title>Coding specification for the national fixed assets investment projects - GB/T 40058-2021 - Chinese standardNet - bzxz.net
Home > GB > Coding specification for the national fixed assets investment projects
Coding specification for the national fixed assets investment projects

Basic Information

Standard ID: GB/T 40058-2021

Standard Name:Coding specification for the national fixed assets investment projects

Chinese Name: 全国固定资产投资项目代码编码规范

Standard category:National Standard (GB)

state:in force

Date of Release2021-04-30

Date of Implementation:2021-08-01

standard classification number

Standard ICS number:Sociology, services, organization and management of companies (enterprises), administration, transportation >> 03.160 Law, administrative management

Standard Classification Number:Comprehensive>>Basic Standards>>A24 Classification Code

associated standards

Publication information

publishing house:China Standards Press

other information

drafter:Ou Hong, Han Zhifeng, Wang Guowei, Zhao Chengfeng, Zhao Di, Li Yiping, Li Haichao, Liu Dabei, Chen Yang, Dong Gao, Zheng Yu, Zhang Jing, Wei Ruqing, Liu Hui

Drafting unit:National Development and Reform Commission, State Information Center, China National Institute of Standardization

Focal point unit:National Administrative Approval Standardization Working Group (SAC/SWG 14)

Proposing unit:National Administrative Approval Standardization Working Group (SAC/SWG 14)

Publishing department:State Administration for Market Regulation National Standardization Administration

Introduction to standards:

GB/T 40058-2021.Coding specification for the national fixed assets investment projects.
1 Scope
GB/T 40058 specifies the composition, coding procedure, coding rules, application areas and maintenance methods of fixed asset investment project codes.
GB/T 40058 is applicable to the standardized management of various fixed asset investment project codes.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in the text. Among them, for dated references, only the version corresponding to the date applies to this document; for undated references, the latest version (including all amendments) applies to this document.
GB/T 10113-2003 General terms for classification and coding
3 Terms and definitions
The terms and definitions defined in GB/T 10113-2003 and the following terms and definitions apply to this document. For ease of use, some terms and definitions in GB/T 10113-2003 are repeated below.
3.1
Coding
The process of assigning a code to an object or concept. [Source: GB/T 10113-2003, 2.2.1] 3.2
Code
A character or a group of characters representing a specific object or concept. [Source: GB/T 10113-2003, 2.2.5]
3.3
Fixed asset investment projects
Fixed asset investment projects invested and constructed in China.
Note: A construction unit (activity) that has a main function, an overall design, independent economic accounting, and is managed in accordance with the "Regulations on Government Investment" and the "Regulations on the Approval and Recording of Enterprise Investment Projects".
3.4
​​ Project type project type
Determine the project type based on whether the project is confidential and the main construction content of the project. According to the main construction content of the project, the project is divided into capital construction projects, technical transformation projects, simple acquisition projects, information projects and other projects.
This document stipulates the composition, coding procedures, coding rules, application areas and maintenance methods of fixed asset investment project codes. This document is applicable to the standardized management of various fixed asset investment project codes.


Some standard content:

