. 7.4. The verification certificate of the qualified fee table shall be issued: only the qualified one shall be issued, and the unqualified one shall be issued by the card page or the unqualified one. 7.5 Verification period
The fee table shall be inspected by the court for weeks! Years, the business shall be adjusted or the effective quantity shall be set after the new one. The new one should be selected.
Instant Recording A
JJG: 1M0—2006
Electronic Parking Meter (Account Meter) Verification Certificate and Verification Result Notice (see inside) Format A. Your certificate currency! Format
A.1.] Format: J[G10I—2006 Electronic Parking Meter 4.1.2 Verification, the most standard meter used
Degree or degree
.1.3 Functional Symptoms and Environmental Initial System
A.1.4 Verification 1.4.1 External or external
Management Single Output
A.1.4.2 Kinetic Energy Inspection
1.1.4.3 Net Number Price Preliminary Inspection
Inch Epidemic Prevention Equipment|| tt||Wash writing spirit
A.1.4.5At that time
4.1.4.G inches: Old
A.1.4.7When
Said#(eim
2.1.2.6Tax set coupons:
1..! Next effect dirt inspection:
Miscellaneous juice:
Control result judgment (internal true selection form
Internal consultation, after the comparison does not meet the items, Appendix B
Exemption section:||tt ||Receiver number:
DG1010—2006
Electronic parking meter (parking meter) calibration record number;
1. External and internal defects inspection:
7. Function specification: information inquiry
Core protection
3. Recording effect setting: fee review setting
Time period setting
Unit charging room
Light setting and
Card punching type:
Child card type. Read and write the business:
Check the vehicle and punch the card 20 times, the total number of other vehicles punched in
5. Check the previous time
times, check the reverse operation of the meter
Check the current schedule
6. The clock difference is connected to the time:
Measure the water level
Use the laser to measure the time difference between the two periods:
According to the total amount of relevant tickets
times, the total amount of small tickets
Current delay fee (um)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.