Original standard number GB 8598-88 HG/T 3106-1988 Inner tube vulcanizing machine HG/T3106-1988 Standard download decompression password: www.bzxz.net
Some standard content:
UDC678.4.058 National Standard of the People's Republic of China HGh3106- Tube curing press Published on 1988-01-13 Published by the National Bureau of Standards All kinds of standard industry materials are free to download Implemented on 1988-03-01 National Standard of the People's Republic of China Tube curing press Tube euring press This standard applies to the vulcanizing press for the inner tube of pneumatic tires (hereinafter referred to as the vulcanizing press). This standard does not apply to the vulcanizing press for the inner tube of bicycles, motorcycles and bicycles. 1 Specifications and main parameters 1.1 Specifications and main parameters of the vulcanizing press shall comply with the provisions of the following table. Inside the connecting rodbzxz.net Vulcanizer Clamping force Nominal distance Model installation height Input inner tube Saturated steam pressure Not lower Input model Saturated steam pressure Not greater than 1.2 The model of the vulcanizer shall comply with the provisions of the relevant rubber machinery product model compilation method. 2 Technical requirements UDC678.4.058 GB8598-88 Opening and closing mold Not lower Vulcanizers shall comply with the requirements of this standard and be manufactured according to drawings and technical documents approved by the prescribed procedures. 2.1 Vulcanizers shall have devices for adjusting and indicating the clamping force. 2.2 2.3 The vulcanizer should have an instrument to indicate the temperature inside the mold and the pressure inside the tire. The vulcanizer should have a timing or program control device to ensure the automation of the process such as "mold closing-vulcanization-mold opening". 2.4 2.5 The painting requirements of the vulcanizer should comply with the provisions of the "General Technical Conditions for Painting of Rubber and Plastic Machinery", and the appearance requirements should comply with the provisions of HG5-1541 "General Technical Conditions for Appearance of Rubber Machinery". 2.6 The lubrication system of the vulcanizer must be unobstructed, without leakage, and ensure that all lubrication parts (points) are well lubricated. 2.7 The parallelism error of the lower plane of the crossbeam of the vulcanizer to the upper plane of the base should comply with the following provisions: For vulcanizers with specifications of 910, 1140, and 1430, the parallelism error shall not be greater than 0.5mm, and for vulcanizers with specifications of 2040, the parallelism error shall not be greater than 1.0mm. 2.8 The trouble-free working time of the vulcanizer shall not be less than 200h. 3 Safety requirements 3.1 The structure of the vulcanizer shall meet the requirements of easy lifting and transportation. 3.2 The vulcanizer shall have a safety interlock device that can stop the crossbeam at any position during the mold closing process and enable it to move in the opposite direction. 3.3 The vulcanizer shall have a safety interlock device that can only open the mold when the pressure in the tire is less than 0.03MPa. 3.4 The vulcanizer must stop working after each working cycle. When restarting the mold closing, it must be started manually. Approved by the Ministry of Chemical Industry of the People's Republic of China on January 8, 1988 and implemented on March 1, 1988 3.5 The vulcanizer must have an overload protection device. GB8598-88 3.6 The sound pressure level of the noise when the vulcanizer is in operation shall not be greater than 80dB (A). 3.7 The installation position of the safety guardrail of the vulcanizer should be 60 to 100 mm below the parting surface of the hand model. 3.8 The exposed rotating parts of the vulcanizer must be equipped with safety protection devices. The safety color and safety signs of the vulcanizer should comply with the provisions of GB2893 "Safety Color" and GB2894 "Safety Signs". 3.9 The safety requirements for transportation, storage, installation, commissioning, operation, use and maintenance protection of the vulcanizer should be stated in the instruction manual. 4 Test methods and inspection rules 4.1 Idle operation test 4.1.1 Before the idle operation test, check the following items: a. The nominal spacing on the inside of the connecting rod should not be less than the provisions in the table; the model installation height should comply with the provisions in the table. Whether the vulcanizer meets the requirements of 2.2.2.3, 3.7 and 3.8; use an inside micrometer to check whether the parallelism error of the lower plane of the beam to the upper plane of the base meets the provisions of 2.7. 