ICS03.160
CCSA24
National Standard of the People's Republic of China
GB/T40058—2021
Coding specification for the national fixed assets investment projects2021-04-30Release
State Administration for Market Regulation
National Standardization Administration
2021-08-01Implementation
Normative reference documents
Terms and definitions
Item code structure
Structure requirements
Time code
Region code
Central business guidance department code
Item type code
Random code
Check code
Project code generation
5.1. Apply for project code
Assign project code
Project code identification
6 Project code application
Project code application scope
Project code verification
Collect approval information
Share approval results
Collect project supervision information
Query project handling information
Submit project construction information
Application in other fields
Project code maintenance
Project code and identification management Management
Project code processing for delayed approval documents
Project information management after coding
Project code processing for re-approval, verification and filing Project code processing for incorrectly coded projects
Project code processing for invalid projects
Project code processing for projects demonstrated in multiple feasibility study reports Project code processing for newly added project types
Code maintenance organization
-rrKaeerKAca-
GB/T40058—2021
GB/T40 058—2021
8PPP project management code
Basic requirements
PPP project management code structure
8.3PPP project management code generation.
8.4PPP project management code application·
Appendix A (informative)
Appendix B (informative)
References
National fixed asset investment project code coding example…PPP project management code coding example·
-rKaeerKa-
GB/T 40058—2021
This document is drafted in accordance with the provisions of GB/T1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Rules for Standardization Documents".
Please note that some of the contents of this document may involve patents. The issuing agency of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Administrative Standardization Working Group (SAC/SWG14). The drafting units of this document are: National Development and Reform Commission, National Information Center, China National Institute of Standardization. The main drafters of this document are: Ou Hong, Han Zhifeng, Shi Guowei, Zhao Chengfeng, Zhao Di, Li Yi, Li Haichao, Liu Dabei, Chen Yang, Dong Dai, Zheng Yu, Zhang Jing, Wei Ruqing, Liu Hui.
-riKacerKAca-
GB/T40058—2021
The fixed asset investment project code system is the basic investment management system clearly stipulated in the "Opinions of the CPC Central Committee and the State Council on Deepening the Reform of the Investment and Financing System" (Zhongfa 2016118), "Government Investment Regulations" (State Council Order No. 712) and "Enterprise Investment Project Approval and Filing Management Regulations" (State Council Order No. 673). Making good use of project codes is the statutory obligation of project units and the statutory responsibility of relevant departments. The project code generated by the National Investment Project Online Approval Supervision Platform (hereinafter referred to as the Online Platform) is the only identity identifier for the entire construction cycle of the project. It is the basic means for all relevant departments to strengthen collaborative management and improve service levels. It is also an important tool for project units to quickly obtain government management and service information and efficiently promote project work. It strongly supports the approval, supervision and service work of government departments. This document is designed in accordance with the basic principles and methods of information coding in national standards. In the design of code structure and selection of code types, it fully considers the various application requirements in project management, enhances the scalability and compatibility of coding, and reserves expansion space for future optimization. rrkaeerkAca
1 Scope
National Fixed Asset Investment Project Code Coding Specification GB/T40058—2021
This document specifies the composition, coding procedure, coding rules, application fields and maintenance methods of fixed asset investment project codes. This document is applicable to the standardized management of various types of fixed asset investment project codes. 2 Normative Reference Documents
The contents of the following documents constitute the indispensable terms of this document through normative references in the text. For dated references, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies to this document.
GB/T10113-2003 General terms for classification and coding 3 Terms and definitions
The terms and definitions defined in GB/T10113-2003 and listed below apply to this document. For ease of use, some terms and definitions in GB/T10113-2003 are repeated below. 3.1
Coding
The process of assigning codes to things or concepts. [Source: GB/T10113—2003, 2.2.13.2
Codecode
One or a group of characters representing a specific thing or concept [Source: GB/T10113—2003, 2.2.5] 3.3
Fixed asset investment projectsfixed asset investment projects Fixed asset investment projects invested and constructed in China. Note: A construction unit (activity) with a main function, an overall design, independent economic accounting, and managed in accordance with the "Government Investment Regulations" and the "Enterprise Investment Project Approval and Recording Management Regulations". The project type is determined based on whether the project is confidential and the main construction content of the project. According to the main construction content of the project, the project is divided into capital construction projects, technical transformation projects, simple acquisition projects, information projects and other projects: Note 1: Capital construction projects are fixed asset investment projects that are composed of one or several single projects within the scope of an overall design or preliminary design, and are subject to unified economic accounting and unified administrative management. Note 2: Technical transformation projects are fixed asset investment projects that use new technologies, new processes, new equipment, and new materials to transform and upgrade existing facilities, process conditions, and production services, eliminate backward production capacity, and achieve internal development. Note 3: Simple purchase projects refer to fixed asset investment projects that are managed in accordance with the "Regulations on Government Investment" and the "Regulations on the Approval and Filing of Enterprise Investment Projects" by government departments or enterprises in accordance with regulations, including equipment, tools, and appliances, including vehicles, ships, aircraft, exploration equipment, construction machinery, etc. 1
