This standard specifies the connection dimensions of steam turbines and steam turbine generators. This standard applies to 0.75-600MW condensing steam turbine generator sets in fixed power plants. JB/T 1329-1991 Connection dimensions of steam turbines and steam turbine generators JB/T1329-1991 Standard download decompression password: www.bzxz.net
Some standard content:
The People's Republic of China Pressurized Machinery Industry Standard JB/T13291991 1991-07-014 1992-07-01fish This standard specifies the connection dimensions of steam turbine and steam turbine generator. This standard applies to 0.75~600MW fixed power station condensing steam turbine generator sets. 2 Shaft extension 2.1 Turbine shaft extension 2.1.10.7512MW steam turbine shaft extension dimensions shall comply with the provisions of Table 1 and Figure 1. Bearing center relief 140 jin6 Not specified 2.1.225~100MW steam turbine shaft extension dimensions shall comply with the provisions of Table 2 and Figure 2. 1991-07-01鼠 JB/T1329#1991 JB13291973 (width b×height h) 36×20 36×20 36×20 45×25 50×28 Gear shaft Gear shaft Gear shaft Turbine shaft Turbine shaft 1992-07-01 278++* Shendiao Bearing JB/T13291991 2.1.3 The shaft extension dimensions of 125MW steam turbine shall comply with the requirements of Table 3 and Figure 3. Conveyor rear bearing center 400-8:14 (width b×height h) 60×38 80×40 80×48 JB/T1329F1991 2.1.4200MW steam turbine shaft extension dimensions shall comply with the provisions of Table 4 and Figure 4. 1+805 Center coupling (width bxheight h) 300MW steam turbine shaft extension is integrated with the half coupling at the turbine end, which is the integrated rotor head (see Figure 23). 600M steam turbine shaft extension and the rate coupling at the end of the steam turbine are integrated into one, which is the integral rotor head (see 242, 2 steam turbine generator shaft extension 2.210.75.1.5MW steam turbine generator shaft extension dimensions shall comply with the provisions of Table 5 and Figure 5.AA (width bx quotient h) JB/T1329F1991 2.2.23MW steam turbine generator shaft extension dimensions shall comply with the provisions of Table 6 and Figure 6.AR 2.2.36, 12MW steam turbine generator shaft extension dimensions shall comply with the provisions of Table 7 and Figure 7.L3 maximum C×45°||tt ||The bottom of the shaft is parallel to the cone 160n6146.51 180±0.05200f92 370135 190n6174.5200±0.05225f92904414155 2.2.425~100MW steam turbine generator shaft extension size shall comply with Table 8 and Figure 8.4 10M110X4 10M130×4 (width b×height h) 36×20 (width b×height h) 15.3+g 24 17.5+9.24 45×25 50×28 335.25+*4 425.25+g*s To the maximum size of the oil baffle 271.47280±0.05 Not specified JB/T1329F1991 Not specified Not specified 350±0.03450f9 Note: 1) Size of hydrogen turbine generator. Not specified 5125MW turbine generator shaft extension size shall comply with the requirements of Table 9 and Figure 9. 2.2. 5 Maximum dimension to oil baffle Centre line of generator front bearing Not specified 115.8-8.28 142.5-8.20 (width bxheight h) 60×38 80×40 80×40 425.25+g.0s 422.63360f7 JB/T1329F1991 2.2.6The shaft extension dimension of 200MW steam turbine generator shall comply with the requirements of Table 10 and Figure 10. Electric Front bearing center line 1:200/ 300MW steam turbine generator shaft extension dimensions shall comply with the provisions of Table 11 and Figure 11, 2.2.7 Generator front bearing center line 188-8:3bZxz.net 186±0.25 (width b×height h) 80×40 (width x height h) 445.85-2.e25 JB/T1329F1991 8600MW steam turbine generator shaft extension dimensions shall comply with the provisions of Table 12 and Figure 12. 2.2.8 Torque is transmitted by 6 45 chain pins Torque is transmitted by 8 43 dimensional pins 3 Coupling JB/T13291991 3.10.75MW steam turbine generator set elastic diagram column pin coupling connection dimensions shall comply with the provisions of Figure 13. 10-8 Uniform distribution Steam turbine Gear cat 80.20*92* 3.21.5MW steam turbine generator set rigid coupling connection dimensions shall comply with the provisions of Figure 14. 3.33MW steam turbine generator set rigid coupling connection dimensions shall comply with the provisions of Figure 15. 8 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.