SJ 2246-1982 RX202, RX203 type microwave gas discharge tube SJ2246-1982 standard download decompression password: www.bzxz.net
Some standard content:
Ministry of Electronics Industry of the People's Republic of China Standard SJ2246-82 RX-203 type microwave gas discharge tube RX-202# Published on December 22, 1982 Implementation on July 1, 1983 Ministry of Electronics Industry of the People's Republic of China Ministry of Electronics Industry of the People's Republic of China Standard RX-220, RX-203 type microwave gas discharge tube SJ2246-82 This standard applies to RX-202, RX--203 type microwave gas discharge tubes (hereinafter referred to as "switch tubes"), which are ten-centimeter-band broadband pre-protection switch tubes and are used in radar equipment with a waveguide system of 72.14mm×34.04mm. This standard is a supplement to the general technical requirements of microwave gas discharge tubes (SJ343-73) (hereinafter referred to as "general technical requirements"). Except for the contents specified in this standard, the other contents shall be implemented in accordance with the relevant provisions of the general technical requirements. 1 Dimensions The dimensions of the switch tube shall comply with the provisions of Figure ! 2 Parameter specifications The parameters of the switch tube shall comply with the provisions of the parameter specification table. Glass and metal sealing test Take 10 switch tubes (it is allowed to take tubes with some items of the same process that are unqualified, but the total leakage power must be qualified) for a single glass and metal sealing test. First, use 5 tubes for the test. After the test, all the switch tubes are qualified and the test is qualified. The other 5 will not be tested. If one of the five switches fails, another five switches shall be tested. If all switches pass the test, the test is qualified. If two (or more) of the five switches tested first fail, or one (or more) of the five switches fail in the subsequent test, the test is unqualified. A retest is required according to the provisions of the general technical department. If all the switches pass the test in the first quarter (or three consecutive months), the test will not be conducted again this year. Otherwise, it shall be carried out according to the general technical department. 4 Impact test The acceleration is 5g, the impact frequency is 50 to 70 times/min, and the impact is 500 times in the vertical and horizontal directions. 5 Amplitude recovery time The amplitude recovery time is calculated based on the attenuation of the received signal by the switch tube as 3dB. 6 Low temperature test under working state After maintaining the ambient temperature at -55±2℃ for 30 minutes, the amplitude recovery time is measured with high power. 7 High temperature test under working condition Under the condition of ambient temperature of 70±2℃. After maintaining for 30 minutes, add high power to measure the total leakage power. Ministry of Electronics Industry of the People's Republic of China Issued on December 22, 1982 and implemented on July 1, 1983 SJ2246-82 8 When the output of switch tubes is less than 100 per quarter (or for three consecutive months), routine tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 17, 18 and 19 of the General Technology (SJ343-73) and Article 3 of this standard. 9 When the output of switches is less than 100 per quarter (or for three consecutive months), life tests shall be carried out once every six months (or for six consecutive months). The tests shall be carried out in accordance with Articles 22 and 23 of the General Technology (SJ343-73). 10 Life test 10.1 Take 5 switching tubes for life test. 10.2 During the life test, the standard life parameters are tested at 200, 300, 334, 350, 380 and 400 hours respectively. 10.3 See Appendix (Supplement) for the principle diagram of life test.11 Weight The weight of the switching tube is inspected once a year. 12When RX--202 and RX--203 microwave gas discharge tubes are continuously produced, routine tests and life tests can be carried out on any one tube. The results can be used to replace the other tube. 13When using the switching tube, a soft metal gasket should be added to the connection surface to ensure good contact. 14Article 3, Article 5 (2) and Article 7 (2) of General Technical SJ343-73 are not applicable to this standard. Model standard 82-087 43±05 Modulator Magnetron SJ2246-82 Life test schematic (supplement) External size Total overpower Voltage fluctuation series Electric zone rectification coefficient Total input loss Radiation epidemic recovery time Iron welcome you Multi-moisture overload request||t t||tidal test total melting rate quality limit technology under the name of the work perform the family time upper state under the Gundam S:J224682 202 use teaching liquid gas tube to report the standard ticket 250:-7845 2898~2845 2695~2845 2685~2845 Hua Shen City Car Fumei Water 350± 25 350±a5 350±35±0.1 rstors 18, 18 Alarm strength test Total device voltage Burst test Total device voltage Glass and metal scratch test Total continuous power Life test Life standard 1. Overload of starter 2. Unloading when amplitude is restored Continued table 1 SJ2246-82 RX-202 special specification for gas discharge tube 2695~2845 2695~2 845 2895~2845 26952845 2685~2845 2695~2845 350±35 350±3b 350±35 400±40Www.bzxZ.net 350±35 2.5±0.25 Note, for the test, the heart volume note is for the enjoyment and recovery of the wine delivery. When we get the test, the test subject can choose a domestic class in 269~2848MH2. -ss Dimensions Editor-in-chief Voltage gain coefficient Voltage range Total input Total input loss specification Resolution recovery time Low temperature test Total leakage rate Tidal test Total leakage over-rate Low temperature test under working conditions Long recovery time Education test under working conditions B code 3 SJ2246-82||tt ||RX-207 Micro-designed Gas Discharge Tube Number Energy Range Research 2965~3115 2965~3115 2965~3115 2865~3115 2965-3115 2865~3115 Zhushen Motor Vehicle Medical Center Ding Hospital 850±351±0.1 350±$5 360±35 350±35 35e± 35 350±38 Test plan 16-17, 89928S Joint consumption monitoring test Total device overpower Impact test Total overload rate Share consumption and metal adjustment test Total social work Life test Life standard, 1.Total end overload rate s, amplitude recovery time reading Happy fee 2 SJ2246—82 RX—20 strong microwave gas effect tube number report source ticket Wu 29853115 2965~3115 2905~3115 65~3115 2865~3115 2965~3115 Recommendation God you 350±35 380±85 150±35 400±40 350±35 300± 35 Wide leather 2.5±0.25 students, come to the whole, always choose the model of the share of the United States for testing, the more controlled rate can be in 2965~8118H2 product national standard one product selection line, 396 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.