-rrKaeerkAca-
GB/T40058—2021
Note 4: Information projects refer to various projects that support government agencies or enterprises in performing management and service functions by means of information technology, including big data, information application systems (including office automation systems, management information systems, application integration systems, database systems, etc.), information networks and software and hardware support systems, information resource development and utilization, information security, and other new construction, expansion, or renovation and upgrading projects. Note 5: Other projects refer to fixed asset investment projects other than the above 1 category. 3.5
Project encoding authority
project encoding authority
The department that handles the approval, approval or filing procedures. 3.6
The National Investment Project Online Approval and Supervision Platform is a comprehensive project management service platform built on the Internet and the National Electric Power Government Extranet, and consists of a central platform and a local platform. Note: The central platform is responsible for managing projects approved, verified and filed by the State Council and its relevant departments: the local platform is responsible for managing projects approved, verified or filed by local governments at all levels and their relevant departments. 3.7
Integrated administration authorityThe department that coordinates and promotes the construction, application and standardized operation of the online platform. Note: Responsible for researching and formulating relevant management systems, business rules and standards, supervising their implementation, and carrying out performance management. The central platform integrated administration department is the National Development and Reform Commission, and the relevant units that perform the duties of local platform integrated administration are local investment authorities or other departments designated by local governments. 3.8
Application administration departmentimplementingadministrationauthorityThe department that performs the functions of project approval and supervision, and handles and collects information through the online platform. 4 Project code structure
4.1 Structure requirements
The project code consists of 4-digit time code, 6-digit area code, 2-digit central business guidance department code, 2-digit project type code, 5-digit random code and 1-digit check code. Each code segment is connected by a horizontal line, totaling 21 digits. For specific examples, see Appendix A, and the code structure is shown in Figure 1.
xxxx-xxxxxx-Xx-xx-xxxxx×
1-digit check code
5-digit random code
2-digit project type code
2-digit central business guidance department code Department code
6-digit area code
4-digit time code
Figure 1 Project code structure
2 Time code
Should be carried out according to the following requirements:
a) The time code consists of 4 Arabic numerals, indicating the year and month when the project obtains the project code; b) The year is represented by the last 2 digits, and the month is represented by 2 digits. 2
-rrKaeerkAca-
: Area code
Should be carried out according to the following requirements:
The area code consists of 6 Arabic numerals;
GB/T 40058—2021
The area code for the items managed by the local platform is the statistical division code for the county and above of the area to which the coding agency belongs, and is uniformly managed by the comprehensive management department of the online platform: The area code for the items managed by the central platform is uniformly marked as 000000c
The code of the central business guidance department
Should be carried out in accordance with the following requirements:
The code of the central business guidance department is identified by a 2-digit code, see Table 1; the corresponding central business guidance departments such as the Administrative Approval Bureau, Government Service Management Bureau, and Big Data Management Bureau shall be uniformly numbered The code for the central business guidance department is 89; other business departments not listed in the coding table are uniformly coded as 99, which is used to associate departments that are not listed in the central business guidance department coding table (such as the Civil Air Defense Office, the Transportation Warfare Office and people's organizations, etc.). Note: The central business guidance department code is the code for the central business guidance department corresponding to the local department with coding responsibilities. Central Business Guidance Department Coding Table
Central Business Guidance Department Code
Full Name of Central Business Guidance Department
Ministry of Foreign Affairs of the People's Republic of China
National Development and Reform Commission of the People's Republic of China Ministry of Education of the People's Republic of China
Ministry of Science and Technology of the People's Republic of China
Ministry of Industry and Information Technology of the People's Republic of China National Ethnic Affairs Commission of the People's Republic of China Ministry of Public Security of the People's Republic of China
Ministry of State Security of the People's Republic of China
Ministry of Civil Affairs of the People's Republic of China
Ministry of Justice of the People's Republic of China
Ministry of Finance of the People's Republic of China
Ministry of Human Resources and Social Security of the People's Republic of China Ministry of Natural Resources of the People's Republic of China
Ministry of Ecology and Environment of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China Ministry of Transport of the People's Republic of China
Ministry of Water Resources of the People's Republic of China
Ministry of Agriculture and Rural Affairs of the People's Republic of China
Ministry of Commerce of the People's Republic of China
Ministry of Culture and Tourism of the People's Republic of China
National Health Commission of the People's Republic of China-rrKaeerkAca-
Abbreviation of Central Business Guidance Departments
Ministry of Foreign Affairs
National Development and Reform Commission
Ministry of Education
Ministry of Science and Technology
1.Ministry of Industry and Information Technology
State Ethnic Affairs Commission
Ministry of Public Security
Ministry of Security
Ministry of Civil Affairs
Department Head
Ministry of Finance
Ministry of Human Resources and Social Security
