title>HG/T 20519.26-1992 Equipment pipe opening orientation diagram - HG/T 20519.26-1992 - Chinese standardNet - bzxz.net
Home > HG > HG/T 20519.26-1992 Equipment pipe opening orientation diagram
HG/T 20519.26-1992 Equipment pipe opening orientation diagram

Basic Information

Standard ID: HG/T 20519.26-1992

Standard Name: Equipment pipe opening orientation diagram

Chinese Name: 设备管口方位图

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1993-01-18

Date of Implementation:1993-04-01

standard classification number

Standard ICS number:General, Terminology, Standardization, Documentation>>Technical Drawing>>01.100.01 Technical Drawing General 71.010

Standard Classification Number:>>>>G0 Engineering Construction>>Raw Materials Industry, Communications, Broadcasting Engineering>>P72 Petrochemical, Chemical Engineering

associated standards

Publication information

other information

Introduction to standards:

HG/T 20519.26-1992 Equipment pipe opening orientation diagram HG/T20519.26-1992 standard download decompression password: www.bzxz.net

Some standard content:

Equipment pipe opening orientation diagram
HG 20519.26-92
Equipment pipe opening orientation diagram
HG20519.26-92
1 Non-standard equipment should draw a pipe opening orientation diagram, using A4 drawing sheet and simplified plane drawing. Draw a drawing for each equipment number. Equipment with the same structure but different pipe opening orientation can be drawn on the same drawing. 2 The pipe opening orientation diagram should indicate the position of the equipment's pipe opening, tank ear (hanging column), support leg (or ear seat), grounding plate, tower skirt bottom reinforcement rib and manhole on the skirt, the position and number of anchor bolt holes, and mark the pipe opening symbol (consistent with the pipe opening symbol on the equipment drawing). The anchor bolt holes on the support of horizontal equipment (including heat exchangers) must be indicated if they have different diameters or different shapes (movable end or fixed end).
3 A direction mark should be drawn in the upper right corner of the drawing. The direction indicator is in the form of a circle with a diameter of 20mm, indicating the angles of the four directions of east, west, south and north, and noting the north direction \N", such as: N
The north direction "N\" of the direction indicator should be consistent with the north direction "N" of the equipment layout drawing. 4 List the pipe opening table consistent with the equipment drawing above the title bar. Note the equipment assembly drawing number on the right side of the pipe opening table. For example: "Equipment assembly drawing number ××××××." 5 The line width of the pipe opening orientation diagram shall comply with the provisions of HG20519.28-92. 6 The following two points should be added to the equipment pipe opening orientation diagram: (1) Use paint to indicate the 0° position on the skirt or body to facilitate identification of the orientation during on-site installation. (2) Indicate the orientation and installation height of the nameplate. Indicate the thickness of the insulation layer so that the nameplate is exposed outside the insulation layer. See example figure
8-436 mid-span
equipment assembly drawing number ××××
GB 9115.10-88RFPN2.5 pressure gauge port L1.2GB9115.10-88RFPN2.5
feed port
GB9115.10-88RFPN2.5 gas outlet
GB9115.10-88RFPN2.5 temperature gauge port
nominal pipe portwwW.bzxz.Net
symbol diameter
connection form
and standard||t t||500GB9115.10-88RFPN2.5 manhole
32GB9115.10-88RFPN2.5 liquid outlet pipe nominal
or name symbol diameter
project name:
design project:
XxXx tower
· port orientation diagram (example diagram)
connection form
or name
or name
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.