4.1.2 Idle operation test The number of continuous opening and closing of the mold shall not be less than 20 times, and the following items shall be checked during the test: a. Check the correctness and reliability of the control system according to the requirements of 2.4 and 3.4. Check whether the safety interlock device works sensitively and reliably according to the requirements of 3.2 and 3.3; whether the working condition of the lubrication system meets the requirements of 2.6; d. The opening and closing time shall comply with the provisions in the table; e. There shall be no leakage in the steam pipeline and compressed air pipeline; Check the stability and reliability of each transmission part (no abnormal phenomenon). 4.2 Load test. The load test can only be carried out after the idle operation test is passed. The load test is divided into cold mold closing test and hot mold vulcanization test. In the cold mold closing test, check the following items: 4.2.1. The clamping force of the vulcanizer shall not be less than 98% of the value specified in the table; the noise sound pressure level of the vulcanizer during operation shall not be greater than the provisions of 3.6. 4.2.2 The hot mold vulcanization test shall only be carried out in the following cases (generally carried out in the user's factory): a. Trial and final product identification for new products or old products transferred to the factory: when the product has major changes in structure and process; when the product resumes production after a long-term suspension; during normal production, one machine shall be regularly sampled for inspection. d. 4.3 Inspect the trouble-free working time of the vulcanizer according to the requirements of 2.8 (it can be entrusted to the user's factory). 4.4 Before the vulcanizer leaves the factory, an empty running test and a cold mold closing test must be carried out. 4.5 Each vulcanizer must be inspected and qualified by the quality inspection department of the manufacturer before it can leave the factory. When leaving the factory, it shall be accompanied by a certificate proving that the product quality is qualified, and its content shall include the actual measured data of the factory inspection. 5 Marking, packaging, transportation, storage 5.1 Each product shall be fixed in a conspicuous position. The type, size and technical requirements of the product label shall comply with the provisions of JB8 "Product Label". 5.2 The basic contents of product marking include: Manufacturer name and trademark; Product model and name; Product factory number; Standard according to m Help paint label wave industry data feel Manufacturing date. GB859888 5.3 The graphic signs of packaging, storage and transportation shall comply with the provisions of GB191 "Graphic signs of packaging, storage and transportation". 5.4 The packaging of vulcanizing machine shall comply with the provisions of HG5-1543 "General Technical Conditions for Rubber Machinery Packaging" and HG5--1561 "General Technical Conditions for Export Rubber Machinery Packaging". 5.5 The transportation of vulcanizing machine shall comply with the relevant regulations of the transportation department. 5.6 Vulcanizing machine products should be stored in rainproof and ventilated warehouses or temporary sheds and kept properly. 6 Manufacturing Guarantee On the premise that the user complies with the requirements of this standard on transportation, storage and installation and use in the instruction manual, the manufacturer guarantees that the product meets the requirements of this standard. The warranty period is eighteen months from the date of arrival of the product. Additional Notes: This standard is proposed and managed by the National Technical Committee for Standardization of Rubber and Plastic Machinery. This standard was drafted by Yiyang Rubber Machinery Factory. The main drafters of this standard are Jin Runquan and Chen Gang. From the date of implementation of this standard, the original departmental standard HG5-1477-82 will be invalid. National Standard of the People's Republic of China GB8598-88 Published by China Standards Press (Beijing Fuwai Sanlihe) Printed by Beijing Printing Factory of China Standards Press Distributed by Xinhua Bookstore Beijing Distribution Office Sold by Xinhua Bookstores in various places Copyright reserved Reprinting is prohibited Format 880×12301/16 First edition in September 1988 Printing sheet 1/2 Number of words 5000 First printing in September 1988 Printing number 1-2500 Book number: 155066·1-5719 Standard H97-17 Standard filter according to wave chart m Various types of port industry information free download Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.