Ministry of Natural ResourcesbZxz.net
Ministry of Ecology and Environment
Ministry of Housing and Urban-Rural Development
Ministry of Transport
Ministry of Water Resources
Ministry of Agriculture and Rural Affairs
Ministry of Commerce
Ministry of Culture and Tourism
National Health Commission
GB/T40058—2021
Code of Central Business Guidance Departments
Table 1 Code Table of Central Business Guidance Departments (Continued) Full Name of Central Business Guidance Departments
Ministry of Veterans Affairs of the People's Republic of China Ministry of Emergency Management of the People's Republic of China
People's Bank of China
National Audit Office of the People's Republic of China
State-owned Assets Supervision and Administration Commission of the State Council General Administration of Customs of the People's Republic of China
State Administration of Taxation
State Administration for Market Regulation
State Administration of Radio and Television
State General Administration of Sport
National Bureau of Statistics
National International Development Cooperation Agency
National Healthcare Security Administration
State Administration of Publication and Radio
National Copyright Administration
State Administration of Religious Affairs
Hong Kong and Macao Affairs Office of the State Council
Overseas Chinese Affairs Office of the State Council
Taiwan Affairs Office of the State Council
Cyberspace Administration of China
State Council Information Office
China Meteorological Administration
China Banking and Insurance Regulatory Commission
China Securities Regulatory Commission
State Administration of Grain and Material Reserves
National Energy Administration
State Administration of Science, Technology and Industry for National Defense
State Tobacco Monopoly Administration
State Immigration Administration
State Forestry and Grassland Administration
National Railway Administration
Civil Aviation Administration of China
State Post Bureau
-KaeerKca-
Central Business Guidance Department Arrow Name
Ministry of Veterans Affairs
Ministry of Emergency Management
People's Bank
National Audit Office
State-owned Assets Supervision and Administration Commission
General Administration of Maritime and Environmental Protection
State Administration of Taxation
State Administration for Market Regulation
State Administration of Radio, Film and Television
General Administration of Sports
Statistics Bureau
International Development Cooperation Agency
Medical Insurance Bureau
State Administration of State Administration
Press and Publication Administration
Copyright Bureau
Religious Affairs Bureau
Hong Kong and Zhanjiang Office
Cyberspace Administration
Press Office
Meteorological Bureau
China Banking and Insurance Regulatory Commission
China Securities Regulatory Commission
Grain and Reserves Bureau
Energy Bureau| |tt||National Defense Science and Technology Bureau
Tobacco Bureau
Immigration Bureau
Forestry and Grassland Bureau
Railway Bureau
Civil Aviation Administration
Post Office
Central Business Guidance Department Code
Central Business Guidance Department Code Table (Continued) Table 1
Full Name of Central Business Guidance Department
State Administration of Cultural Heritage
State Administration of Traditional Chinese Medicine
State Coal and Mine Safety Supervision Bureau
State State Administration of Foreign Exchange
State Drug Administration
State Intellectual Property Office
State Archives Administration
State Bureau of Secrets
State Cryptography Administration
Office of the Central Organization and Establishment Commission
City Approval Bureau, Government Service Administration Bureau, Big Data Bureau and other corresponding central business guidance departments
Business departments not listed in the comprehensive code table
Note: For relevant information in the table, see GB/T39048-202C. The project type code
should be in accordance with the following requirements:
GB/T40058—2021
Central business guidance department
Cultural Relics Bureau
Traditional Chinese Medicine Bureau
Coal Mine Safety Supervision Bureau
State Administration of Foreign Exchange
Drug Administration
Intellectual Property Office
Archives Bureau
Secrecy Bureau
Cryptography Bureau
Central Organization Department
The project type code consists of two Arabic numerals and is compiled based on whether the project is confidential and the main construction content of the project; confidential projects and non-confidential projects are coded separately. The project type code is shown in Table 2. Table 2
Project type coding table
Project classification
Capital construction project
Technical transformation project
Simple purchase project
Informatization project
Project category
Capital construction project
Confidential capital construction project
Technical transformation project
Shami technical transformation project
Simple purchase project
Shami simple purchase project
Informatization project
Confidential informationization project||tt| |Type Description
Capital construction projects are projects within the scope of an overall design or preliminary design, consisting of one or more individual projects, which are subject to unified economic accounting and unified administrative management.
Technical transformation projects are fixed asset investment projects that adopt new technologies, new processes, new equipment, and new materials to transform and upgrade existing facilities, process conditions, and production services, eliminate backward production capacity, and achieve intensive development.
Pure purchase projects are projects that government departments or enterprises purchase in accordance with regulations. Equipment, tools, and appliances (including vehicles, ships, aircraft, surveying equipment, etc.) Information technology projects are all kinds of projects that support government agencies or enterprises to perform management and service functions by means of information technology, including big data, information technology application systems (including office automation systems, management information systems, application integration systems, database systems, etc.), information networks and software and hardware support systems, information resource development and utilization, and information security, etc., newly built, expanded or upgraded projects. 5
-rrKae erkAca-
GB/T40058—2021
Project classification
Other projects
Random code
Table 2 Project type coding table (continued)
Project type
Other projects
Other confidential projects
Type description
Other projects are fixed asset investment projects other than the above 4 categories. The random code consists of 5 Arabic numerals, which are 5 random numbers generated by the online platform. 4.7 Check code
Check code consists of 5 Arabic numerals, ranging from 0 to 9, and is calculated and determined according to the first 19 digits according to the check code calculation method. 5 Project code generation
5.1 Application for project code
The project unit must apply for the project code through the corresponding online platform before handling the first administrative procedure. Central projects apply through the central platform; local projects apply through the local platform. 5.2 The assignment of project codes shall meet the following requirements. Before assigning codes, the coding agency shall provide consulting services on development plans, industrial policies, etc. to the project units, and help the project units screen and eliminate problems in the interim report to avoid repeated codes for a single project. b) The coding agency shall not assign project codes to projects that are clearly prohibited by laws, administrative regulations, and relevant plans and industrial policies.
) The central platform for non-confidential projects generates project codes based on the coding decision and basic project information. The coding agency for confidential projects is responsible for generating project codes in a network environment that meets national confidentiality requirements: d) The coding agency shall ensure that one project corresponds to one project code. 5.3 Project code identification
Perform according to the following requirements
a) After the project code is generated: Generate a unified project code identification as a transmission carrier for the project code. The project code logo is a picture with a fixed format, see Figure 2. Sichuan uses the project code logo one-dimensional code to query project information such as project name, project code, project status, etc.
b) Project status includes "coded (F), pending project establishment (B), established project (L), started (K), completed (J), code expired (S), abnormal (Y)",The project status in the project code identification is expressed in English letters as follows: 1) Coded (F): refers to the online platform information showing that the project has only obtained the project code through the online platform, and has not completed any procedures: Pending project approval (B): refers to the online platform information showing that the project has completed at least one approval procedure, but has not completed the approval (project proposal, feasibility study or preliminary design), approval or filing: 2) Project approved (1): refers to the online platform information showing that the project has completed the approval (project proposal or feasibility study), approval or filing: 3) But has not started construction: 4) Started (K): refers to the online platform information showing that the project has started construction, but has not been completed: 5) Completed (J): refers to the online platform information showing that the project has been completed; GB/T 40058—2021
Code expiration (S): refers to the online platform information showing that the project code has expired and is unavailable; if after the project is coded, the project is no longer implemented due to subjective reasons, changes in objective conditions or policy adjustments, the project status is set to code expiration: Abnormal (Y): refers to the online platform information showing that the project has an abnormal situation after obtaining the project code, such as not submitting approval information within 1 year after coding, and not submitting construction information within 2 years after project establishment.
Fixed asset investment projects
1806-310000-70-02-001986
Figure 2 Example of project code identification
6 Application of project code
6.1 Scope of application of project code
Project approval, verification, filing and other approvals, investment plans, fund allocation, public resource transactions, bidding, supervision and inspection, post-evaluation, administrative processing, administrative penalties, information disclosure, etc., all involving the use of project names, should be marked with project codes in the corresponding documents, and the project code identification should be added. The relevant information in the above behaviors should be uniformly collected on the online platform through the project code, and information sharing should be achieved among various departments.
6.2 Project code verification
6.2.1 When accepting investment project approval matters, the application management department should verify the project information through the online platform. Applications without project codes or that have not passed the project code verification shall not be accepted and the project unit shall be informed: For the accepted interim reports, the acceptance notice shall indicate the project code.
6.2.2 The project code is a necessary condition for a legal project, but not a sufficient condition. When the project unit uses the project code to carry out related work, the applicant should use the project code to learn about its basic situation and legal information to prevent risks. 6.3 Collection of approval information
The application management department is encouraged to timely collect the receipt, acceptance, handling, and completion information of approval matters through the online platform. After the project approval matters are completed, the completion opinions, the number title of the approval document, the project unit, the investment amount and other key information of the approval document and the electronic version of the approval document should be collected in a timely manner. Relevant information should be exchanged to the online platform in real time. 6.4 Sharing approval results
After the project code is completed, the application management department should obtain the approval results of other departments collected on the online platform through the project code as the basis for approval of the department. The approval results that can be obtained through sharing will no longer be repeatedly provided by the project unit. 6.5 Collecting project supervision information
When the project supervision department carries out project supervision work, the supervision and law enforcement results information should be uniformly collected to the project code, and the relevant information should be exchanged to the online platform.
6.6 Querying project handling information
The project unit can query the project approval information through the project code to obtain the project approval results. It can supervise the project by querying the project handling information.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.